1 FRESNO COUNTY INTELLIGENT TRANSPORTATION SYSTEMS (ITS) PLAN UPDATE DELIVERABLE NO. 1 PROJECT PLAN FRESNO COUNTY, CALIFORNIA Prepared for Fresno Council of Governments 2035 Tulare Street, Suite 201 Fresno, CA May 2014 Prepared by URS Corporation 2020 East First Street, Suite 400 Santa Ana, CA (714) Fax: (714)

2 Section TABLE OF CONTENTS Page 1.0 INTRODUCTION PROJECT BACKGROUND ITS PLANNING PROCESS RELATIONSHIP TO 1999 FRESNO COUNTY ITS PLAN PURPOSE OF PROJECT PLAN PROJECT OUTREACH OUTREACH PLAN OUTREACH METHODS STAKEHOLDER PARTICIPANTS PROJECT ADVISORY COMMITTEE (PAC) STAKEHOLDER LIST STAKEHOLDER GROUP ORGANIZATION POTENTIAL STAKEHOLDER GROUP COMMITTEES PROJECT SCHEDULE PROJECT SCHEDULE PLAN SUCCESS AND RISK FACTORS SUCCESS FACTORS RISK FACTORS MITIGATION STRATEGIES NEXT STEPS TABLES TABLE 2-1. OUTREACH APPROACH TABLE 3-1. FRESNO COUNTY ITS PLAN UPDATE STAKEHOLDER LIST FIGURES FIGURE 3-1. PROJECT STAKEHOLDER ORGANIZATION FIGURE 4-1. PROJECT SCHEDULE i

3 1.0 INTRODUCTION The Fresno County Intelligent Transportation Systems (ITS) Plan update is a critical component of a coherent plan to address the transportation needs of the county. As travel demand on the freeway and arterial system increases, there is an increasing need to improve the system through better management of existing capacity, rather than continuing to add capacity to the existing system. In recognition of this, the Fresno Council of Governments (FCOG) and the various local communities in the county continue to invest in ITS. The updated ITS Plan will ensure that these investments address the important needs in the county and bring the maximum benefit to travelers while developing a specific implementation plan for the county. 1.1 PROJECT BACKGROUND A comprehensive ITS Strategic Deployment Plan (SDP) was developed for Fresno County in 1999, led by the Fresno Council of Governments, which was then known as the Council of Fresno County Governments (COFCG). The SDP was developed in consultation with local Fresno County agencies, and reflected the input and priorities of the local agencies. Subsequently, an ITS SDP was developed for the eight counties of the San Joaquin Valley: Fresno, Kern, Kings, Madera, Merced, San Joaquin, Stanislaus, and Tulare. Because of the short time between completion of the 1999 Fresno County Plan and the 2001 San Joaquin Valley, these two documents are consistent with one another with regards to Fresno County inputs, needs, and plans. While certain elements of the 1999 ITS Plan have been updated as necessary, a comprehensive update of the countywide Plan has not been completed since In the interim, Fresno Metropolitan area agencies have made significant investments in the planning, design, and implementation of ITS for the surface transportation and transit networks. There is an expectation, documented in the 1999 Fresno ITS Strategic Plan and Architecture that investment in ITS strategies will continue with a focus at the local level. At the same time, it s important that investments be made in reliable technologies that deliver proven benefit in a cost effective manner. Toward this end, Fresno COG is leading this countywide ITS Master Plan Update to direct ITS investments throughout the county over the next ten years and beyond. Concurrently, Fresno COG is in the process of updating the Regional Transportation Plan (RTP) for 2014 including the development of an updated project list for implementation using local and federal funding. ITS strategies, particularly those related to operational improvements to the arterial street system, and to enhancing transit service are important elements of the RTP and can provide improvements that lend to the Sustainable Community Strategies (SCS). Updating the ITS Plan will provide timely input to the RTP and the SCS, and will improve consistency among the three planning documents. 1.2 ITS PLANNING PROCESS The ITS planning process is much like any other transportation planning activity, with the primary difference being the focus on technological solutions. One of the primary areas of emphasis of ITS planning is the extensive involvement and participation by the stakeholders of the region. This is especially important to ensure interagency systems integration, address 1-1

4 potential institutional issues early, and to provide the necessary education and awareness of advanced technology transportation solutions. Using the federal ITS planning process as a guideline, the overall approach to achieving the stated project goals will be performance of the following tasks (the bolded text indicates the current task and/or deliverable in process): Task 1: Project Initiation Task 2: Data Gathering Task 3: Assessment of the 1999 ITS Strategic Plan Task 4: Update Regional ITS Inventories Task 5: Stakeholder Consultation/Identify ITS Needs, Vision, Goals, and Objectives Task 6: Develop Key Regional ITS Strategies Task 7: Determine Specific Needs, ITS Service Packages and Elements Based on Strategies Task 8: Define Operational Roles and Responsibilities Consistent with Regional Vision, Goals, Objectives, and Strategies Task 9: Determine the Functional Requirements Task 10: Prepare Regional ITS Architecture Task 11: Develop an Architecture Use Plan Task 12: Develop Regional Strategic Deployment Plan Task 13: ITS Website for Regional Stakeholders Task 14: Presentations The resulting products of these tasks will be the following (the bolded text indicates the current task and/or deliverable in process): Deliverable 1: o The will incorporate the Outreach Plan, the stakeholder governance structure, the detailed master project schedule, a narrative that will define success factors, project risks, and mitigation strategies to deal with the identified project risks. Deliverable 2: Draft and Final Existing Data Report o The Report identifies the ITS elements within the County, existing and planned policies/projects, and combine that with an understanding of the regions users to fully understand the various opportunities and constraints within the County. Deliverable 3: Report assessing the 1999 ITS Strategic Deployment Plan 1-2

5 o The report documents the findings of the assessment of the 1999 SDP and the lessons learned in the interviews with project stakeholders. Deliverable 4: System Inventory Summary Report o The will report presents a summary of the findings from the Inventory Survey forms from various Stakeholders identifying existing and planned ITS elements within each jurisdiction. Deliverable 5: Visions, Goals, Objectives and Needs Technical Report o The report will identify an ITS vision for Fresno County, set of goals and objectives, and identify ITS needs after various exercises with Stakeholders. Deliverable 6: Draft and Final Regional ITS Strategies Report o The report refine and present a range of Intelligent Transportation Systems (ITS) components for inclusion in the ITS Strategic Deployment Plan. Deliverable 7: Regional Consolidated Needs Assessment Summary Technical Report o The report will translate generic ITS needs into the National ITS Architecture framework. ITS Elements will also be identified as part of the process of identifying and selecting Service Packages for the region. Deliverable 8: Regional ITS Operational Roles and Responsibilities Technical Report o The report will identify Operational Roles and Responsibilities that are consistent with the Vision Statement and the Goals and Objectives identified and developed in Task 5 and will also be based on the Strategies development in Task 6. Deliverable 9: Draft and Final Functional Requirements o The report will identify Functional Requirements for ITS Architecture for the Fresno COG region based on FHWA s guidance Deliverable 10: Draft and Final Electronic Copy of the Turbo Architecture Database o The electronic Turbo Architecture database will be developed consistent with Version 7 of the National ITS Architecture, FHWA Rule 940.9, and Part V of the FTA National ITS Architecture Policy for Transit Projects and provided to Fresno COG. Deliverable 11: Draft and Final Architecture Use and Maintenance Plan o The report will develop an Architecture Use Plan that will describe how to use the Architecture. The Report will provide project planning, project programming, project design, and maintenance plans and procedures. Deliverable 12: Draft Strategic Deployment Plan o The report will take all of the inputs from Tasks 2 through 11 and meld them together into a cohesive and comprehensive ITS Strategic Deployment Plan Report and Phasing Plan for Fresno County. Deliverable 13: Draft and Final website 1-3

6 o The project website will provide background on the project, the stakeholder roster, and links to meeting agendas and minutes and will be housed on the Fresno COG server. Deliverable 14: PowerPoint Presentations o The two presentations will provide the overall ITS strategic plan for the key stakeholders use, one on the executive summary and one on the overall Plan. 1.3 RELATIONSHIP TO 1999 FRESNO COUNTY ITS PLAN As noted in Section 1.1, an ITS Strategic Deployment Plan (SDP) was completed for Fresno County in That Plan was comprehensive, in terms of both needs assessment and the development of recommendations. For this Plan update, the 1999 ITS Plan was reviewed and assessed. Fresno County ITS stakeholder agencies were contacted to discuss and document successes and lessons learned coming out of the 1999 ITS Plan. This assessment will provide some insight and guidance in the project process when considering project and program prioritization, which will be influenced to varying degrees by the changes in technology since The assessment will provide a look back at prior ITS planning and implementation efforts and lessons learn from those efforts while moving forward with this most current ITS planning and implementation effort. 1.4 PURPOSE OF PROJECT PLAN The purpose of the is to provide a strategy for project stakeholder outreach, a project stakeholder governance structure, a detailed master project schedule, and an additional narrative that defines success factors, project risks, and mitigation strategies to deal with the identified project risks. 1-4

7 2.1 OUTREACH PLAN 2.0 PROJECT OUTREACH The mission of this Outreach Plan is to support the coordination of the collaborative efforts of regional stakeholders in order to develop a comprehensive master plan for ITS in Fresno County. The plan will provide stakeholders with guidance for implementing systems that provide a safe, efficient surface transportation network for all users. The involvement of stakeholders at various levels is a critical component of achieving this vision. The objective of outreach and education is to establish a process to collaborate with core stakeholders, consult and gain input from interested stakeholders, and provide information to the general public. This approach to outreach and education is summarized in the table below. Table 2-1. Outreach Approach Stakeholder Groups Levels of Involvement Outreach Methods Agency Stakeholders Interdepartmental groups within Fresno COG Caltrans Other impacted urban and rural public agencies that own or operate surface transportation facilities or assets (cities, county, transit operators, etc.) Public agencies in nearby regions Groups or institutions impacted by or involved in the operation of surface transportation facilities Inform and Consult Explain the project and gain input regarding inventories, needs, and any related issues Collaborate Work jointly to share information and reach consensus on key aspects of the project Project Advisory Committee Workshops Project Website Newsletter Interviews Surveys General Public Inform Provide support to FCOG in explaining the project and potential impacts on all modes of transportation Consultant Team outreach to the General Public is not anticipated as part of this project. The identification of Agency Stakeholders is well underway. The list will be modified as needed throughout the project in collaboration with the Project Advisory Committee. Outreach to the General Public is not anticipated as part of this ITS Plan update. However, the Consultant Team may provide support to FCOG in their general community outreach activities, as it relates to the ITS Plan update. 2.2 OUTREACH METHODS These activities convey the toolset that the Consultant Team plans to use to accomplish their tasks: Compile Stakeholder List. 2-1

8 Conduct Project Advisory Committee (PAC) meetings with key personnel within Fresno COG and Caltrans. These meetings will be conference calls with some held in person in conjunction with the stakeholder workshops. The meetings will be designed to elicit ideas, background information, and concerns related to this project and are expected to last between one and two hours. Develop and distribute survey forms to stakeholders. Conduct Project Stakeholder Workshops (8 planned). Attend local and regional meetings (as appropriate). Distribute, collect, and compile Inventory Surveys. Conduct one-on-one contacts (as required). Develop project identity and logo. Create project introduction flyer. The flyer will be developed early in the project in the form of a Fact Sheet to explain the project. Fresno COG to produce and distribute hard copy version of the flyer. Provide material for a Project Web Site, for dissemination of project background information, announcements, meeting materials, and deliverables. Send out alerts (as needed). 2-2

9 3.0 STAKEHOLDER PARTICIPANTS 3.1 PROJECT ADVISORY COMMITTEE (PAC) A Project Advisory Committee (PAC) has been identified for the Fresno County ITS Plan Update. The make-up of the PAC was designated by Fresno COG staff. The PAC is envisioned to be a sounding board for Fresno COG and the Consultant Team on various issues that may arise during the course of the Plan update. The PAC is composed of representatives of key state and local transportation organizations from around Fresno County. The PAC consists of the individual stakeholders from the following agencies: Fresno Council of Governments (Fresno COG) Caltrans District 6 Fresno County City of Clovis City of Fresno Kern Council of Governments (Kern COG) 3.2 STAKEHOLDER LIST Table 3-1 lists 58 key agencies/organizations from around Fresno County in which at least one individual will be identified for engagement in the ITS Plan Update process. In some cases, multiple individuals from a single organization may wish to participate in the Plan update process. Input from the PAC, the identified stakeholders, and others, will be instrumental in developing an updated ITS Plan that reflects the needs of Fresno County and its ITS stakeholders. 3.3 STAKEHOLDER GROUP ORGANIZATION Figure 3-1 shows a proposed organization for the overall stakeholder group. Fresno COG, as the lead transportation planning and programming agency for the county will act as the project lead. The PAC will act in an advisory role to Fresno COG and the Consultant Team. The PAC will assist with oversight of the conduct and administration of the overall ITS Plan update. The PAC may act as sounding board for various strategies under consideration prior to introduction to the remainder of the stakeholder group. The Consultant Team will act primarily at the direction of Fresno COG, secondarily at the direction of the PAC, and successively at the direction of the general stakeholder group, as appropriate. The general stakeholder group will provide input to Fresno COG and the Consultant Team in the identification of ITS needs and the development of general and project priorities. In the event of conflicting direction from project stakeholders, Fresno COG and the PAC will arbitrate input and provide direction to the Consultant Team. 3-1

10 Table 3-1. Fresno County ITS Plan Update Stakeholder List American Ambulance California Highway Control (CHP) Caltrans District 10 Caltrans District 5 Caltrans District 6 Caltrans Headquarters City of Clovis City of Clovis Fire Department City of Clovis Police Department City of Coalinga City of Coalinga Fire Department City of Coalinga Police Department City of Firebaugh City of Firebaugh Fire Department City of Firebaugh Police Department City of Fowler City of Fowler Fire Department City of Fowler Police Department City of Fresno City of Fresno Department of Airports City of Fresno Fire Department City of Fresno Police Department City of Huron City of Huron Fire Department City of Huron Police Department City of Kerman City of Kerman Fire Department City of Kingsburg City of Kingsburg Fire Department City of Kingsburg Police Department City of Mendota City of Mendota Police Department City of Orange Cove City of Orange Cove Fire Department City of Orange Cove Police Department City of Parlier City of Parlier Police Department City of Reedley City of Reedley Fire Department City of Reedley Police Department City of Selma City of Selma Fire Department City of Selma Police Department Federal Highway Administration California Division Fresno Area Express (FAX) Fresno Council of Governments (Fresno COG) Fresno County Fresno County Fire Department Fresno County Office of Emergency Services Fresno County Rural Transit Agency Fresno County Sheriff's Office Fresno County Transportation Authority Fresno Cycling Club Kern Council of Governments (Kern COG) Mid Valley Fire Protection District (Mendota) North Central Fire Protection District (Kerman) 3-2

11 Figure 3-1. Project Stakeholder Organization Fresno COG Project Advisory Committee Project Oversight Strategic Direction Arbitrates Conflicting Stakeholder Input Project Lead Executes and Manages Consultant Contract Responsible for Ensuring Compliance with the National ITS Architecture Ensures an Open and Inclusive Process Encourages Agency Participation Arbitrates Conflicting Stakeholder Input Consultant Team Key Technical Team Develop Key Technical Elements of the Regional ITS Architecture and Strategies Develops a Regional ITS Architecture that is Compliant with the National ITS Architecture General Stakeholder Group Provides Input on ITS Needs and Priorities Reviews Project Deliverables Attends Stakeholder Meetings 3.4 POTENTIAL STAKEHOLDER GROUP COMMITTEES Fresno COG and the PAC may want to consider assembling ad hoc committees of the overall stakeholder group, based on areas of technical expertise and/or mode of transportation. For example, there may be some benefit in designating an ad hoc transit committee, made up of representatives from county transit operators, to act as a sounding board on specific transit ITS topics. Similarly, an ad hoc public safety committee may be designated to advise Fresno COG and the Consultant Team on matters related to implementation of ITS that supports public safety (incident response, emergency management, etc.). These ad hoc committees would be formed at the direction of Fresno COG and the PAC. 3-3

12 4.1 PROJECT SCHEDULE 4.0 PROJECT SCHEDULE The ITS Plan Update has 14 tasks with milestones and deliverables over a 15 month schedule. Figure 4-1 outlines the most current project schedule (as of 4/30/14). 4-1

13 FRESNO COUNTY ITS MASTER PLAN UPDATE ID Task Name Duration Start Finish 1 Fresno County ITS County Plan 319 days Tue 9/10/13 Fri 11/28/ Project Initiation (Task 1) 104 days Tue 9/10/13 Fri 1/31/14 3 Final Deliverable 66 days Fri 11/1/13 Fri 1/31/ Data Gathering (Task 2) 124 days Tue 9/10/13 Fri 2/28/14 5 Final Deliverable 1 day Fri 2/28/14 Fri 2/28/ Assessment of 1999 SDP (Task 3) 98 days Mon 11/4/13 Wed 3/19/14 7 Final Deliverable 1 day Wed 3/19/14 Wed 3/19/ Update ITS Inventory (Task 4) 125 days Mon 12/2/13 Fri 5/23/14 9 Final Deliverable 1 day Wed 6/4/14 Wed 6/4/ ITS Needs, Vision, Goals (Task 5) 117 days Thu 1/16/14 Fri 6/27/14 11 Project Stakeholder Meeting #1 1 day Wed 1/22/14 Wed 1/22/14 12 Project Stakeholder Meeting #2 1 day Wed 3/19/14 Wed 3/19/14 13 Project Stakeholder Meeting #3 1 day Wed 4/30/14 Wed 4/30/14 14 Project Stakeholder Meeting #4 1 day Wed 6/4/14 Wed 6/4/14 15 Draft Deliverable 1 day Thu 5/15/14 Thu 5/15/14 16 Final Deliverable 1 day Fri 6/13/14 Fri 6/13/ Develop ITS Strategies (Task 6) 148 days Mon 2/3/14 Wed 8/27/14 18 Project Stakeholder Meeting #5 1 day Wed 7/23/14 Wed 7/23/14 19 Project Stakeholder Meeting #6 1 day Wed 8/27/14 Wed 8/27/ ITS Service Packages (Task 7) 110 days Mon 5/5/14 Fri 10/3/14 21 Final Deliverable 1 day Fri 10/3/14 Fri 10/3/ Role and Responsibilities (Task 8) 90 days Mon 6/2/14 Fri 10/3/14 23 Final Deliverable 1 day Fri 10/3/14 Fri 10/3/ Function Requirements (Task 9) 90 days Mon 6/2/14 Fri 10/3/14 25 Final Deliverable 1 day Fri 10/3/14 Fri 10/3/ Prepare ITS Architecture (Task 10) 110 days Mon 6/2/14 Fri 10/31/14 27 Draft Deliverable 1 day Fri 8/29/14 Fri 8/29/14 28 Final Deliverable 1 day Fri 10/31/14 Fri 10/31/ Develop Architecture Use Plan (Task 11) 110 days Mon 6/2/14 Fri 10/31/ Develop SDP (Task 12) 150 days Mon 5/5/14 Fri 11/28/14 31 Project Stakeholder Meeting #7 1 day Wed 9/24/14 Wed 9/24/14 32 Draft Final Deliverable 1 day Fri 10/3/14 Fri 10/3/14 33 Project Stakeholder Meeting #8 1 day Wed 10/29/14 Wed 10/29/14 34 Final Deliverable 1 day Fri 11/28/14 Fri 11/28/ ITS Website (Task 13) 174 days Tue 4/1/14 Fri 11/28/ Presentations (Task 14) 41 days Fri 10/3/14 Fri 11/28/14 37 Draft and Final Deliverable 1 day Fri 10/3/14 Fri 10/3/14 38 Draft and Final Deliverable 1 day Fri 10/31/14 Fri 10/31/14 39 Draft and Final Deliverable 1 day Fri 11/28/14 Fri 11/28/ Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Project: Fresno Co. ITS Master Plan Date: Wed 4/30/14 Master Plan Duration Task Draft or Final Deliverable Project Stakeholder Meeting Page 1

14 5.0 PLAN SUCCESS AND RISK FACTORS 5.1 SUCCESS FACTORS A successful ITS Plan is consistent with other transportation planning and programming documents in the region that encompass ITS elements. The Updated ITS Plan will also be consistent with statewide transportation planning, as well as national goals and guidelines. With the incorporation of multiple agencies, the ITS Plan must account for interactions with stakeholders not accustomed to addressing transportation issues directly, and prepare comprehensive communication and management strategies. Within the regional framework, the ITS Plan must identify agency responsibilities and provide agency commitments to the plan. 5.2 RISK FACTORS The primary risk factor for a regional planning document is outreach to a large group of stakeholders and agreement amongst the stakeholders to the strategies and elements set forth in the plan. Stakeholders have varying objectives for the ITS Plan which can redirect the path of the project, which leads to project delays and potential loss of stakeholder participation. As this plan encompasses many stakeholders of many regional roles and level, the responsibilities and expectations can be unclear. This can lead to misunderstanding of leadership versus supporting roles. 5.3 MITIGATION STRATEGIES Developing an Outreach Plan will help mitigate many of the project risks. Recognizing that stakeholders have varying objectives for the ITS Plan and addressing the goals of the stakeholders early on in the project will create a mutually accepted working relationship. Determining a management structure for stakeholders early on in the project will facilitate an efficient project schedule and provide each stakeholder with a firm understanding of the project. 5-1

15 6.0 NEXT STEPS The next step in the project is to obtain a complete understanding of the existing conditions affecting the County of Fresno. This includes an appreciation for ongoing planning efforts and their relationships to this study; knowledge of the needs and expectations of the Stakeholders; and a thorough understanding of the physical features that will influence opportunities for enhancing the County systems. The deliverable is the Data Report that will identify and map the ITS elements within the County, existing and planned policies/projects, combined with an understanding of the region s ITS users to fully understand the various opportunities and constraints within the County. The Consultant Team will initiate the collection of ITS inventory from ITS stakeholders throughout Fresno County. After the ITS inventory has been initiated, an assessment of the 1999 ITS Plan will be developed in which various stakeholders will be queried about their knowledge of, and impressions of the successes and challenges of the 1999 ITS Plan. Towards the conclusion of these steps, the Consultant Team will perform an ITS needs survey, in which stakeholders will be asked to identify their own ITS needs, and to assist with prioritization of those ITS needs. These tasks will further lead into development if the Regional ITS Architecture and Strategic Deployment Plan. 6-1

TRANSPORTATION TECHNICAL COMMITTEE

TRANSPORTATION TECHNICAL COMMITTEE TRANSPORTATION TECHNICAL COMMITTEE Date: Friday, March 15, 2013 Time: 8:30 AM Place: COG Sequoia Conference Room 2035 Tulare St., Suite 201, Fresno, CA Members Present: Ken Hamm, City of Fresno Nicholas

More information

ANNUAL CURRICULUM REVIEW PROCESS for the 2016/2017 Academic Year

ANNUAL CURRICULUM REVIEW PROCESS for the 2016/2017 Academic Year ANNUAL CURRICULUM REVIEW PROCESS for the 2016/2017 Academic Year Annual Curriculum review is a process undertaken in advance of each new academic year to renew, revise and update curriculum. Faculty members,

More information

Great Teachers, Great Leaders: Developing a New Teaching Framework for CCSD. Updated January 9, 2013

Great Teachers, Great Leaders: Developing a New Teaching Framework for CCSD. Updated January 9, 2013 Great Teachers, Great Leaders: Developing a New Teaching Framework for CCSD Updated January 9, 2013 Agenda Why Great Teaching Matters What Nevada s Evaluation Law Means for CCSD Developing a Teaching Framework

More information

Youth Sector 5-YEAR ACTION PLAN ᒫᒨ ᒣᔅᑲᓈᐦᒉᑖ ᐤ. Office of the Deputy Director General

Youth Sector 5-YEAR ACTION PLAN ᒫᒨ ᒣᔅᑲᓈᐦᒉᑖ ᐤ. Office of the Deputy Director General Youth Sector 5-YEAR ACTION PLAN ᒫᒨ ᒣᔅᑲᓈᐦᒉᑖ ᐤ Office of the Deputy Director General Produced by the Pedagogical Management Team Joe MacNeil, Ida Gilpin, Kim Quinn with the assisstance of John Weideman and

More information

INTERNATIONAL STUDENT TIMETABLE BRISBANE CAMPUS

INTERNATIONAL STUDENT TIMETABLE BRISBANE CAMPUS INTERNATIONAL STUDENT TIMETABLE TERM DATES Induction Day Term Dates* Holiday Periods* Student Fees 2017 (New Students only) Commence Until Commence Until Due Public Holidays Term 4 Fri 6 th Oct Mon 9 th

More information

West Georgia RESA 99 Brown School Drive Grantville, GA

West Georgia RESA 99 Brown School Drive Grantville, GA Georgia Teacher Academy for Preparation and Pedagogy Pathways to Certification West Georgia RESA 99 Brown School Drive Grantville, GA 20220 770-583-2528 www.westgaresa.org 1 Georgia s Teacher Academy Preparation

More information

COURSE LISTING. Courses Listed. Training for Cloud with SAP SuccessFactors in Integration. 23 November 2017 (08:13 GMT) Beginner.

COURSE LISTING. Courses Listed. Training for Cloud with SAP SuccessFactors in Integration. 23 November 2017 (08:13 GMT) Beginner. Training for Cloud with SAP SuccessFactors in Integration Courses Listed Beginner SAPHR - SAP ERP Human Capital Management Overview SAPHRE - SAP ERP HCM Overview Advanced HRH00E - SAP HCM/SAP SuccessFactors

More information

Collaboration Tier 1

Collaboration Tier 1 Tier 1 Tier 1 Creation/Revision Date: Collaborate More with Campus and External units Apr-09 News media staff Collaborate more with media units Continue strong collaboration with and other IT units Collaborate

More information

Self Assessment. InTech Collegiate High School. Jason Stanger, Director 1787 Research Park Way North Logan, UT

Self Assessment. InTech Collegiate High School. Jason Stanger, Director 1787 Research Park Way North Logan, UT Jason Stanger, Director 1787 Research Park Way North Logan, UT 84341-5600 Document Generated On June 13, 2016 TABLE OF CONTENTS Introduction 1 Standard 1: Purpose and Direction 2 Standard 2: Governance

More information

Advanced Corporate Coaching Program (ACCP) Sample Schedule

Advanced Corporate Coaching Program (ACCP) Sample Schedule Please note: This is a sample, it does not represent any classes have filled or been cancelled, nor does it show any additional classes we've added due to those that filled. All course times are in New

More information

Dates and Prices 2016

Dates and Prices 2016 Dates and Prices 2016 ICE French Language Courses www.ihnice.com 27, Rue Rossini - 06000 Nice - France Phone: +33(0)4 93 62 60 62 / Fax: +33(0)4 93 80 53 09 E-mail: info@ihnice.com 1 FRENCH COURSES - 2016

More information

Nearing Completion of Prototype 1: Discovery

Nearing Completion of Prototype 1: Discovery The Fit-Gap Report The Fit-Gap Report documents how where the PeopleSoft software fits our needs and where LACCD needs to change functionality or business processes to reach the desired outcome. The report

More information

SAT & ACT PREP. Evening classes at GBS - open to all Juniors!

SAT & ACT PREP. Evening classes at GBS - open to all Juniors! SAT & ACT PREP Evening classes at GBS - open to all Juniors! Both tests are accepted by all colleges. You may sign up for SAT Prep, ACT Prep, or both. SAT PREP Begins Mon. Jan. 22, 2018 Classes taught

More information

TENNESSEE S ECONOMY: Implications for Economic Development

TENNESSEE S ECONOMY: Implications for Economic Development TENNESSEE S ECONOMY: Implications for Economic Development William F. Fox, Director Center for Business and Economic Research The University of Tennessee, Knoxville August 2005 U.S. ECONOMY W.F. Fox, CBER,

More information

City of Roseville 2040 Comprehensive Plan Scope of Services

City of Roseville 2040 Comprehensive Plan Scope of Services City of Roseville 2040 Comprehensive Plan Scope of Services The WSB Team will provide the following services related to the City of Roseville 2040 Comprehensive Plan as described in the attached Professional

More information

Charter School Reporting and Monitoring Activity

Charter School Reporting and Monitoring Activity School Reporting and Monitoring Activity All information and documents listed below are to be provided to the Schools Office by the date shown, unless another date is specified in pre-opening conditions

More information

The IDN Variant Issues Project: A Study of Issues Related to the Delegation of IDN Variant TLDs. 20 April 2011

The IDN Variant Issues Project: A Study of Issues Related to the Delegation of IDN Variant TLDs. 20 April 2011 The IDN Variant Issues Project: A Study of Issues Related to the Delegation of IDN Variant TLDs 20 April 2011 Project Proposal updated based on comments received during the Public Comment period held from

More information

REVIEW CYCLES: FACULTY AND LIBRARIANS** CANDIDATES HIRED ON OR AFTER JULY 14, 2014 SERVICE WHO REVIEWS WHEN CONTRACT

REVIEW CYCLES: FACULTY AND LIBRARIANS** CANDIDATES HIRED ON OR AFTER JULY 14, 2014 SERVICE WHO REVIEWS WHEN CONTRACT REVIEW CYCLES: FACULTY AND LIBRARIANS** CANDIDATES HIRED ON OR AFTER JULY 14, 2014 YEAR OF FOR WHAT SERVICE WHO REVIEWS WHEN CONTRACT FIRST DEPARTMENT SPRING 2 nd * DEAN SECOND DEPARTMENT FALL 3 rd & 4

More information

GRAHAM BRUCE PAC MEETING MINUTES Wednesday, September 14, :30 pm to 7:45 pm

GRAHAM BRUCE PAC MEETING MINUTES Wednesday, September 14, :30 pm to 7:45 pm GRAHAM BRUCE PAC MEETING MINUTES Wednesday, September 14, 2016 6:30 pm to 7:45 pm In attendance: Dave Lambert, Rosanne Lambert, Lani Morden, Danica Hendry, Melanie Cheng, Melanie Hussin, Samiul Haq, Melvin

More information

BYLAWS of the Department of Electrical and Computer Engineering Michigan State University East Lansing, Michigan

BYLAWS of the Department of Electrical and Computer Engineering Michigan State University East Lansing, Michigan BYLAWS of the Department of Electrical and Computer Engineering Michigan State University East Lansing, Michigan 48824-1226 ADOPTED 9-24-71 AMENDED 2-3-72 5-31-77 4-26-83 2-10-88 6-7-90 5-5-94 4-27-95

More information

Software Development Plan

Software Development Plan Version 2.0e Software Development Plan Tom Welch, CPC Copyright 1997-2001, Tom Welch, CPC Page 1 COVER Date Project Name Project Manager Contact Info Document # Revision Level Label Business Confidential

More information

International Environmental Policy Spring :374:315:01 Tuesdays, 10:55 am to 1:55 pm, Blake 131

International Environmental Policy Spring :374:315:01 Tuesdays, 10:55 am to 1:55 pm, Blake 131 International Environmental Policy Spring 2012-11:374:315:01 Tuesdays, 10:55 am to 1:55 pm, Blake 131 Instructor: Dr. Pamela McElwee Assistant Professor, Department of Human Ecology Cook Office Building,

More information

State Parental Involvement Plan

State Parental Involvement Plan A Toolkit for Title I Parental Involvement Section 3 Tools Page 41 Tool 3.1: State Parental Involvement Plan Description This tool serves as an example of one SEA s plan for supporting LEAs and schools

More information

Annex 4 University of Dar es Salaam, Tanzania

Annex 4 University of Dar es Salaam, Tanzania Inception Report for Growth and Employment Platform First phase (August 2011- July 2013) 15 November 2011 Annex 4 University of Dar es Salaam, Tanzania Content: 1. Action plan 2. PhD Courses 3. PhD Scholarships

More information

Document number: 2013/ Programs Committee 6/2014 (July) Agenda Item 42.0 Bachelor of Engineering with Honours in Software Engineering

Document number: 2013/ Programs Committee 6/2014 (July) Agenda Item 42.0 Bachelor of Engineering with Honours in Software Engineering Document number: 2013/0006139 Programs Committee 6/2014 (July) Agenda Item 42.0 Bachelor of Engineering with Honours in Software Engineering Program Learning Outcomes Threshold Learning Outcomes for Engineering

More information

Tarrant County Sheriff's Office 2016 Training Calendar

Tarrant County Sheriff's Office 2016 Training Calendar Advanced Mechanics of Arrest 16 Feb. 25th - 26th June 30th - July 1st Sept. 1st - 2nd Dec. 15th - 16th Arrest Search and Seizure (ICC) 16 Jan. 11th - 12th July 20th - 21st ASP Baton Recertification 4 Jan.

More information

Appendix IX. Resume of Financial Aid Director. Professional Development Training

Appendix IX. Resume of Financial Aid Director. Professional Development Training Appendix IX Resume of Financial Aid Director Professional Development Training ALBERT TEZENO 6815 Chapelfield Houston Texas 77049 Tezeno_aj@yahoo.com 281-459-4114 cell 832-642-6937 Director of Financial

More information

Legal Technicians: A Limited License to Practice Law Ellen Reed, King County Bar Association, Seattle, WA

Legal Technicians: A Limited License to Practice Law Ellen Reed, King County Bar Association, Seattle, WA Legal Technicians: A Limited License to Practice Law Ellen Reed, King County Bar Association, Seattle, WA Washington State recently approved licensing "Legal Technicians" to practice family law and several

More information

Delaware Performance Appraisal System Building greater skills and knowledge for educators

Delaware Performance Appraisal System Building greater skills and knowledge for educators Delaware Performance Appraisal System Building greater skills and knowledge for educators DPAS-II Guide for Administrators (Assistant Principals) Guide for Evaluating Assistant Principals Revised August

More information

WP 2: Project Quality Assurance. Quality Manual

WP 2: Project Quality Assurance. Quality Manual Ask Dad and/or Mum Parents as Key Facilitators: an Inclusive Approach to Sexual and Relationship Education on the Home Environment WP 2: Project Quality Assurance Quality Manual Country: Denmark Author:

More information

Adult Community Learning. Course Programme 2017/18

Adult Community Learning. Course Programme 2017/18 Adult Community Learning Programme 2017/18 Venue Hire at Linton Village College Atriums: These bright and airy open spaces are interlinked by a café area whilst the East Wing opens out onto the serene

More information

Xinyu Tang. Education. Research Interests. Honors and Awards. Professional Experience

Xinyu Tang. Education. Research Interests. Honors and Awards. Professional Experience Xinyu Tang Parasol Laboratory Department of Computer Science Texas A&M University, TAMU 3112 College Station, TX 77843-3112 phone:(979)847-8835 fax: (979)458-0425 email: xinyut@tamu.edu url: http://parasol.tamu.edu/people/xinyut

More information

This Access Agreement covers all relevant University provision delivered on-campus or in our UK partner institutions.

This Access Agreement covers all relevant University provision delivered on-campus or in our UK partner institutions. UNIVERSITY OF HERTFORDSHIRE ACCESS AGREEMENT 2011/12 1 Overview The University of Hertfordshire has a strong track record of success in raising aspirations and thus in widening participation. This is amply

More information

QIs 3.4, 4.4. Student Support. discussions. staff team. Reports in place. participating in. self evaluation procedures. All students.

QIs 3.4, 4.4. Student Support. discussions. staff team. Reports in place. participating in. self evaluation procedures. All students. Priority Statement: FURTHER DEVELOPMENT IN ASSESSMENT AND REPORTING SERVICE IMPROVEMENT PLAN PRIORITY 4.1,5.2 Objective Task By When By Whom Resources To further develop our procedures for reporting to

More information

Entry Plan for the First 100 Days for Tari N. Thomas. Interim Superintendent of Schools Orange, Petersham and RC Mahar Regional

Entry Plan for the First 100 Days for Tari N. Thomas. Interim Superintendent of Schools Orange, Petersham and RC Mahar Regional Entry Plan for the First 100 Days for Tari N. Thomas Interim of Schools Orange, Petersham and RC Mahar Regional Orange, Petersham, R.C. Mahar Regional Schools Entry Plan for First 100 Days for Thomas The

More information

Study on the implementation and development of an ECVET system for apprenticeship

Study on the implementation and development of an ECVET system for apprenticeship Study on the implementation and development of an ECVET system for apprenticeship Thomas Reglin Gabriele Fietz Forschungsinstitut Betriebliche Bildung (f-bb) ggmbh Nuremberg Isabelle Le Mouillour BIBB,

More information

SPM 5309: SPORT MARKETING Fall 2017 (SEC. 8695; 3 credits)

SPM 5309: SPORT MARKETING Fall 2017 (SEC. 8695; 3 credits) SPM 5309: SPORT MARKETING Fall 2017 (SEC. 8695; 3 credits) Department of Tourism, Recreation and Sport Management College of Health and Human Performance University of Florida Professor: Dr. Yong Jae Ko

More information

Office: Colson 228 Office Hours: By appointment

Office: Colson 228 Office Hours: By appointment 1 Welcome to English 101: Composition and Rhetoric Section: 300 CRN# 82076 Fall 2015 1:00 PM to 2:15 PM Tuesdays, we meet in in Clark 410 Thursdays, we meet in Clark 212 Instructor: Shaun Turner Phone:

More information

ACC 380K.4 Course Syllabus

ACC 380K.4 Course Syllabus ACC 380K.4 Course Syllabus Unique 02485, MW 11-12.30 Fall 2005 Faculty Information Lecturer: Lynn Serre Dikolli Office: GSB 5.124F Voice: 232-9343 Office Hours: MW 9.30-10.30, F 12-1 other times by appointment

More information

M.S. in Environmental Science Graduate Program Handbook. Department of Biology, Geology, and Environmental Science

M.S. in Environmental Science Graduate Program Handbook. Department of Biology, Geology, and Environmental Science M.S. in Environmental Science Graduate Program Handbook Department of Biology, Geology, and Environmental Science Welcome Welcome to the Master of Science in Environmental Science (M.S. ESC) program offered

More information

Aclara is committed to improving your TWACS technical training experience as well as allowing you to be safe, efficient, and successful.

Aclara is committed to improving your TWACS technical training experience as well as allowing you to be safe, efficient, and successful. Aclara is committed to improving your TWACS technical training experience as well as allowing you to be safe, efficient, and successful. We've added new courses, included a semi-yearly meter school, updated

More information

FINANCIAL STRATEGIES. Employee Hand Book

FINANCIAL STRATEGIES. Employee Hand Book FINANCIAL STRATEGIES Employee Hand Book 2009-2010 S:\District Office\District Business ED\00Financial Services\09 10\Financial Services Orientation2 Welcome Welcome to Financial Strategies. This program

More information

Welcome to the University of Hertfordshire and the MSc Environmental Management programme, which includes the following pathways:

Welcome to the University of Hertfordshire and the MSc Environmental Management programme, which includes the following pathways: University of Hertfordshire Hatfield AL10 9AB UK tel +44 (0)1707 284000 fax +44 (0)1707 284115 herts.ac.uk Dear Student Welcome to the University of Hertfordshire and the MSc Environmental Management programme,

More information

FISK. 2016/2018 Undergraduate Bulletin

FISK. 2016/2018 Undergraduate Bulletin FISK 2016/2018 Undergraduate Bulletin 1 Cover image: Spire of Jubilee Hall photo: photographer unknown 2 About the Bulletin The content of this Bulletin represents the most current information available

More information

Nichole Davis Mentoring Program Administrator Risk Management Counsel South Carolina Bar

Nichole Davis Mentoring Program Administrator Risk Management Counsel South Carolina Bar Nichole Davis Mentoring Program Administrator Risk Management Counsel South Carolina Bar Rule 425, SCACR, established the Lawyer Mentoring Program. The goal of the program is to provide new lawyers with

More information

EUROPEAN COMMISSION DG RTD

EUROPEAN COMMISSION DG RTD EUROPEAN COMMISSION DG RTD SEVENTH FRAMEWORK PROGRAMME THEME 7 TRANSPORT - SST SST.2007.4.1.2: Human physical and behavioral components GA No. 218740 COVER Coordination of Vehicle and Road Safety Initiatives,

More information

2017 FALL PROFESSIONAL TRAINING CALENDAR

2017 FALL PROFESSIONAL TRAINING CALENDAR 2017 FALL PROFESSIONAL TRAINING CALENDAR Date Title Price Instructor Sept 20, 1:30 4:30pm Feedback to boost employee performance 50 Euros Sept 26, 1:30 4:30pm Dealing with Customer Objections 50 Euros

More information

MKT ADVERTISING. Fall 2016

MKT ADVERTISING. Fall 2016 TENTATIVE syllabus ~ subject to changes and modifications at the start of the semester MKT 4350.001 ADVERTISING Fall 2016 Mon & Wed, 11.30 am 12.45 pm Classroom: JSOM 2.802 Prof. Abhi Biswas Email: abiswas@utdallas.edu

More information

School Leadership Rubrics

School Leadership Rubrics School Leadership Rubrics The School Leadership Rubrics define a range of observable leadership and instructional practices that characterize more and less effective schools. These rubrics provide a metric

More information

16-17 NOVEMBER 2017, MOSCOW, RUSSIAN FEDERATION OVERVIEW PRESENTATION

16-17 NOVEMBER 2017, MOSCOW, RUSSIAN FEDERATION OVERVIEW PRESENTATION 16-17 NOVEMBER 2017, MOSCOW, RUSSIAN FEDERATION OVERVIEW PRESENTATION Tuberculosis is the leading infectious killer Current actions and investments are falling far short ENDING TB IN THE SUSTAINABLE DEVELOPMENT

More information

THE FIELD LEARNING PLAN

THE FIELD LEARNING PLAN THE FIELD LEARNING PLAN School of Social Work - University of Pittsburgh FOUNDATION FIELD PLACEMENT Term: Fall Year: 2009 Student's Name: THE STUDENT Field Liaison: Name of Agency/Organization: Agency/Organization

More information

Overview of the Otemachi-Marunouchi-Yurakucho District Redevelopment Project Council. Private-Public, Partnership

Overview of the Otemachi-Marunouchi-Yurakucho District Redevelopment Project Council. Private-Public, Partnership April, 2008 Overview of the Otemachi-Marunouchi-Yurakucho District Redevelopment Project Council Private-Public, Partnership Outline of City-planning Guidelines 2005 Otemachi-Marunouchi-Yurakucho District

More information

Date Day Scholastic Co-scholastic Activity Examinations Important Days 1-Apr-13 Mon W New Session begins 2-Apr-13 Tue W 3-Apr-13 Wed W 4-Apr-13 Thu W

Date Day Scholastic Co-scholastic Activity Examinations Important Days 1-Apr-13 Mon W New Session begins 2-Apr-13 Tue W 3-Apr-13 Wed W 4-Apr-13 Thu W Annual School Planner -------------------------------------2013-2014 1-Apr-13 Mon W New Session begins 2-Apr-13 Tue W 3-Apr-13 Wed W 4-Apr-13 Thu W 5-Apr-13 Fri W Rangoli - III, IV, V National Maritime

More information

2015 Academic Program Review. School of Natural Resources University of Nebraska Lincoln

2015 Academic Program Review. School of Natural Resources University of Nebraska Lincoln 2015 Academic Program Review School of Natural Resources University of Nebraska Lincoln R Executive Summary Natural resources include everything used or valued by humans and not created by humans. As a

More information

Statewide Strategic Plan for e-learning in California s Child Welfare Training System

Statewide Strategic Plan for e-learning in California s Child Welfare Training System Statewide Strategic Plan for e-learning in California s Child Welfare Training System Decision Point Outline December 14, 2009 Vision CalSWEC, the schools of social work, the regional training academies,

More information

ACC 362 Course Syllabus

ACC 362 Course Syllabus ACC 362 Course Syllabus Unique 02420, MWF 1-2 Fall 2005 Faculty Information Lecturer: Lynn Serre Dikolli Office: GSB 5.124F Voice: 232-9343 Office Hours: MW 9.30-10.30, F 12-1 other times by appointment

More information

H2020 Marie Skłodowska Curie Innovative Training Networks Informal guidelines for the Mid-Term Meeting

H2020 Marie Skłodowska Curie Innovative Training Networks Informal guidelines for the Mid-Term Meeting H2020 Marie Skłodowska Curie Innovative Training Networks Informal guidelines for the Mid-Term Meeting These guidelines are not an official document of the Research Executive Agency services. June 2016

More information

university of wisconsin MILWAUKEE Master Plan Report

university of wisconsin MILWAUKEE Master Plan Report university of wisconsin MILWAUKEE Master Plan Report 2010 introduction CUNNINGHAM 18 INTRODUCTION EMS CHEMISTRY LAPHAM 19 INTRODCUCTION introduction The University of Wisconsin-Milwaukee (UWM) is continually

More information

Shared Leadership in Schools On-line, Fall 2008 Michigan State University

Shared Leadership in Schools On-line, Fall 2008 Michigan State University Professor Susan Printy East Lansing, MI 48823 Phone: 517.355.4508 Fax: 517.353.6393 (Be sure to use my name) Email: sprinty@msu.edu Shared Leadership in Schools On-line, Fall 2008 Michigan State University

More information

FLATHEAD RESERVATION TRANSPORTATION SAFETY MANAGEMENT PLAN April 2009

FLATHEAD RESERVATION TRANSPORTATION SAFETY MANAGEMENT PLAN April 2009 FLATHEAD RESERVATION TRANSPORTATION SAFETY MANAGEMENT PLAN April 2009 The Confederated Salish and Kootenai Tribes is committed to reducing the number of deaths and serious injuries and improving the overall

More information

ACC : Accounting Transaction Processing Systems COURSE SYLLABUS Spring 2011, MW 3:30-4:45 p.m. Bryan 202

ACC : Accounting Transaction Processing Systems COURSE SYLLABUS Spring 2011, MW 3:30-4:45 p.m. Bryan 202 1 The University of North Carolina at Greensboro Bryan School of Business and Economics Department of Accounting and Finance ACC 325-01: Accounting Transaction Processing Systems COURSE SYLLABUS Spring

More information

Suffolk County Civil Service Dispatcher Exam

Suffolk County Civil Service Dispatcher Exam Suffolk County Dispatcher Exam Free PDF ebook Download: Suffolk County Dispatcher Exam Download or Read Online ebook suffolk county civil service dispatcher exam in PDF Format From The Best User Guide

More information

Office Hours: Day Time Location TR 12:00pm - 2:00pm Main Campus Carl DeSantis Building 5136

Office Hours: Day Time Location TR 12:00pm - 2:00pm Main Campus Carl DeSantis Building 5136 FIN 3110 - Financial Management I. Course Information Course: FIN 3110 - Financial Management Semester Credit Hours: 3.0 Course CRN and Section: 20812 - NW1 Semester and Year: Fall 2017 Course Start and

More information

ACCA PROSPECTUS JAN-JUN 2018 SEMESTER 1 SANDTON CAMPUS BECOME YOUR VISION, A CHARTERED FINANCE PROFESSIONAL!

ACCA PROSPECTUS JAN-JUN 2018 SEMESTER 1 SANDTON CAMPUS BECOME YOUR VISION, A CHARTERED FINANCE PROFESSIONAL! SANDTON CAMPUS CAMPUSES: SANDTON PRETORIA PARKTOWN NAMIBIA JAN-JUN 2018 SEMESTER 1 ACCA PROSPECTUS BECOME YOUR VISION, A CHARTERED FINANCE PROFESSIONAL! Grooming financially Tel: +27 (0)11 234 9223 qualified

More information

Technical Advising Professionals (TAPs) Quarterly Webinar

Technical Advising Professionals (TAPs) Quarterly Webinar California Smarter Lunchrooms Movement Technical Advising Professionals (TAPs) Quarterly Webinar July 24, 2014 10-11 AM PST; 1-2 PM EST California Smarter Lunchrooms Movement (CA SLM) Collaborative This

More information

Running Head: STUDENT CENTRIC INTEGRATED TECHNOLOGY

Running Head: STUDENT CENTRIC INTEGRATED TECHNOLOGY SCIT Model 1 Running Head: STUDENT CENTRIC INTEGRATED TECHNOLOGY Instructional Design Based on Student Centric Integrated Technology Model Robert Newbury, MS December, 2008 SCIT Model 2 Abstract The ADDIE

More information

Update on the Next Accreditation System Drs. Culley, Ling, and Wood. Anesthesiology April 30, 2014

Update on the Next Accreditation System Drs. Culley, Ling, and Wood. Anesthesiology April 30, 2014 Accreditation Council for Graduate Medical Education Update on the Next Accreditation System Drs. Culley, Ling, and Wood Anesthesiology April 30, 2014 Background of the Next Accreditation System Louis

More information

3. Improving Weather and Emergency Management Messaging: The Tulsa Weather Message Experiment. Arizona State University

3. Improving Weather and Emergency Management Messaging: The Tulsa Weather Message Experiment. Arizona State University 3. Improving Weather and Emergency Management Messaging: The Tulsa Weather Message Experiment Kenneth J. Galluppi 1, Steven F. Piltz 2, Kathy Nuckles 3*, Burrell E. Montz 4, James Correia 5, and Rachel

More information

DOCTOR OF PHILOSOPHY BOARD PhD PROGRAM REVIEW PROTOCOL

DOCTOR OF PHILOSOPHY BOARD PhD PROGRAM REVIEW PROTOCOL DOCTOR OF PHILOSOPHY BOARD PhD PROGRAM REVIEW PROTOCOL Overview of the Doctor of Philosophy Board The Doctor of Philosophy Board (DPB) is a standing committee of the Johns Hopkins University that reports

More information

Self-Study Report. Markus Geissler, PhD

Self-Study Report. Markus Geissler, PhD Self-Study Report Submitted to the Committee of Peers conducting the Post-Tenure Review, Type B of Markus Geissler, PhD Professor, Computer Information Science for the period of August 2010 to May 2013

More information

MSW POLICY, PLANNING & ADMINISTRATION (PP&A) CONCENTRATION

MSW POLICY, PLANNING & ADMINISTRATION (PP&A) CONCENTRATION MSW POLICY, PLANNING & ADMINISTRATION (PP&A) CONCENTRATION Overview of the Policy, Planning, and Administration Concentration Policy, Planning, and Administration Concentration Goals and Objectives Policy,

More information

Arizona GEAR UP hiring for Summer Leadership Academy 2017

Arizona GEAR UP hiring for Summer Leadership Academy 2017 GEAR UP Summer Leadership Academy (GUSLA) Arizona GEAR UP hiring for Summer Leadership Academy 2017 NAU/AZ GEAR UP will host a six (6) day summer enrichment experience for GEAR UP students on the NAU Mountain

More information

THE UNIVERSITY OF SYDNEY Semester 2, Information Sheet for MATH2068/2988 Number Theory and Cryptography

THE UNIVERSITY OF SYDNEY Semester 2, Information Sheet for MATH2068/2988 Number Theory and Cryptography THE UNIVERSITY OF SYDNEY Semester 2, 2017 Information Sheet for MATH2068/2988 Number Theory and Cryptography Websites: It is important that you check the following webpages regularly. Intermediate Mathematics

More information

Stochastic Calculus for Finance I (46-944) Spring 2008 Syllabus

Stochastic Calculus for Finance I (46-944) Spring 2008 Syllabus Stochastic Calculus for Finance I (46-944) Spring 2008 Syllabus Introduction. This is a first course in stochastic calculus for finance. It assumes students are familiar with the material in Introduction

More information

Qualitative Site Review Protocol for DC Charter Schools

Qualitative Site Review Protocol for DC Charter Schools Qualitative Site Review Protocol for DC Charter Schools Updated November 2013 DC Public Charter School Board 3333 14 th Street NW, Suite 210 Washington, DC 20010 Phone: 202-328-2600 Fax: 202-328-2661 Table

More information

BUS Computer Concepts and Applications for Business Fall 2012

BUS Computer Concepts and Applications for Business Fall 2012 BUS 1950-001 Computer Concepts and Applications for Business Fall 2012 Instructor: Contact Information: Paul D. Brown Office: 4503 Lumpkin Hall Phone: 217-581-6058 Email: PDBrown@eiu.edu Course Website:

More information

Introduction to Financial Accounting

Introduction to Financial Accounting Universitat Pompeu Fabra Introduction to Financial Accounting Course 2013 2014 Grades: Administració i Direcció d Empreses (ADE) code: 20837 Economia (ECO) code: 20837 Ciències Empresarials - Management

More information

Information Session on Overseas Internships Career Center, SAO, HKUST 1 Dec 2016

Information Session on Overseas Internships Career Center, SAO, HKUST 1 Dec 2016 Information Session on Overseas Internships 2016-17 Career Center, SAO, HKUST 1 Dec 2016 Agenda Mailing lists subscription Overseas Internship Programs (summer and year-round) Sponsorship Schemes Things

More information

Procedures for Academic Program Review. Office of Institutional Effectiveness, Academic Planning and Review

Procedures for Academic Program Review. Office of Institutional Effectiveness, Academic Planning and Review Procedures for Academic Program Review Office of Institutional Effectiveness, Academic Planning and Review Last Revision: August 2013 1 Table of Contents Background and BOG Requirements... 2 Rationale

More information

EECS 571 PRINCIPLES OF REAL-TIME COMPUTING Fall 10. Instructor: Kang G. Shin, 4605 CSE, ;

EECS 571 PRINCIPLES OF REAL-TIME COMPUTING Fall 10. Instructor: Kang G. Shin, 4605 CSE, ; EECS 571 PRINCIPLES OF REAL-TIME COMPUTING Fall 10 Instructor: Kang G. Shin, 4605 CSE, 763-0391; kgshin@umich.edu Number of credit hours: 4 Class meeting time and room: Regular classes: MW 10:30am noon

More information

Guidance on the University Health and Safety Management System

Guidance on the University Health and Safety Management System Newcastle University Safety Office 1 Kensington Terrace Newcastle upon Tyne NE1 7RU Tel 0191 222 6274 University Safety Policy Guidance Guidance on the University Health and Safety Management System Document

More information

Common Core Postsecondary Collaborative

Common Core Postsecondary Collaborative Common Core Postsecondary Collaborative Year One Learning Lab April 25, 2013 Sheraton Wild Horse Pass Chandler, Arizona At this Learning Lab, we will share and discuss An Overview of Common Core Postsecondary

More information

MIDTERM REPORT. Solano Community College 4000 Suisun Valley Road Fairfield, California

MIDTERM REPORT. Solano Community College 4000 Suisun Valley Road Fairfield, California MIDTERM REPORT Solano Community College 4000 Suisun Valley Road Fairfield, California 94534-3197 Submitted to the Accrediting Commission for Community and Junior Colleges Western Association of Schools

More information

GRANT WOOD ELEMENTARY School Improvement Plan

GRANT WOOD ELEMENTARY School Improvement Plan GRANT WOOD ELEMENTARY 2014-15 School Improvement Plan Building Leadership Team Cindy Stock and Nicole Shaw, BLT Co-Chairs Lisa Johnson, Kindergarten Liz Altemeier, First Grade Megan Goldensoph, Third Grade

More information

The patient-centered medical

The patient-centered medical Primary Care Residents Want to Learn About the Patient- Centered Medical Home Gerardo Moreno, MD, MSHS; Julia Gold, MD; Maureen Mavrinac, MD BACKGROUND AND OBJECTIVES: The patient-centered medical home

More information

T Seminar on Internetworking

T Seminar on Internetworking T-110.5191 Seminar on Internetworking T-110.5191@tkk.fi Aalto University School of Science 1 Agenda Course Organization Important dates Signing up First draft, Full paper, Final paper What is a good seminar

More information

SSTATE SYSIP STEMIC IMPROVEMENT PL A N APRIL 2016

SSTATE SYSIP STEMIC IMPROVEMENT PL A N APRIL 2016 SSIP S TATE S Y S TEM I C I M P R O V EM EN T PL A N APRIL 2016 CONTENTS Acronym List... 2 Executive Summary... 3 Infrastructure Development... 5 1(a) Specify improvements that will be made to the State

More information

BY-LAWS THE COLLEGE OF ENGINEERING AND COMPUTER SCIENCE THE UNIVERSITY OF TENNESSEE AT CHATTANOOGA

BY-LAWS THE COLLEGE OF ENGINEERING AND COMPUTER SCIENCE THE UNIVERSITY OF TENNESSEE AT CHATTANOOGA BY-LAWS THE COLLEGE OF ENGINEERING AND COMPUTER SCIENCE THE UNIVERSITY OF TENNESSEE AT CHATTANOOGA BY-LAWS THE COLLEGE OF ENGINEERING AND COMPUTER SCIENCE THE UNIVERSITY OF TENNESSEE AT CHATTANOOGA Table

More information

Short Term Action Plan (STAP)

Short Term Action Plan (STAP) Short Term Action Plan (STAP) 10/14/2017 1 Managing Complex Change Vision Skills Incentives Resources Action Plan Assessment Meaningful Change Skills Incentives Resources Action Plan Assessment Confusion

More information

FINANCE 3320 Financial Management Syllabus May-Term 2016 *

FINANCE 3320 Financial Management Syllabus May-Term 2016 * FINANCE 3320 Financial Management Syllabus May-Term 2016 * Instructor details: Professor Mukunthan Santhanakrishnan Office: Fincher 335 Office phone: 214-768-2260 Email: muku@smu.edu Class details: Days:

More information

Sul Ross State University Spring Syllabus for ED 6315 Design and Implementation of Curriculum

Sul Ross State University Spring Syllabus for ED 6315 Design and Implementation of Curriculum Sul Ross State University Spring 2017 Syllabus for ED 6315 Design and Implementation of Curriculum Instructor: Rebecca Schlosser, J.D., Ed.D. Office Hours via Blackboard Instant Messaging: Mon, Tues, Wedn,

More information

California Professional Standards for Education Leaders (CPSELs)

California Professional Standards for Education Leaders (CPSELs) Standard 1 STANDARD 1: DEVELOPMENT AND IMPLEMENTATION OF A SHARED VISION Education leaders facilitate the development and implementation of a shared vision of learning and growth of all students. Element

More information

Master's degree students

Master's degree students PhD degree 4 weeks before thesis defense 2 weeks before thesis defense As soon as possible s in West PhD in Group 3 electronically submit Form 8 to PUWL. MS thesis and PhD in Group 1 and Group 2 electronically

More information

STANISLAUS COUNTY CIVIL GRAND JURY CASE #08-04 LA GRANGE ELEMENTARY SCHOOL DISTRICT

STANISLAUS COUNTY CIVIL GRAND JURY CASE #08-04 LA GRANGE ELEMENTARY SCHOOL DISTRICT STANISLAUS COUNTY CIVIL GRAND JURY 2007-2008 CASE #08-04 LA GRANGE ELEMENTARY SCHOOL DISTRICT SUMMARY A complaint was submitted to the Stanislaus County Grand Jury alleging that the La Grange Elementary

More information

Comprehensive Program Review Report (Narrative) College of the Sequoias

Comprehensive Program Review Report (Narrative) College of the Sequoias Program Review - Child Development Comprehensive Program Review Report (Narrative) College of the Sequoias Program Review - Child Development Prepared by: San Dee Hodges, Rebecca Griffith, Gwenette Aytman

More information

TABLE OF CONTENTS. By-Law 1: The Faculty Council...3

TABLE OF CONTENTS. By-Law 1: The Faculty Council...3 FACULTY OF SOCIAL SCIENCES, University of Ottawa Faculty By-Laws (November 21, 2017) TABLE OF CONTENTS By-Law 1: The Faculty Council....3 1.1 Mandate... 3 1.2 Members... 3 1.3 Procedures for electing Faculty

More information

University of Toronto

University of Toronto University of Toronto OFFICE OF THE VICE PRESIDENT AND PROVOST Governance and Administration of Extra-Departmental Units Interdisciplinarity Committee Working Group Report Following approval by Governing

More information

London College of Contemporary Arts. Short Courses 2017/18

London College of Contemporary Arts. Short Courses 2017/18 London College of Contemporary Arts Short Courses 2017/18 Contents Introduction to LCCA Dean s Welcome 2 Why Study With Us? 6 What Our Students Say 8 Short Courses Creative Fashion Design 12 Pattern Cutting

More information

Navitas UK Holdings Ltd Embedded College Review for Educational Oversight by the Quality Assurance Agency for Higher Education

Navitas UK Holdings Ltd Embedded College Review for Educational Oversight by the Quality Assurance Agency for Higher Education Navitas UK Holdings Ltd Embedded College Review for Educational Oversight by the Quality Assurance Agency for Higher Education February 2014 Annex: Birmingham City University International College Introduction

More information

Skillsoft Acquires SumTotal: Frequently Asked Questions. October 2014

Skillsoft Acquires SumTotal: Frequently Asked Questions. October 2014 Skillsoft Acquires SumTotal: Frequently Asked Questions October 2014 1. What have we announced? Skillsoft has completed the previously announced acquisition of SumTotal. Skillsoft s acquisition of SumTotal

More information