Sir John A Macdonald Cluster of Schools November 3, 2015

Similar documents
Toronto District School Board

Committee on Academic Policy and Issues (CAPI) Marquette University. Annual Report, Academic Year

Trends & Issues Report

Proposed Bell Time Change and Possible Grade Reconfiguration For BES and BJSHS

St. Paul, St. Michael, Our Lady of Lourdes: Pupil Accommodation Review. December 7, 2016

BILD Physical Intervention Training Accreditation Scheme

Annual Report to the Public. Dr. Greg Murry, Superintendent

Compilation of Data: Ecole Christine Morrison Ecole Mission Central French Immersion & English Programs

Archdiocese of Birmingham

First Nation, Métis and Inuit Education Annual Action Plan

QIs 3.4, 4.4. Student Support. discussions. staff team. Reports in place. participating in. self evaluation procedures. All students.

BASIC EDUCATION IN GHANA IN THE POST-REFORM PERIOD

2. Sibling of a continuing student at the school requested. 3. Child of an employee of Anaheim Union High School District.

Post-16 transport to education and training. Statutory guidance for local authorities

Transportation Equity Analysis

Multiple Measures Assessment Project - FAQs

Financing Education In Minnesota

VISION: We are a Community of Learning in which our ākonga encounter Christ and excel in their learning.

Special Educational Needs and Disabilities Policy Taverham and Drayton Cluster

1. Amend Article Departmental co-ordination and program committee as set out in Appendix A.

ABI11111 ABIOSH Level 5 International Diploma in Environmental Sustainability Management

Description of Program Report Codes Used in Expenditure of State Funds

Position Statements. Index of Association Position Statements

A Global Imperative for 2015: Secondary Education. Ana Florez CIES, New Orleans March 11th, 2013

Nova Scotia School Advisory Council Handbook

Special Educational Needs and Disability (SEND) Policy

Executive Summary. Walker County Board of Education. Dr. Jason Adkins, Superintendent 1710 Alabama Avenue Jasper, AL 35501

REQUEST FOR PROPOSALS SUPERINTENDENT SEARCH CONSULTANT

SPORTS POLICIES AND GUIDELINES

Science Clubs as a Vehicle to Enhance Science Teaching and Learning in Schools

Evaluation of Hybrid Online Instruction in Sport Management

ONTARIO FOOD COLLABORATIVE

Oasis Academy Coulsdon

VISUALIZING SUCCESS PLANNING FOR THE FUTURE PUBLIC FORUM DECEMBER 17, 2013

5 Early years providers

Week 4: Action Planning and Personal Growth

Summary results (year 1-3)

SEN INFORMATION REPORT

École Jeannine Manuel Bedford Square, Bloomsbury, London WC1B 3DN

Running Head GAPSS PART A 1

Administrative/Professional Council Meeting May 23, :30 p.m. Spotlight Room, Bone Student Center

Math Pathways Task Force Recommendations February Background

PAPILLON HOUSE SCHOOL Making a difference for children with autism. Job Description. Supervised by: Band 7 Speech and Language Therapist

CONTINUUM OF SPECIAL EDUCATION SERVICES FOR SCHOOL AGE STUDENTS

The feasibility, delivery and cost effectiveness of drink driving interventions: A qualitative analysis of professional stakeholders

CEREMONIALS/RECOGNITION OF SPECIAL GUESTS

AAC/BOT Page 1 of 9

Comprehensive Program Review (CPR)

CONSULTATION ON THE ENGLISH LANGUAGE COMPETENCY STANDARD FOR LICENSED IMMIGRATION ADVISERS

(2) GRANT FOR RESIDENTIAL AND REINTEGRATION SERVICES.

STUDENT ASSESSMENT, EVALUATION AND PROMOTION

Reforms for selection procedures fundamental programmes and SB grant. June 2017

Effective Pre-school and Primary Education 3-11 Project (EPPE 3-11)

ANNUAL REPORT. The South Australian Law Reform Institute. 1 January December 2012

Comprehensive Program Review (CPR)

Researcher Development Assessment A: Knowledge and intellectual abilities

West Georgia RESA 99 Brown School Drive Grantville, GA

HOW DO YOU IMPROVE YOUR CORPORATE LEARNING?

Computer Emergency Response Team (CERT)

SEN SUPPORT ACTION PLAN Page 1 of 13 Read Schools to include all settings where appropriate.

Collegiate Academies Response to Livingston School Facility RFA Submitted January 23, 2015

July 13, Maureen Bartolotta, Chair; Jim Sorum, Vice Chair; Maureen Peterson, Clerk; Arlene Bush, Treasurer; Mark Hibbs and Chuck Walter.

TEXAS CHRISTIAN UNIVERSITY M. J. NEELEY SCHOOL OF BUSINESS CRITERIA FOR PROMOTION & TENURE AND FACULTY EVALUATION GUIDELINES 9/16/85*

PE SPORT FUNDING AT IVY LANE SCHOOL September 2016 July 2017 A grant of 9,335 received EFFECTIVE USE OF FUNDING

Cooper Upper Elementary School

College of Business University of South Florida St. Petersburg Governance Document As Amended by the College Faculty on February 10, 2014

Colorado s Unified Improvement Plan for Schools for Online UIP Report

READY OR NOT? CALIFORNIA'S EARLY ASSESSMENT PROGRAM AND THE TRANSITION TO COLLEGE

Archdiocese of Birmingham

GRAHAM BRUCE PAC MEETING MINUTES Wednesday, September 14, :30 pm to 7:45 pm

Business Tech Prep Summit

EXPANSION PACKET Revision: 2015

Legal Technicians: A Limited License to Practice Law Ellen Reed, King County Bar Association, Seattle, WA

PUBLIC SCHOOL OPEN ENROLLMENT POLICY FOR INDEPENDENCE SCHOOL DISTRICT

School Concurrency Update. Palm Beach County

USC VITERBI SCHOOL OF ENGINEERING

American String Teachers Association Greater Los Angeles Section

FRESNO COUNTY INTELLIGENT TRANSPORTATION SYSTEMS (ITS) PLAN UPDATE

Special Educational Needs and Disabilities

Options for Elementary Band and Strings Program Delivery

Statistical Peers for Benchmarking 2010 Supplement Grade 11 Including Charter Schools NMSBA Performance 2010

Committee to explore issues related to accreditation of professional doctorates in social work

Samuel Enoka Kalama Intermediate School

The Teaching and Learning Center

Lismore Comprehensive School

SELF-ASSESSMENT EXTREMISM & RADICALISATION SELF-ASSESSMENT AND RISK ASSESSMENT

Cooper Upper Elementary School

430 F.2d 368 United States Court of Appeals, Fifth Circuit.

ANNUAL REPORT of the ACM Education Policy Committee For the Period: July 1, June 30, 2016 Submitted by Jeffrey Forbes, Chair

ACBSP Related Standards: #3 Student and Stakeholder Focus #4 Measurement and Analysis of Student Learning and Performance

4.0 CAPACITY AND UTILIZATION

Public Comments (2 minute limit per person) AS Executive Board Reports (15 minutes)

Why Philadelphia s Public School Problems Are Bad For Business

TRANSPORTATION TECHNICAL COMMITTEE

Earl Marriott Secondary School

I set out below my response to the Report s individual recommendations.

Superintendent s 100 Day Entry Plan Review

This Access Agreement covers all relevant University provision delivered on-campus or in our UK partner institutions.

PREDISPOSING FACTORS TOWARDS EXAMINATION MALPRACTICE AMONG STUDENTS IN LAGOS UNIVERSITIES: IMPLICATIONS FOR COUNSELLING

BUSI 2504 Business Finance I Spring 2014, Section A

Transcription:

Final Report of the Program Area Review Team (PART) for Sir John A Macdonald Cluster of Schools November 3, 2015 RECOMMENDATIONS The Sir John A Macdonald CI Cluster of Schools Program Area Review Team recommends the following: 1. Grade Changes; a. The junior elementary schools (Brian PS, Cherokee PS, Ernest PS, and Muirhead PS) become JK to Grade 5 schools. b. That Pleasant View JHS becomes a Grade 6 to 8 school. i. With a corresponding school name change being, to Pleasant View Middle School. c. That Grade 9 pupils from Pleasant View move to Sir John A Macdonald CI or L Amoreaux CI depending on home address. 2. Shift in French Programs; a. The pathway from Brian PS be to Don Valley MS for Grades 6 to 8, Windfields JHS for Grade 9, and then to York Mills CI for Grades 10 to 12. b. That an additional guaranteed option be provided to Don Valley MS French Immersion pupils to attend Newtonbrook SS for Grades 9 to 12. c. That a French Extended Program be created at Cherokee PS feeding to a new French Extended Program at Pleasant View MS. d. That a French Immersion Program be created at Ernest PS. 3. Change to the Brian PS, Ernest PS and Muirhead PS Junior Attendance Areas with the Regular Program pathway to Pleasant View MS and Sir John A Macdonald CI or L Amoreaux CI in the case of Ernest PS. 4. Implementation; a. That Grade 6 and 9 shifts occur for September 2017; b. That new French program sites at Ernest PS and Cherokee PS be implemented for September 2016; c. That existing French Immersion program changes occur beginning September 2017 meaning new program sites will have their first grade of intake (French Immersion Grade 6s will move to Don Valley); d. That the change to the Brian PS, Ernest PS and Muirhead PS boundary be implemented for September 2016 with grandparenting of existing pupils and their younger siblings; e. That school based transition teams be established, involving teachers, parents, principal, and when appropriate students, to identify and mitigate issues in student readiness, including such matters of student safety. P20151106-SirJohnAMacdonaldClusterJHSClusterPARTReportFinal.doc Page 1 of 6

BACKGROUND A Local Feasibility Team (LFT) comprised of the area Trustee, Superintendent, TDSB Principals and central program and planning staff, was established to complete the Junior High School review established by the Board of Trustees in June 2000. The objective of the LFT was to come up with a feasible solution for transitioning away from the Junior High School model while addressing significantly over and underutilized schools in the area, as well as enhancing program offerings in local schools. A previous LFT in 2013 established that Grade 9 would move from Pleasant View JHS to Sir John A Macdonald CI or L Amoreaux CI, depending on home address, after a more extensive analysis of the impact on elementary school feeders. The LFT created 17 scenarios, and a preferred scenario was identified as the most feasible within the context of the TDSB Long Term Program and Accommodation Plan s (LTPAS) Program and Planning Accommodation Drivers. The transition of the LFT to a Program Area Review Team (PART) was approved by Central Accommodation Team (CAT) on September 17, 2015. The objective of the PART is to continue the work of the LFT in evaluating the feasibility of the preferred scenario 9b (revised), by seeking advice and feedback from impacted parent representatives through the course of 3 working meetings. The PART also presented the preferred scenario to the general public to seek input from the broader community. Meeting minutes can be found on the TDSB website. At the first PART meeting, an explanation of the role of the PART as an advisory committee was given. The group was provided with the Program and Accommodation Drivers that the LFT used to arrive at the preferred scenario, specifically addressing over and underutilized schools, rational attendance areas and equity and access to programs for all students. The PART was asked to evaluate the options using the same criteria. A data package with all of the scenarios the LFT created was distributed to the PART. The data included actual 2014 student enrolments, projected 2019 and 2024 enrolments based on the scenario being considered, as well as an illustration of each of the feeder pathways. The LFT identified Scenario 9b (revised) as the preferred scenario. Enrolment and utilization information about the preferred scenario is shown in Appendix A. At the second PART meeting, feedback was provided by the group on the preferred scenario in a round table discussion. Feedback forms were also distributed to team members. The group was asked about the advantages and disadvantages of the proposed scenario. The comments and questions posed at the second PART meeting informed the content of the presentation at the public meeting. A summary of the feedback received at the public meeting and a copy of the presentation can be found online at the Sir John A Macdonald Program Area Review website. The PART held a third working meeting to discuss the feedback received at the public meeting about the preferred scenario and provide guidance on how to proceed. The PART membership found consensus on Grade 9 changes, Grade 6 at Pleasant View and P20151106-SirJohnAMacdonaldClusterJHSClusterPARTReportFinal.doc Page 2 of 6

name changes for September 2017. Consensus was found on the creation of new French Immersion and Extended French programming for September 2016. A vote was held on implementation for Grade 6 changes to French Immersion programming (Grade 6 move to Don Valley), and was agreed by a large majority to begin in September 2017. STAKEHOLDER ENGAGEMENT Program Area Review Team School/Organization Name Role Brian Public School Paul Farrell Principal Bianca O'Brien Nancy Simich Nellemarie Hyde Aretha Phillip Cherokee Public School Phyllis Jackson Principal Tom Mitsopoulos Ernest Public School Linda Sue Thomas Principal Angela Morelli L'Amoreaux Collegiate Huw Chinnery Principal Institute Jenny Jebanesan Emir Tascioglu Muirhead Public School Baila Goldfarb Principal Joanna Hodgson Pleasant View Junior High Linda Nardea Principal School Mary LIanos Sir John A Macdonald Rick Tarasuk Principal Collegiate Institute TDSB Trustee Ken Lister Trustee, Ward 17 TDSB Trustee Manna Wong Trustee, Ward 20 Staff Resources Organization Name Role TDSB Central Staff David Paltser Educational Planning Officer TDSB Central Staff John Tancredi Central Coordinating Principal, Teaching and Learning TDSB Central Staff Lori Moore Supervising Principal Special Education French as a Second Language Advisory Committee Kristina Laperle Parent Co Chair P20151106-SirJohnAMacdonaldClusterJHSClusterPARTReportFinal.doc Page 3 of 6

Meeting Details Meeting Type Date Time Committee October 6, 2015 4:00 to 5:00 p.m. Committee October 20, 2015 4:00 to 5:00 p.m. Public Meeting October 27, 2015 7:00 to 9:00 p.m. Committee November 3, 2015 4:00 to 5:30 p.m. ANALYSIS OF THE PREFERRED SCENARIO The analysis is summarized in Appendix A and suggests that preferred scenario will provide: With grade changes, program relocations, and attendance boundary changes, sufficient classroom space exists to accommodate intermediate grade students at Pleasant View MS, and all secondary grade students at Sir John A Macdonald CI or L Amoreaux CI. The resulting impact to the elementary schools indicates general improvement to the number schools that are over or under enrolled, and corresponding changes to utilization rates, and a reduction in the projected number of portables required. o For example, the current situation has 1 school operating above 100% and 2 schools operating below 65 %. By 2024 there will be 1 school being utilized over 100% and 4 schools under 65%. This is contrary to the accommodation drivers outlined in the Board s Long Term Program and Accommodation Strategy. o The preferred scenario leaves no schools having a utilization rate above 100% or below 65% o All non capital means (boundary change, program relocation, grade changes) have been employed to balance enrolments across the schools. Program opportunities are improved for community students. o Students will no longer leave the community to participate in Extended French Programming with the creation of a program at Cherokee PS. SUMMARY OF FINDINGS There is generally strong support amongst the PART members to proceed with the preferred scenario. Parents generally recognize the benefits of the JK Grade 5, Grade 6 to 8, and Grade 9 to 12 model and the additional choice this will provide to families. Throughout the course of our discussions, parents at the PART working and public meetings raised several questions about and made comments concerning the accommodation plan for the area. These are summarized under the following themes. 1. Timing of Changes When would implementation take place? Is there enough time to plan? Too many changes at once? Could the changes be phased in? P20151106-SirJohnAMacdonaldClusterJHSClusterPARTReportFinal.doc Page 4 of 6

2. Readiness of Students Parents are concerned Grade 6 students are too young to move schools There is anxiety around the change Safety concerns around getting to school (walking, TTC) and the distances involved Maturity level of students 3. Childcare Before and After Care Some parents want Childcare to be provided at Middle School for the Grade 6 students Can programming be provided at Lunch or after school for Grade 6 pupils? 4. Student Success What will happen to the teachers and the resources? How will we ensure the good student achievement continues? Concerns around EQAO testing in Grade 6 5. French Immersion Pathway There are concerns around the number of transitions in the proposed French Immersion Pathway (Don Valley Windfields York Mills) There are concerns over the distance of travel and expense for parents Why don t we expand York Mills CI so that Grade 9 can be accommodated? 6. Brian/Ernest/Muirhead Boundary Change If the regular track at the school declines will there be limited opportunities for Spec Ed pupils? There is a good sense amongst the parent community that with careful planning and the commitment of school staff, administration, parents, and the Superintendent and Trustee, we can achieve the goal to improve program delivery and remedy accommodation pressures. P20151106-SirJohnAMacdonaldClusterJHSClusterPARTReportFinal.doc Page 5 of 6

Appendix A Program Area Review Team Sir John A Macdonald Cluster of Schools Site Details 1 2 3 4 5 6 7 Sir John A Macdonald CI L'Amoreaux CI Pleasant View JHS Brian PS Cherokee PS Ernest PS Muirhead PS Total Status Quo Data Grades Served Gr. 9-12 Gr. 9-12 Gr. 7-9 Gr. JK - 6 Gr. JK - 6 Gr. JK - 6 Gr. JK - 6 Capacity* 1,353 957 591 358 243 452 264 4,218 Portables on Site 2014/15 0 12 0 5 0 0 0 17 Headcount Enrolment Oct 2014 1,159 734 282 450 172 156 193 3,146 Utilization Oct 2014 86% 77% 48% 126% 71% 35% 73% 75% Projected Headcount Enrolment 2024 1,085 596 284 556 130 121 184 2,956 Projected Utilization - 2024 80% 62% 48% 155% 53% 27% 70% 70% Programs (Special Education, French, Other) Autism (2.0) Extended French French Immersion (11.0) Behaviour (1.0), MID (2.0), LD (2.0) - Program/Community Partnerships Brian's Petits Amis Children's Centre (3-excl., 5- shared) Mrs. Rashida Moosvi (1-shared) *Total School Student Capacity based on TDSB Room Use Scenario 9b (revised) - Grade Changes, Program Shifts, Boundary Changes Grades Served Gr. 9-12 Gr. 9-12 Gr. 6-8 Gr. JK - 5 Gr. JK - 5 Gr. JK - 5 Gr. JK - 5 Projected Headcount Enrolment 2024 1,198 752 397 378 166 338 182 3,410 Projected Utilization - 2024 89% 79% 67% 106% 68% 75% 69% 81% P20151106-SirJohnAMacdonaldClusterJHSClusterPARTReportFinal.doc Page 6 of 6