1 Public Disclosure Authorized Document of The World Bank Report No: ICR Public Disclosure Authorized Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-43810) ON A CREDIT 4381-HO IN THE AMOUNT OF SDR 9.8 MILLION (US$15.37 MILLION EQUIVALENT) TO THE REPUBLIC OF HONDURAS FOR AN EDUCATION QUALITY, GOVERNANCE AND INSTITUTIONAL STRENGTHENING PROJECT Public Disclosure Authorized Human Development Network Central America Country Management Unit Latin America and the Caribbean Region December 20, 2013

2 CURRENCY EQUIVALENTS (Exchange Rate Effective December 20, 2013) Currency Unit = Lempiras (L) Lempiras = US$1 US$ = SDR 1 FISCAL YEAR January 1 December 31 ABBREVIATIONS AND ACRONYMS AECO Asociaciones Educativas Comunitarias (Community-Based Educational Associations) CCEPREB Centro Comunitario de Educación Prebásica (Community-Based Pre- Primary School) COMDE Consejo Municipal de Desarrollo Educativo (Municipal Council for Educational Development) CPS Country Partnership Strategy DIGECE Dirección General de Evaluación de la Calidad Educativa (Department of Educational Quality Assessment) DPL Development Policy Loan ECU EFA Coordination Unit EFA Education for All EFA-FTI Education for All / Fast-Track Initiative EGRA Early-Grade Reading Abilities EMIS Education Management Information System FM Financial Management GIZ Deutsche Gesellschaft für Internationale Zusammenarbeit (German Society for International Cooperation) GoH Government of Honduras HRM Human Resources Management IADB Inter-American Development Bank IAPP Indigenous and Afro-Honduran People s Plan IBE Intercultural and Bilingual Education IDA International Development Association INPREMA Instituto Nacional de Previsión del Magisterio (National Teachers Pension Fund Institute) IOI Intermediate Outcome Indicator IRI Intermediate Results Indicator KfW Kreditanstalt für Wiederaufbau (German Development Bank) KPI Key Performance Indicator LSMS Living Standards Measurement Survey MERECE Mesa Redonda de Cooperantes Externos en Educación (International Donors' Education Round Table) NES National Educational Strategy ii

3 PAD Project Appraisal Document PDO Project Development Objective PEC Proyecto Educativo de Centro (School s Educational Development Plan) PER Proyecto Educativo de Red (School Network s Educational Development Plan) PIRLS Progress in International Reading Literacy Survey POA Plan Operativo Anual (Annual Operational Plan) PROHECO Programa Hondureño de Educación Comunitaria (Honduran Community-Based Education Program) PROMEESE Programa de Mejoramiento de la Estadística Educativa de la Secretaría de Educación (Ministry of Education s Program for the Strengthening of Educational Statistics) PRONEEAAH Programa Nacional de Educación para las Etnias Autóctonas y Afroantillanas de Honduras (National Education Program for Ethnic Groups in Honduras) PRS Poverty Reduction Strategy RFM Results Framework and Monitoring RSN Rural School Network SACE Sistema de Administración de Centros Educativos (Integrated System for the Administration of the Education System) SEDUC Secretaría de Educación (Ministry of Education) SIAFI Sistema Integrado de Administración Financiera (Integrated System for the Financial Management of the Public Sector) SIARHD Sistema Integrado para la Administración de los Recursos Humanos Docentes (Integrated System for the Administration of Teachers Payroll) SIL Specific Investment Lending SINECE Sistema Nacional de Evaluación de la Calidad Educativa (National System for Educational Quality Assessment) SINIEH Sistema Nacional de Información Educativa de Honduras (Honduras National System for Information on the Education Sector) TBB Transparency Bulletin Board TERCE Tercer Estudio Regional Comparativo y Explicativo (Third Regional Comparative and Explicatory Study) THRU Transparency and Human Rights Unit TIMSS Trends in Mathematics and Science Study UPEG Unidad de Planeación y Evaluación de la Gestión (Planning and Management Evaluation Unit) Vice President: Hasan A. Tuluy Country Director: Felipe Jaramillo Sector Manager: Reema Nayar Project Team Leader: Juan Diego Alonso ICR Primary Author: Claudia Zambra Taibo iii

4

5 REPUBLIC OF HONDURAS EDUCATION QUALITY, GOVERNANCE AND INSTITUTIONAL STRENGTHENING PROJECT CONTENTS Data Sheet A. Basic Information B. Key Dates C. Ratings Summary D. Sector and Theme Codes E. Bank Staff F. Results Framework Analysis G. Ratings of Project Performance in ISRs H. Restructuring I. Disbursement Graph 1. Project Context, Development Objectives and Design Key Factors Affecting Implementation and Outcomes Assessment of Outcomes Assessment of Risk to Development Outcome Assessment of Bank and Borrower Performance Lessons Learned Comments on Issues Raised by Borrower/Implementing Agencies/Partners Annex 1. Project Costs and Financing Annex 2. Outputs by Component Annex 3. Economic and Financial Analysis Annex 4. Bank Lending and Implementation Support/Supervision Processes Annex 5. Beneficiary Survey Results Annex 6. Stakeholder Workshop Report and Results Annex 7. Summary of Borrower's ICR and/or Comments on Draft ICR Annex 8. Comments of Cofinanciers and Other Partners/Stakeholders Annex 9. List of Supporting Documents MAP iv

6

7 A. Basic Information Country: Honduras Project Name: Honduras Education Quality, Governance, & Institutional Strengthening Project ID: P L/C/TF Number(s): IDA ICR Date: 12/20/2013 ICR Type: Core ICR Lending Instrument: SIL Borrower: GOVERNMENT OF HONDURAS Original Total Commitment: XDR 9.80M Disbursed Amount: XDR 9.80M Revised Amount: XDR 9.80M Environmental Category: C Implementing Agencies: Ministry of Education of Honduras Cofinanciers and Other External Partners: German Cooperation (GIZ, KfW) was a significant external partner B. Key Dates Process Date Process Original Date Revised / Actual Date(s) Concept Review: 01/16/2007 Effectiveness: 11/14/ /14/2008 Appraisal: 10/01/2007 Restructuring(s): 03/22/ /29/2012 Approval: 01/24/2008 Mid-term Review: 11/30/ /24/2011 Closing: 06/30/ /30/2013 C. Ratings Summary C.1 Performance Rating by ICR Outcomes: Risk to Development Outcome: Bank Performance: Borrower Performance: Moderately Satisfactory Significant Moderately Satisfactory Moderately Satisfactory C.2 Detailed Ratings of Bank and Borrower Performance (by ICR) Bank Ratings Borrower Ratings Moderately Moderately Quality at Entry: Government: Unsatisfactory Satisfactory v

8 Quality of Supervision: Overall Bank Performance: Satisfactory Moderately Satisfactory Implementing Agency/Agencies: Overall Borrower Performance: Moderately Satisfactory Moderately Satisfactory C.3 Quality at Entry and Implementation Performance Indicators Implementation QAG Assessments Indicators Performance (if any) Potential Problem Project at any time (Yes/No): Problem Project at any time (Yes/No): DO rating before Closing/Inactive status: Yes Yes Moderately Satisfactory Quality at Entry (QEA): Quality of Supervision (QSA): Rating None None D. Sector and Theme Codes Original Actual Sector Code (as % of total Bank financing) Central government administration Pre-primary education Primary education Sub-national government administration Tertiary education 9 9 Theme Code (as % of total Bank financing) Education for all Rural services and infrastructure E. Bank Staff Positions At ICR At Approval Vice President: Hasan A. Tuluy Pamela Cox Country Director: Felipe Jaramillo Jane Armitage Sector Manager: Reema Nayar Eduardo Velez Bustillo Project Team Leader: Juan Diego Alonso Cristian Aedo ICR Team Leader: Juan Diego Alonso ICR Primary Author: Claudia Zambra Taibo vi

9 F. Results Framework Analysis Project Development Objectives (from Project Appraisal Document) The objective of the Project was to support the Government of Honduras (GoH) to increase the coverage, quality, accountability and governance of its basic education system. The Project Development Objective (PDO) was defined more specifically in the Project Appraisal Document (PAD) as follows: 1. Expand pre-school coverage in disadvantaged communities; 2. Improve completion rates in PROHECO schools; 3. Improve teacher accountability; and 4. Improve accountability of schools to citizens. Revised Project Development Objectives (as approved by original approving authority) N/A (a) PDO Indicator(s) Indicator PDO Indicator 1 Value (quantitative or qualitative) Date achieved Comments PDO Indicator 2 Value (quantitative or qualitative) Baseline Value Original Target Values (from approval documents) Formally Revised Target Values Increased preschool enrollment in targeted areas Actual Value Achieved at Completion or Target Years 45% 53% 65% 67% Target surpassed. Target was revised upward in the 2012 restructuring due to improved data on population projections, which are used in the denominator of enrollment rates. However, all values reflect: (i) data at the national level, not targeted areas specifically, and (ii) data for the kindergarten year (year prior to starting primary education), not for the whole pre-primary education level (3- to 5-year-olds). Increased 6 th Grade Gross Completion Rates in PROHECO schools 37% 45% 98% 98% vii

10 Date Achieved Comments PDO Indicator 3 Value (quantitative or qualitative) Date achieved Comments Target achieved. Target and baseline were revised upward in the 2012 restructuring due to improved data generated under the Project specifically for the Honduran Community-Based Education Program (Programa Hondureño de Educación Comunitaria or PROHECO) schools, whereas the original target was set on the basis of national averages. Gross completion rates were also redefined at restructuring as equivalent to graduation rates, or the number of students graduating from 6 th grade, divided by the number of students that enrolled in 6 th grade at the beginning of the year. The revised baseline (82.3% for the year 2010) was based on the earliest data generated by the Project. Percentage of PROHECO schools that report through the PROHECO module of SEDUC s web portal information about enrollment, teacher absenteeism and number of school days 0% 50% 60% Target surpassed. This indicator was revised in the 2012 restructuring to absorb two previous indicators: Compliance with the official school calendar in targeted regions and Reduction in teacher absenteeism in targeted regions. Through the PROHECO module of the Integrated System for the Administration of the Education System (Sistema de Administración de Centros Educativos or SACE), the Ministry of Education (Secretaría de Educación or SEDUC) s web-based school management information system, schools were to report the number of school days and the rate of teacher absenteeism. In 2013, SEDUC collected information on enrollment, number of school days, and student absenteeism through a one-time manual survey from 2,311 out of a total of 3,880 PROHECO schools (about 60%), which was uploaded into the SACE. By September 2013, only 243 PROHECO schools had not reported data through SACE (less than 7% of all PROHECO schools). However, a specific PROHECO module was not created because the same information, i.e. enrollment and number of school days, is being collected systematically for all schools, including PROHECO schools. Although teacher absenteeism data is not being collected through SACE, in the case of PROHECO schools, teacher absenteeism is collected by the Associations for Community-Based Education (Asociaciones Educativas Comunitarias or AECOs), which pay teacher salaries. For every day a PROHECO teacher is absent, a proportion of the monthly payment is deducted. For the rest of schools, viii

11 number of school days is used as a proxy for teacher absenteeism, and absenteeism is also being monitored by the Minister s Front Office. PDO Indicator 4 Value (quantitative or qualitative) Date Achieved Comments Increased proportion of complaints submitted to SEDUC s Transparency Unit made through the Transparency School Boards 0 40% 21% Target partially achieved (58%). There were two original PDO indicators to measure governance/improved accountability of schools to citizens: Increased proportion of schools who involve parents in social audits of the schools using the 60 words per minute fluency test in second grade in targeted areas, and Development of a balance score card for the national, departmental and the school level and its distribution to all departments and schools. The first indicator was dropped in the 2012 restructuring: it had been conceived as a measure of social accountability of school quality through parents testing of their children s reading abilities through the Early Grade Reading Abilities (EGRA) test, but the test was not meant to be administered by parents who were illiterate or had limited education. The second indicator was revised and replaced balance score cards with Transparency School Boards (TSBs), also known as Transparency Bulletin Boards (TBBs), which were considered a stronger mechanism for improving governance of the system and its grievance redress mechanism. (b) Intermediate Outcome Indicator(s) Indicator Baseline Value Original Target Values (from approval documents) Formally Revised Target Values Actual Value Achieved at Completion or Target Years Component 1 Enhancing and Scaling Up Interventions that Address the Needs of the Poor Indicator 1 Value (quantitative or qualitative) Number of new CCEPREBs opened and functioning with adequate school supplies (300 of (316 of which which are are IBE) IBE) Date ix

12 Achieved Comments Target partially achieved (98% of the total, surpassed for IBE). This Indicator was revised in the 2012 restructuring and merged two original Intermediate Outcome Indicators (IOIs): Number of new Community- Based Pre-Primary Schools (Centros Comunitarios de Educación Pre- Básica or CCEPREBs) opened and Number of CCEPREBs equipped with fungible materials per year. More CCEPREBs were opened than the target throughout the lifetime of the Project (946, of which 344 were IBE), but roughly 20% were closed due to different reasons (insufficient enrollment, reduction in payments to volunteer teachers, political crisis of 2009, etc.). Furniture, pedagogical packages and related equipment, and school supplies were distributed between May and August 2013 to all 781 CCEPREBs that remain open, including all IBE CCEPREBs. An additional 1,130 pre-primary PROHECO teachers (in pre-existing PROHECO preschools) also received pedagogical packages and equipment. Indicator 2 Value (quantitative or qualitative) Date Achieved Comments Number of new CCEPREB volunteers trained of which at least of which at 300 IBE least 450 IBE 1179 of which 417 are IBE Target partially achieved (98% for the total, 93% for IBE). This indicator was meant to ensure that each CCEPREB had its volunteer teacher trained in the use of the pedagogical package for pre-primary education. The target was based on 50% expected turnover for volunteers; as such, 1,200 volunteers would need to be trained (one for each of the 800 CCEPREBs that were expected to be opened, plus another 400 assuming 50% turnover). Assuming equal turnover for Intercultural and Bilingual Education (IBE) volunteers, the target was revised upward in the 2012 restructuring to 450 (so that each of the 300 IBE CCEPREBs would have 1 trained volunteer if 50% of them quit). At Project closing, 82% of CCEPREBs opened with Project funds had a trained volunteer teacher (645 teachers in 781 CCEPREBs). Of those, 292 IBE teachers were also trained in IBE methods as well as use of the pedagogical package. Indicator 3 Number of PROHECO schools receiving the packages of didactic material adapted to the National Curriculum, including textbooks and teacher workbooks, in Natural and Social Sciences x

13 Value (quantitative or qualitative) Date Achieved Comments Indicator 4 Value (quantitative or qualitative) Date Achieved Comments 0 2,099 (including all PROHECO- IBE schools) 2,748 (including 317 PROHECO- IBE schools) Target surpassed. This indicator was revised in the 2012 restructuring and merged three original IOIs: Number of PROHECO schools receiving the packages of didactic material ; Package of didactic materials adapted to the National Curriculum for the first two cycles of basic education in the areas of Math, Spanish, Social Sciences and Natural Sciences ; and Teacher manual/toolkit for the usage of the package of didactic materials designed. Didactic materials for Spanish and Math, however, were eliminated from the Project, as these were prepared and distributed separately with financing from the Common Fund of Education Donors, a pooled-fund investment from 5 donors (Spain, Canada, France, Germany, and European Union). Number of PROHECO teachers trained in the usage of multi-grade didactic materials 0 4,152 4,152 3, Target partially achieved (89%). This indicator was revised in the 2012 restructuring from the original Number of PROHECO teachers trained in active-participatory methodologies and in the usage of multigrade didactic materials. Training in active-participatory methodologies was eliminated since it was no longer considered a relevant methodology by SEDUC. The goal of this indicator was to train every multi-grade PROHECO teacher in multi-grade teaching techniques. As of 2013, the number of multigrade PROHECO teachers is 4,298, so the target was underestimated. Based on the Project target, 89% of teachers were trained; based on the actual number of multigrade PROHECO teachers, 86% were trained. Indicator 5 Number of beneficiaries (#), of which female (%) Value (quantitative or qualitative) 0 137,312 (of which) 50% female 138,395 (of which) 50% female xi

14 Date Achieved Comments Target surpassed. This core sector indicator was added in the 2012 restructuring. The number of beneficiaries was estimated as the sum of: (i) CCEPREB volunteer teachers receiving training; (ii) PROHECO teachers receiving training and teacher workbooks; and (iii) PROHECO students receiving textbooks. The final numbers were: (i) 1,179 CCEPREB volunteer teachers trained in the pedagogical package, 292 of which were also trained in IBE methods; (ii) 5,376 PROHECO teachers that received teacher workbooks for Natural and Social Sciences, 3,711 of which were also trained in multi-grade techniques; and (iii) 131,840 PROHECO students, grades 1 through 6, that received their Natural and Social Sciences textbooks. Component 2 Community Participation in School Management Indicator 6 Value (quantitative or qualitative) Date Achieved Comments Indicator 7 Value (quantitative or qualitative) Date Achieved Comments Indicator 8 Number of workshops organized to disseminate information related to the PROHECO teachers' pension benefits and rights Target surpassed. This indicator was added in the 2012 restructuring, consistent with revised activities for Component 2. The target aimed for at least 3 workshops per department (18 departments total in the country). A total of 53 workshops were organized in 2012, and 36 additional workshops were organized in Promoters and coordinators of PROHECO program trained in financial management and recording capabilities at the AECO level Target surpassed. The target was revised during the 2012 restructuring to correct a mistake in the RFM of the PAD. By 2009, 220 promoters and coordinators had already been trained by the Project. After the political crisis of 2009 (before restructuring), the new administration replaced all promoters and coordinators, so the restructuring included training for the new set (an additional 220 people). In the end, the Project trained 465 PROHECO promoters and coordinators. Number of operational manuals on the preparation and monitoring of xii

15 Value (quantitative or qualitative) Date Achieved Comments PECs and PERs distributed to school networks in the 12 targeted departments 0 1,500 2,018 PER manuals; 3027 PEC manuals Target surpassed. This indicator was revised in the 2012 restructuring and merges two original IOIs: Operational Manual on communitybased school management revised and distributed to all AECOs ; and PEC templates consolidated into a single official template applicable to all schools. By restructuring, GIZ had funded the preparation of operational manuals on the development and monitoring of School s Educational Development Plans (Proyectos Educativos de Centro or PECs) and School Network s Educational Development Plans (Proyectos Educativos de Red or PERs), drawing on principles of community-based school management, and distributed them to all school networks, including Community Based Educational Associations (AECOs), in their 6 targeted provinces. The indicator was revised to complement these efforts by focusing on distribution to networks in the remaining 12 departments. Indicator 9 Value (quantitative or qualitative) Date Achieved Comments Indicator 10 Number of school networks with PERs (that draw on school PECs) developed in the 12 departments targeted (33 in progress) Target partially achieved (78%). This indicator, which was originally worded AECO members trained in the preparation of PEC and PER, was revised in the 2012 restructuring. Since at that time PERs had already been developed in all school networks in 6 Western departments GIZ s targeted departments the indicator focused instead on Honduras remaining 12 departments. In addition, the reference to AECOs was removed since school networks in all 12 departments would be targeted, regardless of whether a PROHECO school was part of the school network or not. Integrated system for community-based school management developed and implemented in all school networks in the 12 departments targeted and linked to the central level web-based EMIS xiii

16 Value (quantitative or qualitative) Date Achieved Comments Target not achieved. This indicator was revised in the 2012 restructuring and merges two original IOIs: Managerial information systems developed and implemented in targeted schools and networks ; and Participatory school management monitoring and evaluation system to monitor school, teacher and student performance developed and implemented in targeted schools and networks. The goal was twofold: (i) to have a single, integrated system, thus necessitating a single indicator, and (ii) to refocus efforts on the 12 non-giz financed departments. The system is being finalized and is expected to go live by mid- January Meanwhile, surveys have been distributed to all school networks, information from which will be used to populate the web portal. Component 3 Governance and Institutional Strengthening of the Ministry of Education Indicator 11 Development and Implementation of a web-based Education Management and Information System (EMIS) Value 0 (quantitative (no system in place) or qualitative) System fully operative and with actualized information from 100% of departments. System fully operational with updated information from 100% of departments. An EMIS (the SACE) has been developed and collects information on schools, teachers, enrollment, etc., to be crossreferenced with other information systems, including payroll (SIARHD), etc. It has updated information for 100% of departments. Date Achieved Comments Target achieved. This indicator is a revised version from the 2012 restructuring of the original indicator Availability of information in a web-based technological platform for monitoring performance. The xiv

17 revision clarifies that it refers to an integrated EMIS being financed by the Project. The EMIS (which is known as the SACE) integrates all school management systems within SEDUC into a single platform. All departments have fully updated information on enrollment, teachers, and other indicators. Continuous additions are being incorporated into the SACE, expecting to have a fully integrated system by end-january Indicator 12 Number of schools with Transparency School Boards deployed in the 12 targeted departments Value 0 6,194 6,308 (quantitative or qualitative) Date Achieved Comments Target surpassed. This indicator was added in the 2012 restructuring in line with the creation of the Transparency and Human Rights Unit (THRU) after Project approval and the deployment of Transparency Bulletin Boards (TBBs) that was launched with financing from GIZ in 6 targeted departments. The new indicator focused on installing TBBs in all schools in at least 3 municipalities within Honduras 12 remaining departments. In 2013, the THRU decided to expand deployment to 4 municipalities in each department. The number of TBBs deployed, 6,308, is an estimate based on a representative sample of centers with TBBs verified by consultants hired by the Project in 10 out of 12 departments (centers are currently being verified in the other 2 departments). Indicator 13 Value (quantitative or qualitative) Date Achieved HRM system strengthened and SIARHD fully migrated to the SIAFI and fully decentralized to all 18 departments of the country Undifferentiated lines Valid system of Valid HRM fully of authority, payroll system of strengthened; responsibility, integrity, payroll revamped information and SIARHD fully integrity, SIARHD fully execution across the migrated to SIARHD compatible to central level and SIAFI fully SIAFI, in terms between central and migrated to of integrity and departmental levels. SIAFI validity controls; and SIARHD fully decentralized to 5 departments xv

18 Comments Target partially achieved. This indicator was revised in the 2012 restructuring from its original version HRM system strengthened and SIARHD decentralized to departments Indicator 14 Value (quantitative or qualitative) Date The Human Resources Management (HRM) system within SEDUC was significantly strengthened through a series of systematic measures to improve accountability and governance. The Integrated System for the Administration of Teachers Payroll (Sistema Integrado de Administración de los Recursos Humanos Docentes or SIARHD) did not need to be migrated to the Integrated System for the Financial Management of the Public Sector (Sistema Integrado de Administración Financiera or SIAFI) because the validity and integrity controls in the revamped system are compatible with SIAFI requirements. The target, however, was only partially achieved because the HRM system has yet to be decentralized to all 18 departments. It has only been implemented in 5 thus far. By December, the HRM system is expected to be decentralized to another 2 departments. Staff from DIGECE and other relevant technical units of SEDUC trained in using information from learning assessment to monitor performance, feedback into policy making and results dissemination 0 SINECE actualized and fully functional Achieved Comments Target surpassed. This indicator was modified in the 2012 restructuring from its original version SINECE personnel trained in using information from learning assessment to monitor performance, feedback into policy making and results dissemination, to reflect the number of staff trained within the Department of Education Quality Assessment (Dirección General de Evaluación de la Calidad Educativa or DIGECE), which is the Department in charge of the National System for Educational Quality Assessment (Sistema Nacional de Evaluación de la Calidad Educativa or SINECE), along with other relevant technical staff from SEDUC. xvi

19 G. Ratings of Project Performance in ISRs No. Date ISR Archived DO IP Actual Disbursements (USD millions) 1 06/05/2008 Satisfactory Satisfactory /11/2008 Moderately Satisfactory Moderately Satisfactory /08/2009 Moderately Satisfactory Moderately Satisfactory /26/2009 Moderately Satisfactory Moderately Satisfactory /04/2009 Moderately Satisfactory Moderately Satisfactory /18/2010 Moderately Satisfactory Moderately Satisfactory /09/2011 Moderately Satisfactory Moderately Unsatisfactory /05/2011 Moderately Satisfactory Moderately Unsatisfactory /25/2012 Moderately Satisfactory Moderately Unsatisfactory /15/2012 Moderately Satisfactory Moderately Satisfactory /24/2013 Moderately Satisfactory Moderately Satisfactory /24/2013 Moderately Satisfactory Moderately Satisfactory H. Restructuring (if any) Restructurin g Date(s) Board Approved PDO Change ISR Ratings at Restructurin g DO IP Amount Disbursed at Restructuring in USD millions N MS MU N MS MU 8.98 Reasons for Restructuring & Key Changes Made The Project was restructured to provide a partial waiver for the withdrawal condition affecting Sub-component 3.1, which supported improvements to the SIARHD. The major changes and rationale for the restructuring were as follows: a waiver of the withdrawal condition affecting Component 2 (Community Participation in School Management for Better Performance) insofar as the xvii

20 xviii spirit behind the withdrawal condition - the reinstatement of pension benefits to teachers from the Honduran Program for Communitybased Education (Programa Hondureño de Educación Comunitaria or PROHECO) - was met; a revision of all the remaining dated legal covenants (Other Undertakings) in light of the set of administrative acts undertaken by the Government to regularize the social security situation of PROHECO teachers; a revision to Project activities to adjust them to: i) a shortened implementation period due to the 2009 pause and delay in satisfying the Project s withdrawal conditions; ii) funding from other sources outside of the Project, and iii) the Government s strategy; a revision to the indicators in the Results Framework and Monitoring to reflect the changes in Project activities; a revision in Project costs consistent with the revised Project activities and scope; and a reallocation of Credit proceeds across all 5 categories that reflected the changes in Project activities and costs.

21 I. Disbursement Profile xix

22

23 1. Project Context, Development Objectives and Design 1.1 Context at Appraisal 1. In 2007, Honduras education sector was mired in challenges including limited coverage, especially at the pre-primary and secondary education levels, low quality and weak student performance, inequitable access by geographic and socioeconomic status, and low transition and graduation rates at all levels. Challenges were more prevalent in rural areas and among poorer segments of the population. These issues featured prominently in spite of increased expenditures (from 5% of GDP in 1990 to 6.8% in ) for education, mostly biased towards the wage bill 2. Low administrative and management capacity within the Ministry of Education (SEDUC), coupled with a dearth of information and reliable data that could feed into an institutionalized monitoring, evaluation, and strategic planning function, were affecting educational outcomes. Accountability at all levels was minimal and weak governance, especially in human resources management (HRM), was seen through the lack of compliance with the school calendar, due to the high number of teacher strikes and high teacher absenteeism. 2. The Bank s rationale for involvement stemmed from a long-standing commitment to fulfilling unmet needs in the education sector, helping the Government of Honduras (GoH) overcome governance and capacity challenges, and continued support for prior education coverage and quality interventions to ensure their sustainability. Since 1999, the Bank (and other donors) had supported the Honduran Community-Based Education Program (Programa Hondureño de Educación Comunitaria or PROHECO), to enhance access to education in rural areas and foster community participation in schools. PROHECO was relatively successful in addressing some of the afore-mentioned challenges, specifically coverage and accountability, as PROHECO teachers were only paid for days worked. PROHECO schools came the closest to achieving the nationally mandated goal of 200 days of school (at 175 days), compared to regular schools (72 days) 3. The program also appeared to have increased quality, especially in rural areas The Project was also aligned to: (i) the GoH s long-term vision to improve the quality of education in order to achieve social equity, under the National Strategic Plan (Plan de Nación ); (ii) Honduras Poverty Reduction Strategy (PRS) goals, namely improving the quality and efficiency of education at all levels, supporting decentralization and community participation in education management, improving teachers performance and supporting programs to improve their qualifications, and promoting PROHECO and Intercultural and Bilingual Education (IBE); (iii) Honduras 1 WB (forthcoming); Social Expenditure and Institutional Review: Honduras. 2 Teacher salaries had increased 18 percent in real terms between 2002 and WB (2007); Honduras: Public Expenditure Review. 3 See Project Appraisal Document (PAD), p.4. 4 Di Gropello, E. and Marshall, J. (2011); Decentralization and Educational Performance: Evidence from the PROHECO Community School Program in Rural Honduras, Education Economics, Vol 19, Issue 2, pp

24 Education for All Fast Track Initiative (EFA-FTI) goals ; and (iv) Honduras Strategic Sectoral Education Plan Original Project Development Objectives (PDO) and Key Indicators 4. The objective of the Project was to support the GoH to increase the coverage, quality, accountability, and governance of its basic education system, as reflected in the Financing Agreement. The Project Appraisal Document (PAD) was more specific, listing the four parts of the PDO with their corresponding Key Performance Indicators (KPIs) consistent with Project design, as follows: Coverage: Expand pre-school coverage in disadvantaged communities. KPI 1. Increased preschool enrollment in targeted areas. Quality: Improve completion rates in PROHECO schools. KPI 2. Increased 6 th grade gross completion rates in PROHECO schools. Accountability: Improve teacher accountability. KPI 3. Improved compliance with the official school calendar in targeted regions; KPI 4. Reduction in teacher absenteeism in targeted regions. Governance: Improve accountability of schools to citizens. KPI 5. Increased proportion of schools who involve parents in social audits of the schools using the 60-words-per-minute fluency test in second grade; KPI 6. Development of a balance score card for the national, departmental and school level and its adoption by departments and schools (national and in targeted regions). 1.3 Revised PDO (as approved by original approving authority) and Key Indicators, and reasons/justification 5. The PDO was not revised. Some KPIs were changed in the 2012 restructuring: Table 1. Original and Revised KPIs PDO Indicator Original KPIs Revised KPIs Increased preschool enrollment in targeted areas 1. Increased preschool enrollment in targeted areas 1. No change Improve completion rates in PROHECO schools Improve teacher accountability Improve accountability of schools to citizens 2. Increased 6 th grade gross completion rates in PROHECO schools 3. Improved compliance with the official school calendar in targeted regions 4. Reduction in teacher absenteeism in targeted regions 5. Increased proportion of schools who involve parents in social audits of the schools using the 60-words-per-minute fluency test in second grade 6. Development of a balance score card for the national, departmental and school level and its adoption by departments and schools (national and in targeted regions) 2. No change 3. Percentage of PROHECO schools that report through the PROHECO module of SEDUC s web portal information about enrollment, teacher absenteeism, and number of school days. 4. Increased proportion of complaints submitted to SEDUC s Transparency Unit made through the Transparency School Boards 2

25 6. Improve teacher accountability: The KPI was revised to absorb the two previously existing KPIs, and to reflect that absenteeism (former KPI 3) and number of school days (former KPI 4) would now be reported through the portal. 7. Improve accountability of schools to citizens: KPI 5 was eliminated because parents needed training in order to perform social audits through fluency tests and many parents were either illiterate or had limited schooling. KPI 6 was revised to reflect a new modality, Transparency Bulletin Boards (TBBs, referred to as Transparency School Boards in the restructuring) 5, which were already being implemented with funding from German GIZ in 6 departments, and were considered a stronger system for improving governance with a better grievance redress mechanism than the balance score cards. 1.4 Main Beneficiaries 8. The Project s main beneficiaries belong in four main categories. 1) Students: preprimary students in underserved areas attending new CCEPREBs; PROHECO students at all levels receiving new materials and benefitting from newly trained teachers, including IBE students; low income students from the National University of Agriculture (UNA) receiving shoes in order to undertake the Infrastructure School Census, plus all Census student participants trained. 2) Teachers: PROHECO teachers trained in multi-grade and IBE pedagogy and affiliated with the National Teachers Pension Fund Institute (Instituto Nacional de Previsión del Magisterio or INPREMA), and new CCEPREB volunteers trained. 3) SEDUC staff: 18 line units involved in Project activities trained in financial management, administrative support for activities, information systems upgrades and other essential functions; several units equipped with computers and furniture; decentralized staff trained for SACE and SIAHRD decentralization and other essential functions; all staff from increased governance and accountability through the SACE, the School Infrastructure Census and cleanup of SIARHD. 4) Community participants and stakeholders: members of the school networks administration trained in implementing PECs and PERs; members of the Municipal Councils for Educational Development (Consejos Municipales de Desarrollo Educativo or COMDEs) trained in the new legal framework for community-based participation; stakeholders with access to TBBs. 1.5 Original Components 9. Project components are the same in the PAD and Financing Agreement, but Subcomponents are worded differently. The ICR is based on the language of the PAD, which is more detailed and comprehensive. 10. Component 1: Enhancing and Scaling-Up Interventions that Address the Needs of the Poor. This component would support pre-primary and primary school 5 The term Transparency Bulletin Board (TBB) will be used throughout the ICR as it better explains the tool. TBBs are bulletin boards that must be placed visibly on school grounds with information about enrollment, teacher lists, school budget, etc. 3

26 interventions focused on the poorest segments of the population. It had two subcomponents: (1.1) Expanding coverage for preschool education in rural areas; and (1.2) Quality improvement in PROHECO multi-grade schools through teacher training and provision of materials. 11. Component 2: Community Participation in School Management. This component would foster community participation within an Integrated School Management System. It had three subcomponents: (2.1) Consolidation and Institutionalization of the School Management System: This sub-component would finance analysis of existing school management modalities among traditional, PROHECO, and PROHECO-IBE educational networks to develop consolidated policies for community participation, social management, school planning, school systems for information, monitoring and evaluation, and financial administration. (2.2) School Planning and Resources for Quality Education: This sub-component would finance the review and development of instruments to support school and network planning and resource management through cooperative school networks. (2.3) School Management and Education Performance Monitoring and Evaluation: This sub-component would finance the development and implementation of a participatory monitoring and evaluation system for school management. 12. Component 3: Governance and Institutional Strengthening of the Ministry of Education. The component would finance efforts to strengthen SEDUC, including improving governance and management capacity. The component was divided into three sub-components: (3.1) Information for improved performance and greater accountability: This sub-component would finance: a web-based technological platform to allow for improved decision-making and monitoring of performance; improved statistics about sector performance at all levels available to the general public, including capacity building of the statistics unit; expanding, strengthening, updating and maintaining the SIARHD at central and sub-national levels to provide reliable information on teachers at all levels, and integrating SIARHD into SIAFI; and strengthening the capacity for educational planning and the use of information for decision-making at the central and departmental levels. (3.2) National System of Assessment of Learning Outcomes: This sub-component would finance the country s participation in international standardized assessments of student learning and strengthen the institutional capacities of SEDUC to use the information for monitoring of learning outcomes and decision-making, and to increase overall transparency through dissemination of the results. (3.3) Human Resource Management and Evaluation: This sub-component would finance the improvement and implementation of critical human resource management processes and procedures for a more effective personnel system for teachers. 13. Component 4. Project Administration: This component would finance the cost of technical personnel (local consultants) and operating costs. The proposed administration arrangements foresaw the EFA-FTI Project Implementation Unit within SEDUC to be the main implementing agency, supported by five dedicated consultants. 1.6 Revised Components 4

27 14. All components were revised during the June 2012 Level II restructuring. 15. Component 1: Enhancing and Scaling-Up Interventions that Address the Needs of the Poor. Sub-component 1.2 was reduced in scope to focus only on didactic materials for PROHECO schools in the social and natural sciences, since packages in Math and Spanish for PROHECO schools were being provided by the Common Fund of Education Donors (Fondo Común). 16. Component 2: Community Participation in School Management. This component was decreased in scope and budget to account for a shorter implementation period postrestructuring. The remaining activities under Sub-component 2.1 were geared toward specific support to strengthen the PROHECO program and capacity of its teachers, including training on their newly acquired pension rights, and to train AECOs to strengthen financial management capabilities. The remaining activities in Sub-component 2.2 focused on distributing operational manuals to prepare and monitor outcomes of PECs and PERs and training management entities within rural school networks to prepare and monitor PECs and PERs. Sub-component 2.3 was unchanged. 17. Component 3. Governance and Institutional Strengthening of the Ministry of Education. Activities under Component 3 were revised to account for a shorter implementation period, since a separate withdrawal condition affecting Sub-component 3.1 had been waived in the March 2011 restructuring; Component 3 increased in scope. The scope of Sub-component 3.1 was increased to finance the deployment of TBBs in 12 departments of the country, building on those already launched in the other six western departments with funding from GIZ. It would also finance data collection for the School Infrastructure Census, a consultancy to evaluate human resources in SEDUC and its departmental branches and propose a new organizational chart for SEDUC under the newly decentralized structure, and a series of consultancies to provide technical support to key SEDUC authorities to strengthen their capacity to implement the Project. 18. Component 4: Project Administration. This component increased significantly since the Project had to finance additional staff critical to its operation, for which funding had not originally been set aside. 1.7 Other significant changes First restructuring: March 22, The withdrawal condition affecting Sub-Component 3.1 (Schedule 2, Section IV.B.1(b) of the Financing Agreement dated July 2, 2008) was waived. The condition called for an update of the SIAHRD on the basis of a teachers census and post audit, which would be tested by way of random audits. The condition was partially met upon completion of a teachers census and post audit, and the subsequent updating of SIARHD to reflect census and post audit recommendations. The partial waiver referred to the pending verification of the updated SIARHD by independent audit. 5

28 Second restructuring: June 29, The withdrawal condition affecting Component 2 (Schedule 2, Section IV.B.1(c) of the Financing Agreement dated July 2, 2008) was waived. The condition called for the deposit of the amount owed for PROHECO teachers pension benefits dating back to January 1, 1999 into a separate account, for the benefit of PROHECO teachers. It was determined that the spirit behind the condition had been met since INPREMA had reinstated pension rights for PROHECO teachers by signing an Agreement to reincorporate PROHECO teachers and put a plan in place to fully refund teachers who were eligible for pension payments since The remaining legal covenants were revised accordingly. Project activities, especially those originally linked to Component 2 and Sub-component 3.1, were revised to adjust for the shorter implementation period, new GoH priorities, and funding from other sources for complementary activities. The Results and Monitoring Framework, including several IOIs and targets, were revised to reflect new activities and data generated by the Project. Out of 16 original IOIs, 2 remained unchanged, 14 others were consolidated into 9, and 3 more IOIs were added resulting in 14 IOIs. Project costs were revised, consistent with revised activities (with significant decrease in scope for Component 2 and increase in scope for Components 3 and 4), and Credit proceeds reallocated accordingly across the five categories. 2. Key Factors Affecting Implementation and Outcomes 2.1 Project Preparation, Design and Quality at Entry 21. The Project benefited from its complementarity with Honduras long-term education strategy, contributing to coverage and quality goals in basic education, especially for poorer segments of the population, and strengthening governance and accountability. Two main risks emerged from evaluations of previous IDA financed projects in the education sector: sustainability of multiple interventions and a consistent inability to improve institutional weaknesses. The Project s aim was thus to strengthen and streamline existing structures and processes that would support sustainability of successful past interventions (e.g. the PROHECO model) through a simple design with selective interventions (the focus on pre-primary education). 22. The original design was rather complex, however, especially with regard to the high number of line units involved in Project implementation (18 in total), and the PDO s focus on four broad areas (coverage, quality, accountability and governance). Project design benefited nonetheless from consultation with other donors and with the GoH to ensure that EFA goals (as the overarching platform in the country) remained at the forefront and Project activities did not overlap with other donors. Project components and activities were aligned with these four goals, more so to the PDO indicators. 23. During preparation, the Bank was made aware that INPREMA had stopped collecting pension contributions from PROHECO teachers and granting them benefits, in spite of cumulative contributions received since 1999 in the amount of US$ 1.8 million, a portion of which had been financed by the International Development Association (IDA) under the previous Bank Project. Given the Bank s long-standing investment in the PROHECO 6

29 program, two withdrawal conditions were added to the Financing Agreement. These conditions pertained to Component 2 and Sub-Component 3.1, which amounted to about 50% of Credit funds. Section V of the Financing Agreement (Other Undertakings) provided a schedule for the PROHECO-related condition to be fulfilled by March 1, Another sustainability risk identified was the use of a self-contained implementation unit within SEDUC. To mitigate that risk and improve coordination with other donors, Project management would fall to the existing EFA Coordination Unit (ECU) within SEDUC. Prior assessments of the ECU had determined that it had no internal capacity to maintain financial management and procurement procedures consistent with IDA standards. As such, five consultants would be hired to exclusively manage Project fiduciary aspects and coordination. Additional training and guidance on IDA fiduciary procedures would be built in for other ECU staff. 2.2 Implementation 25. Prior to Effectiveness, SEDUC (with the Bank s approval) decided against transferring project administration responsibilities to the ECU as planned, given mounting concerns over its capacity. Instead, a new Project Management Unit (PMU) was created within SEDUC to manage the Project, with additional staffing and budgeting needs, plus the originally envisaged five consultants. The strengthened PMU was better able to manage the complex design and numerous implementing units involved. Financing for the PMU initially came from counterpart funds but, by November 2011, SEDUC was unable to sustain financing for the PMU and fund other activities, like stipends for CCEPREB volunteers. The Bank absorbed the PMU costs, freeing up counterpart funds to pay all stipends through Project closure. 26. There was a 10-month delay between Board approval (January 24, 2008) and Effectiveness (November 14, 2008). This was mostly due to delays in ratifying the Loan Agreement, which required the President s signature. Further delays resulted from the political crisis that ensued when President Zelaya was ousted on June 28, 2009, and the Bank (and all other donors) put operations on hold. Operations resumed when President Lobo took office in January High turnover in the Executive also filtered down to the ministerial level and to heads of line units, departmental and municipal offices, and so forth. This resulted in a total of four different Ministers of Education throughout the life of the Project, and, with each one, a reshuffling of SEDUC staff, especially those in managerial positions. These changes curtailed institutional memory, including knowledge of the Project and Bank fiduciary procedures among implementing units. 27. There were delays by the GoH in satisfying the withdrawal conditions, in part due to the political crisis. As a result, about 50% of Credit funds was blocked until 2011; another 25% was blocked until The Bank also incorporated critical steps related to the withdrawal conditions into the design of two complementary Development Policy Lending (DPL) operations. The Bank restructured the Project in March 2011, as soon as the first of the withdrawal conditions was waived (the SIARHD-related condition), releasing that portion of the funds. When the second condition was met satisfactorily, the 7

Implementation Status & Results Honduras Honduras Education Quality, Governance, & Institutional Strengthening (P101218)

Implementation Status & Results Honduras Honduras Education Quality, Governance, & Institutional Strengthening (P101218) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Honduras Honduras Education Quality, Governance, & Institutional Strengthening (P101218) Operation

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA59105 Project Name Providing an Education of Quality in Haiti (PEQH) (P155191) Region LATIN AMERICA AND CARIBBEAN Country Haiti Sector(s)

More information

Implementation Status & Results Indonesia BERMUTU-Better Education through Reformed Management and Universal Teacher Upgrading (P097104)

Implementation Status & Results Indonesia BERMUTU-Better Education through Reformed Management and Universal Teacher Upgrading (P097104) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia BERMUTU-Better Education through Reformed Management and Universal Teacher Upgrading (P097104)

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (TF-97340) ON A GRANT FROM THE EDUCATION FOR ALL-FAST TRACK INITIATIVE CATALYTIC FUND

IMPLEMENTATION COMPLETION AND RESULTS REPORT (TF-97340) ON A GRANT FROM THE EDUCATION FOR ALL-FAST TRACK INITIATIVE CATALYTIC FUND Public Disclosure Authorized Document of The World Bank Report No: ICR00003482 Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (TF-97340) ON A GRANT FROM THE EDUCATION FOR ALL-FAST

More information

Mexico (CONAFE) Dialogue and Discover Model, from the Community Courses Program

Mexico (CONAFE) Dialogue and Discover Model, from the Community Courses Program Mexico (CONAFE) Dialogue and Discover Model, from the Community Courses Program Dialogue and Discover manuals are used by Mexican community instructors (young people without professional teacher education

More information

Dakar Framework for Action. Education for All: Meeting our Collective Commitments. World Education Forum Dakar, Senegal, April 2000

Dakar Framework for Action. Education for All: Meeting our Collective Commitments. World Education Forum Dakar, Senegal, April 2000 Dakar Framework for Action Education for All: Meeting our Collective Commitments Text adopted by the World Education Forum Dakar, Senegal, 26-28 April 2000 Dakar Framework for Action Education for All:

More information

Educational system gaps in Romania. Roberta Mihaela Stanef *, Alina Magdalena Manole

Educational system gaps in Romania. Roberta Mihaela Stanef *, Alina Magdalena Manole Available online at www.sciencedirect.com ScienceDirect Procedia - Social and Behavioral Scien ce s 93 ( 2013 ) 794 798 3rd World Conference on Learning, Teaching and Educational Leadership (WCLTA-2012)

More information

Envision Success FY2014-FY2017 Strategic Goal 1: Enhancing pathways that guide students to achieve their academic, career, and personal goals

Envision Success FY2014-FY2017 Strategic Goal 1: Enhancing pathways that guide students to achieve their academic, career, and personal goals Strategic Goal 1: Enhancing pathways that guide students to achieve their academic, career, and personal goals Institutional Priority: Improve the front door experience Identify metrics appropriate to

More information

GRADUATE STUDENTS Academic Year

GRADUATE STUDENTS Academic Year Financial Aid Information for GRADUATE STUDENTS Academic Year 2017-2018 Your Financial Aid Award This booklet is designed to help you understand your financial aid award, policies for receiving aid and

More information

HOUSE OF REPRESENTATIVES AS REVISED BY THE COMMITTEE ON EDUCATION APPROPRIATIONS ANALYSIS

HOUSE OF REPRESENTATIVES AS REVISED BY THE COMMITTEE ON EDUCATION APPROPRIATIONS ANALYSIS BILL #: HB 269 HOUSE OF REPRESENTATIVES AS REVISED BY THE COMMITTEE ON EDUCATION APPROPRIATIONS ANALYSIS RELATING TO: SPONSOR(S): School District Best Financial Management Practices Reviews Representatives

More information

EDUCATION AND DECENTRALIZATION

EDUCATION AND DECENTRALIZATION EDUCATION AND DECENTRALIZATION Skopje, 2006 Education and Decentralization: User-friendly Manual Author: Jovan Ananiev, MSc. Project management: OSCE Spillover Monitor Mission to Skopje/Confidence Building

More information

FUNDING GUIDELINES APPLICATION FORM BANKSETA Doctoral & Post-Doctoral Research Funding

FUNDING GUIDELINES APPLICATION FORM BANKSETA Doctoral & Post-Doctoral Research Funding FUNDING GUIDELINES Doctoral & Post-Doctoral Research Funding Project: Phd and Post-Doctoral Grant Funding Funding Opens on: 18 April 2016 Funding Window Closes on: 16 May 2016 FUNDING GUIDELINES APPLICATION

More information

Table of Contents Welcome to the Federal Work Study (FWS)/Community Service/America Reads program.

Table of Contents Welcome to the Federal Work Study (FWS)/Community Service/America Reads program. Table of Contents Welcome........................................ 1 Basic Requirements for the Federal Work Study (FWS)/ Community Service/America Reads program............ 2 Responsibilities of All Participants

More information

FOR OFFICIAL USE ONLY INTERNATIONAL DEVELOPMENT ASSOCIATION PROJECT APPRAISAL DOCUMENT ON A PROPOSED CREDIT

FOR OFFICIAL USE ONLY INTERNATIONAL DEVELOPMENT ASSOCIATION PROJECT APPRAISAL DOCUMENT ON A PROPOSED CREDIT Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: PAD1080 Public Disclosure Authorized Public Disclosure Authorized INTERNATIONAL DEVELOPMENT ASSOCIATION PROJECT

More information

AB104 Adult Education Block Grant. Performance Year:

AB104 Adult Education Block Grant. Performance Year: AB104 Adult Education Block Grant Performance Year: 2015-2016 Funding source: AB104, Section 39, Article 9 Version 1 Release: October 9, 2015 Reporting & Submission Process Required Funding Recipient Content

More information

Ex-Post Evaluation of Japanese Technical Cooperation Project

Ex-Post Evaluation of Japanese Technical Cooperation Project Bangladesh Ex-Post Evaluation of Japanese Technical Cooperation Project Project for Strengthening Primary Teacher Training on Science and Mathematics External Evaluator: Yuko Aoki, Kokusai Kogyo 0. Summary

More information

Standards and Criteria for Demonstrating Excellence in BACCALAUREATE/GRADUATE DEGREE PROGRAMS

Standards and Criteria for Demonstrating Excellence in BACCALAUREATE/GRADUATE DEGREE PROGRAMS Standards and Criteria for Demonstrating Excellence in BACCALAUREATE/GRADUATE DEGREE PROGRAMS World Headquarters 11520 West 119th Street Overland Park, KS 66213 USA USA Belgium Perú acbsp.org info@acbsp.org

More information

Guidelines for Mobilitas Pluss postdoctoral grant applications

Guidelines for Mobilitas Pluss postdoctoral grant applications Annex 1 APPROVED by the Management Board of the Estonian Research Council on 23 March 2016, Directive No. 1-1.4/16/63 Guidelines for Mobilitas Pluss postdoctoral grant applications 1. Scope The guidelines

More information

GUIDE TO EVALUATING DISTANCE EDUCATION AND CORRESPONDENCE EDUCATION

GUIDE TO EVALUATING DISTANCE EDUCATION AND CORRESPONDENCE EDUCATION GUIDE TO EVALUATING DISTANCE EDUCATION AND CORRESPONDENCE EDUCATION A Publication of the Accrediting Commission For Community and Junior Colleges Western Association of Schools and Colleges For use in

More information

Accounting 380K.6 Accounting and Control in Nonprofit Organizations (#02705) Spring 2013 Professors Michael H. Granof and Gretchen Charrier

Accounting 380K.6 Accounting and Control in Nonprofit Organizations (#02705) Spring 2013 Professors Michael H. Granof and Gretchen Charrier Accounting 380K.6 Accounting and Control in Nonprofit Organizations (#02705) Spring 2013 Professors Michael H. Granof and Gretchen Charrier 1. Office: Prof Granof: CBA 4M.246; Prof Charrier: GSB 5.126D

More information

Alternative education: Filling the gap in emergency and post-conflict situations

Alternative education: Filling the gap in emergency and post-conflict situations 2009 Alternative education: Filling the gap in emergency and post-conflict situations Overview Children and youth have a wide range of educational needs in emergency situations, especially when affected

More information

The Rise of Results-Based Financing in Education 2015

The Rise of Results-Based Financing in Education 2015 World Bank Group Education Global Practice Smarter Education Systems for Brighter Futures SNAPSHOT The Rise of Results-Based Financing in Education 2015 Education is one of the surest means we have to

More information

Procedures for Academic Program Review. Office of Institutional Effectiveness, Academic Planning and Review

Procedures for Academic Program Review. Office of Institutional Effectiveness, Academic Planning and Review Procedures for Academic Program Review Office of Institutional Effectiveness, Academic Planning and Review Last Revision: August 2013 1 Table of Contents Background and BOG Requirements... 2 Rationale

More information

UCB Administrative Guidelines for Endowed Chairs

UCB Administrative Guidelines for Endowed Chairs UCB Administrative Guidelines for Endowed Chairs I. General A. Purpose An endowed chair provides funds to a chair holder in support of his or her teaching, research, and service, and is supported by a

More information

Statewide Strategic Plan for e-learning in California s Child Welfare Training System

Statewide Strategic Plan for e-learning in California s Child Welfare Training System Statewide Strategic Plan for e-learning in California s Child Welfare Training System Decision Point Outline December 14, 2009 Vision CalSWEC, the schools of social work, the regional training academies,

More information

Rules of Procedure for Approval of Law Schools

Rules of Procedure for Approval of Law Schools Rules of Procedure for Approval of Law Schools Table of Contents I. Scope and Authority...49 Rule 1: Scope and Purpose... 49 Rule 2: Council Responsibility and Authority with Regard to Accreditation Status...

More information

Delaware Performance Appraisal System Building greater skills and knowledge for educators

Delaware Performance Appraisal System Building greater skills and knowledge for educators Delaware Performance Appraisal System Building greater skills and knowledge for educators DPAS-II Guide for Administrators (Assistant Principals) Guide for Evaluating Assistant Principals Revised August

More information

Guidelines for Mobilitas Pluss top researcher grant applications

Guidelines for Mobilitas Pluss top researcher grant applications Annex 1 APPROVED by the Management Board of the Estonian Research Council on 23 March 2016, Directive No. 1-1.4/16/63 Guidelines for Mobilitas Pluss top researcher grant applications 1. Scope The guidelines

More information

CHALLENGES FACING DEVELOPMENT OF STRATEGIC PLANS IN PUBLIC SECONDARY SCHOOLS IN MWINGI CENTRAL DISTRICT, KENYA

CHALLENGES FACING DEVELOPMENT OF STRATEGIC PLANS IN PUBLIC SECONDARY SCHOOLS IN MWINGI CENTRAL DISTRICT, KENYA CHALLENGES FACING DEVELOPMENT OF STRATEGIC PLANS IN PUBLIC SECONDARY SCHOOLS IN MWINGI CENTRAL DISTRICT, KENYA By Koma Timothy Mutua Reg. No. GMB/M/0870/08/11 A Research Project Submitted In Partial Fulfilment

More information

EDUCATIONAL ATTAINMENT

EDUCATIONAL ATTAINMENT EDUCATIONAL ATTAINMENT By 2030, at least 60 percent of Texans ages 25 to 34 will have a postsecondary credential or degree. Target: Increase the percent of Texans ages 25 to 34 with a postsecondary credential.

More information

INSTRUCTION MANUAL. Survey of Formal Education

INSTRUCTION MANUAL. Survey of Formal Education INSTRUCTION MANUAL Survey of Formal Education Montreal, January 2016 1 CONTENT Page Introduction... 4 Section 1. Coverage of the survey... 5 A. Formal initial education... 6 B. Formal adult education...

More information

FACULTY OF PSYCHOLOGY

FACULTY OF PSYCHOLOGY FACULTY OF PSYCHOLOGY STRATEGY 2016 2022 // UNIVERSITY OF BERGEN STRATEGY 2016 2022 FACULTY OF PSYCHOLOGY 3 STRATEGY 2016 2022 (Adopted by the Faculty Board on 15 June 2016) The Faculty of Psychology has

More information

Charter School Reporting and Monitoring Activity

Charter School Reporting and Monitoring Activity School Reporting and Monitoring Activity All information and documents listed below are to be provided to the Schools Office by the date shown, unless another date is specified in pre-opening conditions

More information

SASKATCHEWAN MINISTRY OF ADVANCED EDUCATION

SASKATCHEWAN MINISTRY OF ADVANCED EDUCATION SASKATCHEWAN MINISTRY OF ADVANCED EDUCATION Report March 2017 Report compiled by Insightrix Research Inc. 1 3223 Millar Ave. Saskatoon, Saskatchewan T: 1-866-888-5640 F: 1-306-384-5655 Table of Contents

More information

Program Change Proposal:

Program Change Proposal: Program Change Proposal: Provided to Faculty in the following affected units: Department of Management Department of Marketing School of Allied Health 1 Department of Kinesiology 2 Department of Animal

More information

Guatemala: Teacher-Training Centers of the Salesians

Guatemala: Teacher-Training Centers of the Salesians Guatemala: Teacher-Training Centers of the Salesians Ex-post evaluation OECD sector Basic education / 11220 BMZ project ID 1995 66 621 Project-executing agency Consultant Asociación Salesiana de Don Bosco

More information

Nearing Completion of Prototype 1: Discovery

Nearing Completion of Prototype 1: Discovery The Fit-Gap Report The Fit-Gap Report documents how where the PeopleSoft software fits our needs and where LACCD needs to change functionality or business processes to reach the desired outcome. The report

More information

GUATEMALA COUNTRY STUDY

GUATEMALA COUNTRY STUDY GEMS Girls Education Monitoring System GUATEMALA COUNTRY STUDY Prepared for: United States Agency for International Development Bureau for Economic Growth, Agriculture and Trade/Office of Women in Development

More information

National and Regional performance and accountability: State of the Nation/Region Program Costa Rica.

National and Regional performance and accountability: State of the Nation/Region Program Costa Rica. National and Regional performance and accountability: State of the Nation/Region Program Costa Rica. Miguel Gutierrez Saxe. 1 The State of the Nation Report: a method to learn and think about a country.

More information

School Inspection in Hesse/Germany

School Inspection in Hesse/Germany Hessisches Kultusministerium School Inspection in Hesse/Germany Contents 1. Introduction...2 2. School inspection as a Procedure for Quality Assurance and Quality Enhancement...2 3. The Hessian framework

More information

Anthropology Graduate Student Handbook (revised 5/15)

Anthropology Graduate Student Handbook (revised 5/15) Anthropology Graduate Student Handbook (revised 5/15) 1 TABLE OF CONTENTS INTRODUCTION... 3 ADMISSIONS... 3 APPLICATION MATERIALS... 4 DELAYED ENROLLMENT... 4 PROGRAM OVERVIEW... 4 TRACK 1: MA STUDENTS...

More information

Grant/Scholarship General Criteria CRITERIA TO APPLY FOR AN AESF GRANT/SCHOLARSHIP

Grant/Scholarship General Criteria CRITERIA TO APPLY FOR AN AESF GRANT/SCHOLARSHIP 2017-2018 Grant/Scholarship General Criteria CRITERIA TO APPLY FOR AN AESF GRANT/SCHOLARSHIP 1) Student(s) must attend an AESF member Episcopal school 2) An AESF Grant/Scholarship Application and supporting

More information

KOMAR UNIVERSITY OF SCIENCE AND TECHNOLOGY (KUST)

KOMAR UNIVERSITY OF SCIENCE AND TECHNOLOGY (KUST) Course Title COURSE SYLLABUS for ACCOUNTING INFORMATION SYSTEM ACCOUNTING INFORMATION SYSTEM Course Code ACC 3320 No. of Credits Three Credit Hours (3 CHs) Department Accounting College College of Business

More information

Professional Development and Incentives for Teacher Performance in Schools in Mexico. Gladys Lopez-Acevedo (LCSPP)*

Professional Development and Incentives for Teacher Performance in Schools in Mexico. Gladys Lopez-Acevedo (LCSPP)* Public Disclosure Authorized Professional Development and Incentives for Teacher Performance in Schools in Mexico Gladys Lopez-Acevedo (LCSPP)* Gacevedo@worldbank.org Public Disclosure Authorized Latin

More information

Department: Basic Education REPUBLIC OF SOUTH AFRICA MACRO INDICATOR TRENDS IN SCHOOLING: SUMMARY REPORT 2011

Department: Basic Education REPUBLIC OF SOUTH AFRICA MACRO INDICATOR TRENDS IN SCHOOLING: SUMMARY REPORT 2011 Department: Basic Education REPUBLIC OF SOUTH AFRICA MACRO INDICATOR TRENDS IN SCHOOLING: SUMMARY REPORT 2011 Published by the Department of Basic Education Sol Plaatje House 222 Struben Street Pretoria

More information

Argosy University, Los Angeles MASTERS IN ORGANIZATIONAL LEADERSHIP - 20 Months School Performance Fact Sheet - Calendar Years 2014 & 2015

Argosy University, Los Angeles MASTERS IN ORGANIZATIONAL LEADERSHIP - 20 Months School Performance Fact Sheet - Calendar Years 2014 & 2015 SCHOOL PERFORMANCE FACT SHEET CALENDAR YEARS 2014 & 2015 On Time Completion Rates (Graduation Rates) Calendar Year Number of Students Who Began the Program Students Available for Graduation Number of On

More information

MANAGEMENT CHARTER OF THE FOUNDATION HET RIJNLANDS LYCEUM

MANAGEMENT CHARTER OF THE FOUNDATION HET RIJNLANDS LYCEUM MANAGEMENT CHARTER OF THE FOUNDATION HET RIJNLANDS LYCEUM Article 1. Definitions. 1.1 This management charter uses the following definitions: (a) the Executive Board : the Executive Board of the Foundation,

More information

Stakeholder Engagement and Communication Plan (SECP)

Stakeholder Engagement and Communication Plan (SECP) Stakeholder Engagement and Communication Plan (SECP) Summary box REVIEW TITLE 3ie GRANT CODE AUTHORS (specify review team members who have completed this form) FOCAL POINT (specify primary contact for

More information

Delaware Performance Appraisal System Building greater skills and knowledge for educators

Delaware Performance Appraisal System Building greater skills and knowledge for educators Delaware Performance Appraisal System Building greater skills and knowledge for educators DPAS-II Guide (Revised) for Teachers Updated August 2017 Table of Contents I. Introduction to DPAS II Purpose of

More information

Massachusetts Department of Elementary and Secondary Education. Title I Comparability

Massachusetts Department of Elementary and Secondary Education. Title I Comparability Massachusetts Department of Elementary and Secondary Education Title I Comparability 2009-2010 Title I provides federal financial assistance to school districts to provide supplemental educational services

More information

Audit Of Teaching Assignments. An Integrated Analysis of Teacher Educational Background and Courses Taught October 2007

Audit Of Teaching Assignments. An Integrated Analysis of Teacher Educational Background and Courses Taught October 2007 Audit Of Teaching Assignments October 2007 Audit Of Teaching Assignments Audit of Teaching Assignments Crown copyright, Province of Nova Scotia, 2007 The contents of this publication may be reproduced

More information

Bachelor of International Hospitality Management, BA IHM. Course curriculum National and Institutional Part

Bachelor of International Hospitality Management, BA IHM. Course curriculum National and Institutional Part Bachelor of International Hospitality Management, BA IHM Course curriculum 2016-2018 August 2016 0 INDHOLD 1. curriculum framework... 4 1.1. Objective of the study programme... 4 1.2. Title and duration...

More information

1. Amend Article Departmental co-ordination and program committee as set out in Appendix A.

1. Amend Article Departmental co-ordination and program committee as set out in Appendix A. WORKLOAD RESOURCES 1. Amend Article 4.1.00 Departmental co-ordination and program committee as set out in Appendix A. 2. Amend Article 8.4.00 Teaching Load as set out in Appendix B. 3. Add teaching resources

More information

State Parental Involvement Plan

State Parental Involvement Plan A Toolkit for Title I Parental Involvement Section 3 Tools Page 41 Tool 3.1: State Parental Involvement Plan Description This tool serves as an example of one SEA s plan for supporting LEAs and schools

More information

(Effective from )

(Effective from ) PADHO PARDESH - SCHEME OF INTEREST SUBSIDY ON EDUCATIONAL LOANS FOR OVERSEAS STUDIES FOR THE STUDENTS BELONGING TO THE MINORITY COMMUNITIES (Effective from 2013-14) GOVERNMENT OF INDIA MINISTRY OF MINORITY

More information

DEPARTMENT OF ART. Graduate Associate and Graduate Fellows Handbook

DEPARTMENT OF ART. Graduate Associate and Graduate Fellows Handbook DEPARTMENT OF ART Graduate Associate and Graduate Fellows Handbook June 2016 Table of Contents Introduction-Graduate Associates... 3 Graduate Associate Responsibilities... 4 A. Graduate Teaching Associate

More information

MOESAC MEDIUM TERM PLAN

MOESAC MEDIUM TERM PLAN MOESAC MEDIUM TERM PLAN 2011-15 Introduction Medium Term Plan is a key output of a strategic planning process that was initiated in 2010. The process began with a broad-based stakeholder consultation exercise

More information

PROPOSAL FOR NEW UNDERGRADUATE PROGRAM. Institution Submitting Proposal. Degree Designation as on Diploma. Title of Proposed Degree Program

PROPOSAL FOR NEW UNDERGRADUATE PROGRAM. Institution Submitting Proposal. Degree Designation as on Diploma. Title of Proposed Degree Program PROPOSAL FOR NEW UNDERGRADUATE PROGRAM Institution Submitting Proposal Degree Designation as on Diploma Title of Proposed Degree Program EEO Status CIP Code Academic Unit (e.g. Department, Division, School)

More information

Orange Elementary School FY15 Budget Overview. Tari N. Thomas Superintendent of Schools

Orange Elementary School FY15 Budget Overview. Tari N. Thomas Superintendent of Schools + Orange Elementary School FY15 Budget Overview Tari N. Thomas Superintendent of Schools + The Key Metrics of the Organization: Orange Elementary Enrollment 661 Attendance 94% Average Class Size 22 Student

More information

Guidelines for the Use of the Continuing Education Unit (CEU)

Guidelines for the Use of the Continuing Education Unit (CEU) Guidelines for the Use of the Continuing Education Unit (CEU) The UNC Policy Manual The essential educational mission of the University is augmented through a broad range of activities generally categorized

More information

THE ECONOMIC IMPACT OF THE UNIVERSITY OF EXETER

THE ECONOMIC IMPACT OF THE UNIVERSITY OF EXETER THE ECONOMIC IMPACT OF THE UNIVERSITY OF EXETER Report prepared by Viewforth Consulting Ltd www.viewforthconsulting.co.uk Table of Contents Executive Summary... 2 Background to the Study... 6 Data Sources

More information

Background Information. Instructions. Problem Statement. HOMEWORK INSTRUCTIONS Homework #3 Higher Education Salary Problem

Background Information. Instructions. Problem Statement. HOMEWORK INSTRUCTIONS Homework #3 Higher Education Salary Problem Background Information Within higher education, faculty salaries have become a contentious issue as tuition rates increase and state aid shrinks. Competitive salaries are important for recruiting top quality

More information

BENG Simulation Modeling of Biological Systems. BENG 5613 Syllabus: Page 1 of 9. SPECIAL NOTE No. 1:

BENG Simulation Modeling of Biological Systems. BENG 5613 Syllabus: Page 1 of 9. SPECIAL NOTE No. 1: BENG 5613 Syllabus: Page 1 of 9 BENG 5613 - Simulation Modeling of Biological Systems SPECIAL NOTE No. 1: Class Syllabus BENG 5613, beginning in 2014, is being taught in the Spring in both an 8- week term

More information

Modern Trends in Higher Education Funding. Tilea Doina Maria a, Vasile Bleotu b

Modern Trends in Higher Education Funding. Tilea Doina Maria a, Vasile Bleotu b Available online at www.sciencedirect.com ScienceDirect Procedia - Social and Behavioral Scien ce s 116 ( 2014 ) 2226 2230 Abstract 5 th World Conference on Educational Sciences - WCES 2013 Modern Trends

More information

(2) "Half time basis" means teaching fifteen (15) hours per week in the intern s area of certification.

(2) Half time basis means teaching fifteen (15) hours per week in the intern s area of certification. 16 KAR 7:010. Kentucky Teacher Internship Program. RELATES TO: KRS 156.101, 161.028, 161.030, 161.048, 161.095 STATUTORY AUTHORITY: KRS 161.028(1)(a), 161.030 NECESSITY, FUNCTION, AND CONFORMITY: KRS 161.030(5)

More information

Volunteer State Community College Strategic Plan,

Volunteer State Community College Strategic Plan, Volunteer State Community College Strategic Plan, 2005-2010 Mission: Volunteer State Community College is a public, comprehensive community college offering associate degrees, certificates, continuing

More information

JICA s Operation in Education Sector. - Present and Future -

JICA s Operation in Education Sector. - Present and Future - JICA s Operation in Education Sector - Present and Future - September 2010 Preface Only five more years remain for the world to work towards achieving the Millennium Development Goals (MDGs) by 2015. Developing

More information

MSW POLICY, PLANNING & ADMINISTRATION (PP&A) CONCENTRATION

MSW POLICY, PLANNING & ADMINISTRATION (PP&A) CONCENTRATION MSW POLICY, PLANNING & ADMINISTRATION (PP&A) CONCENTRATION Overview of the Policy, Planning, and Administration Concentration Policy, Planning, and Administration Concentration Goals and Objectives Policy,

More information

Table of Contents. Fall 2014 Semester Calendar

Table of Contents. Fall 2014 Semester Calendar Table of Contents Important Dates.............................................. 2 Advising and Registration Information............................ 3 Adding and Dropping Courses.................................

More information

AAUP Faculty Compensation Survey Data Collection Webinar

AAUP Faculty Compensation Survey Data Collection Webinar 2015 2016 AAUP Faculty Compensation Survey Data Collection Webinar John Barnshaw, Ph.D. (jbarnshaw@aaup.org) Sam Dunietz, M.P.P. (sdunietz@aaup.org) American Association of University Professors aaupfcs@aaup.org

More information

ILLINOIS DISTRICT REPORT CARD

ILLINOIS DISTRICT REPORT CARD -6-525-2- HAZEL CREST SD 52-5 HAZEL CREST SD 52-5 HAZEL CREST, ILLINOIS and federal laws require public school districts to release report cards to the public each year. 2 7 ILLINOIS DISTRICT REPORT CARD

More information

Differential Tuition Budget Proposal FY

Differential Tuition Budget Proposal FY Differential Tuition Budget Proposal FY 2013-2014 MPA Differential Tuition Subcommittee MPA Faculty This document presents the budget proposal of the MPA Differential Tuition Subcommittee (MPADTS) for

More information

Australia s tertiary education sector

Australia s tertiary education sector Australia s tertiary education sector TOM KARMEL NHI NGUYEN NATIONAL CENTRE FOR VOCATIONAL EDUCATION RESEARCH Paper presented to the Centre for the Economics of Education and Training 7 th National Conference

More information

POLITECNICO DI MILANO

POLITECNICO DI MILANO Repertory. n. 1013 Protocol. n. 10147 Date 12 April 2011 Title I Class 2 UOR AG POLITECNICO DI MILANO THE CHANCELLOR CONSIDERING the Presidential Decree dated 7/11/1980 No 382 "Reorganization of University

More information

ILLINOIS DISTRICT REPORT CARD

ILLINOIS DISTRICT REPORT CARD -6-525-2- Hazel Crest SD 52-5 Hazel Crest SD 52-5 Hazel Crest, ILLINOIS 2 8 ILLINOIS DISTRICT REPORT CARD and federal laws require public school districts to release report cards to the public each year.

More information

Financing of Higher Education in Latin America Lessons from Chile, Brazil, and Mexico

Financing of Higher Education in Latin America Lessons from Chile, Brazil, and Mexico Inter-American Development Bank Financing of Higher Education in Latin America Lessons from Chile, Brazil, and Mexico Paulina Gonzalez-Pose Sabine Rieble Aubourg Tertiary Education Financing Regional Workshop

More information

Presentation of the English Montreal School Board To Mme Michelle Courchesne, Ministre de l Éducation, du Loisir et du Sport on

Presentation of the English Montreal School Board To Mme Michelle Courchesne, Ministre de l Éducation, du Loisir et du Sport on Presentation of the English Montreal School Board To Mme Michelle Courchesne, Ministre de l Éducation, du Loisir et du Sport on «DÉMOCRATIE ET GOUVERNANCE DES COMMISSIONS SCOLAIRES Éléments de réflexion»

More information

Referencing the Danish Qualifications Framework for Lifelong Learning to the European Qualifications Framework

Referencing the Danish Qualifications Framework for Lifelong Learning to the European Qualifications Framework Referencing the Danish Qualifications for Lifelong Learning to the European Qualifications Referencing the Danish Qualifications for Lifelong Learning to the European Qualifications 2011 Referencing the

More information

Banner Financial Aid Release Guide. Release and June 2017

Banner Financial Aid Release Guide. Release and June 2017 Banner Financial Aid Release Guide Release 8.29.1 and 9.3.3 June 2017 Notices Notices 2017 Ellucian. Contains confidential and proprietary information of Ellucian and its subsidiaries. Use of these materials

More information

Position Statements. Index of Association Position Statements

Position Statements. Index of Association Position Statements ts Association position statements address key issues for Pre-K-12 education and describe the shared beliefs that direct united action by boards of education/conseil scolaire fransaskois and their Association.

More information

GALICIAN TEACHERS PERCEPTIONS ON THE USABILITY AND USEFULNESS OF THE ODS PORTAL

GALICIAN TEACHERS PERCEPTIONS ON THE USABILITY AND USEFULNESS OF THE ODS PORTAL The Fifth International Conference on e-learning (elearning-2014), 22-23 September 2014, Belgrade, Serbia GALICIAN TEACHERS PERCEPTIONS ON THE USABILITY AND USEFULNESS OF THE ODS PORTAL SONIA VALLADARES-RODRIGUEZ

More information

Education in Armenia. Mher Melik-Baxshian I. INTRODUCTION

Education in Armenia. Mher Melik-Baxshian I. INTRODUCTION Education in Armenia Mher Melik-Baxshian I. INTRODUCTION Education has always received priority in Armenia a country that has a history of literacy going back 1,600 years. From the very beginning the school

More information

Improving the impact of development projects in Sub-Saharan Africa through increased UK/Brazil cooperation and partnerships Held in Brasilia

Improving the impact of development projects in Sub-Saharan Africa through increased UK/Brazil cooperation and partnerships Held in Brasilia Image: Brett Jordan Report Improving the impact of development projects in Sub-Saharan Africa through increased UK/Brazil cooperation and partnerships Thursday 17 Friday 18 November 2016 WP1492 Held in

More information

Chart 5: Overview of standard C

Chart 5: Overview of standard C Chart 5: Overview of standard C Overview of levels of achievement of the standards in section C Indicate with X the levels of achievement for the standards as identified by each subject group in the table

More information

CONSULTATION ON THE ENGLISH LANGUAGE COMPETENCY STANDARD FOR LICENSED IMMIGRATION ADVISERS

CONSULTATION ON THE ENGLISH LANGUAGE COMPETENCY STANDARD FOR LICENSED IMMIGRATION ADVISERS CONSULTATION ON THE ENGLISH LANGUAGE COMPETENCY STANDARD FOR LICENSED IMMIGRATION ADVISERS Introduction Background 1. The Immigration Advisers Licensing Act 2007 (the Act) requires anyone giving advice

More information

Brazil. understanding individual rights and responsibilities, as well as those of citizens, the State and other community groups;

Brazil. understanding individual rights and responsibilities, as well as those of citizens, the State and other community groups; Brazil Updated version, August 2006. Principles and general objectives of education The Constitution enacted in October 1988 is based on the principles of civil rights and dignity of the individual. Article

More information

SANTIAGO CANYON COLLEGE STUDENT PLACEMENTOFFICE PROGRAM REVIEW SPRING SEMESTER, 2010

SANTIAGO CANYON COLLEGE STUDENT PLACEMENTOFFICE PROGRAM REVIEW SPRING SEMESTER, 2010 SANTIAGO CANYON COLLEGE STUDENT PLACEMENTOFFICE PROGRAM REVIEW SPRING SEMESTER, 2010 Section I. Signature Page Signature of Program Leader Syed Rizvi Date: Printed Name/Title Signature of Vice President,

More information

Parent Information Welcome to the San Diego State University Community Reading Clinic

Parent Information Welcome to the San Diego State University Community Reading Clinic Parent Information Welcome to the San Diego State University Community Reading Clinic Who Are We? The San Diego State University Community Reading Clinic (CRC) is part of the SDSU Literacy Center in the

More information

Pattern of Administration, Department of Art. Pattern of Administration Department of Art Revised: Autumn 2016 OAA Approved December 11, 2016

Pattern of Administration, Department of Art. Pattern of Administration Department of Art Revised: Autumn 2016 OAA Approved December 11, 2016 Pattern of Administration Department of Art Revised: Autumn 2016 OAA Approved December 11, 2016 Table of Contents I. Introduction... 3 II. Department Mission and Description... 3 III. Academic Rights and

More information

2015 Annual Report to the School Community

2015 Annual Report to the School Community 2015 Annual Report to the School Community Narre Warren South P-12 College School Number: 8839 Name of School Principal: Rob Duncan Name of School Council President: Greg Bailey Date of Endorsement: 23/03/2016

More information

others have examples for how feedback mechanisms at the CBO level have been established?

others have examples for how feedback mechanisms at the CBO level have been established? Dear Data Use Net members, Thanks for the many contributions for Day 3 we appreciate the time you took to submit your comments and examples. As a reminder for other readers, while we ask for your name

More information

Casual and Temporary Teacher Programs

Casual and Temporary Teacher Programs Guidelines The (TRS) is an initiative of the Casual School Teacher Plan to assist schools which are experiencing difficulty in attracting and engaging suitable relief teachers. Schools may be provided

More information

2015 Academic Program Review. School of Natural Resources University of Nebraska Lincoln

2015 Academic Program Review. School of Natural Resources University of Nebraska Lincoln 2015 Academic Program Review School of Natural Resources University of Nebraska Lincoln R Executive Summary Natural resources include everything used or valued by humans and not created by humans. As a

More information

Understanding Co operatives Through Research

Understanding Co operatives Through Research Understanding Co operatives Through Research Dr. Lou Hammond Ketilson Chair, Committee on Co operative Research International Co operative Alliance Presented to the United Nations Expert Group Meeting

More information

Colorado State University Department of Construction Management. Assessment Results and Action Plans

Colorado State University Department of Construction Management. Assessment Results and Action Plans Colorado State University Department of Construction Management Assessment Results and Action Plans Updated: Spring 2015 Table of Contents Table of Contents... 2 List of Tables... 3 Table of Figures...

More information

Milton Public Schools Fiscal Year 2018 Budget Presentation

Milton Public Schools Fiscal Year 2018 Budget Presentation Milton Public Schools Fiscal Year 2018 Budget Presentation 1 Background 2 How does Milton s per-pupil spending compare to other communities? Boston $18,372 Dedham $17,780 Randolph $16,051 Quincy $16,023

More information

Music Chapel House Rules and Policies hapelle Musicale Reine Elisabeth, fondation d'utilité publique

Music Chapel House Rules and Policies hapelle Musicale Reine Elisabeth, fondation d'utilité publique 1 Music Chapel The Queen Elisabeth Music Chapel endeavors to make access to the Music Chapel possible for all students meeting the artistic admission requirements. Admission to the Music Chapel is based

More information

University of Waterloo School of Accountancy. AFM 102: Introductory Management Accounting. Fall Term 2004: Section 4

University of Waterloo School of Accountancy. AFM 102: Introductory Management Accounting. Fall Term 2004: Section 4 University of Waterloo School of Accountancy AFM 102: Introductory Management Accounting Fall Term 2004: Section 4 Instructor: Alan Webb Office: HH 289A / BFG 2120 B (after October 1) Phone: 888-4567 ext.

More information

Navitas UK Holdings Ltd Embedded College Review for Educational Oversight by the Quality Assurance Agency for Higher Education

Navitas UK Holdings Ltd Embedded College Review for Educational Oversight by the Quality Assurance Agency for Higher Education Navitas UK Holdings Ltd Embedded College Review for Educational Oversight by the Quality Assurance Agency for Higher Education February 2014 Annex: Birmingham City University International College Introduction

More information

UCLA Affordability. Ronald W. Johnson Director, Financial Aid Office. May 30, 2012

UCLA Affordability. Ronald W. Johnson Director, Financial Aid Office. May 30, 2012 UCLA Affordability Ronald W. Johnson Director, Financial Aid Office May 30, 2012 1 UC is affordable First, Students must: Apply for admission in November File FAFSA and GPA Verification Form between January

More information