CAMPUS DEVELOPMENT PLAN PRESENTATION

Similar documents
university of wisconsin MILWAUKEE Master Plan Report

Sweetwater Center Collegetown District

University of Central Florida Board of Trustees Finance and Facilities Committee

Council of Educational Facilities Planners, International

HOLY CROSS CATHOLIC SCHOOL SCHOOL INFORMATION PROFILE 2015/2016 SCHOOL YEAR

Master Plan OAKLAND HOSPITAL

ADDENDUM F FACILITIES INFORMATION

Appendix A Cost Estimates

TULSA COMMUNITY COLLEGE IN SUPPORT OF THE COMPREHENSIVE CAMPUS MASTER PLANS

The City University of New York

University of Toronto

HOLY CROSS PREPARATORY SCHOOL TRAVEL PLAN School Travel Plan Holy Cross Preparatory School 1

CLASSROOM USE AND UTILIZATION by Ira Fink, Ph.D., FAIA

City of Mississauga Rathburn Road Transit Priority Measures Duke of York Boulevard to Shipp Drive OUR FILE: W.O PREPARED BY: Darek Sobik CC:

Diocesan Review April 14, Catholic Athletic Trails West Catholic High School Catholic Central High School

L E C O M. LECOM at BRADENTON HOSPITAL DAY 2017 MONDAY, AUGUST 21, 2017 The Ritz-Carlton Sarasota, FL

Everton Library, Liverpool: Market assessment and project viability study 1

Ferris State University. Gwathmey Siegel & Associates Architects llc

NET LEASE INVESTMENT OFFERING. ATI Physical Therapy 4765 Jackson Road Ann Arbor, MI 48103

University of Toronto

Draft Preliminary Master Plan April 18, 2012

BALTIMORE CITY PUBLIC SCHOOLS EDUCATIONAL SPECIFICATIONS PART 1: GENERAL REQUIREMENTS

Post-16 transport to education and training. Statutory guidance for local authorities

Transportation Equity Analysis

4.0 CAPACITY AND UTILIZATION

Oxford Circus Diagonal Crossing Lessons Learned Report

Everton Library: The Jewel on the Hill. Executive Summary. Phase 2 options appraisal study. Heritage Works Buildings Preservation Trust Ltd

RMIT. Open Day. 10am 4pm Sunday 13 August Bundoora. openday.rmit.edu.au

Alight here to Taylor s University

Grade 3: Module 2B: Unit 3: Lesson 10 Reviewing Conventions and Editing Peers Work

SimCity 4 Deluxe Tutorial. Future City Competition

Grade 7 - Expansion of the Hudson s Bay Company: Contributions of Aboriginal Peoples in Canada

Trends & Issues Report

Invest in CUNY Community Colleges

SECTION I: Strategic Planning Background and Approach

Keystone Opportunity Zone

Algebra 2- Semester 2 Review

Educational Management Corp Chef s Academy

PROPOSED MERGER - RESPONSE TO PUBLIC CONSULTATION

Hayward Unified School District Community Meeting #2 at

David Livingstone Centre. Job Description. Project Documentation Officer

Coimisiún na Scrúduithe Stáit State Examinations Commission LEAVING CERTIFICATE 2008 MARKING SCHEME GEOGRAPHY HIGHER LEVEL

The Study of Classroom Physical Appearance Effects on Khon Kaen University English Students Learning Outcome

English Nexus Offender Learning

Mary Washington 2020: Excellence. Impact. Distinction.

Cultivating an Enriched Campus Community

City of Roseville 2040 Comprehensive Plan Scope of Services

Spinners at the School Carnival (Unequal Sections)

1. Amend Article Departmental co-ordination and program committee as set out in Appendix A.

CHAPTER 4: REIMBURSEMENT STRATEGIES 24

Wright State University

foundations in accountancy (FIA) Preparatory Course for ACCA - Diploma in Accounting and Business

AIS KUWAIT. School Improvement Plan (SIP)

A comparative study on cost-sharing in higher education Using the case study approach to contribute to evidence-based policy

Milton Public Schools Fiscal Year 2018 Budget Presentation

Public Speaking Rubric

K-12 EDUCATION. Statement of Qualifications

Maynooth University Study Abroad in Ireland

SMALL GROUPS AND WORK STATIONS By Debbie Hunsaker 1

Compilation of Data: Ecole Christine Morrison Ecole Mission Central French Immersion & English Programs

Introduction to Causal Inference. Problem Set 1. Required Problems

University of Toronto Mississauga Degree Level Expectations. Preamble

FOR TEACHERS ONLY RATING GUIDE BOOKLET 1 OBJECTIVE AND CONSTRUCTED RESPONSE JUNE 1 2, 2005

WORK OF LEADERS GROUP REPORT

2015 Academic Program Review. School of Natural Resources University of Nebraska Lincoln

Geographic Area - Englewood

APRIL 11, 2016 OLATHE PLANNING COMMISSION

Study Guide for Right of Way Equipment Operator 1

Team Dispersal. Some shaping ideas

For the Ohio Board of Regents Second Report on the Condition of Higher Education in Ohio

Chapter 9 Banked gap-filling

Name in full: Last First Middle. Telephone: Day Evening Social Security No.: Internship: Dates of Start and Completion. Name and Address of Hospital:

MIDDLE SCHOOL. Academic Success through Prevention, Intervention, Remediation, and Enrichment Plan (ASPIRE)

Inquiry Learning Methodologies and the Disposition to Energy Systems Problem Solving

Military Engineering Centre of Excellence (MILENG COE) Ingolstadt

The LAUSD is regulated by the California Education Code and governed by the State Board of Education. SCH No July 2011

Newburgh Enlarged City School District Academic. Academic Intervention Services Plan

Self Assessment. InTech Collegiate High School. Jason Stanger, Director 1787 Research Park Way North Logan, UT

EXECUTIVE SUMMARY. Online courses for credit recovery in high schools: Effectiveness and promising practices. April 2017

Michigan State University

Project Advisory Group (PAG) Meeting # 1 Meeting Notes

3. Improving Weather and Emergency Management Messaging: The Tulsa Weather Message Experiment. Arizona State University

STRENGTHENING RURAL CANADA COMMUNITY: SALMO, BRITISH COLUMBIA

Title Columbus State Community College's Master Planning Project (Phases III and IV) Status COMPLETED

Build on students informal understanding of sharing and proportionality to develop initial fraction concepts.

Wellness Committee Action Plan. Developed in compliance with the Child Nutrition and Women, Infant and Child (WIC) Reauthorization Act of 2004

FRESNO COUNTY INTELLIGENT TRANSPORTATION SYSTEMS (ITS) PLAN UPDATE

3/6/2009. Residence Halls & Strategic t Planning Overview. Residence Halls Overview. Residence Halls: Marapai Supai Kachina

Priorities for CBHS Draft 8/22/17

Head of Maths Application Pack

MINUTES VILLAGE OF LA GRANGE BOARD OF TRUSTEES REGULAR MEETING. Town Meeting Spring Avenue School (Gymnasium) 1001 Spring Avenue La Grange, IL 60525

2015 Annual Report to the School Community

Rural Education in Oregon

FIVE-YEAR CAPITAL PLAN. Approved by the Collierville Board of Education January 27, 2015

Student Timetable

Leader s Guide: Dream Big and Plan for Success

Like much of the country, Detroit suffered significant job losses during the Great Recession.

Hardhatting in a Geo-World

2008 TRAFFIC VOLUME COUNTS REPORT

ASMC PROGRAM REVIEW

Transcription:

CAMPUS DEVELOPMENT PLAN PRESENTATION May 009

Introduction Development Plan Scope and Criteria ECS was commissioned in June 008 to prepare a Campus Development Plan to guide campus development to 013 and beyond. The Campus Development Plan models future academic activities, explores how these requirements could be implemented on campus and calculates order-of-magnitude space requirements to describe a general direction for Humber to further develop and improve campus facilities.

Purpose of the Development Plan A roadmap to guide directions for the development and/ or improvement of the campus by identifying a number of principles on how to get there A reference to validate that capital projects and campus development initiatives contribute to the realization of the College s strategic goals, academic plans and operational objectives A resource to describe space needs both internally and externally & is flexible enough to permit changes while specific enough to maintain established priorities

Process Interviews and meetings with senior academic and administrative staff, student leadership members, faculty representatives, and support staff. Assessment of existing campus inventory and calculated instructional space needs based on: Standardized room & seat utilization & hourly targets Future requirements for non-instructional office & support spaces Future requirements for student learner and support spaces Regular presentations of Findings and Observations to the Steering Committee for validation and feedback Presentation of draft Planning Options via Town Hall forums

Context Humber 008-013 Strategic Plan establishes the following priorities for the College: Manage Enrolment Growth Commitment to Teaching and Learning Excellence Commitment to High Quality Services to Support Student Success and Improved Business Practices Commitment to Human Resource Planning and Professional Development ECS believes that the priorities shown in bold green have particular implications for the Development Plan These three priorities are partly contingent on physical changes at the North and Lakeshore campuses

Context Enrolment Projections Fall Target FTE Winter Target FTE Net Difference (+/- %) School / Academic Unit 008 01 008 01 Fall 01 Winter 01 North Campus Business 3,3 3,487 3,300 3,501 +7.9% +6.1% Applied Technology,330,604,91,531 +11.8% +10.5% CCE 36 36 70 70 0.0% 0.0% Health Sciences,168,0 1,968,011 +1.6% +.% Hospitality/Recreation/Tourism 1,151 1,503 1,11 1,4 +30.6% +7.9% Liberal Arts & Science 408 408 494 494 0.0% 0.0% Media Studies & IT 1,487 1,734 1,357 1,550 +16.6% +14.% Sub totals 10,81 11,974 10,59 11,579 +10.7% +9.3% Lakeshore Campus Business 1,57,343 1,503,175 +49.0% +44.7% Creative & Performing Arts 741 741 845 845 0.0% 0.0% Liberal Arts & Science 16 166 191 7 +31.7% +18.8% Media Studies & IT 893 1,330 919 1,98 +48.9% +41.% Social & Community Services 1,80 1,885 1,86 1,833 +47.3% +4.5% Sub totals 4,61 6,465 4,744 6,378 +40.% +34.4% Orangeville Campus Business 86 11 74 108 +40.7% +45.9% Social & Community Services 73 73 68 68 0.0% 0.0% Sub totals 159 194 14 176 +.0% +3.9% Grand Totals 15,583 18,633 15,478 18,133 +19.6% +17.% The presented table shows enrolment growth targets distributed by campus and school to a 01 planning horizon Significant growth (40%) is planned at the Lakeshore Campus while more measured growth (10%) is planned at the North Campus These figures have since been revised higher

Context Space Indicators Total Gross Square Feet - All Campuses Excluding Guelp-Humber and Residences Total Gross Square Feet - All Campuses Excluding Guelp-Humber and Residences 1998-99 to 007-08 Changes in Inventory and Student Population 1,500,000 1,450,000 1,400,000 1,350,000 1,300,000 1,50,000 1,00,000 1,150,000 1,100,000 16,88 16,31 16,31 17,007 18,400 1998-99 1999-00 000-01 001-0 00-03 003-04 004-05 005-06 006-07 007-08 Academic Year 1998-99 to 007-08 Changes in Inventory and GSF per Student 1,500,000 1,450,000 1,400,000 1,350,000 1,300,000 1,50,000 1,00,000 1,150,000 1,100,000 7.5 7.3 70.5 68.1 67.7 18,69 18,969 19,460 66.9 67.0 67.0 1998-99 1999-00 000-01 001-0 00-03 003-04 004-05 005-06 006-07 007-08 Academic Year 0,098 64.9 0,67 67.9,000 1,000 0,000 19,000 18,000 17,000 16,000 15,000 75.0 70.0 65.0 60.0 Student FTE Population Gross Square Feet per FTE Student Enrolment growth has outpaced physical growth at Humber in the past 10 years Current additions and renovations at the North and Lakeshore campuses will not be enough to reverse the decrease in area to student ratio Indicators point to a space deficit in the next five years

Planning Principles Student Space: Highly visible, easily accessible, and comfortably furnished space should be provided in each academic building for students to study independently, study in groups, and/or gather socially. Faculty Space: Appropriate office space should be provided for all faculty, both full time and part time, clustered by academic department and proximate to the labs, workshops and classrooms where the faculty teach most often. Future Growth: Humber is evolving from a suburban institution to an urban one. New buildings need to be taller and use of public transit must be encouraged.

Key Site Challenges - Cohesiveness B A NORTH CAMPUS How to add new buildings while reinforcing internal cohesiveness and circulation along the internal north to south and east to west axis? North Campus

Key Site Challenges - Connectivity B A D C LAKESHORE CAMPUS How to best improve the connections among the various distinct precincts?

Key Site Challenges Surface Parking Main vehicular road DIRECTION Internal secondary street Parking Create a more compact campus. Main student service entrance set back from street Main formal entrance set back from street Main Building Parking Parking Parking Parking Parking Encourage building development which provides closer connections with existing infrastructure. Promote a sense of place. Student Housing Bring transit closer to core of campus.

Key Site Challenges Campus Densities DIRECTION 60m 3 1 1 1 1 4 5 3 4 60m 6 1 1 3 Encourage higher density additions - 3 to 4 storeys minimum. 9 7 3 3 3 60m 3 3 3 5 3 3 3 North Campus Lakeshore East No. of Storeys Above Ground 5 storeys & greater 4 storeys 3 storeys storeys 1 storey Lakeshore West Facilitate a sense of community by integrating a range of functions that tie in with neighbouring functions Promote a livelier campus

Key Site Challenges Transportation Legend Proposed options for LRT stops Present bus stop locations DIRECTION Landscaped courtyards Proposed transit location A Proposed transit location B Service bays Outdoor courtyards A Bus Stops B Pedestrian route from bus stop Bus Stops Loading & unloading service bays C Proposed transit location C Service route Integrate transportation networks to reduce conflicts. Minimize transportation and pedestrian conflicts Promote easier campus access through proper location of lay-bys, bus stops, etc.

Key Site Challenges Main Entrance DIRECTION Student services entrance Main formal entrance Circuitous congested secondary circulation Create a central entry point to the campus. Student Services located away from main entrance Outdoor amphitheatre has poor connectivity to campus Awkward junction Primary axis corridor No direct ground level access Provide easier access to front line services Promote a sense of arrival that is exciting and welcoming Challenges exist due to location of space at back of main campus Ground Floor Plan

Key Site Challenges Landscaping Playing Fields Arboretum North Oriented Campus Ravine N DIRECTION Enhance the quality of constructed landscapes Develop creative landscape and streetscape solutions Unify the North Campus through physical landscape interventions at the North end

North Campus Gateway Contextual Building C A CAMPUS DEVELOPMENT Develop a strategy and sequencing framework for future capital projects for the North Campus Bus LRT Site for future development bridge linked to building A B Preferred location for new light rail transit station Infill Building

Option N-A Library on third and fourth floors with large reading room New information commons at ground floor Possible bridge links Arboretum gardens 1 3 4 Arboretum gardens New student services facilities on ground floor and part second OPTION N-A Construct a new 4-storey 75,000 NASF Library and Student Services building at the main north entrance Enclosed glazed passage overlooking gardens University of Ontario Institute of Technology, Library* Academic Learning Centre - U of T, Mississauga Ground Floor Plan OPTION N-A

Lakeshore Campus A C CAMPUS DEVELOMENT Develop a strategy and sequencing framework for future capital projects for the Lakeshore Campus Lake Shore Blvd. W. Mid-rise Infill Building Kipling Ave. CO LONEL SAMUEL SMITH PARK DRIVE B 3rd. St. Gateway Entrance Building Contextually Anchored Building

Option L-A OPTION L-A 19TH ST. 3170 Lake Shore Blvd. W. TTC Streetcar Loop 3166 Lake Shore Blvd. W. KIPLING AVE. Contextual Addition - Heaslip House, Ryerson University Proposed storey building extension over streetcar loop subject to TTC agreements Possible expansion area if allowable under variance and re-zoning applications Subject to zoning compliance of site for construction of a new, 4 to 8 storey Centre, 60,000 NASF, (96,000 GASF). Consolidation of 3166 & 3170 Lake Shore Blvd. W. properties into a single site is an option to be considered subject to city application and approval Existing 3 storey office building to remain and re-purposed for academic use Construction of a 60,000 NASF- 4 to 8 storey- New Centre to accommodate existing program growth and new program initiatives at 3166 Lake Shore Blvd. W. LAKE SHORE BLVD. W. Site Plan OPTION L-A

Option L-B New east entrance and entrance gallery linked to corridor to center of Lakeshore West New shifted kitchen location Exiting kitchen space to be renovated for new academic or student support use Expand library to accommodate additional student study space & a Learning Commons Existing service yard LAKE SHORE BOULEVARD WEST New student cafeteria seating 1 1 3 LAKESHORE LODGE Existing path to Lakeshore East UOIT, Durham New landscaped forecourt / student social space OPTION L-B Construction of a 64,000 NASF New Centre to accommodate existing program growth and new program initiatives at Lakeshore Campus West New 3-storey Humber Centre Claude Watson School for the Arts, Toronto, ON* Ground Floor Plan OPTION L-B

Option L-C OPTION L-C Possible below grade parking under podium dependant on geo-technical conditions Area reserved for future low rise development dependant on future land variance 3 4 1 University of Ontario Institute of Technology* one story structure with accessible podium roof 64,000 NASF Humber Centre over 4 floors Construction of a 64,000 NASF New Centre to accommodate existing program growth and new program initiatives at Lakeshore Campus East Open Green Space Theatre podium and tower Site Plan OPTION L-C

Planning Principles Student Space Space should be provided in each academic building for students to study independently, study in groups, and/or gather socially. Not all student space needs to be formal or enclosed. Space for students should be highly visible, easily accessible, comfortably furnished, and have wireless capabilities.

Planning Principles Faculty Space Appropriate office space should be provided for all faculty, both full time and contract, in accordance with Humber s space management policy. Whenever practical, faculty offices should be clustered by department. Faculty office space needs to include small meeting rooms to enable faculty to meet privately with students. Departmental clusters should be located proximate to the labs, workshops, and classrooms where the faculty teach most often. This is particularly important for departments that rely extensively on specialized labs and workshops.

Planning Principles Future Growth Humber is evolving from a suburban institution to an urban one. New buildings need to be taller, to make better use of the limited land that is available. Site and building design must encourage use of public transit to reduce the amount of land required for parking and roadways for private transportation. For buildings which will house specialized functions, the design should incorporate expansion either internally, horizontally or vertically.

Planning Principles North Campus The construction of a new 75,000 net assignable square feet building (Option N-A) will provide space for an expanded library and consolidated and enhanced student services. Existing space that will be vacated by library and student services functions will enable Humber to alleviate shortages of space for students and faculty and to provide additional teaching spaces to accommodate enrolment growth. The existing library is best suited for conversion to administrative and faculty offices. Medium and longer term growth can be accommodated in future buildings at the two sites proposed in the campus development plan (Options N-B and N-C).

Planning Principles Lakeshore Campus The space challenges at the Lakeshore campus will not be solved by one new building; a three pronged approach is required. Option L-A, in conjunction with 3170 Lakeshore Drive, will provide additional space for classrooms, light labs, and offices. Option L-B will provide space for an expanded library, consolidated and enhanced student services, and additional academic delivery space. Option L-C will provide space for heavily serviced labs and workshops and other academic space. All buildings are required urgently. The exact sequencing will be determined based on funding availability and other factors.

Thank you for your attention. We welcome your questions and comments. Gateway Contextual Building Mid-rise Infill Building A Lake Shore Blvd. W. D C Kipling Ave. A Contextually Anchored Building B Bus LRT Site for future development bridge linked to building A Preferred location for new light rail transit station 3rd. St. B COLONEL SAMUEL SMITH PARK DRIVE C Infill Building Gateway Entrance Building North Campus - Options Lakeshore Campus - Options May 009