School Information Profile

Similar documents
HOLY CROSS CATHOLIC SCHOOL SCHOOL INFORMATION PROFILE 2015/2016 SCHOOL YEAR

Centennial Middle School (CMS) Design Advisory Team (DAT)

APPROVAL AIDE MEMOIRE

3/6/2009. Residence Halls & Strategic t Planning Overview. Residence Halls Overview. Residence Halls: Marapai Supai Kachina

St. Paul, St. Michael, Our Lady of Lourdes: Pupil Accommodation Review. December 7, 2016

Peterborough Eco Framework

Chicago Public Schools 6 Month Asbestos Surveillance Fall

University of Central Florida Board of Trustees Finance and Facilities Committee

Security & Technology. Track & Tennis. Repairs. Remodeling & Interior Repairs. Exterior Wall. Repairs

Oakridge School District #76

Geographic Area - Englewood

George A. Buljan Middle School School Accountability Report Card Reported Using Data from the School Year Published During

Dyer-Kelly Elementary 1

Here are some helpful steps to guide you in completing the Contributor s Form below:

Design Principles to Set the Stage

Augusta Independent Board of Education August 11, :00 PM 207 Bracken Street Augusta, KY

Woodhouse Primary School Sports Spending

Council of Educational Facilities Planners, International

Geographic Area - Englewood

Diocesan Review April 14, Catholic Athletic Trails West Catholic High School Catholic Central High School

TULSA COMMUNITY COLLEGE IN SUPPORT OF THE COMPREHENSIVE CAMPUS MASTER PLANS

If we want to measure the amount of cereal inside the box, what tool would we use: string, square tiles, or cubes?

FRAMINGHAM SCHOOL COMMITTEE MEETING MINUTES Superintendent s Conference Room July 15, 2014

Building and Construction Skills 2019 v1.0

2015 Annual Report to the School Community

BALTIMORE CITY PUBLIC SCHOOLS EDUCATIONAL SPECIFICATIONS PART 1: GENERAL REQUIREMENTS

Program Proposal Construction Technology Construction Carpenter Diploma. Hazard Community and Technical College

ASMC PROGRAM REVIEW

Toronto District School Board

Kindergarten SAMPLE MATERIAL INSIDE

Hayward Unified School District Community Meeting #2 at

ASRAMA KOLEJ UNIVERSITI TUNKU ABDUL RAHMAN Managed by : Delta Pride (M) Sdn Bhd (399277A)

The term of the agreement will be from July 1, 2014 to June 30, 2015.

SimCity 4 Deluxe Tutorial. Future City Competition

Airplane Rescue: Social Studies. LEGO, the LEGO logo, and WEDO are trademarks of the LEGO Group The LEGO Group.

Schnabel 1 JP SCHNABEL PREFECT 2017/2018

Dyer-Kelly Elementary 1

HOLY CROSS PREPARATORY SCHOOL TRAVEL PLAN School Travel Plan Holy Cross Preparatory School 1

Dyer-Kelly Elementary School School Accountability Report Card Reported Using Data from the School Year Published During

Graphic Imaging Technology II - Part two of a two-year program designed to offer students skills in typesetting, art and pasteup,

Heavy Diesel Service Technician

Algebra 2- Semester 2 Review

JUNIOR HIGH INTRAMURAL / ATHLETICS HANDBOOK /

SCHOOL CONTEXT STATEMENT Updated: August 2013

K-12 EDUCATION. Statement of Qualifications

OHIO COUNTY BOARD OF EDUCATION SALARY SCHEDULES Revised 7/3/12

Charlton Kings Infants School

San Ignacio-Santa Elena Municipal Profile

Cincinnati Country Day Middle School Parents Athletics Handbook

PUBLIC SPEAKING, DISTRIBUTION OF LITERATURE, COMMERCIAL SOLICITATION AND DEMONSTRATIONS IN PUBLIC AREAS

MESH TRAY. Automatic... p. 102 Standard UF... p. 106 Specific installations... p. 109 Accessories... p. 111 MESH TRAY. Scan me! JUNE 2017 CATALOGUE 99

Welcome Vice Presidents CLT Irene M. Barton 9 th District Director

Class of 2018 Junior Proposal for Senior Project. Make the Most of Your Journey

AHA Community Service Agency Contact Information

Cobham Hall Residential Programme

CHELMSFORD SCHOOL COMMITTEE REGULAR MEETING October 8, 2013 Meeting Minutes

Appendix A Cost Estimates

Hampton Falls School Board Meeting September 1, W. Skoglund and S. Smylie.

KeyTrain Level 7. For. Level 7. Published by SAI Interactive, Inc., 340 Frazier Avenue, Chattanooga, TN

WILLMAR CARDINALS ATHLETICS

Dr. Russell Johnson Middle School

North East ISD Transition Services (NETS)

Frequently Asked Questions about Music Education at IU

ACHIEVING SUSTAINABILITY THROUGH GREEN OFFICES PRACTICES

JESSAMINE COUNTY SCHOOLS CERTIFIED SALARY SCHEDULE (188 DAYS)

A History of College Community Schools Present

APRIL 11, 2016 OLATHE PLANNING COMMISSION

Ho-Chunk Nation Department of Education Pre K-12 Grant Program

Military Engineering Centre of Excellence (MILENG COE) Ingolstadt

School Physical Activity Policy Assessment (S-PAPA)

Milton Public Schools Fiscal Year 2018 Budget Presentation

Approval Authority: Approval Date: September Support for Children and Young People

UVA Office of University Building Official. Annual Report

Spaces for Knowledge Generation. a framework for designing student learning environments for the future

Executive Summary. Hamilton High School

FY2018 ANNUAL CAPITAL BUDGET. University of Minnesota

University of Virginia

Financing Education In Minnesota

Iva Meairs Elementary School

Executive Summary. Curry High School

Azusa Pacific University Azusa, CA

JUNIOR HIGH SPORTS MANUAL GRADES 7 & 8

Course Description Course Textbook Course Learning Outcomes Credits Course Structure Unit Learning Outcomes: Unit Lessons: Reading Assignments:

Higher Education. Pennsylvania State System of Higher Education. November 3, 2017

UW RICHLAND. uw-richland richland.uwc.edu

SCHOLARSHIP GUIDELINES FOR HISPANIC/LATINO STUDENTS

El Toro Elementary School

Report of activities 2015

Arthur E. Wright Middle School 1

2016 Annual Report to the School Community

Dr. Russell Johnson Middle School

Signing Routes to School: A Process Evaluation

Postal Address: Kitchener Street, Netherby 5062 Location Address: Kitchener Street, Netherby 5062

Name: Class: Date: ID: A

St. John Fisher College Rochester, NY

Call for Volunteers. Short-term EVS. Volunteering for Acceptance and Diversity. About CID

F O O T B A L L

Columbia County School System Preliminary Rezoning Proposal

Lakewood Board of Education 200 Ramsey Avenue, Lakewood, NJ 08701

ACADEMIC YEAR STUDYING IN SPAIN

Transcription:

School Information Profile W.J. Fricker Public School General Information School Name Address Date Built Grades Size of Site Building Area On the Ground Capacity Portables Parking Spaces W.J. Fricker Public School 790 Norman Avenue, North Bay, ON P1B 8C4 1969 Grade 5 to 8 7.97 Acres 4,418 m2 357 Pupil Spaces 2 38 1

Building Floor Plans 2

Outdoor Space Area of Hard Surfaced Outdoor Play Area and/or Green space Number of Play Fields Facilities (tracks, structures, courts) Other Significant Outdoor Details 2 24,800 m or 6.12 Acres *Paved basketball court on east side of school *Total asphalt area adjacent to east wall of school is approximately 20m.x40m. (800 square metres) *Asphalt paved surface adjacent to north side of school is approx. 10 m. X 20m. (200 square metres) *Some green space around outside of track. *1 baseball field with sand infield and fenced backstop *grass infield of track for soccer/field sports (in ground sprinkler system with approximately 20 sprinkler heads) *400 m track *4 basketball hoops (one paved court and one paved area with hoops mounted on side of building There is a fence between the ball diamond/basketball court and the track/large grassy field. Instructional Rooms Resource Room 1 Elementary 15 Classrooms 3

5 Year FCI: 81% The Facility Condition Index (FCI) is calculated to compare the renewal needs of the building to the replacement cost of the building having the same On the Ground (OTG) Capacity. The renewal needs represent the inventory of replacing/repairing the components of the building. The inventory of renewal needs is summarized with the backlog of current items and going forward five years. 5 Year Future Renewal Needs *Includes backlog of current needs and items to 2020-21. Auxiliary Equipment - Chemical Feed System $10,785 Board Based Technology $96,881 Branch Wiring $740,504 Ceiling Finishes - Suspended Acoustic Panel $349,015 Controls & Instrumentation $297,013 Controls & Instrumentation - Dust Collector $31 Domestic Water Distribution - Original Building - Storage Tank $12,376 Domestic Water Distribution - Plumbing Piping System $173,258 Emergency Lighting & Power $9,000 Exterior Walls - Precast Concrete Panels $62,130 Exterior Walls - Sealant $13,434 Exterior Windows - Clerestory - Library $80,084 Fencing & Gates $22,530 Fire Protection Specialties - Extinguishers $10,400 Fittings - Millwork $371,280 Fittings - Student Storage Lockers $148,512 Fittings - Washroom Accessories $75,000 Fittings - Window Coverings $81,827 Floor Finishes - Carpet $59,358 Floor Finishes - Vinyl Tile $136,160 Heating/Chilling water distribution systems $368,787 Interior Doors $185,120 Interior Doors - Interior Door Hardware $56,160 Interior Stair Construction $39,936 Landscaping $8,906 Lighting Equipment - Exterior $24,348 Main Switchboards - Primary Switchgear $55,680 Other Cooling Generating Systems $307,920 Parking Lots $352,716 Partitions - Moveable Partitions $155,951 Pedestrian Paving - Brick Paver Walkway $92,860 Plumbing Fixtures $35,000 Site Civil/Mechanical Utilities - Underground Utilities $585,387 Site Development - Grass Playing Field $65,593 Site Development - Precast Concrete Retaining Walls $61,880 Site Electrical Utilities - Aboveground Utilities $148,514 Standpipe Systems $95,554 Terminal & Package Units - Radiators $372,518 Total $5,762,408 4

Facility Renewal Projects Completed over past 10 Years (2006 to 2015) Project Year Completed Invoiced Cost Exterior Windows - Pod 2 and 3 2006 $194,812 Plumbing Fixtures - Three Washroom Clusters 2006 $103,405 Domestic Water Distribution - sanitary drains and urinals 2006 $45,120 Exhaust Systems - Ventilation Fans 2006 $38,100 Lighting Equipment - Exit Lighting 2006 $24,014 Public Address Systems 2006 $48,165 Other Communications & Alarm Systems 2006 $36,040 Board Based Technology - Dust Collector 2006 $75,835 Domestic Water - Distribution - Piping System 2008 $42,706 Other Cooling Generating Systems 2008 $12,129 Exterior Doors - Metal 2009 $114,730 Controls & Instrumentation 2009 $14,651 Lighting Equipment - Emergency Lighting 2009 $51,030 Fire Alarm Systems 2009 $68,000 Controls & Instrumentation 2010 $37,869 Controls & Instrumentation 2010 $32,440 Exterior Doors 2013 $43,606 HVAC- replace computer lab and gym units 2015 $266,340 Roof replacement gym and cafeteria sections 2015 $215,252 Total $1,464,244 Annual Utility Costs (2015-16) Consumption Cost (net rebate) Electricity (kwh) 261,267 $44,661.47 Natural Gas (m 3 ) 77,086 $17,531.06 Water/Sewer (m 3 ) 1,740 $7,503.04 Total $69,695.57 Cost per Square Meter $15.78/m 2 Cost per Student $259.09/student Accessibility of Facility Designated Parking Yes Barrier Free Access from Parking to Building Yes Barrier Free Accessible Exterior and Vestibule Doors Yes Barrier Free Washroom at each Accessible Level No Single or Multi Storey Multiple Elevator Access to All Levels No Stair Lift to Access Multi Level Storeys No Barrier Free Ramp to Access Multi Level Storeys No 5

School Year Enrolment, On the Ground Capacity and Surplus/Deficit Spaces Grade 5 Grade 6 Grade 7 Grade 8 Total OTG Capacity Surplus/ Deficit Spaces Historical Projected 2006 53 39 220 192 504 357-147 2007 40 46 144 215 445 357-88 2008 48 38 124 139 349 357 8 2009 36 44 127 130 337 357 20 2010 37 35 127 124 323 357 34 2011 45 37 115 130 327 357 30 2012 33 42 111 121 307 357 50 2013 30 27 119 124 300 357 57 2014 38 30 118 121 307 357 50 2015 60 40 85 109 294 357 63 2016 40 61 83 85 269 357 88 2017 56 54 84 82 276 357 81 2018 58 55 48 84 245 357 112 2019 57 57 60 48 222 357 135 2020 56 56 70 60 242 357 115 2021 49 55 59 70 233 357 124 2022 49 48 69 59 225 357 132 2023 48 48 44 69 209 357 148 2024 48 47 43 44 182 357 175 2025 47 47 42 43 179 357 178 Programs Offered Extended French Grade 5 and 6 Regular Program Grade 7 and 8 2016-17 Staffing Compliment FTE Elementary Teaching Staff 14.85 Support Staff 4.5 Administration 1.25 Class Organization Single Grade Classes Combined Classes Extended French Grade 5 & 6 3 1 Regular Program Grade 7 & 8 6 1 Special Education n/a n/a Total 9 2 Transportation Statistics based on December 2016 Data Number of students within walking distance to school 27 Number of students bussed to school 227 Average distance to school for students walking AM Ride 0.88 km PM Ride Longest length of bus ride in minutes 64 76 Shortest length of bus ride in minutes 2 3 Average length of bus ride in minutes 24.59 25.37 Average distance of bus ride in kilometers 11.09 10.31 TRANSPORTATION ELIGIBILITY JK and SK Home to school Grades 1 to 3 1.0 km Grades 4 to 8 1.6 km Grades 9 to 12 3.0 km 6

2015-16 Extra Curricular Activities Alpine Skiing Art Club - Painting/Drawing/Crafts etc. Baseball/Softball Basketball Breakfast Program Concert Band/Jazz Band/Ensemble Cooking Club Cross Country Running Cross-Country Skiing First Robotics Participatrick Play Day - Fall/Winter/Spring Recycling Club Soccer Student Council/Student Parliament Take Action/We Day/Free The Children Talent Show Terry Fox Track & Field Volleyball Yearbook Fricker Gives Back Volunteer opportunities AV Club Other School Use PROFILE Current facility-sharing community partnerships including full-day child care services located at the school (i.e. leases or license agreements for use of underutilized space). Current community use of the school including permits for before and after school child care programs (i.e. rental permits for use of school space outside of regular instructional hours). Revenue from facility-sharing community partnerships including full-day child care services. Indicate if the revenue is at full cost recovery Revenue from community use of schools rental permits including before and after school child care. Indicate if the revenue is at full cost recovery. Description of the school s suitability for facility partnerships: COMMENTS There are currently no facility-sharing community partnerships at W.J. Fricker. For the 2015-2016 school year, there were 15 Community Use of Schools rental permits issued that represented 990.5 hours of use. The City of North Bay offers an After School Program M-W-F. Currently, revenue is not generated at W.J. Fricker for facility-sharing community partnerships. Revenue from community use of school s rental permits totals $675 ($225 rent, $450 custodial) + HST. Three permits are at full cost recovery and the remaining 12 permits are subsidized through the Community Use of Schools Program where the permitted hours occur during times when custodians are not normally scheduled. This facility is at 82% utilization (2015-2016). By 2020-2021 W.J. Fricker s utilization is projected to decrease to 68%. Utilization needs to drop below 60% before this site could be considered for a facility partnership. 7

8

9

City of North Bay Property Information Address: 790 Norman Avenue Official Plan Designation: Residential Zoning: Residential First Density (R1) Permitted Uses: Single detached dwelling Group Home Type 1 Accessory Bed and Breakfast Accessory Home Based Business Parks and playgrounds Day Nursery Institutional Uses Feeder Schools Program Type Extended French Regular Program Grade of Entry Grade 5 Grade 7 School(s) E.T. Carmichael E.W. Norman Ferris Glen Phelps Silver Birches Sunset Park Vincent Massey Woodland E.T. Carmichael E.W. Norman Vincent Massey 10

11

12