PMP /CAPM EXAM PREP. Order the complete book from the publisher. Booklocker.com.

Similar documents
PM tutor. Estimate Activity Durations Part 2. Presented by Dipo Tepede, PMP, SSBB, MBA. Empowering Excellence. Powered by POeT Solvers Limited

M55205-Mastering Microsoft Project 2016

MMOG Subscription Business Models: Table of Contents

Guide to Teaching Computer Science

Characteristics of the Text Genre Informational Text Text Structure

Pragmatic Use Case Writing

CERTIFIED PROJECT MANAGEMENT SPECIALIST (CPMS) STUDY GUIDE

White Paper. The Art of Learning

PRINCE2 Practitioner Certification Exam Training - Brochure

BOOK INFORMATION SHEET. For all industries including Versions 4 to x 196 x 20 mm 300 x 209 x 20 mm 0.7 kg 1.1kg

Pod Assignment Guide

Economics 201 Principles of Microeconomics Fall 2010 MWF 10:00 10:50am 160 Bryan Building

BADM 641 (sec. 7D1) (on-line) Decision Analysis August 16 October 6, 2017 CRN: 83777

Planting Seeds, Part 1: Can You Design a Fair Test?

International Series in Operations Research & Management Science

University of Groningen. Systemen, planning, netwerken Bosman, Aart

TEACHING Simple Tools Set II

Your Guide to the New Train The Trainer

IBM Software Group. Mastering Requirements Management with Use Cases Module 6: Define the System

Characteristics of the Text Genre Informational Text Text Structure

THE PROMOTION OF SOCIAL AWARENESS

For Portfolio, Programme, Project, Risk and Service Management. Integrating Six Sigma and PRINCE Mike Ward, Outperfom

Generating Test Cases From Use Cases

Instrumentation, Control & Automation Staffing. Maintenance Benchmarking Study

Excel Formulas & Functions

The University of Iceland

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF EDUCATION SCIENCE AND TECHNOLOGY SOCIAL STUDIES SYLLABUS FOR BASIC EDUCATION STANDARD III-VI

Exemplar Grade 9 Reading Test Questions

Subject: Regulation FPU Textbook Adoption and Affordability

Dialogue Live Clientside

Course Content Concepts

Myers-Briggs Type Indicator Team Report

Leadership Guide. Homeowner Association Community Forestry Stewardship Project. Natural Resource Stewardship Workshop

Northeastern University Online Course Syllabus

Outreach Connect User Manual

Introduction to CRC Cards

Conducting the Reference Interview:

TABLE OF CONTENTS TABLE OF CONTENTS COVER PAGE HALAMAN PENGESAHAN PERNYATAAN NASKAH SOAL TUGAS AKHIR ACKNOWLEDGEMENT FOREWORD

Major Milestones, Team Activities, and Individual Deliverables

Lecture 10: Reinforcement Learning

GRADE 2 SUPPLEMENT. Set D4 Measurement: Capacity. Includes. Skills & Concepts. Activity 1: Predict & Fill D4.1

CPMT 1303 Introduction to Computer Technology COURSE SYLLABUS

Measurement & Analysis in the Real World

SkillPort Quick Start Guide 7.0

Document number: 2013/ Programs Committee 6/2014 (July) Agenda Item 42.0 Bachelor of Engineering with Honours in Software Engineering

Epping Elementary School Plan for Writing Instruction Fourth Grade

IBM Training Custom Catalog

Practical Research Planning and Design Paul D. Leedy Jeanne Ellis Ormrod Tenth Edition

Language Acquisition Chart

CHALLENGES FACING DEVELOPMENT OF STRATEGIC PLANS IN PUBLIC SECONDARY SCHOOLS IN MWINGI CENTRAL DISTRICT, KENYA

Guidelines for Writing an Internship Report

2014 Free Spirit Publishing. All rights reserved.

Quick Start Guide 7.0

Learning to Think Mathematically with the Rekenrek Supplemental Activities

D Road Maps 6. A Guide to Learning System Dynamics. System Dynamics in Education Project

Characteristics of the Text Genre Realistic fi ction Text Structure

Rendezvous with Comet Halley Next Generation of Science Standards

CAMP 4:4:3. Supplemental Tools

Universal Design for Learning Lesson Plan

END TIMES Series Overview for Leaders

Tap vs. Bottled Water

Exercise Format Benefits Drawbacks Desk check, audit or update

Mastering Team Skills and Interpersonal Communication. Copyright 2012 Pearson Education, Inc. publishing as Prentice Hall.

Constructing a support system for self-learning playing the piano at the beginning stage

Extraordinary Eggs (Life Cycle of Animals)

Problem Solving for Success Handbook. Solve the Problem Sustain the Solution Celebrate Success

Secondary English-Language Arts

McGraw-Hill Connect and Create Built by Blackboard. Release Notes. Version 2.3 for Blackboard Learn 9.1

Norms How were TerraNova 3 norms derived? Does the norm sample reflect my diverse school population?

For information only, correct responses are listed in the chart below. Question Number. Correct Response

CARPENTRY GRADES 9-12 LEARNING RESOURCES

Ascension Health LMS. SumTotal 8.2 SP3. SumTotal 8.2 Changes Guide. Ascension

Developing Highly Effective Industry Partnerships: Co-op to Capstone Courses

ADAPTIVE PLANNING. 1 Powered by POeT Solvers Limited

Cooking Matters at the Store Evaluation: Executive Summary

Trust and Community: Continued Engagement in Second Life

Designing a Rubric to Assess the Modelling Phase of Student Design Projects in Upper Year Engineering Courses

A Practical Introduction to Teacher Training in ELT

Gridlocked: The impact of adapting survey grids for smartphones. Ashley Richards 1, Rebecca Powell 1, Joe Murphy 1, Shengchao Yu 2, Mai Nguyen 1

Catchy Title for Machine

Fountas-Pinnell Level P Informational Text

MADERA SCIENCE FAIR 2013 Grades 4 th 6 th Project due date: Tuesday, April 9, 8:15 am Parent Night: Tuesday, April 16, 6:00 8:00 pm

Cambridge NATIONALS. Creative imedia Level 1/2. UNIT R081 - Pre-Production Skills DELIVERY GUIDE

GOING GLOBAL 2018 SUBMITTING A PROPOSAL

Ministry of Education, Republic of Palau Executive Summary

Curriculum Design Project with Virtual Manipulatives. Gwenanne Salkind. George Mason University EDCI 856. Dr. Patricia Moyer-Packenham

Designing a Computer to Play Nim: A Mini-Capstone Project in Digital Design I

K-12 PROFESSIONAL DEVELOPMENT

Life and career planning

Project Management 4TH EDITION. by Stanley E. Portny Certified Project Management Professional (PMP)

Digital Technology Merit Badge Workbook

Fountas-Pinnell Level M Realistic Fiction

Houghton Mifflin Online Assessment System Walkthrough Guide

Summarize The Main Ideas In Nonfiction Text

content First Introductory book to cover CAPM First to differentiate expected and required returns First to discuss the intrinsic value of stocks

ACTL5103 Stochastic Modelling For Actuaries. Course Outline Semester 2, 2014

How to Take Accurate Meeting Minutes

MULTIMEDIA Motion Graphics for Multimedia

Welcome Prep

Transcription:

A thorough and in-depth preparation guide for PMP and CAPM exams covering Precedence Diagramming Method/Activity-On-Node concepts and their analysis using Critical Path Method. This guide explains the concepts with illustrated examples with emphasis on special situations. Explanation of concepts through stepwise solved examples will provide readers hands-on ability for their application. This guide will serve as a launch pad for advanced study in this area beyond the requirements of the two exams. PMP /CAPM EXAM PREP Order the complete book from the publisher Booklocker.com http://www.booklocker.com/p/books/5866.html?s=pdf or from your favorite neighborhood or online bookstore. Your Free excerpt appears below. Enjoy!

PMP /CAPM EXAM PREP: A Basic Guide to Activity-On-Node and Critical Path Method

Copyright 2011 Jayanta Das Purkayastha ISBN 978-1-61434-504-6 All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, mechanical, recording or otherwise, without the prior written permission of the author. Although the author has made every effort to ensure accuracy and completeness of information entered in this guide, no responsibility is assumed for errors, inaccuracies, omissions, or inconsistencies included herein. Any slights of people, places or organizations are completely unintentional. PMI, the PMBOK, PMP, and CAPM are trademarks or registered trademarks of the Project Management Institute, Inc. in the United States and other countries. Project Management Institute, Inc. was not involved in the production of, and does not endorse, this publication. Front Image Sashkinw Dreamstime.com Dedication Photo 2011 Jayanta Das Purkayastha ATTENTION CORPORATIONS, UNIVERSITIES, COLLEGES, AND PROFESSIONAL ORGANIZATIONS. Quantity discounts are available on bulk purchases of this guide. For information, please contact the publisher. Published in the United States by Booklocker.com, Inc., Bangor, Maine. Printed in the United States of America on acid-free paper. Booklocker.com, Inc. 2011 First Edition

What This Guide Is About What this Guide Is Not About Who This Guide Is For Feedback Table of Contents Section 1: Get the Basics 1 Summary... 3 Introduction... 3 Understanding Basics of an Activity: Building Block of Activity-On-Node (AON)... 6 Understanding Basics of Precedence Diagramming Method (PDM)/ Activity-On-Node (AON) Diagram... 15 Section 2: Critical Path Method 23 Understanding Critical Activities and Critical Path... 25 Determine Critical Path in a Project Network Diagram... 26 Section 3: Critical Path Analysis of AON using CPM 31 Determining Activity Early Start and Early Finish: Forward Pass... 33 Determining Activity Late Start and Late Finish: Backward Pass... 37 Section 4: Solved Examples 43 Example 1... 45 Example 2... 48 Example 3... 52 Example 4... 56 Example 5... 61 Section 5: Conclusion 67 Benefits of Using AON and CPM... 69 Practice Exercises 71 Further Readings 74 xiii xiii xiv xiv ix

Solutions 75 Index 101 x

Table of Figures FIGURE 1 Interdependencies between Create WBS, Define Activities, and Sequence Activities... 5 FIGURE 2 WBS Work Packages, Activities and Tasks... 7 FIGURE 3 Schedule-related attributes of an activity... 9 FIGURE 4 Predecessor and successor activities... 16 FIGURE 5 Finish-Start (FS) Sequence: Activity A must finish before Activity B can start... 17 FIGURE 6 Finish-Finish (FF) Sequence: Activity A must finish before Activity B can finish.... 18 FIGURE 7 Start-Finish (SF) Sequence: Activity A must start before Activity B can finish... 19 FIGURE 8 Start-Start (SS) Sequence: Activity A must start before Activity B can start.... 19 FIGURE 9 An Activity-On-Node network diagram with two paths... 20 FIGURE 10 Using activity duration to determine Critical Path(s) in AON... 26 FIGURE 11 Using activity float to determine Critical Path(s) in AON... 28 xi

Section 5: Conclusion I am not sure about project scope but we have microscopes and telescopes.

Jayanta Das Purkayastha Understanding AONs and how CPM can be used to analyze them, covers an important aspect of time management for projects. While there exists software that can be used to create AONs and perform CPM, as a project management professional it is important to know the basic concepts, techniques and how they are applied in order to comprehend and interpret results. Such understanding becomes even more critical when one seeks to create and analyze what-if scenarios. Determining the appropriate and efficient organization of activities including minimizing critical activities and ensuring no-occurrence of negative float or negative total float is an important part of schedule management. It must also be understood that network diagrams are never static. They can change as project conditions, constraints and other factors change. Project network diagrams can evolve in cases where Rolling Wave Planning is used especially when all project requirements or details are available during the planning phase. Below are benefits that AON and CPM provide for project managers in order to actively, effectively and efficiently manage project schedules. Knowledge and understanding of the advantages that Activity-On- Node network diagrams bring, along with the use of critical path analysis, is significant in ensuring that they are actually used in management of projects. Benefits of Using AON and CPM 1. AON provides graphical representation of activity sequence and dependency making it convenient to plan and manage schedule activities. Visual representation makes it easier to communicate the project s activities, their sequence and time attributes. 2. The minimum amount of time required to complete the project can be easily and objectively determined from the network diagram given that the duration of each activity is provided or estimated. 3. Critical Path analysis of a network diagram allows for the identification of critical, near-critical and non-critical activities in the project. Especially for critical activities, it will be easier to determine if there is (are) any threat(s) to the project s completion date. 4. Impact assessments on project schedule can be made for different whatif scenarios. For example, different scenarios can be evaluated to see if SECTION 5: CONCLUSION 69

PMP /CAPM Exam Prep A Basic Guide to Activity-On-Node and Critical Path Method a planned project schedule can be compressed to meet a customer imposed completion date which is earlier than the planned completion date. 5. AONs can be very helpful in tracking project performance with regards to schedule. For instance, delay to an identified critical activity can be immediately identified, and steps can be taken to reduce any threat to the project s completion date. 6. For each activity, the early (start or finish) and late (start or finish) dates can be determined allowing for better schedule management at individual activity level. 7. AONs accommodate all types of logical relationships between activities FS, FF, SS, SF including Lags and Leads unlike AOAs which can only use FS (Taylor, 2007). It is not surprising that no tools and techniques are without disadvantage(s) and limitation(s). One of the frequently cited disadvantages of AONs is the sheer difficulty of constructing it for large complex projects with very large number of activities and dependencies. Hard copy representation of such large network diagrams can be very unwieldy. In addition, use of critical path method on large network diagrams can be cumbersome. Use of software programs that handle creation of network diagrams and critical path analysis can greatly assist in mitigating this disadvantage. The limitation of CPM, which one must have noticed already, is that it relies on the duration of each activity in the network diagram. So, it assumes that the duration of each activity can be relied upon. Therefore, the efficacy of CPM depends heavily on this assumption. 70 SECTION 5: CONCLUSION

Jayanta Das Purkayastha Practice Exercises 1. For the network diagram below, determine the following: (a) Critical Path (b) ES, EF, LS, LF and Float for each activity Start 2. For the network diagram below, determine the following: (a) Critical Path (b) ES, EF, LS, LF and Float for each activity 1 4 4 A LS Slack LF ES 7 EF B LS Slack LF ES 9 EF C LS Slack LF End ES 3 EF D LS Slack LF ES 2 EF E LS Slack LF 3. Activity Predecessor(s) Duration (days) A Start 4 B A, C, F 7 C Start 3 D Start 4 E B, F 2 F C 4 G D, F 9 H F, G 7 End E, H 0 PRACTICE EXERCISES 71

PMP /CAPM Exam Prep A Basic Guide to Activity-On-Node and Critical Path Method Based on the activity details given above, do the following: (a) Construct the AON. (b) Determine Critical Path (c) Determine ES, EF, LS, LF and Float for each activity 4. An activity in a network diagram has an Early Start (ES) of 3 days, Duration of 6 days and Late Finish (LF) of 12 days. What is activity's float? (a) 2 days (b) 4 days (c) 3 days (d) 5 days 5. An activity in a network diagram has Duration of 5 days and Early Finish (EF) of 11 days. What is activity's Early Start (ES)? (a) 7 days (b) 4 days (c) 8 days (d) 3 days 6. An activity in a network diagram has Duration of 5 days and Late Finish (LF) of 11 days. What is activity's Late Start (LS)? (a) 7 days (b) 4 days (c) 8 days (d) 3 days 7. An activity in a network diagram has Duration of 5 days and Late Start (LS) of 3 days. What is activity's Late Finish (LF)? (a) 7 days (b) 4 days (c) 8 days (d) 3 days 8. A landscaper must complete preparing the flower bed before the flower plants can be planted. The relationship between prepare flower bed activity and plant flower plants can be best described as: 72 PRACTICE EXERCISES

Jayanta Das Purkayastha (a) Start-Finish (SF) (b) Finish-Start (FS) (c) Finish-Finish (FF) (d) Start-Start (SS) 9. A homeowner plans to sealcoat the driveway of his house. He has already purchased the required quantity of driveway seal coater and the weather would be right to do it. The seal coating material dries quickly and therefore, must be spread without delay. He has already washed and cleaned his driveway, and is prepared to start sealcoating the driveway. Next day, he knows he has to primarily perform two activities pour the seal coater, and spread the sealcoater. The relationship between the predecessor activity to pour the sealcoater and the successor activity to spread the seal coater can be best described as: (a) Start-Finish (SF) (b) Finish-Start (FS) (c) Finish-Finish (FF) (d) Start-Start (SS) 10. At a trade show, two teams were employed to set up electric connection and lighting for each booth. One team laid out the electric cables and connection while the other team set up the lighting and made sure it was set up as per specifications. Both teams must ensure that they have fully completed before the scheduled start date. The relationship between the two teams activities can be best described as: (a) Start-Finish (SF) (b) Finish-Start (FS) (c) Finish-Finish (FF) (d) Start-Start (SS) PRACTICE EXERCISES 73

Jayanta Das Purkayastha Index A Activity-on-Arrow... 3, 15 Activity-On-Node... 3, 5, 6, 15 ADM... See Arrow Diagramming Method AOA... See Activity-on-Arrow AON... See Activity-On-Node Arrow Diagramming Method. 3, 5, 15 B Backward Pass... 6, 33, 37, 38, 78, 84, 86, 91 C CPM... See Critical Path Method Critical Activities... 6, 25 critical activity... 25 critical path.. 14, 25, 26, 33, 77, 83, 84, 89, 90, 98, 99 Critical Path.. 14, See critical path Critical Path Method.. 3, 5, 23, 25, 33 D Duration.. 6, 8, 9, 10, 12, 25, 30, 71, 77, 84, 89, 90 E Early Finish... 6, 9, 10, 11, 12, 14, 33 Early Start... 6, 9, 10, 11, 12, 14, 33 EF... See Early Finish Effort... 8, 9 ES... See Early Start F FF... See Finish-Finish Finish Float...11, 12 Finish-Finish... 6, 15, 17, 18 Finish-Start... 6, 15, 16, 17 Finish-to-Finish... See Finish-Finish Finish-to-Start... See Finish-Start Float... 6, 10, 25, 71, 72 Forward Pass... 6, 33, 34, 38, 78, 84, 90, 91 Free Float...10, 15 FS... See Finish-Start H Hypercritical...6, 25 L Lag...6, 21 Late Finish... 6, 10, 11, 12, 14, 37 Late Start 6, 9, 10, 11, 12, 14, 37, 38 Lead...6, 22 LF... See Late Finish LS... See Late Start N Near-Critical Activities...25 Near-Critical Paths...25 Negative Float...14 Network Path...25 P PDM... See Precedence Diagramming Method SOLUTIONS 101

PMP /CAPM Exam Prep A Basic Guide to Activity-On-Node and Critical Path Method Precedence Diagramming Method... 3, 6, 15, 74, 89 Project Float... 14 S SF... See Start-Finish Slack... 6, 10, 83, 89, 99 SS...See Start-Start Start Float... 11, 12 Start-Finish... 6, 15, 18, 19 Start-Start... 6, 15, 19 Start-to-Finish... See Start-Finish Start-to-Start... See Start-Start Supercritical... 25 T Total Float... 12, 15, 25 W WBS... See Work Breakdown Structure Work Breakdown Structure... 6 work package... 6 work package element... 6 102

A thorough and in-depth preparation guide for PMP and CAPM exams covering Precedence Diagramming Method/Activity-On-Node concepts and their analysis using Critical Path Method. This guide explains the concepts with illustrated examples with emphasis on special situations. Explanation of concepts through stepwise solved examples will provide readers hands-on ability for their application. This guide will serve as a launch pad for advanced study in this area beyond the requirements of the two exams. PMP /CAPM EXAM PREP Order the complete book from the publisher Booklocker.com http://www.booklocker.com/p/books/5866.html?s=pdf or from your favorite neighborhood or online bookstore.