New Elementary School at Thomas Jefferson Arlington, VA. Concept Descriptions. 3 October 2014

Similar documents
ADDENDUM F FACILITIES INFORMATION

If we want to measure the amount of cereal inside the box, what tool would we use: string, square tiles, or cubes?

Ferris State University. Gwathmey Siegel & Associates Architects llc

Design Principles to Set the Stage

Council of Educational Facilities Planners, International

HOLY CROSS CATHOLIC SCHOOL SCHOOL INFORMATION PROFILE 2015/2016 SCHOOL YEAR

Centennial Middle School (CMS) Design Advisory Team (DAT)

4.0 CAPACITY AND UTILIZATION

Hayward Unified School District Community Meeting #2 at

3/6/2009. Residence Halls & Strategic t Planning Overview. Residence Halls Overview. Residence Halls: Marapai Supai Kachina

FY2018 ANNUAL CAPITAL BUDGET. University of Minnesota

Compilation of Data: Ecole Christine Morrison Ecole Mission Central French Immersion & English Programs

Carnegie Mellon University Student Government Graffiti and Poster Policy

APRIL 11, 2016 OLATHE PLANNING COMMISSION

Draft Preliminary Master Plan April 18, 2012

Welcome to Georgia Tech!

The City University of New York

A History of College Community Schools Present

BALTIMORE CITY PUBLIC SCHOOLS EDUCATIONAL SPECIFICATIONS PART 1: GENERAL REQUIREMENTS

University of Central Florida Board of Trustees Finance and Facilities Committee

SimCity 4 Deluxe Tutorial. Future City Competition

CITY COLLEGE OF SAN FRANCISCO. Facility Master Plan Meeting On Student Development December 5, 2016

Office of Graduate Studies at THE UNIVERSITY OF TEXAS AT DALLAS

Keystone Opportunity Zone

Woodhouse Primary School Sports Spending

ACADEMIC YEAR STUDYING IN SPAIN

New York People and Places

Starting primary school

University of Virginia

Amery Area Public Library Long Range Plan

FRED DOUGLAS MASON III

The Charter School East Dulwich

COLLEGE OF OPTOMETRY Strategic Plan College of Optometry The Ohio State University

Some Basic Active Learning Strategies

Math 1313 Section 2.1 Example 2: Given the following Linear Program, Determine the vertices of the feasible set. Subject to:

Executive Summary. Saint Francis Xavier

Tiered Classrooms at St. Olaf College: Faculty and Student Perceptions of Three Different Designs

A MEANINGFUL CAREER IN LESS THAN ONE YEAR MASTER IN TEACHING

UPPER ARLINGTON SCHOOLS

Wright State University

Hardhatting in a Geo-World

Hampton Falls School Board Meeting September 1, W. Skoglund and S. Smylie.

TEACHER OF MATHEMATICS (Maternity Full time or Part time from January 2018)

EDUCATIONAL ATTAINMENT

Peterborough Eco Framework

Healthier US School Challenge : Smarter Lunchrooms

Transportation Service Standards Effective 9/1/2017

Appendix A Cost Estimates

Cobham Hall Residential Programme


MINUTES VILLAGE OF LA GRANGE BOARD OF TRUSTEES REGULAR MEETING. Town Meeting Spring Avenue School (Gymnasium) 1001 Spring Avenue La Grange, IL 60525

with The Grouchy Ladybug

Measurement. When Smaller Is Better. Activity:

UW RICHLAND. uw-richland richland.uwc.edu

University of California, Irvine - Division of Continuing Education

Geographic Area - Englewood

Livermore Valley Joint Unified School District. B or better in Algebra I, or consent of instructor

8. UTILIZATION OF SCHOOL FACILITIES

Guidelines for drafting the participant observation report

Genevieve L. Hartman, Ph.D.

Strategic Planning Stakeholder Input Summary

La Grange Park Public Library District Strategic Plan of Service FY 2014/ /16. Our Vision: Enriching Lives

FRAMINGHAM SCHOOL COMMITTEE MEETING MINUTES Superintendent s Conference Room July 15, 2014

Functional Skills Mathematics Level 2 assessment

GRADE 2 SUPPLEMENT. Set D4 Measurement: Capacity. Includes. Skills & Concepts. Activity 1: Predict & Fill D4.1

Testimony in front of the Assembly Committee on Jobs and the Economy Special Session Assembly Bill 1 Ray Cross, UW System President August 3, 2017

APPROVAL AIDE MEMOIRE

About How Good is Estimation? Assessment Materials Page 1 of 12

STT 231 Test 1. Fill in the Letter of Your Choice to Each Question in the Scantron. Each question is worth 2 point.

Military Engineering Centre of Excellence (MILENG COE) Ingolstadt

Build on students informal understanding of sharing and proportionality to develop initial fraction concepts.

Geographic Area - Englewood

Massachusetts Hospital Lean Network

CLASSROOM USE AND UTILIZATION by Ira Fink, Ph.D., FAIA

THE PROVISIONS OF THIS TRANSFER GUIDE DO NOT CONSTITUTE A CONTRACT, EXPRESSED OR IMPLIED, BETWEEN ANY APPLICANT OR STUDENT AND DEVRY UNIVERSITY.

Jeffrey H. Diritto, M.S., CSCS, SCCC, USAW

Mathematics subject curriculum

PUBLIC SPEAKING, DISTRIBUTION OF LITERATURE, COMMERCIAL SOLICITATION AND DEMONSTRATIONS IN PUBLIC AREAS

Executive Summary. Gautier High School

2017 APPLICATION TO FLY BANNERS/FLAGS On CRA/DDB flagpoles and light posts CITY OF ORLANDO, COMMUNITY REDEVELOPMENT AGENCY, DOWNTOWN DEVELOPMENT BOARD

Everton Library, Liverpool: Market assessment and project viability study 1

Office: CLSB 5S 066 (via South Tower elevators)

Diocesan Review April 14, Catholic Athletic Trails West Catholic High School Catholic Central High School

Master Plan OAKLAND HOSPITAL

Whanganui District Council Sport & Recreation Strategy - Facilities

Plain Language NAGC Review

General Physics I Class Syllabus

Inquiry Learning Methodologies and the Disposition to Energy Systems Problem Solving

The School Report Express. FYI Picayune

Participation Rates: Fall 2012

Maynooth University Study Abroad in Ireland

Writing for the AP U.S. History Exam

ATHLETIC ENDOWMENT FUND MOUNTAINEER ATHLETIC CLUB

Software Maintenance

AC : THE HYBRID REFERENCE DESK: CHANGING STRATE- GIES FOR CHANGING TIMES. Larry A. Thompson, Virginia Tech

Grade 2: Using a Number Line to Order and Compare Numbers Place Value Horizontal Content Strand

Here are some helpful steps to guide you in completing the Contributor s Form below:

Azusa Pacific University Azusa, CA

LIVE MUSIC RETAIL EST atlanta dairies CREATIVE OFFICE RESTAURANTS 777 MEMORIAL DR.

Preparing for Tomorrow s Careers

Transcription:

New Elementary School at Thomas Jefferson Arlington, VA Concept Descriptions 3 October 2014 This is a test-fit planning exercise to determine if a new school of this size can fit on the Thomas Jefferson campus without compromising the Thomas Jefferson Middle School, the heavily-used Theatre and Community Center, or existing TJ Park amenities. Our planning is based on a custom-designed, 725 student K-5 elementary school. (For the purposes of longterm master planning, we also anticipate a future middle school addition for 315 students. That work is not in this project budget nonetheless we want to insure its ability to fit on the campus and account for its future impacts on shared facilities like parking.) These schemes are the first four of many. They are numbered in the order in which they were conceived. All schemes are based on a common architectural program for the elementary school that is intentionally over-sized at 120,000 gross square feet; this conservative approach insures that the school once design is finalized will fit on the site. This test fit is the first step in the design process, and the schemes do not try to solve every specific site issue, such as playground locations, fences, sidewalks and pathways, etc. We have no preference for any scheme at this time. All schemes are multi-story arrangements, allowing for shared-use public spaces on ground floors with quieter, academic spaces above. In all cases, a challenge will be locating all Pre-K, Kindergarten and First grade classrooms at ground level, adjacent to outdoor play areas dedicated to the Elementary school. Since parking analysis is on-going and we do not yet know if new parking will be required to support the schools, we have only addressed general locations for parking, rather than specific quantities of parking spaces. There are tremendous advantages to co-located schools on the same campus. Schemes which are contiguous with the middle school are best at addressing cohort flexibility between the middle school and the elementary school. Specifically, parking, drop off /pick up areas and bus loop areas can be shared and reduce required paved surfaces. In addition playfields and other site amenities can be dual utilized. Schemes herein are combinations of many variables: footprints vary depending on building height: the taller the school, the smaller its footprint. There are many more possibilities that we will evaluate with the help of the TJWG. Scheme 1 Scheme One is a four-story 120,000 GSF elementary school with a 30,000 GSF footprint generally on top of existing south parking lots and tennis and basketball courts. The shallow building s extensive north and south frontages optimize natural daylighting. New parking is planned under the building, the first level of which can be semi-submerged with views out to

the street. Along with a future Middle School addition, the new elementary school holds the street edge and brackets an enhanced entry court in front of the existing community center. Though play and recreational space behind the school is maximized in this scheme, visibility from the street to the park is compromised. A separate sense of entry and identity can easily be achieved for the MS and ES with this option. Scheme 2 Scheme Two is a three-story 120,000 GSF elementary school with a 40,000 GSF footprint generally on top of the existing west parking lot. The existing bus loop, shared by the middle school and the new elementary school, suggests a pleasant and secure urban plaza between the two buildings. Replacement parking is planned along Second Street, under a raised podium for courts and play space. This building is comfortably situated among neighboring tall buildings. Conversely, it is less optimally arranged for harvesting daylight, presents a less prominent façade to South 2 nd Street the main arterial approach to the campus This scheme also places children farther away from existing indoor and outdoor recreational spaces. Scheme 3 Scheme Three is a three story 120,000 GSF elementary school with a 40,000 GSF footprint generally on top of the existing middle school service court. This scheme identifies a very under-utilized portion of the middle school: the existing single-story mechanical suite which also contains a currently un-used central kitchen. This scheme may require demolition of the mechanical suite, or it might build over it. A new entrance to the middle school could be incorporated in this scheme and service and kitchen components could be shared between middle and elementary schools. This scheme fits entirely within property currently owned by APS. Scheme 4 Scheme Four is a three story 120,000 GSF elementary school with a 40,000 GSF footprint generally on the north side or back of the existing middle school and wrapping around the theatre. The existing lobby of the middle school would be reconfigured as shared space for elementary school circulation but remain as pre-function space for the theatre, accessible both during and after school. This scheme fits in underutilized space and would access new elevated play court areas to the west and existing recreational fields to the east. It may require relocation of the middle school main entrance at the southwest corner of the building, closer to Second Street, as part of this project.

SCHEME ONE 4 STORY ES BUILDING & 4 STORY MS ADDITION

SCHEME ONE PICTURAL VIEW FROM SW

SCHEME TWO 3 STORY ES BUILDING & 3 STORY MS ADDITION

SCHEME TWO PICTURAL VIEW FROM SW

SCHEME THREE 3 STORY ES BUILDING & 2 STORY MS ADDITION

SCHEME THREE PICTURAL VIEW FROM SW

SCHEME FOUR 3 STORY ES BUILDING & 2 STORY MS ADDITION

SCHEME FOUR PICTURAL VIEW FROM SW