Internal Circulation Only ICT LIBRARY UPDATE Bi-monthly November-December 2009 Vol. VII; No.6 Contents - Articles - 1-2 (Subject wise alphabetically indexed) - Addition of Books - 3-4 - Reports - 5-10 Prepared by: Librarian
Architecture Articles 1 Design for Hospitality (A+D Vol. XXVI No.12 Dec. 2009) Aviation 1 Non-aeronautical revenues : Rich potential for development (Indian Infrastructure : Nov. 2009) Bridge 1 Bridge Repairs (World Highways Vol.18, Issue No. 9 Nov./Dec. 2009) 2 Large Structure (International construction Vol. 48, No.9, Dec. 2009) Business Development 1 How to Pick a Good Fight (Harvard Business Review Dec. 2009) 2 Negotiation? Auction? A Deal Maker s Guide (Harvard Business Review Dec. 2009) Civil Engineering 1 PPP updated : Long-term challenges (Indian Infrastructure : Nov. 2009) 2 Tunnel Services : (Indian Infrastructure : Nov. 2009) Environment 1 Design and working of a lab scale UHASB Reactor for treatment of moderate strength synthetic waste- water : (Environmental Pollution control Journal : Vol. 12, No. 6 Sept.-Oct. 2009) 2 Noise pollution and its effects on human health : (Environmental Pollution control Journal : Vol. 12, No. 6 Sept.-Oct. 2009) Management 1 What every leader should know about real estate : (Harvard Business Review : Nov. 09) Pavement and Material 1 Asphalt Paving : (World Highways Vol. 18, Issue No. 9 Nov./Dec. 2009) 2 Asphalt Milling : (World Highways Vol. 18, Issue No. 9 Nov./Dec. 2009) 3 Materials Testing : (World Highways Vol. 18, Issue No. 9 Nov./Dec. 2009) Roads & Highways 1 Road Marking : (World Highways Vol. 18, Issue No. 9 Nov./Dec. 2009) 2 Construction equipment : Driven by road projects (Indian Infrastructure : Nov. 2009) 3 Road Recycling : (Indian Infrastructure : Nov. 2009) Traffic & Transportation 1 Tariffs tumble : More players, more offerings (Indian Infrastructure : Nov. 2009) 2 Road safety scenario and proposed action plan (Indian Highways : Nov. 2009) 3 Sustainable road transport for India (Indian Highways : Nov. 2009) 1
ADDITION OF BOOKS 1 World Bank; Indian Road Construction Industry Capacity Issues Constraints 2 ACBAR; Activity Directory, Director of activities by humanitarian 3 PWD; Schedule of Rates for Road & Bridge Works, Arunachal Pradesh, 2009 4 Austroads; Guide to Pavement Technology; Part 4 th, Test Methods 5 IRC-Proceedings; International Seminar on Road Safety Srinagar Sept. 17-18, 1986 6 IRC:SP:30-2009; Manual on Economic Evaluation of Highway Projects in India, 2 nd Revision 7 IRC:SP:21-2009; Guidelines on Landscaping & Tree Plantation 8 ISTD; Annual Report & Accounts, 39 th, 1 st April 2008-31 st March 2009 9 UN; Planning Sustainable Cities Global Report on Human Settlement, 2009 10 FIDIC; State of the World; FIDIC Infrastructure Report 2009 11 FIDIC; Risk Management: Five keys areas of risk in consultants appointments, 2009 12 FIDIC; Building Construction: Definition of Services Guidelines 2009 13 FIDIC; London Conference Talks & Presentations, 2009 14 IBC; Seminar on works contract & Arbitration Agartala, Tripura 9-10, Oct 2009 15 BIS; IS: 2427-1968, Grading of Continuous Filament Viscose 16 BIS; IS-3370 (Part1) 2009: Concrete Structures for Storage (1 st Revision) 17 BIS; IS-3370 (Part II) 2009: Concrete Structures for Storage (1 st Revision) 18 Bridge Superstructure; N. Rajagopalan 19 Road Safety in India: Challenges & Opportunities, 2009 20 Asphalts in Road Constructions; Robert N Hunter 21 Master Plan Gaya; Z. Ahmed 22 Master Plan for Delhi -2021-Draft What Will Be Delhi in 2021 23 Working Group on Road Accidents injury Prevention & Controls; CMD 24 Practical Guide to Employee s Provident Funds Act, Rules & Schemes, 2009 25 Traffic Engineering Handbook; 6 th Edition, Institute of Transportation Engineering, Washington 2009 26 User Guide-Trip Generation An ITE information, Vol. 1 of 3, 8 th Edition 27 User Guide-Trip Generation An ITE information, Vol. 2 of 3, 8 th Edition 28 User Guide-Trip Generation An ITE information, Vol. 3 of 3, 8 th Edition 29 Service Tax- Law Practice & Procedure, 18 th Edition, September 2009, Vol. 1 30 Service Tax- Law Practice & Procedure, 18 th Edition, September 2009, Vol. II 2
31 Schedule of Rates 2009-2010, Bellary Circle, Bellary 32 Operation & Maintenance of Irrigation Project; Sept. 2009, W&LMT&RM Hyderabad 33 Handbook for Shops & Establishments in Delhi, 2009 by V.K. Puri 34 Planning Commission; PPP-National Highways, Model Concession Agreement 35 CRRI; Low Volume Roads: Construction & Maintenance, A working manual, 1996 36 IRF; World Road Statistics 2009 (Data 2002-2007) 37 Nalco water handbook 38 IRC L SP : 84 2009 : Manual of specifications and standards for four laning of highway on PPP 39 Employee s provident fund and miscellaneous provident act 1952-2010 40 Manual of aesthetic design practice 3
REPORTS Airport (Jalgaon); Providing Consultancy Services for project preparation, planning, Designing & Implementation of the Proposed Airport at Jalgaon 1 Environment Impact Assessment Report; August 2009 Kabul-Abu 1 Monthly Progress Report; October 2009 Govt. of Bihar; Bihar State Highway Project(Phase-II), Consultancy Services for Preparation of Detailed Project Report for Bihar State Highways Project Phase-II (Package-2, South Bihar) 1 Monthly Progress Report; October 2009 2 Bid Document; Vol. 1, Pack. No. 5 (SH-73) 3 Bid Document; Vol. II, Technical Specification & BOQ, Pack. No. 5 (SH-73) 4 Bid Document; Vol. III Pack. No. 5 (SH-73) 5 Bid Document; Vol. IV, Typical Section of Road Pack. No. 5 (SH-73) 6 Contract Agreement; Pack. 7, Part ¼ between IVRCL Infrastructures & Projects (SH- 75) 7 Contract Agreement; Pack. 7, Part 2/4 between IVRCL Infrastructures & Projects (SH-75) 8 Contract Agreement; Pack. 7, Part 3/4 between IVRCL Infrastructures & Projects (SH-75) 9 Contract Agreement; Pack. 7, Part 4/4 between IVRCL Infrastructures & Projects (SH-75) 10 Technical Bid; Vol. 1, Pack. 5, SH-73 11 Technical Bid; Vol. II, Pack. 5, SH-73 12 Contract Agreement; Pack. No. 5, Part Vol. 1/7 13 Monthly Progress Report : June 2009 14 Monthly Progress Report; August 2009 4
Ethiopia, (GW) Consultancy Services for the Construction Supervision of Woreta Woldiya Road Upgradation Project Contract 3, Gashena Woldiya Road, Credit No. : 39890 ET. 1 MPR : August 2009 2 QPR : Sept. 2009 3 MPR : Sept. 2009 4 MPR : Oct. 2009 Ethiopia; (JM) Jimma - Mizran : Consultation Service for Review of EIA, RAP & Detailed Engineering Design & Preparation of EIA,RAP 1 MPR No. 17 Sept. 2009 2 Brief status report : No.v 2009 3 Interim Certification no. 9 4 QPR : : Sept. 2009 5 MPR : Nov. 2009 Ethiopia(Afdera-Abala Road); Construction Works of Afdera-Abala Road Project Contract 1: Hawusewa-Abala-Irebti 1 Bidding Document; Vo. 1, January 2008 Ethiopia; (JT) Consultancy Services for Detailed Engineering Design and Construction Supervision of Jijiga-Togochale Road Upgrading Project. 1 Monthly Progress Report; August 2009 2 MPR : Oct. 2009 3 QPR : Sept. 2009 Ethiopia; (Addis Ababa) 1 Interim Pavement application No. 2 July August 2009 Manesar; Pre-Qualification Document for IT Park at IMT, Manesar (Gurgaon) for Different Construction Companies. 1 Monthly Progress Report ; Oct. 2009 2 Quarterly Progress Report : August 2009 3 Monthly Progress Report; Nov. 2009 5
MP-2330; Bhopal Construction of ADB Assisted Thirteen Highway Corridors under Madhya Pradesh State Road Sector Project II (Package 1 Bhopal) under ADB Loan No. 2330 IND. 1 Monthly Progress Report; No. 24, Oct 2009 2 Monthly Progress Report; No. 25, Nov. 2009 L Pack. 1, Bhopal MONGOLIA; (CSZU) Regional Road Development Project Choir-Sainshand -Zamin Uud Road 1 MPR : No. 22 : Sept. 2009 Vadodara -Mumbai Expressway; Preparation of Feasibility-cum-Preliminary Design Report for Vadodara-Mumbai Expressway to be executed as BOT (Toll) Project on DBFO Pattern under NHDP Phase-VI. 1 Monthly Progress Report; July 2009 2 Monthly Progress Report; October 2009 NH-1 (A) (2151)Jammu & Kashmir 1 MPR : Oct. 2009 2 MPR : Nov. 2009 NH-2 (Barwa) 1 Feasibility Report; Vol. II, Appendices to Main Report 2 Feasibility Report; Vol. III(A), Preliminary Design Report NH-02 : (U.P) (GTRIP); 4 LANING AND STRENGT. OF EXISTING 2 LANE FROM KM.199.66 400 SECTION OF NH 2. AGRA-BHOGNIPUR, World Bank : Loan No. 4522 OIN, (GTRIP/SC/1). 1 Monthly Progress Report; No.92, Oct 2009 2 Monthly Progress Report; No.93, Nov. 2009 NH-4(Belgaum-Maharashtra); Preparation of Feasibility for 6 Laning of Belgaum- Maharashtra Border Section of NH-4 in the State of Karnataka under NHDP Phase V (Lot-3) Pack. No. NHDP-V/MC-II/BOT/FR/23 1 Final Feasibility Report; Vol. 1, Main Report, November 2009 2 Final Feasibility Report; Vol. 1(A), Appendices to Main Report, November 2009 3 Final Feasibility Report; Vol. II, Environmental Impact Assessment Report, November 2009 4 Final Feasibility Report; Vol. III, Social Impact Assessment Report, November 2009 5 Final Feasibility Report; Vol. IV, Drawings, November 2009 6
NH-4 ; (Harihar to Haveri) KARNATAKA Western Transport Corridor Tumkur - Haveri Sec. Of NH - 04, Pack. IV & V, ADB Loan. 1 Monthly Progress Report; No. 12, Pack. 4, October 2009 2 Monthly Progress Report; No. 12, Pack. 5, October 2009 NH 6(WB); CONSULTANCY SUPERVISION for DANKUNI TO KHARAGPUR IN THE STATE OF WEST BENGAL (GOLDEN QUADRILATERAL). 1 Monthly Progress Report; October 2009 NH 7(T.N.); Independent Consultancy Services for 4/6 laning of NH-7 from Start of Proposed Flyover at Namakkal (Km 248.625) to start of Karur Bypass (Km 292.600) in the state of Tamil Nadu on North-South corridor under Phase II Programme of NHDP Package No. NS-2/BOT/TN-3. 1 Monthly O &M Report; September 2009 2 Monthly O & M Report : Oct. 2009 NH- 7(AP): Independent Consultant Services for 4 Laning of Islam Nagar Kadtal from Km. 230 to 278 of Nagpur Hyderabad Section on North South Corridor (Project No. NS2/IC/IC/AP-7) 1 Road Safety Pre-opening Audit (Final Report); September 2009 2 Quarterly Progress Report; Sept. 2009 3 Monthly Progress Report; Sept. 2009 4 Monthly Progress Report; Oct. 2009 NH-8 (Ahmadabad-Vadodara); Feasibility for Six Laning of Ahmedabad-Vadodara Section of NH-8 to be Executed as BOT(Toll) Project on DBFO Pattern under NHDP Phase-V 1 MPR : Nov. 2009 NH-8 (Surat-Dahisar);Six laning of Surat-Dahisar Section of NH-8 from Km. 263.000 to Km. 502.000(Length-239Km) in the State of Gujrat & Maharastra to be executed as BOT(Toll) on DBFO pattern under NHDP Phase-V 1 Monthly Progress Report; October 2009 NH- 11; Independent Consultant for 4 Lane of Jaipur - Mahua BOT Project of NH-11 in the state of Rajasthan Package No. IC/PHIIIA/NH11/RJ/002. 1 Monthly Progress Report: Oct. 2009 2 Monthly Progress Report: Nov. 2009 7
NH-21(Punjab); Independent Consultancy Services for 4- Laning of Kurali Kiratpur Section of NH-21 on BOT basis under NHDP III A in the State of Punjab (Pack. No. IC/BOT-II/NH-21/PB/001) 1 Monthly Progress Report; No. 23, August 2009 2 Monthly Progress Report; No. 25, Oct. 2009 NH-22 (Zirakpur-Parwano); Independent Consultancy Services for 4/6 Laning of Zirakpur-Parwanoo Section of NH-22 including Pinjore-Kalka-Bypass on BOT basi under under NHDP III A in the State of Punjab. 1 Quarterly Progress Report; No.6, September 2009 2 Monthly Progress Report; No. 19. Oct. 2009 NH-25/26; Jhansi Lalitpur in the State of Uttar Pradesh NS1/IC/UP-2. 1 Monthly Progress Report; Oct. 2009 2 Monthly Progress Report; Nov. 2009 NH 45; (T.N.) 4 Laning of the Existing 2 Lane Section from km. 121 (near Tindivanam) to km. 192. 25 (near Ulundurpet) on NH 45 in the State of Tamilnadu on Build, Operate, Transfer (BOT) Basis. 1 MPR : Oct. 2009 Package VI-A 2 MPR : Nov. 2009 Package VI-A NH 47; CONSULTANCY SERVICES FOR FEASIBILITY STUDY and D.P.R. FOR 4/6 LANE DIVIDED CARRIAGEWAY OF NH-47, CHERTHALAL TO THIRUVANANTHAPURAM IN THE STATE OF KERALA, PACKAGE NO. NHPD- III/DL4/22. 1 Operation & Maintenance Manual; Vo. 1, April 2008 2 Operation & Maintenance Manual; Vo. II, April 2008 3 Safety Audit of Construction Zone Report October 2009 4 Monthly Progress Report; October 2009 Monthly Progress Report : Nov. 2009 NH-47 (KL); 4/6 Laning of National Highway from Thrissur to Edapally Section of NH- 47, Kerala,on North-South Corridor (Project No. NS2/BOT/KL-1) on BOT Basis. 1 Monthly Progress Report : Oct. 2009 2 Monthly Progress Report : Sept. 2009 3 Quarterly Progress Report : Nov. 2009 8
NH-54; SILCHAR TO UDARBAND TO HARANGAJO of NH 54 {Pack. EW II (AS- 1)}.NH 54 C. PACK. No. EW II (AS 1 & AS 14)(SUPERVISION CONSULT. PACK. No. CS II / A 1). 1 Monthly Progress Report; Oct 2009 NH-83; (Bihar) Consultancy Services for Feasibility cum Preliminary Design for 4/6 Laning of Patna- Gaya Dobhi Section of NH-83 (Pack. NHAI/DBFO II/DPR/03) 1 Monthly Progress Report; October 2009 2 Monthly Progress Report; Nov. 2009 3 Monthly Progress Report; Dec.2009 Yemen 1 Final Report : Work Initiation and training needs assessment 2 Final Report : Monthly Progress report : Oct. 2009 Vadodara Mumbai Expressway 1 MPR : Nov. 2009 : Phase VI 9