As on Status of 50,000 MW Hydro Electric Initiative. CEA was entrusted with the overall responsibility for the scheme.

Similar documents
According to the Census of India, rural

[For Admission Test to VI Class] Based on N.C.E.R.T. Pattern. By J. N. Sharma & T. S. Jain UPKAR PRAKASHAN, AGRA 2

NAVODAYA VIDYALAYA SAMITI PROSPECTUS FOR JAWAHAR NAVODAYA VIDYALAYA SELECTION TEST- 2014

NAVODAYA VIDYALAYA SAMITI PROSPECTUS FOR JAWAHAR NAVODAYA VIDYALAYA SELECTION TEST- 2018

NAVODAYA VIDYALAYA SAMITI PROSPECTUS FOR JAWAHAR NAVODAYA VIDYALAYA SELECTION TEST- 2016

JOIN INDIAN COAST GUARD

व रण क ए आ दन-पत र. Prospectus Cum Application Form. न दय व kऱय सम त. Navodaya Vidyalaya Samiti ਨਵ ਦ ਆ ਦਵਦ ਆਦ ਆ ਸਦ ਤ. Navodaya Vidyalaya Samiti

NAVODAYA VIDYALAYA SAMITI PROSPECTUS FOR JAWAHAR NAVODAYA VIDYALAYA SELECTION TEST- 2015

NAVODAYA VIDYALAYA SAMITI PROSPECTUS FOR JAWAHAR NAVODAYA VIDYALAYA SELECTION TEST- 2015

National rural Health mission Ministry of Health and Family Welfare government of India, new delhi

JAWAHAR NAVODAYA VIDYALAYA, RAKH JAGANOO DISTT:UDHAMPUR (J&K)

Ref. No.YFI/ Dated:

NATIONAL INSTITUTE OF HOMOEOPATHY

RAJASTHAN CENTRALIZED ADMISSIONS TO BACHELOR OF PHYSIOTHERAPY COURSE-2017 (RCA BPT-2017) INFORMATION BOOKLET

INFORMATION BOOKLET. Refer RUHS website ( for updated and relevant information.

Creating Teachers Communities of Learning. Report on the Subject Teacher Forum Program IT for Change

RAJASTHAN UNIVERSITY OF HEALTH SCIENCES Kumbha Marg, Sector-18, Pratap Nagar, Tonk Road, Jaipur Phone: ,

Faculty Details proforma for DU Web-site

Computers on Wheels!!

HCFC Phase-Out Management Plan Servicing Sector

Prof. Dr. Hussein I. Anis

Pragmatic Constraints affecting the Teacher Efficacy in Ethiopia - An Analytical Comparison with India

Important Questions For Physics For Maharashtra Board

HIGH COURT OF HIMACHAL PRADESH, SHIMLA No.HHC/Admn.2(31)/87-IV- Dated:

Sl. No. Name of the Post Pay Band & Grade Pay No. of Post(s) Category

भ रत य व ज ञ न व क ष ए अन स ध न स स थ न वतर पवत

SEDA MALAYSIA S REMINDER ON OPENING OF RENEWABLE ENERGY QUOTA FOR PROJECTS IN SABAH AND WP LABUAN

A Pipelined Approach for Iterative Software Process Model

IIPS MMS Entrance Test May 30, 2004

i didnt do my homework poem

SimCity 4 Deluxe Tutorial. Future City Competition

M-Tech Degree Course PROSPECTUS

Systematic Assessment and Monitoring leading to Improving Quality of Education

Recruitment for Teaching posts of RUHS Information Booklet. Refer RUHS website ( for updated and relevant information.

D.No. /GC/14 Dated : Copy to the following for information and necessary action.

Maharashtra State Board 12th Class Physics

HIMACHAL PRADESH NATIONAL LAW UNIVERSITY, SHIMLA GHANDAL, P.O. SHAKRAH, SUB TEHSIL DHAMI, DISTRICT SHIMLA

NIMS UNIVERSITY. DIRECTORATE OF DISTANCE EDUCATION (Recognized by Joint Committee of UGC-AICTE-DEC, Govt.of India) APPLICATION FORM.

(Effective from )

Integrated M.Sc.-Ph.D. Programs in Life Sciences and Physical Science

STRENGTHENING RURAL CANADA COMMUNITY: SALMO, BRITISH COLUMBIA

2017 Women s Individual Tennis Regional Contacts and Playoff Berth Information

PROSPECTUS DIPLOMA IN CENTRAL EXCISE AND CUSTOMS. iiem. w w w. i i e m. c o m

2 Participatory Learning and Action Research (PLAR) curriculum

STRENGTHENING AND EXPANSION OF VOCATIONAL TRAINING IN MADHYA PRADESH. Directorate of Skill Development Madhya Pradesh, Jabalpur

Kendriya Vidyalaya Sangathan

Ioe Entrance Exam 2070 Model Question Papers

OKURA SETS UP GLOBAL BUSINESS HEADQUARTERS IN SINGAPORE

OPEN AND DISTANCE LEARNING (ODL) EDUCATION SYSTEM: PAST, PRESENT AND FUTURE A SYSTEMATIC STUDY OF AN ALTERNATIVE EDUCATION SYSTEM

Biodiversity Conservation

RASHTRASANT TUKADOJI MAHARAJ NAGPUR UNIVERSITY APPLICATION FORM

BREAST FEEDING: ADVOCACY & PRACTICE COURSE. November 21 December 4, 2010 A REPORT

Course Description: Technology:

June 15, 1962 in Shillong, Meghalaya, India. Address: Civil Dept, Assam Engineering College, Guwahati

SAMPLE PAPER SYLLABUS

University of Central Florida Board of Trustees Finance and Facilities Committee

INDIAN STATISTICAL INSTITUTE 203, BARRACKPORE TRUNK ROAD KOLKATA

PROF. DR.-ING. JAMEEL AHMAD KHAN

United states panel on climate change. memorandum

WORKSHOP. technologies

Re-Advertisement No.: 01/2017 Dated:

The Gandhigram Rural Institute Deemed University Gandhigram

The Comparative Study of Information & Communications Technology Strategies in education of India, Iran & Malaysia countries

RAJASTHAN UNIVERSITY OF HEALTH SCIENCE

STATUS OF OPAC AND WEB OPAC IN LAW UNIVERSITY LIBRARIES IN SOUTH INDIA

Whole School Literacy Policy 2017/18

Impact of Digital India program on Public Library professionals. Manendra Kumar Singh

IMPORTANT GUIDELINE FOR PROJECT/ INPLANT REPORT. FOSTER DEVELOPMENT SCHOOL OF MANAGEMENT, DR.BABASAHEB AMBEDKAR MARATHWADA UNIVERSITY,AURANGABAD...

Integration of ICT in Teaching and Learning

Knowing the Unknown! One Day Orientation Program for School Students of Parikrma Humanity Foundation, Bangalore

Advertisement No. 2/2013

Developing a Distance Learning Curriculum for Marine Engineering Education

Central Institute of Educational Technology (CIET)

Saiyad Nazia Fatima Rizvi* Department of Agri-Business Management, Lovely Professional University, Jalandhar, Punjab. Abstract

Practical Learning Tools (Communication Tools for the Trainer)

EMBA 2-YEAR DEGREE PROGRAM. Department of Management Studies. Indian Institute of Technology Madras, Chennai

Introducing the New Iowa Assessments Reading Levels 12 14

GOVERNMENT ENGINEERING COLLEGE, JHALAWAR (An Autonomous Institute of Govt. of Rajasthan) RECRUITMENT OF NON-TEACHING POSITIONS

OFFICIAL DOCUMENT. Foreign Credits, Inc. Jawaharlal Nehru Technological University

Dspace West Bengal Download or Read Online ebook dspace west bengal in PDF Format From The Best User Guide Database

STUDENT SATISFACTION IN PROFESSIONAL EDUCATION IN GWALIOR

Open Distance Learning - Environmental Management Course

Introduction 3. Outcomes of the Institutional audit 3. Institutional approach to quality enhancement 3

Instructional Approach(s): The teacher should introduce the essential question and the standard that aligns to the essential question

EAL Train the Trainer Course New dates: 31 st January 1 st February 2018

Pltw Biomedical Science Unit 4 Answer Key

ESIC Advt. No. 06/2017, dated WALK IN INTERVIEW ON

CURRICULUM VITAE FOR ANNET NSIIMIRE

The Entrepreneurial Mindset Syllabus

INSTITUTE OF MANAGEMENT STUDIES NOIDA

Curriculum Vitae of Prof. Yoginder Singh Verma

Doctor in Engineering (EngD) Additional Regulations

ANNUAL REPORT. The South Australian Law Reform Institute. 1 January December 2012

HOLY CROSS PREPARATORY SCHOOL TRAVEL PLAN School Travel Plan Holy Cross Preparatory School 1

ScienceDirect. Malayalam question answering system

Common Performance Task Data

UVA Office of University Building Official. Annual Report

International Workshop on Indigenous Knowledge and Disaster Risk Reduction: From Practice to Policy. [Summary Report] September 2008

Eller College of Management. MIS 111 Freshman Honors Showcase

Infrared Paper Dryer Control Scheme

Transcription:

As on 30.09.2015 Status of 50,000 MW Hydro Electric Initiative On 24 th May, 2003, Hon ble Prime Minister of India launched a scheme, formulated by Central Electricity Authority (CEA), for preparation of Preliminary Feasibility Report (PFRs) of 162 New Hydro Electric Schemes totalling to over 50,000 MW. All the PFRs were targetted to be completed by September, 2004. CEA was entrusted with the overall responsibility for the scheme. Preparation of PFRs involved conceptual planning, preparation of project and equipment layouts, infrastructure requirement, preliminary environmental and geological studies, power evacuation arrangement, cost estimates and economic evaluation. PFRs of all the 162 schemes have been prepared ahead of schedule. The schemes are located in 16 states as under : Sl. No. State Number of Schemes Installed 1 Andhra Pradesh 1 81 2 Arunachal Pradesh 42 27293 3 Chhattisgarh 5 848 4 Himachal Pradesh 15 3328 5 Jammu & Kashmir 13 2675 6 Karnataka 5 1900 7 Kerala 2 126 8 Madhya Pradesh 3 205 9 Maharashtra 9 411 10 Manipur 3 362 11 Meghalaya 11 931 12 Mizoram 3 1500 13 Nagaland 3 330 14 Orissa 4 1189 15 Sikkim 10 1469 16 Uttaranchal 33 5282 Total 162 47930 Status of preparation of DPR of these 162 schemes is given at Annex-I

Status of 50000 MW H.E. Initiative Schemes Annex-I As on 30.09.2015 Sl. No.Particulars Nos. Cap. As per PFR Cap. As per DPR Annex 1 DPRs Prepared 40 21317.00 19376.00 A 2 Schemes under S&I 8 2416.00 B 3 Work held up on account of 114 24197.00 (a) Proposed change in / Non allotment 67 9985.00 C (b) Non availability of MoEF Clearances 20 7399.00 D (c) Local Agitation / Other Issues 27 6813.00 E Total 162 47930.00

Annex - A Sheet 1 of 2 50 000 MW Hydroelectric Initiative (DPR Prepared) Annex-A Sl. Scheme State I. C. As per PFR I. C. As per DPR Remarks 1 Bajoli Holi Himachal Pradesh 180.00 180.00 GMR Energy Under Construction 2 Chhatru Himachal Pradesh 108.00 108.00 DSCL DPR concurred by CEA 3 Luhri Himachal Pradesh 465.00 776.00 SJVNL DPR prepared. Returned for resubmission. 4 Tidong-I Himachal Pradesh 60.00 100.00 Nuziveedu seeds Under construction 5 Kawar J&K 320.00 520.00 NHPC DPR prepared, under examination CEA 6 Kiru J&K 430.00 660.00 NHPC DPR prepared, under examination CEA 7 Ratle J&K 560.00 690.00 NHPC Under Construction 8 Ujh J&K 280.00 212.00 CWC DPR prapared 9 Badrinath (Alaknanda) Uttarakhand 140.00 300.00 GMR Energy 10 Bhaironghati Uttarakhand 65.00 381.00 UJVNL 11 Bogudiyar - Sirkari Bhyal Uttarakhand 170.00 146.00 GVK-L&T (Goriganga Hydro Power ) DPR concurred for 300 MW by CEA 08.08.2008. Accorded by MOEF. DPR prepared for 381 MW. Returned for resubmission. DPR prepared. Returned for resubmission. 12 Devsari Uttarakhand 300.00 252.00 SJVNL DPR Concurred by CEA on 07.08.2012. 13 Gangotri Uttarakhand 55.00 UJVNL 14 Harsil Uttarakhand 210.00 UJVNL DPR prepared. Included in Bhaironghati HEP. DPR prepared. Included in Bhaironghati HEP. 15 Jelam Tamak Uttarakhand 60.00 108.00 THDC 16 Rupsiabagar Khasiyabara DPR submitted in Dec.,2012 and under examination in CEA. Uttarakhand 260.00 261.00 NTPC DPR concurred for 261 MW by CEA 17 Lata Tapovan Uttarakhand 310.00 171.00 NTPC Under Construction 18 Nand Prayag Langashu Uttarakhand 141.00 100.00 UJVNL DPR for 100 MW submitted in March, 2011 and returned for resubmission. 19 Naitwar-Mori Uttarakhand 33.00 56.00 SJVNL DPR approved for 60 MW by State Govt. 20 Gundia Karanataka 300.00 200.00 KPCL DPR prepared for 400 MW. Concurred by CEA for 200 MW on 25.08.2008. 21 Attunli Ar.Pradesh 500.00 680.00 Jindal Power ltd. DPR under exmination in CEA 22 Demwe Ar.Pradesh 3000.00 2890.00 Athena Demwe Projects Demwe lower (1750 MW) DPR prepared & Concurred. DPR of Demwe upper (1140 MW) returned to project authorities. 23 Etalin Ar.Pradesh 4000.00 3097.00 Jindal Steel & Power DPR Concurred by CEA on 12.7.2013. 24 Hirong Ar. Pradesh 500.00 500.00 Jaiprakash Power DPR Concurred by CEA on 10.4.2013. 25 Hutong Ar. Pradesh 3000.00 1200.00 Mountain Falls DPR of Hutong-II (1200 MW) Returned in May'12 Hutong-I (588 MW) abandoned. Issue of Storage Vs RoR to be shorted out. 26 Kalai Ar. Pradesh 2600.00 2650.00 Mountain Falls / Reliance Power DPR of Kalai-I (1450 MW) returned for resubmission and DPR Of Kalai-II concurred by CEA on 27.3.15. 27 Naying Ar. Pradesh 1000.00 1000.00 D.S. Construction DPR Concurred by CEA on 31.07.2013.

Annex - A Sheet 2 of 2 Sl. Scheme State I. C. As per PFR I. C. As per DPR Remarks 28 Tato-II Ar. Pradesh 700.00 700.00 Reliance Power DPR Concurred by CEA on 22.05.2012. 29 Badao Ar.Pradesh 120.00 60.00 Coastal Projects Pvt. DPR earlier prepared by NEEPCO. Project has allotted to Coastal Projects Pvt. DPR to be prepared again. 30 Dibbin Ar.Pradesh 100.00 120.00 31 Phanchung Ar.Pradesh 60.00 56.00 KSK Electricity Financing India India bulls Real Estate DPR Concurred by CEA for 120 MW on 04.12 2009. DPR submitted to State Govt. 32 Pakke Bung-I Ar.Pradesh 110.00 40.00 EDCL DPR submitted to State Govt. 33 Simang Ar.Pradesh 90.00 133.00 Adishankar Power Pvt. DPR submitted to State Govt. The project is being developed in two stages of Simang-I (67 MW) and Simang-II (66 MW) 34 Talong Londa Ar.Pradesh 300.00 225.00 GMR Energy DPR Concurred by CEA on 30.04.2013. 35 Tarangwarang Ar.Pradesh 30.00 36.00 India bulls Real Estate DPR submitted to State Govt. 36 Dikhu Nagaland 140.00 186.00 Manu Energy Pvt. DPR Concurred by CEA on 11.02.2014. 37 Mawhu Meghalaya 120.00 90.00 NEEPCO DPR prepared for 90 MW 38 Dikchu Sikkim 105.00 96.00 Sneha kinetic Projects. Under construction 39 Panan Sikkim 200.00 300.00 Himigiri Hydro Pvt. Under construction 40 Rongnichu Sikkim 195.00 96.00 Total 21317.00 19376.00 Madya Bharat Power Co. Under construction. As per PFR the project is indentified as Rogni Storage of 195 MW.

Annex - B Sheet 1 of 1 Sl. Scheme State Annex-B 50 000 MW Hydroelectric Initiative (Schemes under S&I) Installed 1 Tidong-II Himachal Pradesh 70.00 2 Sirkari Bhyol Rupsiabagar Torrent Power AEC & Gammon India Schedule for Preparati on of DPR 7/16 Remarks S & I in progress.tor approved. IC revised to 60 MW. Uttarakhand 210.00 UJVNL 12/16 Survey & Investigation in progress 3 Umduna Meghalaya 57.00 ETA Star Infra. 12/15 S&I in progress. Level problem with Mawhu resolved.ic revised to 90 MW. 4 Umjaut Meghalaya 69.00 ETA Star Infra. & GoMe (JV) 12/15 S&I almost completed DPR under preparation 5 Duimukh Ar.Pradesh 150.00 SJVN 6/16 Survey & Investigation in progress 6 Kapakleyak Ar.Pradesh 160.00 Energy Dev. Co. 12/15 & 12/15 Under S&I. Scheme has been split in three stages as Pachuk-I, Pachuk-II, & Pachuk-II lower. DPR of Pachut-II Lower prepared and is Under Examination in State Govt. 7 Oju-I Ar.Pradesh 700.00 8 Oju-II Ar.Pradesh 1000.00 Navayuga Engg. Co. Navayuga Engg. Co. 12/16 12/16 Oju-I & Oju-II has been merged and renamed as Oju HEP (1800 MW). Survey & Investigation in progress. Total 2416.00

Annex -C Sheet 1 of 2 Annex-C 50 000 MW Hydroelectric Initiative (Schemes held up due to change in / Non-allotment) Sl. Scheme State Installed First Year Tariff (Rs.) 1 Agoline Ar. Pradesh 375.00 3.51 2 Elango Ar.Pradesh 150.00 5.00 3 Etabue Ar.Pradesh 165.00 3.43 4 KurungI&II Ar. Pradesh 330.00 4.04 5 Mirak Ar.Pradesh 141.00 3.42 6 Ringong Ar.Pradesh 150.00 3.61 7 Chanda Ar.Pradesh 110.00 2.67 8 Sebu Ar.Pradesh 80.00 3.71 9 Tenga Ar.Pradesh 600.00 3.52 10 Nalo Ar.Pradesh 360.00 3.27 11 Pondugala Andhra Pradesh 81.00 3.48 12 Kotri Chhattisgarh 150.00 5.48 13 Nugur-I Chhattisgarh 170.00 4.89 14 Nugur-II Chhattisgarh 210.00 4.16 15 Rehar-I Chhattisgarh 171.00 8.70 16 Rehar-II Chattisgarh 147.00 5.16 17 Gondhala Himachal Pradesh 144.00 1.92 18 Jangi Thopan Himachal Pradesh 480.00 2.00 19 Khoksar Himachal Pradesh 90.00 2.46 20 Thopan Powari Himachal Pradesh 480.00 1.81 21 Khab-II Himachal Pradesh 186.00 3.04 22 Gharopa Himachal Pradesh 114.00 2.09 23 Chamba Himachal Pradesh 126.00 1.48 24 Dumkhar J&K 45.00 4.66 25 Kanyunche J&K 45.00 4.71 26 Karkit J&K 30.00 5.40 27 Khalsi J&K 60.00 4.10 28 Takmaching J&K 30.00 5.54 29 Barinium J&K 240.00 2.54 30 Bichlari J&K 35.00 1.11 31 Shuas J&K 230.00 2.94 32 Tamankal Karanataka 300.00 3.32 33 Karappara Kuriarkutty Kerala 66.00 7.88 34 Perianjakully Kerala 60.00 6.25 35 Basania Madhya Pradesh 90.00 17.23 36 Ghargaon Maharashtra 52.00 15.50 37 Hiranyakeshi Maharashtra 18.00 20.26 38 Kadvi Maharashtra 22.00 34.03

Annex -C Sheet 2 of 2 Sl. Scheme State Installed First Year Tariff (Rs.) 39 Kasari Maharashtra 25.00 18.16 40 Kumbhi Maharashtra 17.00 35.19 41 Kunghara Maharashtra 72.00 11.34 42 Pranhita Maharashtra 48.00 10.32 43 Samda Maharashtra 52.00 14.11 44 Wainganga Maharashtra 105.00 3.86 45 Khongnum Chakka st.- Manipur 67.00 4.59 46 Nunglieban Manipur 105.00 5.16 47 Pabaram Manipur 190.00 4.33 48 Mawput Meghalaya 21.00 4.07 49 Nongnam Meghalaya 50.00 2.44 50 Rangmaw Meghalaya 65.00 2.32 51 Sushen Meghalaya 65.00 3.85 52 Tizu Nagaland 150.00 2.56 53 Yangnyu Nagaland 40.00 4.48 54 Boinu Mizoram 640.00 4.83 55 Tlawng Mizoram 45.00 5.84 56 Baljori Orissa 178.00 5.90 57 Lower Kolab Orissa 465.00 7.10 58 Naraj Orissa 287.00 4.92 59 Tikarpara Orissa 259.00 3.69 60 Lingza Sikkim 120.00 2.85 61 Ringpi Sikkim 70.00 3.17 62 Rukel Sikkim 33.00 5.48 63 Deodi Uttarakhand 60.00 1.37 64 Kalika Dantu Uttarakhand 230.00 2.95 65 Khartoi Lumti Talli Uttarakhand 55.00 3.00 66 Bagoli Dam Uttarakhand 72.00 4.10 67 Ramganga Uttarakhand 66.00 3.25 Total 9985.00

Annex - D Sheet 1 of 1 Annex-D 50 000 MW Hydroelectric Initiative (Schemes held up due to Non-availability of MoEF Clearance) Sl. Scheme State Installed 1 Bhareli-I Ar.Pradesh 1120.00 NEEPCO 2 Bhareli-II (Kameng-II) Ar.Pradesh 3 Papu Ar.Pradesh 200.00 4 Kameng Dam Ar.Pradesh 600.00 5 Utung Ar.Pradesh 100.00 600.00 Mountain Falls India bulls Real Estate KSK Energy Ventures KSK Energy Ventures. Status Held up - Pakke wild life sanctuary Held up project in Pakke Wild life Santuary. S&I held up due to MoEF Clearance. Project in Askot wild life Sanctuary. The project may be dropped due to vicinity of wlid life santuary. Project may be dropped as proposal of amalgamating of Utung not accepted by EAC 6 Naba Ar.Pradesh 1000.00 Abir Infra. Pvt. S&I held up due to unapproachable area/difficult & inhospitable terrain and local Law & Order problem 7 Dengser Ar.Pradesh 552.00 8 Niare Ar.Pradesh 800.00 9 Lachen Sikkim 210.00 NHPC Coastal Infra. Pvt. Coastal Infra. Pvt. S&I held up due to unapproachable area/difficult & inhospitable terrain and local Law & Order problem S&I held up due to unapproachable area/difficult & inhospitable terrain and local Law & Order problem S&I held up as per MoEF directives - Projects above Chunthang area should not be considered. 10 Arakot Tiuni Uttarakhand 72.00 UID S&I held up due to non availability of MoEF Clearance. 11 Bokang Baling Uttarakhand 330.00 THDC 12 Chhunger - Chal Uttarakhand 240.00 NHPC 13 Garba Tawaghat Uttarakhand 630.00 NHPC 14 Jadh Ganga Uttarakhand 50.00 THDC S&I held up due to MoEF Clearance. Project in Pakke wild life sanctuary S&I held up due to MoEF Clearance. Project in Askot wild life Sanctuary. Involves Askot wild life Sanctuary. May be dropped. Project in Gangotri National Park. MoEF clearance awaited. 15 Karmoli Uttarakhand 140.00 THDC Project in Gangotri National Park. MoEF clearance awaited. 16 Rishi Ganga - 1 Uttarakhand 70.00 UJVNL Held up due to MoEF Clearance. 17 Rishi Ganga - II Uttarakhand 35.00 UJVNL Held up due to MoEF Clearance. 18 Sela Urthing Uttarakhand 230.00 UJVNL 19 Taluka Sankri Uttarakhand 140.00 UJVNL 20 Urthing Sobla Uttarakhand 280.00 Reliance Power Total 7399.00 MoEF clearance awaited., involves Askot Musk Deer Sanctuary. MoEF problem, located in Govind Pashu Vihar. S&I held up. Project area falls under Askot Musk Deer Sanctuary.

Annex -E Sheet 1 of 1 Annex-E 50 000 MW Hydroelectric Initiative (Schemes which are held up due to Local Agitation / Other Issues) Sl. Scheme State Installed 1 Bardang Himachal Pradesh 114.00 ABG Shipyard Status S&I held up due to local agitation 2 Khab-I Himachal Pradesh 450.00 HPPCL S&I held up due to local agitation 3 Yangthang Himachal Pradesh 261.00 Yangthang Power Ventures S&I held up due to local agitation 4 Shamnot J&K 370.00 NHPC S&I not taken up as the project will submerge National Highway. 5 Agnashini Karanataka 600.00 KPCL S&I held up due to local agitation 6 Gangavali Karanataka 400.00 KPCL S&I held up due to local agitation 7 Kalinadi Stage-III Karanataka 300.00 KPCL S&I held up due to local agitation 8 Bauras Madhya Pradesh 55.00 NHDC 9 Hoshangabad Madhya Pradesh 60.00 NHDC 10 Talem Sikkim 75.00 Shyam Energy Pvt. 11 Rangyong Sikkim 141.00 BSCPL-SCL JV Due to high cost of R&R, the viability of the project could not be established. NHDC showed inability to develop the project. Work held up due to local agitation. S&I held due to opposition of local people 12 Teesta-I Sikkim 320.00 Himalayan Greens Energy Pvt. The project had been cancelled by Govt. of Sikkim. The case of revival of project is in court 13 Gohana Tal Uttarakhand 60.00 THDC Conflict of scheme with other 3 schemes namely Birahiganga, Birahiganga-I,II. State Govt. turned down THDC proposal. 14 Maleri Jelam Uttarakhand 55.00 THDC S&I could not taken be taken up because of local villagers problem. 15 Mapang - Bogidiyar Uttarakhand 200.00 GVK-L&T Project is under subjudice in Supreme Court 16 Jakhol Sankri Uttarakhand 33.00 SJVNL Work of S & I stopped by villagers. 17 Tamak Lata Uttarakhand 280.00 UJVNL Project is under subjudice in Supreme Court a 18 Lungleng Mizoram 815.00 NEEPCO Involves International aspect. 19 Mawblei Meghalaya 140.00 MeECL S&I held up due to fund constraints 20 Nongkolait Meghalaya 120.00 MeSEB S&I held up due to fund constraints 21 Selim Meghalaya 170.00 MeSEB Project was yaken up in STC for conversion from Storage to RoR and developer were asked to carried out studies. 22 Umngi Meghalaya 54.00 MeECL S&I held up due to fund constraints 23 Amulin Ar. Pradesh 420.00 Reliance Power S&I not in progress due to Basin studies recommendation and road/infratsructure issues. 24 Emini Ar. Pradesh 500.00 25 Mihumdon Ar.Pradesh 400.00 Reliance Power Reliance Power S&I not in progress due to Basin studies recommendation and road/infratsructure issues. S&I not in progress due to Basin studies recommendation and road/infratsructure issues. 26 Emra-II Ar.Pradesh 390.00 27 Ashupani Ar.Pradesh 30.00 Total 6813.00 Athena Enegy Ventures Arti Power and Ventures Pvt. No road is available to the project site. Local Issues, communication problem Survey & Investigation held up a