Transportation Improvement Program

Similar documents
Appendix A Cost Estimates

Columbia County School System Preliminary Rezoning Proposal

2008 TRAFFIC VOLUME COUNTS REPORT

FLATHEAD RESERVATION TRANSPORTATION SAFETY MANAGEMENT PLAN April 2009

Designation of Medical Providers

2017 Polk County City Election Polling Locations

NET LEASE INVESTMENT OFFERING. ATI Physical Therapy 4765 Jackson Road Ann Arbor, MI 48103

Update Date: 11/03/2010 Page 1 of 2

Wright State University

OGLE SCHOOL MAKE BEAUTY YOUR BUSINESS PROGRAMS. Cosmetology Esthetics Instructor 2014 MODERN SALON EXCELLENCE IN EDUCATION TOP HONOREE

Please visit to ensure you are looking at the most up to date schedule!

January Tolsma Indoor Track

NATIONAL CENTER FOR EDUCATION STATISTICS

Commerce City Neighborhood Meeting

City of Mississauga Rathburn Road Transit Priority Measures Duke of York Boulevard to Shipp Drive OUR FILE: W.O PREPARED BY: Darek Sobik CC:

Post-16 transport to education and training. Statutory guidance for local authorities

Name in full: Last First Middle. Telephone: Day Evening Social Security No.: Internship: Dates of Start and Completion. Name and Address of Hospital:

HOLY CROSS CATHOLIC SCHOOL SCHOOL INFORMATION PROFILE 2015/2016 SCHOOL YEAR

SEARCH PROSPECTUS: Dean of the College of Law

Transportation Service Standards Effective 9/1/2017

WILLIAMSBURG. Hello Neighbors! Events POOL UPDATE. July Fate July 7, 2017

SimCity 4 Deluxe Tutorial. Future City Competition

A History of College Community Schools Present

Financing Education In Minnesota

TFMA Fall Technical Seminars September 3-5, 2014 Hyatt Regency Riverwalk San Antonio, Texas

Kennedale High School Master Calendar of Events

New Student Application. Name High School. Date Received (official use only)

About the College Board. College Board Advocacy & Policy Center

2014 AIA State Cross Country

Project Advisory Group (PAG) Meeting # 1 Meeting Notes

MID-CITIES STAMP CLUB THE EARLY YEARS By Ray E. Cartier

Keystone Opportunity Zone

1.0 INTRODUCTION. The purpose of the Florida school district performance review is to identify ways that a designated school district can:

Transportation Equity Analysis

Fall Creek Falls State Park Inn Pikesville, TN April 28-30, 2018

Virginia Principles & Practices of Real Estate for Salespersons

2015 Educator Workshops

FORT HAYS STATE UNIVERSITY AT DODGE CITY

Master Plan OAKLAND HOSPITAL

FY Matching Scholarship Grant Allocations by County Based on Free and Reduced Lunch (FRL) Population 1

Cynthia Dawn Martelli, Ed.D.

EPA Approved Laboratories for UCMR 3

Title II of WIOA- Adult Education and Family Literacy Activities 463 Guidance

ST. PAUL'S LUTHERAN WRESTLING BASIC INFORMATION

The Economic Impact of College Bowl Games

Update Peer and Aspirant Institutions

University of Essex Access Agreement

Independent Assurance, Accreditation, & Proficiency Sample Programs Jason Davis, PE

Wake County Utility Connections for Tenants, Renters, and Relocation

The Global Economic Education Alliance

TARRANT COUNTY COLLEGE DISTRICT. Meeting of the Board of Trustees. April23, :30 p.m.

html

North Texas Library Partners, home of the North Texas Regional Library System. Information Toolkit

LESSON TITLE: The Road to Writing Perfect Paragraphs: Follow The Old Red Trail

Executive Summary. Walker County Board of Education. Dr. Jason Adkins, Superintendent 1710 Alabama Avenue Jasper, AL 35501

HOLY CROSS PREPARATORY SCHOOL TRAVEL PLAN School Travel Plan Holy Cross Preparatory School 1

KANSAS SCHOOL FIRE DRILL LOG

CALIFORNIA DEPARTMENT OF EDUCATION

Emergency Medical Technician Course Application

Supporting Youth Transition through Transportation & Mobility

TRENDS IN. College Pricing

STUDENT 16/17 FUNDING GUIDE LOANS & GRANTS FOR FULL-TIME POST-SECONDARY STUDIES

San Antonio Breast Cancer Symposium

Northwest-Shoals Community College - Personnel Handbook/Policy Manual 1-1. Personnel Handbook/Policy Manual I. INTRODUCTION

Draft Budget : Higher Education

MAGNET PROGRAM REVIEW. Authors : Anisa Rhea Ph.D., WCPSS Evaluation and Research Department Roger Regan Ph.D., WCPSS Magnet Programs ABSTRACT

Tale of Two Tollands

Physicians Medical Center (Texas Health Center for Diagnostics & Surgery Plano) Community Health Needs Assessment

Bachelor of Engineering

PLANNING FOR K TO 12. Don Brodeth, CFA Taft Consulting Group

NORTH CAROLINA VIRTUAL PUBLIC SCHOOL IN WCPSS UPDATE FOR FALL 2007, SPRING 2008, AND SUMMER 2008

2017 APPLICATION TO FLY BANNERS/FLAGS On CRA/DDB flagpoles and light posts CITY OF ORLANDO, COMMUNITY REDEVELOPMENT AGENCY, DOWNTOWN DEVELOPMENT BOARD

Council of Educational Facilities Planners, International

2017 Women s Individual Tennis Regional Contacts and Playoff Berth Information

The LAUSD is regulated by the California Education Code and governed by the State Board of Education. SCH No July 2011

L E C O M. LECOM at BRADENTON HOSPITAL DAY 2017 MONDAY, AUGUST 21, 2017 The Ritz-Carlton Sarasota, FL

Michigan State University

FRESNO COUNTY INTELLIGENT TRANSPORTATION SYSTEMS (ITS) PLAN UPDATE

This Access Agreement is for only, to align with the WPSA and in light of the Browne Review.

OUTLETS OF MICHIGAN CENTER OVERVIEW. Outlets of Michigan is a 350,000 square foot ground up. 3.4 million shoppers within a 30 mile radius.

PENNSYLVANIA. A review of the. for the school year. Department of Education

Trends in Higher Education Series. Trends in College Pricing 2016

This Access Agreement is for only, to align with the WPSA and in light of the Browne Review.

Permit Activity Report: 07/31/2014 to 08/06/2014

Availability of Grants Largely Offset Tuition Increases for Low-Income Students, U.S. Report Says

Teach For America alumni 37,000+ Alumni working full-time in education or with low-income communities 86%

Three-Year Capital Plan

POLICE COMMISSIONER. New Rochelle, NY

Fruitvale Station Shopping Center > Retail

GAINESVILLE BUILDING INSPECTION SERVICES COMMERCIAL & INDUSTRIAL PERMIT APPLICATIONS FROM 2/1/2016 TO 2/29/2016

Centennial Middle School (CMS) Design Advisory Team (DAT)

MINUTES VILLAGE OF LA GRANGE BOARD OF TRUSTEES REGULAR MEETING. Town Meeting Spring Avenue School (Gymnasium) 1001 Spring Avenue La Grange, IL 60525

funding support Further Education - Students aged 19+

Segmentation Study of Tulsa Area Higher Education Needs Ages 36+ March Prepared for: Conducted by:

Trends in College Pricing

Sweetwater Center Collegetown District

Global Business. ICA s first official fair to promote co-operative business. October 23, 24 and 25, 2008 Lisbon - Portugal From1pmto8pm.

Wyoming Psychological Association 2017 Fall Conference Continuing Education for Mental Health Professionals

u Articulation and Transfer Best Practices

TRANSPORTATION TECHNICAL COMMITTEE

Transcription:

2013 2016 Transportation Improvement Program Appendix D Environmental Clearance Projects Appendix D contains a list of projects that are not planned for construction within the fouryear time frame of the, but are referenced in the current Transportation Improvement Program in order to allow engineering, feasibility, or environmental clearance efforts to continue. Please note that most of these projects are preliminary and do not represent any commitment of construction funding, but strictly intended to pursue environmental clearance activities consistent with early project development. Consistency with the Mobility Plan will be reexamined as alternatives are explored in these studies and environmental clearance efforts. North Central Texas Council of Governments DFW Metropolitan Planning Organization

2013 2016 Transportation Improvement Program Environmental Clearance Projects Fort Worth District North Central Texas Council of Governments DFW Metropolitan Planning Organization

2:35:04 PM FORT WORTH DISTRICT PROJECTS PAGE: 1 FORT WORTH TARRANT 0008-13-124 IH 820 E NORTH RICHLAND HILL TXDOT-FORT WORTH LIMITS FROM: NORTH INTERCHANGE AT SH 121 RANDOL MILL ROAD 55009 RECONSTRUCT FREEWAY; SH 121 INTERCHANGE AT IH 820; HOV & TMS; FROM 8 TO 10 LANE FACILITY NORTH OF SH 121S & 4 TO 8 LANE FACILITY S OF SH 121 FT1-151.20.1, TSM2-001 FORT WORTH TARRANT 0008-13-210 IH 820 E,R FORT WORTH TXDOT-FORT WORTH LIMITS FROM: IH 820 NB/SB OVER W FORK OF TRINITY AND WEST FORK OF TRINITY RELIEF 53101 REPLACE BRIDGES AS A PART OF IH 820 CORRIDOR IMPROVEMENTS APPROVED FOR REPLACEMENT KM'S EMAIL 2/23/2007 FT1-151.20.1 FORT WORTH TARRANT 0008-13-221 IH 820 E FORT WORTH TXDOT-FORT WORTH LIMITS FROM: APPROX. 0.50 MI S OF TRINITY BLVD. SH 121 54062 INTERIM WIDENING TO PROVIDE 2 ADDITIONAL LANES FT1-151.20.1 FORT WORTH TARRANT 0014-16-252 IH 35W C,E,R FORT WORTH TXDOT-FORT WORTH LIMITS FROM: IH 820 REV DATE: 02/2011 US 81/287 11578 WIDEN 4 LANES TO 8 LANES WITH INTERMITTENT AUXILIARY LANES AND 2/3 TO 2/3/4 FRONTAGE ROADS CONNECTIONS; AND ADD 2 MANAGED LANES FROM BASSWOOD TO IH 820 FOR AN ULTIMATE OF 6 MANAGED LANES FT1-5.40.1, FT1-5.40.2 FORT WORTH TARRANT 0014-16-268 IH 35W C,E,R FORT WORTH TXDOT-FORT WORTH LIMITS FROM: IH 820 IH 30 54109 WIDEN 4/6/8 TO 8 LANES WITH COLLECTOR DISTRIBUTOR INTERMITTENT AUXILIARY LANES AND 2 TO 2/3 FRONTAGE ROAD CONNECTIONS FROM IH 820 TO SH 183, 2 TO 3/4 FROM SH 183 TO SH 121, AND 0 TO 2/3 FROM SH 121 TO IH 30 ADD PROJECT TO APPENDIX D FT1-5.50.1, FT1-5.50.2, FT1-5.60.1 FORT WORTH TARRANT 0014-16-970 IH 35W C FORT WORTH TXDOT-FORT WORTH LIMITS FROM: IH 820 US 81/287 55025 RECONSTRUCT ROADWAY 4 TO 4 LANES AND ADD 0 TO 4 MANAGED TOLL LANES PAYMENT FOR NORTH TARRANT EXPRESS; PE/ROW FOR THIS PROJECT LISTED IN CSJ 0014-16-255 AND CSJ 0014-16-252 FT1-5.40.1, FT1-5.40.2 FORT WORTH TARRANT 0014-16-980 IH 35W C FORT WORTH TXDOT-FORT WORTH LIMITS FROM: IH 820 US 81/287 55021 RECONSTRUCT ROADWAY 4 TO 4 LANES AND ADD 0 TO 4 MANAGED TOLL LANES PAYMENT FOR NORTH TARRANT EXPRESS; PE/ROW FOR THIS PROJECT LISTED IN CSJ 0014-16-255 AND CSJ 0014-16-252 FT1-5.40.1, FT1-5.40.2 PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER D.2

2:35:05 PM FORT WORTH DISTRICT PROJECTS PAGE: 2 FORT WORTH HOOD 0080-03-049 US 377 C,R GRANBURY TXDOT-FORT WORTH LIMITS FROM: END OF BRAZOS RIVER BRIDGE 0.615 SOUTH OF BRAZOS RIVER BRIDGE 54018 WIDEN 4 LANE TO 6 LANE DIVIDED WITH INTERCHANGE AT SH 144 AND FM 51 RSA1-450.3, FT3-007 FORT WORTH HOOD 0080-04-081 US 377 C GRANBURY TXDOT-FORT WORTH LIMITS FROM: EAST OF OLD ACTION HIGHWAY END OF BRAZOS RIVER BRIDGE IN GRANBURY WIDEN 4 LANE CONTINUOUS TWO-WAY LEFT TURN LANE TO 6 LANE DIVIDED WITH INTERCHANGE AT BU 377H TX356 (EARMARK); LOCAL CONTRIBUTION PAID FOR BY HOOD COUNTY 54019 RSA1-450.3, FT3-007 FORT WORTH HOOD 0080-04-090 US 377 E,R CRESSON TXDOT-FORT WORTH LIMITS FROM: AT-GRADE RR CROSSINGS ON US 377 AND SH 171 IN CRESSON 54061 CANCEL; CONSTRUCT RR GRADE SEPARATION TO OVERPASS BOTH RRS CANCELLED TSM2-001 FORT WORTH HOOD 0080-04-094 US 377 E,R GRANBURY TXDOT-FORT WORTH LIMITS FROM: FM 167 NORTH EAST OF OLD ACTON HIGHWAY 54071 WIDEN 4 LANE TO 6 LANE DIVIDED RSA1-450.3 FORT WORTH TARRANT 0081-12-041 IH 35W C FORT WORTH TXDOT-FORT WORTH LIMITS FROM: US 81/287 DENTON COUNTY LINE RECONSTRUCT FROM 4 TO 6 LANES WITH 4 MANAGED TOLL LANES AND 4 FRONTAGE ROAD LANES CONGRESSIONAL EARMARK; CAT 10 - IMD 54104.1 FT1-5.20.2 FORT WORTH TARRANT 0081-13-904 IH 35W C FORT WORTH TXDOT-FORT WORTH LIMITS FROM: DENTON COUNTY LINE EAGLE PARKWAY 54104.2 RECONSTRUCT FROM 4 TO 6 LANES WITH 4 HOV/MANAGED LANES AND 4/6 FRONTAGE ROAD LANES FT1-5.20.2 FORT WORTH TARRANT 0171-04-059 SH 199 E,R AZLE TXDOT-FORT WORTH LIMITS FROM: EAST FRONTAGE RD. AT ASH CREEK 54078 CANCEL - REHABILITATE BRIDGE MO3-002 CANCELLED - TO BE LET WITH CSJ 0171-04-053 ROADWAY PROJECT PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER D.3

2:35:05 PM FORT WORTH DISTRICT PROJECTS PAGE: 3 FORT WORTH TARRANT 0314-07-046 IH 20 C HUDSON OAKS HUDSON OAKS LIMITS FROM: ON IH 20 FRONTAGE ROADS; CENTERPOINT ROAD LAKESHORE DRIVE IN HUDSON OAKS WIDEN EXISTING LAKESHORE BRIDGE, CONSTRUCT NEW FRONTAGE ROAD AND RECONSTRUCT EXISTING WESTBOUND FRONTAGE ROAD ADD TO /S 11754.2 TSM2-001, MO3-002 FORT WORTH TARRANT 0363-01-110 SH 26 E,R HURST TXDOT-FORT WORTH LIMITS FROM: IH 820 CHEEK-SPARGER ROAD (HURST SECTION) 54065 RECONSTRUCT FROM 4 LANE TO 6 LANE DIVIDED RSA1-125.4 FORT WORTH TARRANT 0363-01-139 SH 26 R COLLEYVILLE TXDOT-FORT WORTH LIMITS FROM: HALL-JOHNSON ROAD CHEEK SPARGER 11153.2 4 TO 6 LANES, ADD CURB & GUTTER, STORM SEWER, REPLACE BRIDGES, AND UPGRADE SIGNAL SYSTEM RSA1-125.0 FORT WORTH HOOD 0365-02-027 SH 171 C,E,R CRESSON TXDOT-FORT WORTH LIMITS FROM: 0.58 MI W OF INTERSECTION W/ US 377 JOHNSON COUNTY LINE 54013 CANCEL; CONSTRUCT ONE WAY PAIR ON SH 171 (2 TO 4 LANES) RSA1-452.1 FORT WORTH TARRANT 0718-02-045 FM 156 C FORT WORTH TXDOT-FORT WORTH LIMITS FROM: US 81/287 WATAUGA ROAD (MCELROY) 11244.1 WIDEN 2 TO 4 LANE DIVIDED NRSA1-FTW-4 FORT WORTH JOHNSON 0747-05-035 FM 157 C,E MANSFIELD TXDOT-FORT WORTH LIMITS FROM: BU 287 P US 67 54053 DEVELOP SCHEMATIC TO REALIGN ROADWAY FT3-010 FORT WORTH TARRANT 0902-48-697 CS E FORT WORTH TXDOT-FORT WORTH LIMITS FROM: ON WHITE SETTLEMENT ROAD AT BYPASS CHANNEL IN FORT WORTH REVIEW OF ENVIRONMENTAL DOCUMENT AND SCHEMATIC FOR FUTURE CROSSING OF BYPASS CHANNEL BY WHITE SETTLEMENT ROAD TRINITY RIVER VISION 53125 NRSA1-FTW-25, MO3-002 PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER D.4

2:35:05 PM FORT WORTH DISTRICT PROJECTS PAGE: 4 FORT WORTH TARRANT 0902-48-998 VA C,T FORT WORTH FWTA LIMITS FROM: DFW INTERNATIONAL AIRPORT COTTONBELT RAILWAY CONSTRUCT NEW RAIL CONNECTION; DFW INTERNATIONAL AIRPORT INTERMODAL CONNECTION TO COTTONBELT TMF DOLLARS 11515 TR1 10315.0, TR3-007 FORT WORTH JOHNSON 0902-50-104 CS C,R BURLESON TXDOT-FORT WORTH LIMITS FROM: ON ASHBURY FROM CATHY DRIVE 0.3 MILE S OF HULEN (SHAFFSTALL) 53079 CONSTRUCTION OF A 4 LANE EXTENSION OF ALSBURY BOULEVARD 2008 OMNIBUS APPROPRIATIONS ACT NRSA1-FTW-20 FORT WORTH TARRANT 1068-02-076 IH 30 E,R ARLINGTON TXDOT-FORT WORTH LIMITS FROM: 1.0 MI W OF SH 360 GREAT SOUTHWEST PKWY 11253.2 CONST DIR CONN INTCHG AT SH 360 & TRAFFIC MANAGEMENT SYSTEM IN1-9.28.1, TSM3-002 FORT WORTH TARRANT 1068-02-121 IH 30 E,R FORT WORTH TXDOT-FORT WORTH LIMITS FROM: MORRISON DRIVE OVER IH30 54067 CANCEL PROJECT; REHAB & WIDEN THE 2 LANE BRIDGE AND APPR MO3-002 TO REPLACE IN SYNC WITH CSJ 1068-02-072; CANCELLED FORT WORTH TARRANT 2266-02-054 SH 360 E,R ARLINGTON TXDOT-FORT WORTH LIMITS FROM: AVE K/BROWN BLVD ABRAM STREET RECONSTRUCT FROM 6 LANES TO 6 LANES FROM AVE K/BROWN BLVD TO IH 30 AND RECONSTRUCT FROM 6 TO 8 LANES FROM IH 30 TO ABRAM ST WITH SH 180 INTERCHANGE AMENDMENT 51345 FT1-9.20.3, FT1-9.30.1 FORT WORTH TARRANT 2266-02-086 SH 360 E,R ARLINGTON TXDOT-FORT WORTH LIMITS FROM: ABRAM STREET IH 20 51346 RECONSTRUCT FROM 6 TO 8 LANES AMENDMENT FT1-9.30.1 PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER D.5

2013 2016 Transportation Improvement Program Environmental Clearance Projects Dallas District North Central Texas Council of Governments DFW Metropolitan Planning Organization

2:34:25 PM DALLAS DISTRICT PROJECTS PAGE: 1 DALLAS ROCKWALL 0009-04-060 SH 66 E ROCKWALL TXDOT-DALLAS LIMITS FROM: SH 205 (ROCKWALL SQUARE) FM 549 53081 WIDEN FROM 2 LANE RURAL UNDIVIDED TO 4 LANE URBAN DIVIDED ENGINEERING AUTHORIZED BY CONGRESSIONAL DEMO FUNDS RSA1-617.0, RSA1-617.1, RSA1-617.4 DALLAS COLLIN 0047-06-145 US 75 E OTHER TXDOT-DALLAS LIMITS FROM: DALLAS COUNTY LINE SH 121 / SPUR 399 20201 HOV ACCESS STUDY (COLLIN COUNTY PORTION) PE STUDY ONLY FT1-23.30.2 DALLAS DALLAS 0047-07-219 US 75 E OTHER TXDOT-DALLAS LIMITS FROM: IH 635 COLLIN COUNTY LINE HOV ACCESS STUDY (DALLAS COUNTY PORTION) 20217 FT1-23.30.2, FT1-23.40.1, FT1-23.40.2, FT1-23.40.3, FT1-23.40.4, FT1-23.405., FT1-23.50.1 DALLAS COLLIN 0047-14-053 US 75 E MELISSA TXDOT-DALLAS LIMITS FROM: OUTER LOOP (CR 366) GRAYSON COUNTY LINE ENGINEERING FOR RECONSTRUCTION OF 4 TO 6 MAIN LANES; RECONSTRUCT 2 LANE FRONTAGE ROADS DFW RTR-CC2 FUNDS 20084 FT1-23.10.1 DALLAS ELLIS 0048-04-079 IH 35E E,R WAXAHACHIE TXDOT-DALLAS LIMITS FROM: US 77 SOUTH OF WAXAHACHIE US 77 NORTH OF WAXAHACHIE 51422 RECONSTRUCT AND WIDEN FROM 4 LANES TO 6 LANES MAY SPLIT INTO 2 PROJECTS FT1-7.100.5 DESIGNED BUT NEEDS CONSTRUCTION FUNDS - C/O TO APP D DALLAS DENTON 0081-03-047 US 377 C OTHER DENTON CO LIMITS FROM: SOUTH OF FM 1171 CRAWFORD ROAD 20115 RECONSTRUCT AND WIDEN 2 LANE RURAL HIGHWAY AS 4 LANE DIVIDED URBAN DFW RTR-DE1 FUNDS IN 2014 RSA1-368.1 DALLAS DENTON 0081-03-054 US 377 E OTHER TXDOT-DALLAS LIMITS FROM: CRAWFORD RD NORTH OF HICKORY CREEK 55002 RECONSTRUCT AND WIDEN 2 LANE RURAL HIGHWAY AS A 4 LANE DIVIDED URBAN ADD TO /S; PASS THRU FUNDED RSA1-368.2 PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER D.6

2:34:25 PM DALLAS DISTRICT PROJECTS PAGE: 2 DALLAS DENTON 0081-04-038 US 377 E OTHER TXDOT-DALLAS LIMITS FROM: NORTH OF HICKORY CREEK FM 1830 55004 RECONSTRUCT AND WIDEN 2 LANE RURAL HIGHWAY AS A 4 LANE DIVIDED URBAN ADD TO /S; PASS THRU FUNDED RSA1-368.2 DALLAS COLLIN 0091-03-022 SH 289 E OTHER TXDOT-DALLAS LIMITS FROM: N BUS 289C, NORTH OF CELINA N CR 60/CR 107 (GRAYSON C/L) 54023 RECONSTRUCT AND WIDEN 2 LN RURAL HIGHWAY TO 6 LNS RSA1-202.1 DALLAS DALLAS 0092-01-052 US 175 C DALLAS TXDOT-DALLAS LIMITS FROM: ON SM WRIGHT PHASE 2 (EXISTING SM WRIGHT RECONSTRUCTION FROM US 175/ SH 310 IH 45 RECONSTRUCT FREEWAY TO 6 LANE ARTERIAL WITH TRANSITIONS TO SH 310 (NORTH OF BUDD ST.) R PHASE IS REALLY UTILITY FUNDING; CONSTRUCTION FUNDING INCLUDES $3.088 M OF CE; RTR 121-DA2 FUNDS 20062 FT1-29.10.1, RSA1-84.3, RSA1-84.4 DALLAS DALLAS 0092-14-080 IH 345 E DALLAS TXDOT-DALLAS LIMITS FROM: EAST OF DOWNTOWN BETWEEN IH 30 AND SPUR 366 (WOODALL RODGERS FREEWAY) 20266 ENGINEERING FOR BRIDGE RECONSTRUCTION M03-002 DALLAS DALLAS 0094-07-020 SH 183 E,R DALLAS TXDOT-DALLAS LIMITS FROM: WEST END OF ELM FORK TRINITY RIVER BRIDGE IH 35E 54066 ADD 6 CONCURRENT HOV/MANAGED LANES TO EXISTING 8 MAINLANES AND 4/6 FRONTAGE LANES FROM SH 183 SOUTH OF SH 114 TO FUTURE TRINITY PKWY AND ADD 4 CONCURRENT HOV/MANAGED LANES TO EXISTING 6 MAINLANES AND 4/6 FRONTAGE LANES FROM TRINITY PKWY TO IH 35E CONSTRUCTION PHASE IN APPENDIX D FT1-22.40.2, FT1-22.40.3 DALLAS DALLAS 0095-13-024 IH 20 E,R MESQUITE TXDOT-DALLAS LIMITS FROM: IH 20 AT FALCON'S LAIR INTERCHANGE 52370 CONSTRUCT DIAMOND INTERCHANGE IN1-30.547.1 CANCELLED THRU DEVELOPMENT PER TXDOT DALLAS ELLIS 0172-08-053 US 287 E OTHER TXDOT-DALLAS LIMITS FROM: SOUTH OF SH 34 IH 45 SOUTH OF ENNIS WIDEN 2-LANE UNDIVIDED HIGHWAY TO 4-LANE DIVIDED HIGHWAY WITH GRADE SEPARATED INTERCHANGES AND CONTROL OF ACCESS ENNIS BYPASS; PH 2 53082 FT1-1.110.6, IN1-1.33.1, IN1-1.560.1, IN1-1.561.1, IN1-1.562.1, TSM2-001 PER 2013-2016 DEVELOPMENT CONST. COST $70,460,035; C/O TO APPX D PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER D.7

2:34:25 PM DALLAS DISTRICT PROJECTS PAGE: 3 DALLAS KAUFMAN 0173-04-026 SH 34 E OTHER TXDOT-DALLAS LIMITS FROM: SH 243 (MULBERRY ST) IN KAUFMAN FM 2578/SH 34 INTERS. IN TERRELL 54058 CONSTRUCT 4 LN RURAL THOROUGHFARE & STRUCTURE (NEW LOCATION) RSA1-610.07, RSA1-610.1 DALLAS DENTON 0196-02-073 IH 35E C OTHER TXDOT-DALLAS LIMITS FROM: SOUTH OF GARDEN RIDGE BLVD NORTH END OF LAKE LEWISVILLE BRIDGE 11798.3 RECONSTRUCT 6 LANE TO 8 MAINLANES, 2 REVERSIBLE MANAGED/HOV AND 2 LANE FRONTAGE ROAD EACH SIDE WITH SIDEWALKS (PHASED IMPLEMENTATION OF IH 35E CORRIDOR) FT1-7.10.5, FT3-010, F3-004 STAGED IMPLEMENTATION OF ULTIMATE BUILD; REVISE FUNDING & SCOPE; CMAQ FOR HOV/MANAGED LANES ONLY; RTR 121-DE1 FUNDS NOX (LBS/DAY): 58.99 VOC (LBS/DAY): 48.04 DALLAS DALLAS 0196-03-223 IH 35E E,R DALLAS TXDOT-DALLAS LIMITS FROM: LOMBARDY LANE SPUR 482 (STOREY RD) 52201 CONSTRUCT 2 SB FRONTAGE ROAD AND ENTRANCE AND EXIT RAMPS FT1-7.50.1 DALLAS DALLAS 0197-02-107 US 175 E DALLAS TXDOT-DALLAS LIMITS FROM: SH 310 AND SM WRIGHT IH 20 11900 RECONSTRUCT AND WIDEN FREEWAY FROM 6 TO 8 LANES WITH AUXILIARY LANES AND DISCONTINUOUS FRONTAGE ROADS FT1-36.10.1 DALLAS ELLIS 0261-01-041 US 67 E MIDLOTHIAN TXDOT-DALLAS LIMITS FROM: AT LAKE RIDGE PKWY 55014 CONSTRUCT INTERCHANGE - PHASE 1 TSM2-001 ADD TO /S DALLAS DALLAS 0261-02-074 US 67 C,E CEDAR HILL TXDOT-DALLAS LIMITS FROM: FM 1382 NEAR WHEATLAND RD 54086 WIDEN 4 LANE FREEWAY FROM 4 TO 6 LANES; CONSTRUCT ADDITIONAL LANES IN MEDIAN REVISE LIMITS AND SCOPE FT1-38.20.1 DALLAS DENTON 0353-02-072 SH 114 E FORT WORTH TXDOT-DALLAS LIMITS FROM: EAST OF FM 156 WEST OF IH 35W 53195 CONSTRUCT 6 MAINLANES (EXISTING 6 LANE FRONTAGE ROADS) FT1-12.20.3 PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER D.8

2:34:25 PM DALLAS DISTRICT PROJECTS PAGE: 4 DALLAS DALLAS 0353-04-068 SP 348 E IRVING TXDOT-DALLAS LIMITS FROM: SH 114 W OF LUNA RD (NEAR ELM FORK TRIN R) 54054 WIDEN 4 LANE DIVIDED URBAN TO 6 LANE DIVIDED URBAN RSA1-26.0, RSA1-26.1 DALLAS DALLAS 0353-04-069 SP 348 E,R DALLAS TXDOT-DALLAS LIMITS FROM: ON LUNA RD AT NORTHWEST HWY IN DALLAS 51240 CONSTRUCT GRADE SEPARATION TSM2-001 NWAO HAS REACHED CONCUR W/ CITY OF DALLAS ON SCHMTC LAYOUT DALLAS DALLAS 0364-02-017 SH 121 C LEWISVILLE TXDOT-DALLAS LIMITS FROM: TARRANT COUNTY LINE DENTON C/L NEAR DENTON CREEK 11239 CONVERT 4 LANE DIVIDED TO 10 LANE FREEWAY WITH 2 TO 3/4 LANE FRONTAGE ROADS REVISE FUNDING FT1-11.50.1 PE FUNDS IN FY 2011 DALLAS DENTON 0364-03-095 SH 121 C,E,R THE COLONY THE COLONY LIMITS FROM: AT SOUTH COLONY BLVD 55007 CONSTRUCT GRADE SEPARATION OVER MAINLANES; ADJUST RAMPS; AND IMPROVE INTERSECTION ADD TO /S TSM2-001 DALLAS DALLAS 0430-01-053 SH 352 E,R SUNNYVALE TXDOT-DALLAS LIMITS FROM: US 80 EB FRONTAGE RD NORTH OF LONG CREEK RD 53098 ADDITION OF TURN LANES - ADD A CONTINUOUS LEFT TURN LANE AND ADD RIGHT TURN LANES TSM2-001 DALLAS KAUFMAN 0495-00-000 CS C OTHER TXDOT-DALLAS LIMITS FROM: PLACEHOLDER FOR FUTURE PROJECTS 55011 PLACEHOLDER FOR FUTURE PROJECTS F3-001 ADD TO /S; PROPOSITION 12 SWAP WITH COLLIN COUNTY DALLAS DALLAS 0581-02-124 LP 12 C,E IRVING TXDOT-DALLAS LIMITS FROM: AT SH 183 11527 RECONSTRUCT INTERCHANGE (PH 1) - TEXAS STADIUM INTERCHANGE IN1-17.22.1 PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER D.9

2:34:25 PM DALLAS DISTRICT PROJECTS PAGE: 5 DALLAS DALLAS 0581-02-128 LP 12 E DALLAS TXDOT-DALLAS LIMITS FROM: SH 114 IH 35E 53048 WIDEN 6 TO 8 LANE FRWY TSM2-005, FT1-17.10.1 DALLAS KAUFMAN 0751-01-040 FM 148 E,R OTHER TXDOT-DALLAS LIMITS FROM: FM 148 NORTH OF US 175 US 175 54003 REALIGN HIGHWAY EAST OF CRANDALL; 2 LANE FACILITY CANCELLED THRU 13-16 DEVELOPMENT REQUEST BY TXDOT NRSA1-DAL-29 DALLAS KAUFMAN 0751-02-019 FM 148 E,R OTHER TXDOT-DALLAS LIMITS FROM: US 175, EAST OF CRANDALL FM 148 SOUTH OF US 175 54002 REALIGN HIGHWAY EAST OF CRANDALL; 2 LANE FACILITY CANCELLED THRU 13-16 DEVELOPMENT REQUEST BY TXDOT NRSA1-DAL-29 DALLAS DALLAS 0918-00-142 VA E OTHER TXDOT-DALLAS LIMITS FROM: IH 20 AT DALLAS/KAUFMAN C/L WISE/DENTON C/L ROUTE STUDIES FOR DETERMINATION OF LOOP 9 IN KAUFMAN, ROCKWALL, COLLIN, AND DENTON COUNTIES New CSJ 0918-24-174 20088 FT3-011 DALLAS DALLAS 0918-45-121 VA C DALLAS DALLAS LIMITS FROM: TRINITY PARKWAY FROM IH 35E/SH 183 SPLIT SH 310//US 175 20180 CONSTRUCTION OF NEW 6 LANE TOLLWAY NEW LOCATION FT1-26.10.1, FT1-26.10.2, FT1-26.20.1, IN1-7.26.1, IN1-22.26.1 PE FUNDED THROUGH 11538/CSJ 0918-45-862; RTR FUNDS ARE FROM THE REPAYMENT OF PGBT-EE LOAN; FUNDS TO BE DEPOSITED INTO RTR 121-DA2 DALLAS DALLAS 0918-45-269 CS C DALLAS DART LIMITS FROM: ON INWOOD AT FOREST PARK 526 ADD TURN LANES AND TRAFFIC SIGNAL TSM2-001, TSM2-002 DEFEDERALIZED THRU 13-16 DEVELOPMENT DALLAS DALLAS 0918-45-270 CS E,R DALLAS DALLAS LIMITS FROM: ON AIRDROME FROM LEMMON MOCKINGBIRD LN 785 INTERSECTION IMPROVEMENT TSM2-001 PLANS TO BE REDONE & COSTS REVISITED NOX (LBS/DAY): 0.36 VOC (LBS/DAY): 1.54 PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER D.10

2:34:25 PM DALLAS DISTRICT PROJECTS PAGE: 6 DALLAS DALLAS 0918-45-812 CS E,R IRVING IRVING LIMITS FROM: ON CONFLANS RD FROM W OF SH 161 VALLEY VIEW LANE IN CITY OF IRVING 11237.2 CONSTRUCT 4-LANE DIVIDED FACILITY NRSA1-DAL-11 DALLAS DALLAS 0918-45-862 VA E DALLAS NTTA LIMITS FROM: TRINITY PARKWAY FROM IH 35E/SH 183 SPLIT SH 310/US 175 ENGINEERING AND TRAFFIC & REVENUE STUDY FOR NEW LOCATION 6 LANE TOLLWAY (TOLL) $50 M IN FUNDING ON HOLD UNTIL COE RELEASE OF CORRIDOR; LOAN TO BE REPAID BY ENTITY THAT BUILDS THE ULTIMATE PROJECT; CONTRUCTION FUNDED THROUGH 20180/CSJ 0918-45-121; RTR 121-DA2 FUNDS 11538 FT1-26.10.1, FT1-26.10.2, FT1-26.20.1 DALLAS DALLAS 0918-45-900 MH C DALLAS DART LIMITS FROM: LEMMON AVENUE AT BLUFFVIEW 533 INTERSECTION IMPROVEMENTS DEFEDERALIZED THRU 13-16 DEVELOPMENT TSM2-001 DALLAS DALLAS 0918-47-051 CS C,R GRAND PRAIRIE DALLAS CO LIMITS FROM: ON WILDLIFE PARKWAY; SH 161 BELT LINE ROAD 20213 WIDEN 0/2 LANE RURAL TO A 2/4 LANE DIVIDED ARTERIAL RTR 121-DA2 FUNDS NRSA1-DAL-107 PROJECT PARTIALLY FUNDED WITH PGBT EE LOAN REPAYMENT FUNDS (RTR 121-DA2 FUNDS) DALLAS VARIOUS 0918-47-939 IH 635 C DALLAS NCTCOG LIMITS FROM: HOV 3+ SUBSIDY FOR IH 635 (LBJ) 20263 HOV 3+ SUBSIDY FT3-006, F3-007 PROJECT FUNDED WITH PGBT EE LOAN REPAYMENT (TO BE REPAID INTO RTR 121-DA1 ACCOUNT) DALLAS ROCKWALL 1016-01-023 FM 551 E,R OTHER TXDOT-DALLAS LIMITS FROM: IH 30 SH 66 53051 RECONSTRUCT 2-LANE TO 3-LANE W/ CONTINUOUS LEFT TURN LANE TSM2-001 DALLAS ELLIS 1051-01-038 FM 664 E OTHER TXDOT-DALLAS LIMITS FROM: US 287 IN WAXAHACHIE IH 45 IN FERRIS FEASIBILITY STUDY TO WIDEN 2 LANE RURAL TO 4 LANE DIVIDED 83223 RSA1-523.0, RSA1-523.1, RSA1-523.2, NRSA-DAL-128 PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER D.11

2:34:25 PM DALLAS DISTRICT PROJECTS PAGE: 7 DALLAS DALLAS 1068-04-119 IH 30 E,R GRAND PRAIRIE TXDOT-DALLAS LIMITS FROM: SH 161 NW 7TH STREET IN GRAND PRAIRIE 52527 CONSTRUCT 2/3 LANE FRONTAGE ROADS TPP(S) MEMO 7-28-99; ROW BY TXDOT; (SEGMENT 5); REVISE SCOPE FT1-28.50.1 DALLAS DALLAS 1068-04-122 IH 30 C GRAND PRAIRIE TXDOT-DALLAS LIMITS FROM: BELT LINE RD MACARTHUR BLVD 52520 CONSTRUCT 2/3 FRONTAGE ROADS FT1-28.50.2 DALLAS DALLAS 1068-04-149 IH 30 E GRAND PRAIRIE TXDOT-DALLAS LIMITS FROM: NW 7TH STREET BELT LINE ROAD 54033 CONSTRUCT 3 LANE WB FRONTAGE ROAD FT1-28.50.1 DALLAS ROCKWALL 1290-03-016 SH 276 C,E ROCKWALL TXDOT-DALLAS LIMITS FROM: FM 549 FM 551 51255 RECONSTRUCT AND WIDEN 2 LANE RURAL TO 6 LANE DIVIDED URBAN NO ROW REQ'D; MOVED BACK TO APPENDIX D RSA1-612.1 DALLAS ROCKWALL 1290-03-020 SH 276 E,R ROCKWALL TXDOT-DALLAS LIMITS FROM: FM 551 FM 548 52524 RECONSTRUCT AND WIDEN 2 LANE RURAL TO 6 LANE DIVIDED URBAN RSA1-612.1 DALLAS ROCKWALL 1290-04-011 SH 276 E,R ROCKWALL TXDOT-DALLAS LIMITS FROM: FM 548 COUNTY ROAD 2472 54035 RECONSTRUCT AND WIDEN 2 LANE RURAL TO 6 LANE DIVIDED URBAN W/ 1290-03-020 RSA1-612.1 DALLAS KAUFMAN 1494-03-001 FM 3486 R OTHER TXDOT-DALLAS LIMITS FROM: FM 986 SH 34, NW 54036 CONSTRUCT NEW 2-LANE FM HIGHWAY SCHMTC APPRVD 03-13-06; ROW BY COUNTY NRSA1-DAL-111 PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER D.12

2:34:25 PM DALLAS DISTRICT PROJECTS PAGE: 8 DALLAS COLLIN 2056-01-042 FM 2551 E,R MURPHY COLLIN CO LIMITS FROM: FM 2514 FM 2170 SOUTH 83209 RECONSTRUCT AND WIDEN 2 LANE RURAL TO 6 LANE URBAN DIVIDED NRSA1-DAL-110 DALLAS DENTON 2250-02-014 LP 288 E,R DENTON DENTON CO LIMITS FROM: US 380 WEST OF DENTON IH 35W SOUTH OF DENTON 53075 CONSTRUCT TWO LANE RURAL ROADWAY ON NEW LOCATION PH 1 OF ULTIMATE FREEWAY - EXTENSION OF LOOP 288 RSA1-386.3, RSA1-386.4 DALLAS DALLAS 2374-01-136 IH 635 E,R OTHER TXDOT-DALLAS LIMITS FROM: MIDWAY ROAD SH 289 (PRESTON ROAD) 54044 IMPROVE 8 LANE FREEWAY AND CONSTRUCT 6 HOV/MANAGED LANES FT1-130.30.2 DALLAS DALLAS 2374-07-046 IH 635 E IRVING TXDOT-DALLAS LIMITS FROM: LUNA ROAD EAST OF LUNA ROAD (BNSF RR) 54042 IMPROVE FREEWAY AND ADD 4 HOV/MANAGED LANES FT1-130.20.2 DALLAS COLLIN 2845-01-015 FM 455 E,R OTHER COLLIN CO LIMITS FROM: WEST OF WILD ROSE LANE SH 121 54063 CONSTRUCT 6 LANE URBAN DIVIDED ON NEW ALIGNMENT TO BE FUNDED BY COLLIN COUNTY NRSA1-DAL-52 DALLAS DALLAS 2964-06-011 SH 190 E,R OTHER TXDOT-DALLAS/NTTA LIMITS FROM: IH 30 US 80 54015 NEW LOCATION 6 LANE TOLLWAY (911); EAST BRANCH; EIS ONGOING FT1-39.10.1 DALLAS DALLAS 2964-06-012 SH 190 E OTHER TXDOT-DALLAS LIMITS FROM: US 80 IH 20 54070 NEW LOCATION 6 LANE TOLLWAY (912); EAST BRANCH; EIS ONGOING FT1-39.10.1 PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER D.13

2:34:25 PM DALLAS DISTRICT PROJECTS PAGE: 9 DALLAS DENTON 3547-03-004 SH 121 E OTHER TXDOT-DALLAS LIMITS FROM: DALLAS COUNTY LINE EAST OF BUSINESS 121H CONSTRUCT CONCRETE TRAFFIC BARRIER AND TRANSITIONS FROM DALLAS COUNTY; WIDEN FREEWAY TO TEN LANES SH 121 SECTION 13 54051 FT1-11.50.1 DALLAS DALLAS 3547-04-001 SH 121 E OTHER TXDOT-DALLAS LIMITS FROM: INTERSECTION BUSINESS 121H DENTON COUNTY LINE 54059 TRANSITION OF FREEWAY WIDENING SH 121 SECTION 13 FT1-11.50.1 PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER D.14