Accreditation Mid-Term Report Standard III B Physical Resources

Similar documents
3/6/2009. Residence Halls & Strategic t Planning Overview. Residence Halls Overview. Residence Halls: Marapai Supai Kachina

Security & Technology. Track & Tennis. Repairs. Remodeling & Interior Repairs. Exterior Wall. Repairs

University of Central Florida Board of Trustees Finance and Facilities Committee

Geographic Area - Englewood

2 Organizational. The University of Alaska System has six (6) Statewide Offices as displayed in Organizational Chart 2 1 :

Self Assessment. InTech Collegiate High School. Jason Stanger, Director 1787 Research Park Way North Logan, UT

FACILITIES & FINANCING: THE GOOD, THE BAD, AND THE UGLY... Jennifer Afdahl Rice Jonathan Dean, Ed. D. David Sciaretta, Ed. D.

Augusta Independent Board of Education August 11, :00 PM 207 Bracken Street Augusta, KY

Centennial Middle School (CMS) Design Advisory Team (DAT)

Listening to your members: The member satisfaction survey. Presenter: Mary Beth Watt. Outline

Geographic Area - Englewood

FY16 UW-Parkside Institutional IT Plan Report

CHESTER FRITZ AUDITORIUM REPORT

Oakridge School District #76

For the Ohio Board of Regents Second Report on the Condition of Higher Education in Ohio

Navitas UK Holdings Ltd Embedded College Review for Educational Oversight by the Quality Assurance Agency for Higher Education

HOLY CROSS CATHOLIC SCHOOL SCHOOL INFORMATION PROFILE 2015/2016 SCHOOL YEAR

California Professional Standards for Education Leaders (CPSELs)

Dyer-Kelly Elementary 1

VOL VISION 2020 STRATEGIC PLAN IMPLEMENTATION

ASMC PROGRAM REVIEW

Dyer-Kelly Elementary School School Accountability Report Card Reported Using Data from the School Year Published During

Nearing Completion of Prototype 1: Discovery

FY2018 ANNUAL CAPITAL BUDGET. University of Minnesota

FORT HAYS STATE UNIVERSITY AT DODGE CITY

UVA Office of University Building Official. Annual Report

Position Statements. Index of Association Position Statements

Graphic Imaging Technology II - Part two of a two-year program designed to offer students skills in typesetting, art and pasteup,

Statewide Strategic Plan for e-learning in California s Child Welfare Training System

MEE 6501, Advanced Air Quality Control Course Syllabus. Course Description. Course Textbook. Course Learning Outcomes. Credits.

Here are some helpful steps to guide you in completing the Contributor s Form below:

STUDENT EXPERIENCE a focus group guide

The City University of New York

Peterborough Eco Framework

Hampton Falls School Board Meeting September 1, W. Skoglund and S. Smylie.

STATE CAPITAL SPENDING ON PK 12 SCHOOL FACILITIES NORTH CAROLINA

SPORTS POLICIES AND GUIDELINES

UTILITY POLE ATTACHMENTS Understanding New FCC Regulations and Industry Trends

LEAD AGENCY MEMORANDUM OF UNDERSTANDING

Dyer-Kelly Elementary 1

Delaware Performance Appraisal System Building greater skills and knowledge for educators

Hayward Unified School District Community Meeting #2 at

Executive Summary. Saint Francis Xavier

CHAPTER XI DIRECT TESTIMONY OF REGINALD M. AUSTRIA ON BEHALF OF SOUTHERN CALIFORNIA GAS COMPANY AND SAN DIEGO GAS & ELECTRIC COMPANY

Internship Program. Employer and Student Handbook

STANDARDS AND RUBRICS FOR SCHOOL IMPROVEMENT 2005 REVISED EDITION

Diocesan Review April 14, Catholic Athletic Trails West Catholic High School Catholic Central High School

Barstow Community College NON-INSTRUCTIONAL

Carnegie Mellon University Student Government Graffiti and Poster Policy

FRAMINGHAM SCHOOL COMMITTEE MEETING MINUTES Superintendent s Conference Room July 15, 2014

Assessment of Student Academic Achievement

Technology Plan Woodford County Versailles, Kentucky

Librarian/Library Faculty Meeting

Curriculum for the Academy Profession Degree Programme in Energy Technology

BYLAWS of the Department of Electrical and Computer Engineering Michigan State University East Lansing, Michigan

Opening Doors. Strategic Plan 2016 through Bishop Dunne Catholic School

Fiscal Years [Millions of Dollars] Provision Effective

Procedure for quality assurance of space and equipment - QP.11

A Financial Model to Support the Future of The California State University

State Parental Involvement Plan

Report of Shree Sanaitha Primary School Kitchen and Dining Sanaitha-4, Siraha District Nepal.!!! Submitted to Kinderhilfe Nepal-Mitterfels e. V.

SORORITY AND FRATERNITY AFFAIRS FLORIDA GREEK STANDARDS ACCREDITATION PROGRAM FOR SOCIAL SORORITIES AND FRATERNITIES

Charter School Reporting and Monitoring Activity

CHELMSFORD SCHOOL COMMITTEE REGULAR MEETING October 8, 2013 Meeting Minutes

GENERAL UNIVERSITY POLICY APM REGARDING ACADEMIC APPOINTEES Limitation on Total Period of Service with Certain Academic Titles

university of wisconsin MILWAUKEE Master Plan Report

Stakeholder Debate: Wind Energy

Schenectady County Is An Equal Opportunity Employer. Open Competitive Examination

Preparing for Tomorrow s Careers

Definitions for KRS to Committee for Mathematics Achievement -- Membership, purposes, organization, staffing, and duties

Class Numbers: & Personal Financial Management. Sections: RVCC & RVDC. Summer 2008 FIN Fully Online

Program Change Proposal:

Higher Education Review (Embedded Colleges) of Navitas UK Holdings Ltd. Hertfordshire International College

Occupational Therapist (Temporary Position)

OP-P 602 A-E Page 1 of 8. Operating Protocol-Procedure #: 602 (A-E) Category: Instruction Office of Primary Responsibility: Office of Academic Affairs

Bella Vista High School School Accountability Report Card Reported Using Data from the School Year Published During

10-Year Priority List

George A. Buljan Middle School School Accountability Report Card Reported Using Data from the School Year Published During

Higher Education. Pennsylvania State System of Higher Education. November 3, 2017

ACHIEVING SUSTAINABILITY THROUGH GREEN OFFICES PRACTICES

Milton Public Schools Fiscal Year 2018 Budget Presentation

ADDENDUM 2016 Template - Turnaround Option Plan (TOP) - Phases 1 and 2 St. Lucie Public Schools

John F. Kennedy Middle School

Student Transportation

THE COLLEGE OF WILLIAM AND MARY IN VIRGINIA INTERCOLLEGIATE ATHLETICS PROGRAMS FOR THE YEAR ENDED JUNE 30, 2005

Keystone Opportunity Zone

STRENGTHENING RURAL CANADA COMMUNITY: SALMO, BRITISH COLUMBIA

SAP EDUCATION SAMPLE QUESTIONS: C_TPLM40_65. Questions. In the audit structure, what can link an audit and a quality notification?

Envision Success FY2014-FY2017 Strategic Goal 1: Enhancing pathways that guide students to achieve their academic, career, and personal goals

CURRICULUM VITAE FOR ANNET NSIIMIRE

PROGRAM HANDBOOK. for the ACCREDITATION OF INSTRUMENT CALIBRATION LABORATORIES. by the HEALTH PHYSICS SOCIETY

Pennsylvania Association of Councils of Trustees THE ROLE OF TRUSTEE IN PENNSYLVANIA S STATE SYSTEM OF HIGHER EDUCATION

FIVE-YEAR CAPITAL PLAN. Approved by the Collierville Board of Education January 27, 2015

FRANKLIN D. CHAMBERS,

BUSI 2504 Business Finance I Spring 2014, Section A

Appendix A Cost Estimates

DU PAGE COUNTY JUDICIAL AND PUBLIC SAFETY COMMITTEE FINAL SUMMARY. November 17, 2015 Regular Meeting 8:15 AM

FRESNO COUNTY INTELLIGENT TRANSPORTATION SYSTEMS (ITS) PLAN UPDATE

College of Business University of South Florida St. Petersburg Governance Document As Amended by the College Faculty on February 10, 2014

4.0 CAPACITY AND UTILIZATION

Transcription:

Accreditation Mid-Term Report Standard III B Physical Resources College Recommendation 6: Develop a long-range capital projects planning process that supports and is aligned with institutional improvement goals of the College: In order to meet the Standards, the team recommends that the College develop a long range capital projects planning process that supports and is aligned with institutional improvement goals of the College. Additionally, the team recommends that the College include major renovations and facilities upgrades in the long-term plan for facilities. (III.B.2.a III.B.4) Progress in Addressing Recommendation. The College has analyzed the planning process for capital projects to identify the problems and has implemented a system that more closely aligns the process with the Educational Master Plan and the institutional improvement goals. The focus is on all capital projects since the Facilities Master Plan Addendum addresses all capital projects and not just long term capital projects (Aera STEM meeting notes 9/23/14). There is now a cohesive system to identify and relate capital projects being discussed within the campus community to the Facilities Master Plan. The Facilities Master Plan is the College s planning document that specifically identifies capital projects (Facilities Master Plan) Processes procedures are now in place the form of a construction design schedule to adequately prevent changes to planned capital projects without the proper review and oversight of how those changes might impact institutional improvement goals (Project Design Schedule). The facilities committee now has the responsibility and authority to monitor and recommend changes to the Capital Projects List in order to insure that the capital projects remain in alignment with the Educational Master Plan and the institutional improvement goals (Facilities Committee Link). The committee s analysis indicates that while the Educational Master Plan is the overarching planning document for the vision and direction of the College, the Facilities Master Plan is the planning document for capital projects that helps to realize that vision. As stated in the Facilities Master Plan, the FMP is meant to provide a vision for the future. This vision includes addressing the needs for new and/or replacement construction, renovation or repurposing of facilities for reuse, and the development/redevelopment of core campus amenities. The FMP was guided by the Educational Master Plan of the College. In this regard, it was created to support the future educational needs of the College, as defined via the program of instruction. The Plan process, therefore, included matching space needs to the curriculum, creating modern teaching, learning and support facilities that will attract students to the College, and providing, through a facility development program, the best opportunity for students to

succeed in their educational mission. It also aligns with the strategic plans for the District and the College. As a result of our analysis the following changes have been made in order to satisfy Recommendation 6, to correct the problems identified with the College s current processes, and to enhance the College s existing Facilities Committee. The Facilities Committee membership has been modified to ensure a broad cross-section of College stakeholders, and will make recommendations to the College President and vest it with the following responsibilities: Coordinate and prioritize the Capital Projects List by reviewing all requests for remodeling, renovation and new construction for alignment with the Educational Master Plan and the institutional improvement goals Plan all capital projects, not just long-range, because they impact each other Coordinate the Facilities Master Plan planning process in a collaborative and open process as illustrated in the FMP. Review any grants or donations for facilities for their compatibility with the Facilities Master Plan Review the Facilities Master Plan annually and create a yearly addendum to the capital projects list in order to remain in alignment with the Educational Master Plan and the institutional improvement goals. The process for updating the Facilities Master Plan and the Capital Projects List has been modified. Maintenance and Operation (M & O) will collect information from the following sources and identify possible projects for inclusion or removal from the Facilities Master Plan and the yearly addendum to the Facilities Master Plan: The Educational Master Plan The Annual Program Reviews The Facilities Condition Index (FCI) from data obtained from State facilities site (Fusion) that includes information on the condition of College buildings as recorded in an assessment conducted by the State Chancellors Office Projections for future growth Regulatory requirements Identified safety concerns Surveys and input from Faculty, Staff, Students and Community and Foundation representatives After collecting information from the aforementioned sources, M & O will then identify the costs associated with these possible projects. The Facilities Committee will review this information for possible inclusion and prioritization in the Facilities Master Plan and Capital Projects List. This prioritization will be based on the Educational Master Plan goals, projected cost, and the availability of funding sources. The Facilities Committee will also review the above mentioned sources for items that may not have been identified by M & O. The Facilities Committee will report its recommendations to the Academic Senate, the College Council, and the Administrative Council. These groups will then provide feedback to the Facilities Committee for inclusion in the Facilities Master Plan and the Facilities Committee s recommendations to the College President. Finally, the President will review these recommendations and make the final decisions regarding the Facilities Master Plan and the Capital Projects List (Facilities Master Plan, Facilities Construction Planning Status).

Several oversight measures are currently in place, or will be upon the implementation of these new procedures, to ensure adherence to this process. For example, the Facilities Committee reviews the Facilities Planning Construction Status Report at each meeting (monthly) for any changes that have not gone through the approved processes. The District s chief financial officer currently reviews all capital and scheduled maintenance projects. The District s Executive Director of Administrative Services holds weekly meetings with the District Office Facility Construction Group. This group maintains oversight responsibility for construction on all three campuses, and reviews the Facilities Planning Construction Status Report as well (PPR Flow Chart). Conclusion In conclusion, implementation of the two recommendations has provided the process and procedure that will meet the standard and provide a capital project planning process that is aligned with institutional improvement goals. The team s recommendation to include major renovations and facilities upgrade in the long-term plan for facilities has already been done and is included in the Facilities Master Plan Addendum dated 04/2014. Future Plans for Sustaining Improvements As a means to improve the process, the Facilities Committee will formally solicit annual feedback from the Academic Senate, the College Council, the Administrative Council, and the College President as to the effectiveness of the process. List of Evidence Aera STEM meeting notes 9/23/14 Facilities Master Plan Project Design Schedule Facilities Committee Link Facilities Master Plan Facilities Construction Planning Status PPR Flow Chart Eligibility Requirement NA

Standard IIIB: Resources The institution effectively uses its human, physical, technology, and financial resources to achieve its mission and to improve academic quality and institutional effectiveness. Accredited colleges in multi-college systems may be organized so that responsibility for resources, allocation of resources, and planning rests with the district/system. In such cases, the district/system is responsible for meeting the Standards, and an evaluation of its performance is reflected in the accredited status of the institution(s). The Bakersfield College Panorama Campus sits on 154 developed acres and consists of a total of 35 buildings, the majority of which were constructed in 1956. The Bakersfield College campus controls all assignable space at both the Bakersfield College Panorama Campus and at the satellite Delano Campus. The Assignable Square Feet (ASF) for the Bakersfield College Panorama Campus and the Delano Campus is 449,133 and 22,350, respectively. The Outside Gross Square Footage for the Bakersfield College Panorama Campus and the Delano Campus is 722,515 and 29,594, respectively. The assignment of space for class instruction at the Kern Community College District Office Weill Institute, Stockdale High School, and Arvin High School fluctuates and is governed by the management at each of the satellite locations. Bakersfield College makes requests for facilities space based on projected course offerings (KCCD Vicinity Map). 1. The institution assures safe and sufficient physical resources at all locations where it offers courses, programs, and learning support services. They are constructed and maintained to assure access, safety, security, and a healthful learning and working environment. Bakersfield College continues to adhere to the laws, codes and regulations that ensure safety and guide the activities on its campus. These include health, safety and fire codes. Bakersfield College s Maintenance and Operations Manager continues to assure sustained safety through consistent inspection of buildings and facilities, assuring that compliance are met for all fire, safety, security, and sanitary codes and regulations. As well, the M and O manager maintains support and works to coordinate with facilities planning and construction projects (Interpretation of Regulations_Manual_updated09-10-09). The recent work of the Bakersfield College Custodial Supervisor has included the implementation of an evening shift along with the team cleaning concept, and the participation in hiring more staff in the department for retirements or replacements. The Custodial Supervisor is committed to provide support and supervision for many events on campus including commencement, holds regular staff meetings in which proper safety procedures are discussed, and attends training seminars on new equipment and products for the custodial department (Rachelle Morehouse Accomplishments) Bakersfield College Public Safety reports to the Vice President, Finance and Administrative Services. Public safety provides a variety of services through the Department of Public Safety

and other departments, including a security escort service, personal safety tips, sexual assault prevention tips, survivor assistance and officer patrols (public_safety.pdf). The director of Public Safety has established a 2014-2015, 18 month work plan to address Student Success, Facilities and Infrastructure, Integration, and communication (Chris Counts Public Safety 18 Month Work Plan 201-2015.pdf) Educational Master Plan is the overarching planning document for the vision and direction of the College, the Facilities Master Plan is the planning document for capital projects that helps to realize that vision (2011-2014 Educational Master Plan) 2. The institution plans, acquires or builds, maintains, and upgrades or replaces its physical resources, including facilities, equipment, land, and other assets, in a manner that assures effective utilization and the continuing quality necessary to support its programs and services and achieve its mission. In support of Actionable Improvement Plan #5, to maintain a more healthful learning and working environment on the Panorama Campus, the Maintenance and Operations Department, working with the Facilities Subcommittee, has implemented and has been evaluating the work order software system School Dude, which is designed to assign and track work; provide support to work with custodial staff to define expectations and improve cleanliness levels across the campus. School Dude is accessed and requests can made online through the Inside BC Portal. The work orders are being completed by priority, safety needs first. The work orders that are not being addressed are being assessed for possible future projects based on priority and funding. The School Dude Preventative Maintenance program will ensure that the five year maintenance program will be implemented and tracked (KCCD Maintenance Portal, Work Order) To maintain a more healthful learning and working environment on the Panorama Campus, the Maintenance and Operations Department, working with the Facilities Subcommittee, implemented and evaluated the work order software system designed to assign and track work; provide support to work with custodial staff to define expectations and improve cleanliness levels across the campus; adjusted start times and cleaning areas of responsibility to be more centralized and balanced; evaluated the effectiveness of increased temporary custodial staff spring 2012; and prioritized maintenance and repairs to existing buildings and building infrastructure.). Start times and cleaning areas of responsibility have been adjusted to be more centralized and balanced and maintenance and repairs to existing buildings and building infrastructure have been more prioritized. Bakersfield College implements a process called Programming a Building The Maintenance and Operations Manager works with the District Facilities Department to ensure that all components for project implementation are met for the design of each project. Meetings are set up with each campus department to review the proposed scope of work to make sure that all of the program needs are met in the schematic design phase. The final project scope of work is approved by the Vice President, Finance and Administrative Services and by the President. (PPR)

The Facilities Planning Committee reviews and/or provides recommendations for new and improved facilities and infrastructure improvements to enhance current and future learning environments for students, community, faculty, and staff to the College Council. The Facilities Planning Committee serves to provide the President with a venue for reviewing on-going and proposed projects that impact the physical campus plants and facilities (Facilities Committee). The facilities committee implements the review and monitoring of recommended changes to the Capital Projects list to ensure the capital projects remain in alignment with the Educational Plan and institutional improvement goals. Maintenance and Operations collects information from the following sources and identify possible projects for inclusion for removal from the Facilities Master Plan and the yearly addendum to the Facilities Master Plan: Education Master Plan, Annual Program Reviews, Facilities Condition Index, Projections for future growth, Regulatory requirements, Identified safety concerns, surveys and input from Faculty, Staff, Students and Community and Foundation representatives (BC Facility Master Plan Presentation 4.18.12 Rev 2.pdf). The chair of the facilities committee has reached out to the SGA and faculty to get more involved and attend the monthly facilities meetings. This outreach effort has been successful as the committee continues to grow (Facilities Committee). Over the last three years, renovations have been ongoing and there are a number of construction projects taking place on campus. Beginning in January, 2012, the Edward Simonsen Performing Arts Center (SPArC) (Speech, Arts and Music building, originally built in the1950s), underwent renovation. Project was completed in the fall of 2014 and has allowed Bakersfield College to expand the breadth of instructional programs with modern equipment for the performing arts students, provide additional performance space for the students, and provide a facility that was sorely needed by the community. The existing gas Teco Gen Chillers were replaced with new more efficient electric Chillers allowing the Thermal Energy System Tank to become operational allowing 90% of the campus to be connected to the chiller loop system. This project has brought significant electrical cost savings to the campus. The sidewalks and concrete areas surrounding the Campus Center were demolished in an effort to facilitate replacement of aged water and gas lines on campus, and to repair failing concrete in many high traffic areas for students and employees bringing these areas in compliance with the ADA path of travel code requirements. This project continued through the summer and was completed fall 2014 (Bond Oversight Report). Bakersfield College has completed the replacement of all of the campus wide toilets and urinals with low flush fixtures. This is saving the campus millions of gallons of water a year. All of the campus s landscaping sprinkler heads are being replaced with more efficient sprinkler heads, saving up to 28% water usage. A new water monitoring program is being installed to ensure the watering of the campus will be monitored effectively. Bakersfield College is in the process of utilizing the state funded vehicle replacement program to obtain electric work vehicles. All of the trades work vehicles are scheduled to be replaced by the end of 2016. The campus is taking advantage of the Prop 39 funding by replacing the existing campus wide exterior parking lot

lights, exterior soffit lighting, and interior florescent lighting with LED lighting fixtures. This will have a considerable savings impact on the campus electric power usage (CCC Prop 39 project allocations 2013-14 FINAL) The District Measure G Bond has completed infrastructure upgrade projects, heating ventilation and air conditioning upgrades, ADA path of travel projects, technology upgrades, roofing replacement projects, modernization to existing buildings, removal of asbestos flooring and lead paint and upgrades to the gymnasium. Scheduled next for modernization are the Language Arts building, the Fine Arts Building and the Student Services Building. Future projects include Gym AC Project, Student Services Air Handler, Chiller Removal, New Maintenance and Operations Building, District Wide Door Hardware Replacement Project, Outdoor Mass Notification Broadcast System Security Camera Project Path of Travel (Facilities Committee Update 140929.pdf, College Council 02.07.2014.pdf, Facilities Planning Construction 2009-2014) 3. To assure the feasibility and effectiveness of physical resources in supporting institutional programs and services, the institution plans and evaluates its facilities and equipment on a regular basis, taking utilization and other relevant data into account. Capital projects support College goals because they originate from the Annual Program Reviews. Projects across the campus stem from requests made through M&O Forms in the Annual Program Reviews from department chairs and deans and then are prioritized. All potential projects are then reviewed by the Facilities Committee to determine if they are capital improvement projects or scheduled maintenance projects. Bakersfield College is committed to using the information from the Annual Program Reviews to meet the needs of the campus programs and services and to prioritize projects which stem from requests from department chairs and deans. (M&O Needs Workbook - 2013-14) Bakersfield College works with the state to update the facilities utilization space inventory on a yearly basis. This information is loaded onto the FUSION website (2011-2014 Educational Master Plan). 4. Long-range capital plans support institutional improvement goals and reflect projections of the total cost of ownership of new facilities and equipment. The Facilities Master Plan is a long-term (15-25 years) planning document for capital projects that is a requirement for getting money from the state to ensure that we are in the facilities

funding queue along with the other 70+ community college districts (http://www2.bakersfieldcollege.edu/nstrobel/collegecouncil/feb0714.htm) The processes and procedures are in place to identify and relate capital projects within the campus community to the Facilities Master Plan and are working as planned to ensure the campus s long term vision is maintained and changes to planned capital projects have the proper review and oversight to minimize the impact on institutional goals. The Facilities Master Plan is in alignment with and works to realize the vision of the Educational Master Plan (2011-2014 Educational Master Plan) A Five Year Construction Plan is in place to provide an annual summary of current and proposed capital outlay projects, is updated and submitted to the Chancellor of the California Community College system. The Five-Year Construction Plan covers seven years; the past year, current year and five future years. The Five-Year Construction Plan gives a complete picture of the capital improvements, needs and projects at each college. It compares the capacity of facilities to the demands created by the actual and projected enrollment of a college or center (Kern Five Year Construction Plan). Bakersfield College implements a system that closely aligns the process of capital project plans with the Educational Master Plan and the institutional improvement goals. The focus is on all capital projects since the Facilities Master Plan Addendum addresses all capital projects and not just long term capital projects. A cohesive system identifies and relates capital projects being discussed within the campus community to the Facilities Master Plan. The Facilities Master Plan is the College s planning document that specifically identifies capital projects. Processes and procedures are in place to adequately prevent changes to planned capital projects without the proper review and oversight of how those changes might impact institutional improvement goals (Facilities Master Plan). Evidence: KCCD Vicinity Map Interpretation of Regulations_Manual_updated09-10-09 Rachelle Morehouse Accomplishments public_safety.pdf Chris Counts Public Safety 18 Month Work Plan 201-2015.pdf 2011-2014 Educational Master Plan KCCD Maintenance Portal Work Order PPR Facilities Committee BC Facility Master Plan Presentation 4.18.12 Rev 2.pdf

Bond Oversight Report CCC Prop 39 project allocations 2013-14 FINAL Facilities Committee Update 140929.pdf College Council 02.07.2014.pdf Facilities Planning Construction 2009-2014 M&O Needs Workbook - 2013-14 2011-2014 Educational Master Plan Kern Five Year Construction Plan Facilities Master Plan Probable Evidence (I am leaving it here to review for later. Good information): http://www2.bakersfieldcollege.edu/nstrobel/collegecouncil/aug1213/strategicfocu s-12aug13.pdf http://www2.bakersfieldcollege.edu/nstrobel/collegecouncil/feb2213.htm https://committees.kccd.edu/sites/committees.kccd.edu/files/collegecouncil- FacilitiesTechnology.pdf Commissions Policies NA Actionable Improvement Plan #5 Standard III.B. Physical Resources To maintain a more healthful learning and working environment on the Panorama Campus, the Maintenance and Operations Department, working with the Facilities Subcommittee, will implement and evaluate the work order software system designed to assign and track work; provide support to work with custodial staff to define expectations and improve cleanliness levels across the campus; adjust start times and cleaning areas of responsibility to be more

centralized and balanced; evaluate the effectiveness of increased temporary custodial staff by spring 2012; and prioritize maintenance and repairs to existing buildings and building infrastructure. Progress In support of Actionable Improvement Plan #5, to maintain a more healthful learning and working environment on the Panorama Campus, the Maintenance and Operations Department, working with the Facilities Subcommittee, has implemented and has been evaluating the work order software system School Dude, which is designed to assign and track work; provide support to work with custodial staff to define expectations and improve cleanliness levels across the campus. School Dude is accessed and requests can made online through the Inside BC Portal. The work orders are being completed by priority, safety needs first. The work orders that are not being addressed are being assessed for possible future projects based on priority and funding. The School Dude Preventative Maintenance program will ensure that the five year maintenance program will be implemented and tracked (KCCD Maintenance Portal). Start times and cleaning areas of responsibility have been adjusted to be more centralized and balanced and maintenance and repairs to existing buildings and building infrastructure have been more prioritized. Bakersfield College implements a process called Programming a Building The Maintenance and Operations Manager works with the District Facilities Department to ensure that all components for project implementation are met for the design of each project. Meetings are set up with each campus department to review the proposed scope of work to make sure that all of the program needs are met in the schematic design phase. The final project scope of work is approved by the Vice President, Finance and Administrative Services and by the President. (PPR) Evidence: KCCD Maintenance Portal PPR