Managing Teams for Integrated Design Solutions

Size: px
Start display at page:

Download "Managing Teams for Integrated Design Solutions"

Transcription

1 Managing Teams for Integrated Design Solutions Vishal Singh, Kathryn von Treuer and Kerry London¹ Deakin Univsersity, Australia ¹RMIT University, Australia Abstract: Key words: Design integration in the architecture, engineering and construction sector requires a multiplicity of skills, knowledge and experience. Design practice requires management tools and skills besides the design skills and the domain knowledge. Teams and design teams have been extensively studied, and it is widely accepted that the team management practices are contingent on the nature of collaboration. This research specifically investigates the critical success factors for managing teams for integrated design and delivery solutions (IDDS), which aims to involve virtual collaborative environments and various stakeholders and supply chain players such as architects, consultants, contractors, and suppliers across the project lifecycle. Since IDDS is a recent development, the associated teamwork factors and challenges are not currently well understood, especially for the design development phases. Therefore, there is an immediate need to investigate the teamwork requirements and challenges for successfully meeting the IDDS objectives. This paper reports the preliminary findings from an ongoing research that investigates this gap. This investigation builds on the rich literature on teamwork and organizational studies, design management and construction supply chain integration to identify the critical success factors necessary for an IDDS team. For teams to be efficient, team members need to have well developed mental models of each other, as well as the mental models for the task, process, context, and competence of the team. In particular, our question is what are the critical task, process, context and competence factors specific to the IDDS teams that involve multiple players representing the construction supply chain? How can the early identification of these factors help better team managment and enhance team efficiency? This research adopts an interdisciplinary approach to investigate these questions. The findings reported in this paper are part of an ongoing research that aims to develop a framework for teamwork in IDDS teams, based on the constructs of mental models. The framework is intended to form the basis for a computer simulation tool, which can support team management decisions and formation of IDDS teams in large construction projects. The research plans and objectives are presented in the paper. Teamwork, mental models, construction supply chain, integrated design and delivery solutions, 1. INTRODUCTION The construction industry globally is increasingly realizing the cost of inefficient processes and wastage that occurs with the traditional design delivery practice. It is widely recognized that the lack of integrated design and delivery across the construction supply chain and inefficient manpower management across the project lifecycle costs billions of dollars in waste (ACIF, 2010). Hence, there is a greater push for approaches such as Integrated Design Delivery Solutions (IDDS) that aim to create more productive environments through collaborative work processes involving information systems, enhanced skills, and integrated data across the entire project lifecycle (CIB, 2010).

2 2 CIB-W Vienna Effective IDDS implementation involving integration of elements within the supply chain may reduce the waste by decreasing duplicity and increasing efficiency (King & Meyer, 2005). However, full service and process integration is challenging and many such at attempts at integration fail because of the varying effectiveness of the change management strategies and people engagement processes within larger teams and organizations (Glendinning, 2003). For teams to be efficient, team members need to have well developed mental models of each other and that of the task, process, context and competence of the team (Badke-Schaub et al., 2007; Druskat & Pescosolido, 2002; Klimoski & Mohammed, 1994; Langan-Fox et al., 2004; Lim & Klein, 2006). Mental models are the internal representation of the external world (Smyth et al., 1994). Team members develop various mental models as they interact with and observe each other (Cannon- Bowers and Salas 1997). Well developed mental models allow team members to coordinate their roles and responsibilities with the rest of the team, and create a shared understanding of the team s overall goals and objectives, which also facilitates the change management process. Well developed mental models of the team members can significantly improve the cost, schedule, and quality measures, especially in complex projects (Rouse et al. 1992), which is often the case with construction projects. However despite the importance of teamwork and the evident push for approaches such as IDDS that aim to integrate the teams across the construction supply chain, there is little research and understanding of the teamwork management issues with construction project supply chain teams. In an extensive literature review, London (2008) highlighted that the focus of past construction supply research can be organised into four key themes; logistics, construction production, strategic procurement and industrial organisation economics. Significantly there is little focussed research of the task, process, context, competence and team factors that constitute the mental models of the members of the construction project supply chain teams. Unless the various factors affecting the mental models are identified and understood, and unless corresponding team management and change management strategies are developed, it may not be possible to effectively achieve the objectives of the IDDS approaches. This paper reports on the preliminary findings from a research study that aims to identify the critical factors affecting the formation of mental models in construction project supply chain teams, especially in view of the IDDS objectives. In particular we seek to explore such questions as: What are the critical task, process, context and competence factors specific to the integrated design and delivery teams involving members from various stakeholder groups of the construction supply chain? How can the identification of these factors early on in the project help better team managment and enhance team efficiency? Can we identify the potential bottlenecks and conflicts in the mental models of the team members at the different phases of the project so that effective resource allocation and monitoring plans can be devised? How do the project conditions influence mental models, for example, how does the formation of mental models vary across distributed and collocated teams? London et al (2005) have shown that the investment in human, cultural and social capital, which are constructs closely related to team mental models is critical to the success of construction projects and the development of the organization s economic capital. This research will also analyse the task, process, context and competence factors from the inclusion of investment as a construct that provides potentially useful indicator and measure of individual and organizational motivation (von Treuer et al, 2009). This paper details the research plan. The paper also reports preliminary findings based on focus group interviews (FGIs) with representatives from Australian AEC sector on the potential challenges to integrated design delivery practice using a collaboration platform, with Building Information Model (BIM) at the core of data exchange. Thus, while the objectives of IDDS are broader than

3 Managing Teams for Integrated Design Solutions 3 achieving an integrated BIM delivery for the project, these discussions provide an insight into the potential challenges in managing the teamwork issues for an IDDS approach, which unlike the traditional design and delivery practice envisages including the client as an integral part of the information supply chain. Furthermore, the challenges to IDDS implementation are likely to be greater for a fully integrated construction supply chain team, integrated across the entire project lifecycle, which will be investigated in future FGIs, interviews and surveys. 2. BACKGROUND Inspired by the successful implementation of supply chain management in the manufacturing sector and their ability to integrate the design and delivery services, the construction industry policymakers have supported the adoption of the concept by construction industry participants (CIB, 2010; London, 2004). However there has been a general lack of widescale implementation in civil, residential and commercial sectors. The emphasis of management decisions in the manufacturing sector is on the modelling of volume production (Azambuja and O Brien, 2009). The construction industry, however, has a very different structural organisation. The behavioural characteristics and the industrial organisation of the supply chains within the construction sector can differ markedly (London, 2008; London, 2004). The success from the supply chain management and integrated design and delivery services in the manufacturing sector cannot be directly translated to the construction commercial sector. There are similar characteristics in the residential sector with the volume housebuilders. However, even in that sector there are limitations as the larger players are still not as significant in being able to make widescale change to the sector on their own. Coupled with this is that each tier in the supply chain has diverse players who have unique business environments and different work practices and mindsets. Therefore new research is required to understand these challenges and our project is precisely to carry this out. In the construction industry, from commercial organisations to government agencies, it has been widely acknowledged that there is a need for more efficient and easy to use decision support methods to enable coordination and control of all parties involved in the construction supply chain network (Love et al, 2009). Figure 1 provides an indication of a generic supply chain including the various actors. This representation however belies the complexity of the construction supply chain and the complex interdependencies that arise as different supply chains form for different projects. Integration of key players in the supply chain is considered to be an important part of project success. As each player pursues its own contractual objectives, it is suspected that a lack of integration and teamwork has resulted in low productivity and low innovation. Figure 1. Construction Supply Chain Economics (London, 2008)

4 4 CIB-W Vienna Such challenges are likely to impede the IDDS initiatives envisioned by the construction industry as the design and delivery practice of the future. One of the biggest challenges for managers and organizations involved in the design and construction supply chain is to understand, and deal with, a distributed project team with diverse task, process, context, and team member mental models, resulting from the diversity in social, operational and functional backgrounds of the team members at individual as well as organizational level. The diverse backgrounds may result in different beliefs, cultures, goals, objectives, skills, norms, standards, and other factors that may result in syntactic as well as semantic conflicts (Druskat & Pescosolido, 2002; Langan-Fox et al., 2004; Lim & Klein, 2006). Formation of mental models has been studied across diverse domains such as defence, psychology, information technology and so on (Badke-Schaub et al., 2007, Mohammed and Dumbville, 2001). It is well established that effective teamwork requires various kinds of competencies that can be discussed in terms of the knowledge, skills and attitudes that are specific or generic to the task, and specific or generic to the team (Ancona & Caldwell, 2007; Cannon-Bowers et al., 1993; Cohen & Bailey, 1997). Hence, well developed mental models for the task, process, context, competence and the team members are critical to effective team performance (Badke-Schaub et al., 2007; Druskat & Pescosolido, 2002; Klimoski & Mohammed, 1994; Langan-Fox et al., 2004; Lim & Klein, 2006). These findings suggest that organizational contingency theories (Lawrence and Lorsch, 1967; Donaldson, 2001; Levitt et al, 1999) also apply to formation of mental models in teams. Therefore, while general patterns and critical parameters related to the formation of mental models in teams can be identified, the results may vary according to the specifics of the industry and the project, i.e., which of these parameters are applicable, and what are their values in the given industry and the project, Figure 2. TASK e.g. What is this? What comes next? PROCESS e.g. How to do this? TEAM MEMBERS e.g. Who knows what? CONTEXT e.g. What to do in this situation? COMPETENCE e.g. Can we do this? Do we have the capability? Figure 2. Mental models that team members need to develop for effective team performance The capability to predict the likely effects of pre-developed mental models of team members, based on the actual data related to their prior experience and existing mental models, and the specific project data, can significantly enhance project decision making. Such efforts are found to be useful in forming effective small project teams, where the scale of the project and the personnel data is manageable using a manual process. For example, Wilde (2007) reports how they use psychometric data and personality tests to consistently form high performing student design teams at Stanford University. However, in real world construction projects, the complexity of the supply chain, and, hence, the number of variables and the amount of data to analyze can be expected to be much higher. Personality assessments and psychometric tests are not uncommon in staffing and recruiting processes, but this approach is rarely applied to project team formation within and across the organizations. In large team sizes such as in construction projects, such tests may be useful in matching people not only based on their availability and expertise but also on their potential to collectively work together towards the project goals. However, while there is enough technical support to conduct tests for the individual s fit to the project and the organization, there is little

5 Managing Teams for Integrated Design Solutions 5 support to analyze how the numerous individuals, selected through this process, will work together, in different phases of the project. Hence, this research aims to address some of the related issues. Methodologically, one of the major areas of development will be to move from a static analysis approach to dynamic analysis, based on the likely emergent scenarios and interactions of personnel and project-specific data. The critical success factors pertaining to the teamwork in IDDS teams in construction projects identified from this research will be mapped to develop a framework that is intended to form the basis for a computer simulation based tool, which can support management and analysis of large data sets. The developed tool can be used to conduct predictive longitudinal simulations of how the construction project, and the project-related mental models, may evolve over time as a result of the diverse mental models of the team members at the start of the project. The simulation tool will build on the prior research on computational modelling of individuals and societies (Carley and Newell, 1994; Levitt et al 1999; Macy and Willer, 2002). 3. RESEARCH DESIGN AND ANALYSIS This research will initially utilise a grounded theory approach (Martin & Turner, 1986) where data is collected from several sources (interviews, focus groups, surveys) in order to indentify the variables which are critical to measure in the decision framework. A case study will also be conducted and will validate and refine the framework. Participants will include various members of a construction supply chain project team. This research can be categorized in the following stages, Figure 3: Interviews, FGIs and surveys Case Study Final FGIs Development of simulation tool Critical factors, preliminary framework Refined framework Validated / formalized computational framework Multiple stages: implementation, testing, model validation Figure 3. Research design; stages in development of the computational framework 3.1 Framework creation The initial framework creation will be based on the identification of the critical factors that emerge from literature review, interviews, FGIs and the survey. FGIs will include representatives from each tier and discipline of the construction supply chain. Two FGIs will be conducted for preliminary data collection. The interviews and FGIs will be recorded on tape and later transcribed. The survey questionnaire design and measures for identification of critical success factors will build on similar surveys used in assessment of integrated delivery services in other disciplines such as healthcare (vontreuer et al, 2009). Online surveys are also planned such that a larger sample size can be obtained to validate the findings from a smaller group of participants, accessed through industry networks within the Australian construction sector.

6 6 CIB-W Vienna 3.2 Framework development Once the critical factors and their interdependencies have been mapped to create the framework, a case study will be conducted to refine the framework. The case study will map the mental models of the various members of a single IDDS team that is involved in distributed design and delivery. The selection of the case study will be based on the following criteria: (1) two different project teams from the same parent organization will be studied such that there is only partial overlap of members across the two teams; and (2) while project team members may be part of multiple projects at least some of the team must have committed 50% of their work hours to the current project. 3.3 Framework validation The refined framework will be presented to industry experts and representatives of various disciplines in the construction supply chain to validate the findings. Follow-up FGIs are planned where these experts can collectively provide feedback and critic the framework. The refined framework will be formalized using an object-oriented approach to form the basis for a computational model that can be used as simulation tool. 3.4 Development of simulation tool The most critical parameters related to the task, process, context and team member mental models will be computationally modelled and implemented as a simulation tool. The simulation tool will build on the prior research on computational modelling of individuals and societies (Carley and Newell, 1994, Macy and Willer, 2002). Tools such as the Virtual Design Team (VDT) (Kunz et al., 1998) are widely used and recognized as useful simulation tools for advanced project management and decision making. Singh (2010) has demonstrated that computer simulations are useful in studying the formation of team member mental models. Real world case studies and other measures of model validation will be conducted to ensure usability of the simulation tool. 4. PRELIMINARY RESEARCH DATA The findings reported in this paper are based on data from FGIs conducted with representatives from various stakeholder groups in the construction supply chain that typically form an IDDS team. This includes architects, engineers, consultants, contractors, facility managers and collaboration platform service providers for construction projects. Representatives from large contracting firms and government organizations, who often work as clients in construction projects also participated in the workshop. The FGI discussions revolved around the potential challenges to integrated design delivery practice using a collaboration platform, with BIM at the core of data exchange. The FGI participants were encouraged to discuss the challenges to using an integrated information system and Building Information Models for managing the information supply chain across the project lifecycle. The FGI discussions were recorded on tape and transcribed by the researchers to categorize the discussions across the issues relating to task, process, context, competence and team member mental models.

7 Managing Teams for Integrated Design Solutions 7 5. RESEARCH FINDINGS Verbal protocol analysis technique was be used to analyse the data and identify the underlying patterns and trends across the identified themes, i.e., task, process, context, competence and team. Protocol analysis is a rigorous methodology for eliciting verbal reports of thought sequences as a valid source of data on thinking (Ericsson, 2001). FGI discussions primarily revolved around the challenges in developing and using an integrated Building Information Model in a project, and the issues with managing the information supply chain. FGI discussions indicate that even at the outset of a project the different stakeholders are likely to start with conflicting mental models and apprehensions about each other s beliefs and level of engagement in the project. Table 1 lists of the key factors associated with the task, process, context, and competence and team member mental models. Table 1. Key factors associated with different mental models Themes Factors and description Task (creating an Purpose of the model: In creating an integrated BIM for the project members need a shared integrated BIM for understanding of the purpose of the model, which also determines how the task is shared and the project) distributed among the team members. Level of detail: Team members need clarity on the level of detail expected in the model. The level of detail in the model is contingent on the project requirements and the purpose of the model. Related aspects of task or model development where shared understanding is needed includes model types and sub-models, accuracy and completeness, as-built data for facilities management, and documentation and communication tasks. Process (Process needed to manage an in Integrated BIM project) Context (team situation, culture and practices) Team members need shared understanding of the processes for managing the integrated BIM project development. This includes agreed protocols and practices for business processes, collaboration and information exchange, and interaction with the model. Mutual agreement and processes are critical for the following: Design review and clash detection: Team members need agreed practices for conducting design review using BIM models and tools that allow clash detection. Participants reported resistance among some stakeholder groups to change design review norms which are currently based on document sign-offs and approvals. Version management: Concerns were raised about potential conflicts that may arise from multiple files and versions of the model that are generated across the team. Besides the management of the different versions of the model concerns were raised about the software versions as well. In general, it was agreed that versions management requires measures such as standard file nomenclature system and notifications and flagging on model updates. Data organization and management: In an integrated BIM project the amount of data generated can multiply significantly. At the same time, different disciplinary and functional groups may be working on parallel models that need to be integrated. Ideally it will be useful to have all the generated data across the entire project lifecycle stored for archiving and history tractability for legal reasons. But that may lead to data explosion. Hence, mutually agreed data management processes are required for decision making such as data pruning. Work culture and practice: Project teams and organizations may vary significantly in their culture and work practice. Further, adopting IDDS approach will require adopting new work culture and news ways of working. The change in work practices often requires shifting organizational cultures from a focus on separate services to a focus on operating within a fully integrated service system. Cultural change refers to the establishment of norms, attitudes, and interpersonal relationships that will foster cohesive use of that system by all the team members. Project phase: Team members need to have clear understanding of their roles, responsibilities and contributions to the integrated BIM model at different phases of the project. This includes clarity on the scope of the model and its usage across the different phases of the project. Regulations and standards: Building regulations and standards vary across states and countries. Hence, team members need to be alert about these conditions when working on projects or teams distributed across boundaries. Project requirements: How the team is organized, how the task is coordinated and what processes

8 8 CIB-W Vienna Themes Competence (Capabilities of the team and tools) Team member (about the team and team members) Factors and description are adopted will vary according to the project requirements. Hence, team members need a shared understanding of the project requirements and the scope and objectives of the integrated design delivery approach specific to the project. FGI participants agreed that even though some of these requirements and project context will evolve midway through the project, considerable improvements can be obtained by discussing the project upfront with all the project holders. Discussions suggest that it may be useful to mutually develop and create measures that will help identification and agreement on emergent project requirements. Such measures and agreements will reduce the likely misunderstandings and disagreements that may arise out of unforseen project conditions, which often occur in most projects. BIM readiness and technical competence of project partners is a critical factor in determining the teamwork efficiency. Project managers need structured approaches and checklists to identify potential clashes that may arise due to the use of incompatible tools and technologies. Potential users need to be aware of the competencies and skills required to use the various applications and at the same time they need to be aware of the capabilities and limitations of the tools at the outset of the project. Issues of data format and import/ export capabilities of the softwares need to considered at the project planning stage itself. Due consideration must be given to the variable ability of the team members to learn new tools and processes, and their existing skills and specialities. Capabilities of the information systems and the collaboration platform may also determine the nature of collaboration and the opportunity for social learning and team building. FGI participants also raised concerns over the other capabilities of the information systems that include security; bandwidth; server capacity; visualization capabilities; integration capabilities; querying and archiving; usability and interface. FGI discussions revealed a concern over the tendency of some functional groups and disciplines to work in isolation. Lack of trust in accuracy and completeness of the information and models created by members of other disciplines was a concern. FGI discussions emphasised that roles and responsibilities need to be clearly defined, which often becomes a contentious issue, especially in changing team environments. Issues such as data authorship and access rights remain a concern. Some disciplinary groups expressed a fear of additional work, showing resistance to change. FGI participants discussed a range of strategies for dealing with the resistance to change including motivations and initiatives for the different user groups to adopt new ways of working, government and regulatory measures that will drive this change as a necessary condition, creation of communities of practice that can encourage and train the members of the various communities, and identification of the change leaders. The discussions suggested that willingness of the team members to learn and adapt to the project requirements reflects a measure of investment and the expected return on investment. Some of the factors that individuals and firms in multi-organizational collaboration consider as part of their assessment of the return on investment include: Financial investment in technology: Is it worth investing in a new technology unless the returns from the project cover it? Even if the returns in the current project are low will it provide long term advantages in future projects? Effort and time invested in creating a shared protocol for working with the team and other project partners: Am I likely to work with the same group in future or not? Is the project long enough or worthy enough to invest time and effort in creating a project specific protocols and culture? Investing in new skills and specialities: Adopting news ways of working or new technical skills requires commitment and time. Some project stakeholders who are recognized for their expertise and experience in their existing skills and capabilities, and have built a strong reputation for it, are reluctant to venture into developing new skills and specialities. The inherent uncertainties and lack of experience acts a deterrent to investing in the new skills and specialities, especially for people who have spent decades working and mastering a particular skill and expertise. Though the factors have been classified within one category often one factor is associated with multiple mental models such that the task, process, context, competence and team member mental models are closely interrelated and affect each other. For example, model validation is not only about

9 Managing Teams for Integrated Design Solutions 9 the task but also the process involved in conducting that task. Similarly, skills acquisition is not only about the competence but also about what the individuals think of the team, and their roles and responsibilities towards the team. Further research is needed to build on this mapping and develop a dependency model that provides the framework for a computational application. 6. CONCLUSION This paper discusses an ongoing research that aims to investigate teamwork challenges and opportunities in construction supply chain networks, especially with respect to the objectives of integrated design delivery solutions. The paper details the research plans and the steps towards achieving the research objective of creating the basis for a computational simulation tool as a decision support system for team selection and resource allocation for efficient management of teams engaged in integrated design delivery and solutions practice. This research adopts the construct of mental models as the basis for establishing the parameters of team work. Findings from the preliminary focus group interviews with representatives of various stakeholder groups are analysed and categorised into issues related to task, process, context, competence and team member mental models. The focus group discussions suggest that there are overlaps across the different mental models and the key issues concerning efficient teamwork and project management. Among other issues it is evident that team members have a sense of measuring their investment in the project and the returns on the investment. This investment involves multiple parameters such as time, effort, money, and reputation. Further research is planned to investigate these issues and develop the framework. 7. REFERENCES ACIF - Australian Construction Industry Forum, 2010, Construction Forecasting. URL: Accessed on May 15 th Ancona, D. G., and Caldwell, D., 2007, Improving the Performance of New Product Teams. Engineering Management Review, IEEE, 35(4), 45. Azambuja,M. and O Brien,W., 2009, Construction Supply Chain Modelling : Issues and Perspectives- chapter 2 ( in) Construction Supply Chain Management Handbook, Taylor and Frances USA. pp ISBN Badke-Schaub, P., Neumann, A., Lauche, K. and Mohammed S., 2007, Mental models in design teams: a valid approach to performance in design collaboration? CoDesign, 3: Cannon-Bowers, J. A., and Salas E., 1997, Teamwork competencies, The interaction of team member knowledge skills and attitudes, p In O. F. O'Neil (ed.), Workforce readiness, Competencies and assessment. Erlbaum, Hillsdale, NJ. Carley, K. M., and Newell, A., 1994, The Nature of the Social Agent, Journal of Mathematical Sociology 19: CIB, 2010, CIB White Paper on IDDS Integrated Design and Delivery Solutions, CIB Publication 328 ISBN: Cohen, S. G., and Bailey, D. E., 1997, What Makes Teams Work: Group Effectiveness Research from the Shop Floor to the Executive Suite, Journal of Management, 23(3), Donaldson, L The Contingency Theory of Organizations. Sage Publications, Thousand Oaks, CA. Druskat, V. U., and Pescosolido, A. T., 2002, The Content of Effective Teamwork Mental Models in Self-Managing Teams: Ownership, Learning and Heedful Interrelating. Human Relations, 55(3), Ericsson, K. A., 2001, Protocol analysis in psychology. In N. Smelser & P. Baltes (Eds.), International Encyclopedia of the Social and Behavioral Sciences, Oxford, UK: Elsevier, p Glendinning, C., 2003, Breaking down barriers: Integrating health and care services for older people in England, Health Policy, 65, King, G., and Meyer, K., 2005, Service integration and co-ordination: A framework of approaches for the delivery of coordinated care to children with disabilities and their families, Child: Care, Health, and Development, 32, Klimoski, R., and Mohammed, S., 1994, Team Mental Model: Construct or Metaphor? Journal of Management, 20(2),

10 10 CIB-W Vienna Kunz, J. C., Levitt, R. E. and Jin Y., 1998, The Virtual Design Team: A Computational Simulation Model of Project Organizations. Communications of the Association for Computing Machinery, 41: Langan-Fox, J., Anglim, J. and Wilson, J.R., 2004, Mental models, team mental models, and performance: Process, development, and future directions. Human Factors in Ergonomics and Manufacturing, 14(4), p Lawrence, P. R. and Lorsch J. W. (with the research assistance of J. S. Garrison), 1967, Organization and Environment: Managing Differentiation and Integration. Division of Research, Graduate School of Business Administration, Harvard University, Boston, MA. Levitt, R.E., Thomsen, J., Christiansen, T.R., Kunz, J.C., Jin, Y. and Nass, C., 1999, Simulating Project Work Processes and Organizations: Toward a Micro-Contingency Theory of Organizational Design, Management Science 45 (11): Lim, B.-C., and Klein, K. J., 2006, Team mental models and team performance: A field study of the effects of team mental model similarity and accuracy, Journal of Organizational Behaviour, 27, London, K.A., 2004, Construction Supply Chain Procurement Modelling, PhD Thesis: The University of Melbourne. London, K.A., 2008, Construction Supply Chain Economics, Spon Research Series, Routledge Taylor and Francis, Abingdon, UK research text (100) ISBN London, K. A., Chen P. S., and Bavinton. N. J., 2005, Adopting reflexive capability in international briefing, Facilities, Love, P, Edwards, D., Irani, Z. and Walker, D., 2009, Project pathogens: The anatomy of omission errors in construction and omission errors in construction and resource engineering projects IEEE Transactions on Engineering Management. Macy, M., and Willer, R., 2002, From Factors to Actors: Computational Sociology and Agent-Based Modeling, Annual Review of Sociology 28: Martin, P. Y. and Turner, B. A., 1986, Grounded Theory and Organizational Research, The Journal of Applied Behavioral Science, 22(2), 141. Mohammed, S. and Dumville, B.C., 2001, Team Mental Models in a Team Knowledge Framework: Expanding Theory and Measurement across Disciplinary Boundaries. Journal of Organizational Behavior, 22(2), p Rouse, W., Cannon-Bowers, J. and Salas, E., 1992, The role of mental models in team performance in complex systems, Systems, Man and Cybernetics, IEEE Transactions 22: Singh, V., 2010, Computational Exploration of Modes of Social Learning and Team Mental Models. PhD Thesis: Faculty of Architecture, Design and Planning, The University of Sydney, Australia. Wilde, D., J., 2007, Teamology: The Construction and Organization of Effective Teams. Springer. Singh, V., Gu, N., Taylor, C., London, K. and Brankovic, L., 2008, CRC Construction Innovation Collaboration Platform: Final Report. CRC for Construction Innovation, Brisbane, URL: Accessed on March 24 th von Treuer, K.M., McGillivray, J. and Windle, K., 2009, Headspace Barwon, the story so far, A report on the journey toward youth health service integration in Barwon, Deakin University, Australia.

A Note on Structuring Employability Skills for Accounting Students

A Note on Structuring Employability Skills for Accounting Students A Note on Structuring Employability Skills for Accounting Students Jon Warwick and Anna Howard School of Business, London South Bank University Correspondence Address Jon Warwick, School of Business, London

More information

Towards a Collaboration Framework for Selection of ICT Tools

Towards a Collaboration Framework for Selection of ICT Tools Towards a Collaboration Framework for Selection of ICT Tools Deepak Sahni, Jan Van den Bergh, and Karin Coninx Hasselt University - transnationale Universiteit Limburg Expertise Centre for Digital Media

More information

A GENERIC SPLIT PROCESS MODEL FOR ASSET MANAGEMENT DECISION-MAKING

A GENERIC SPLIT PROCESS MODEL FOR ASSET MANAGEMENT DECISION-MAKING A GENERIC SPLIT PROCESS MODEL FOR ASSET MANAGEMENT DECISION-MAKING Yong Sun, a * Colin Fidge b and Lin Ma a a CRC for Integrated Engineering Asset Management, School of Engineering Systems, Queensland

More information

Innovating Toward a Vibrant Learning Ecosystem:

Innovating Toward a Vibrant Learning Ecosystem: KnowledgeWorks Forecast 3.0 Innovating Toward a Vibrant Learning Ecosystem: Ten Pathways for Transforming Learning Katherine Prince Senior Director, Strategic Foresight, KnowledgeWorks KnowledgeWorks Forecast

More information

Document number: 2013/ Programs Committee 6/2014 (July) Agenda Item 42.0 Bachelor of Engineering with Honours in Software Engineering

Document number: 2013/ Programs Committee 6/2014 (July) Agenda Item 42.0 Bachelor of Engineering with Honours in Software Engineering Document number: 2013/0006139 Programs Committee 6/2014 (July) Agenda Item 42.0 Bachelor of Engineering with Honours in Software Engineering Program Learning Outcomes Threshold Learning Outcomes for Engineering

More information

DICTE PLATFORM: AN INPUT TO COLLABORATION AND KNOWLEDGE SHARING

DICTE PLATFORM: AN INPUT TO COLLABORATION AND KNOWLEDGE SHARING DICTE PLATFORM: AN INPUT TO COLLABORATION AND KNOWLEDGE SHARING Annalisa Terracina, Stefano Beco ElsagDatamat Spa Via Laurentina, 760, 00143 Rome, Italy Adrian Grenham, Iain Le Duc SciSys Ltd Methuen Park

More information

2017 FALL PROFESSIONAL TRAINING CALENDAR

2017 FALL PROFESSIONAL TRAINING CALENDAR 2017 FALL PROFESSIONAL TRAINING CALENDAR Date Title Price Instructor Sept 20, 1:30 4:30pm Feedback to boost employee performance 50 Euros Sept 26, 1:30 4:30pm Dealing with Customer Objections 50 Euros

More information

California Professional Standards for Education Leaders (CPSELs)

California Professional Standards for Education Leaders (CPSELs) Standard 1 STANDARD 1: DEVELOPMENT AND IMPLEMENTATION OF A SHARED VISION Education leaders facilitate the development and implementation of a shared vision of learning and growth of all students. Element

More information

Politics and Society Curriculum Specification

Politics and Society Curriculum Specification Leaving Certificate Politics and Society Curriculum Specification Ordinary and Higher Level 1 September 2015 2 Contents Senior cycle 5 The experience of senior cycle 6 Politics and Society 9 Introduction

More information

A pilot study on the impact of an online writing tool used by first year science students

A pilot study on the impact of an online writing tool used by first year science students A pilot study on the impact of an online writing tool used by first year science students Osu Lilje, Virginia Breen, Alison Lewis and Aida Yalcin, School of Biological Sciences, The University of Sydney,

More information

Stakeholder Engagement and Communication Plan (SECP)

Stakeholder Engagement and Communication Plan (SECP) Stakeholder Engagement and Communication Plan (SECP) Summary box REVIEW TITLE 3ie GRANT CODE AUTHORS (specify review team members who have completed this form) FOCAL POINT (specify primary contact for

More information

Evaluation of Usage Patterns for Web-based Educational Systems using Web Mining

Evaluation of Usage Patterns for Web-based Educational Systems using Web Mining Evaluation of Usage Patterns for Web-based Educational Systems using Web Mining Dave Donnellan, School of Computer Applications Dublin City University Dublin 9 Ireland daviddonnellan@eircom.net Claus Pahl

More information

Evaluation of Usage Patterns for Web-based Educational Systems using Web Mining

Evaluation of Usage Patterns for Web-based Educational Systems using Web Mining Evaluation of Usage Patterns for Web-based Educational Systems using Web Mining Dave Donnellan, School of Computer Applications Dublin City University Dublin 9 Ireland daviddonnellan@eircom.net Claus Pahl

More information

Motivation to e-learn within organizational settings: What is it and how could it be measured?

Motivation to e-learn within organizational settings: What is it and how could it be measured? Motivation to e-learn within organizational settings: What is it and how could it be measured? Maria Alexandra Rentroia-Bonito and Joaquim Armando Pires Jorge Departamento de Engenharia Informática Instituto

More information

Planning a research project

Planning a research project Planning a research project Gelling L (2015) Planning a research project. Nursing Standard. 29, 28, 44-48. Date of submission: February 4 2014; date of acceptance: October 23 2014. Abstract The planning

More information

InTraServ. Dissemination Plan INFORMATION SOCIETY TECHNOLOGIES (IST) PROGRAMME. Intelligent Training Service for Management Training in SMEs

InTraServ. Dissemination Plan INFORMATION SOCIETY TECHNOLOGIES (IST) PROGRAMME. Intelligent Training Service for Management Training in SMEs INFORMATION SOCIETY TECHNOLOGIES (IST) PROGRAMME InTraServ Intelligent Training Service for Management Training in SMEs Deliverable DL 9 Dissemination Plan Prepared for the European Commission under Contract

More information

Virtual Teams: The Design of Architecture and Coordination for Realistic Performance and Shared Awareness

Virtual Teams: The Design of Architecture and Coordination for Realistic Performance and Shared Awareness Virtual Teams: The Design of Architecture and Coordination for Realistic Performance and Shared Awareness Bryan Moser, Global Project Design John Halpin, Champlain College St. Lawrence Introduction Global

More information

P. Belsis, C. Sgouropoulou, K. Sfikas, G. Pantziou, C. Skourlas, J. Varnas

P. Belsis, C. Sgouropoulou, K. Sfikas, G. Pantziou, C. Skourlas, J. Varnas Exploiting Distance Learning Methods and Multimediaenhanced instructional content to support IT Curricula in Greek Technological Educational Institutes P. Belsis, C. Sgouropoulou, K. Sfikas, G. Pantziou,

More information

Executive Guide to Simulation for Health

Executive Guide to Simulation for Health Executive Guide to Simulation for Health Simulation is used by Healthcare and Human Service organizations across the World to improve their systems of care and reduce costs. Simulation offers evidence

More information

Programme Specification

Programme Specification Programme Specification Title: Accounting and Finance Final Award: Master of Science (MSc) With Exit Awards at: Postgraduate Certificate (PG Cert) Postgraduate Diploma (PG Dip) Master of Science (MSc)

More information

MSW POLICY, PLANNING & ADMINISTRATION (PP&A) CONCENTRATION

MSW POLICY, PLANNING & ADMINISTRATION (PP&A) CONCENTRATION MSW POLICY, PLANNING & ADMINISTRATION (PP&A) CONCENTRATION Overview of the Policy, Planning, and Administration Concentration Policy, Planning, and Administration Concentration Goals and Objectives Policy,

More information

Interview on Quality Education

Interview on Quality Education Interview on Quality Education President European University Association (EUA) Ultimately, education is what should allow students to grow, learn, further develop, and fully play their role as active citizens

More information

Strategic Practice: Career Practitioner Case Study

Strategic Practice: Career Practitioner Case Study Strategic Practice: Career Practitioner Case Study heidi Lund 1 Interpersonal conflict has one of the most negative impacts on today s workplaces. It reduces productivity, increases gossip, and I believe

More information

Developing a Distance Learning Curriculum for Marine Engineering Education

Developing a Distance Learning Curriculum for Marine Engineering Education Paper ID #17453 Developing a Distance Learning Curriculum for Marine Engineering Education Dr. Jennifer Grimsley Michaeli P.E., Old Dominion University Dr. Jennifer G. Michaeli, PE is the Director of the

More information

QUT Digital Repository:

QUT Digital Repository: QUT Digital Repository: http://eprints.qut.edu.au/27298 Gero, John. S., Maher, Mary Lou., Bilda, Zafer., Marchant, David., Namprempree, Kanyarat., Bagot, Woods and Candy, Linda. Studying collaborative

More information

Georgia Tech College of Management Project Management Leadership Program Eight Day Certificate Program: October 8-11 and November 12-15, 2007

Georgia Tech College of Management Project Management Leadership Program Eight Day Certificate Program: October 8-11 and November 12-15, 2007 Proven Methods for Project Planning, Scheduling and Control Managing Project Risk Project Managers as Agents of Change and Innovation Georgia Tech College of Management Project Management Leadership Program

More information

Knowledge Elicitation Tool Classification. Janet E. Burge. Artificial Intelligence Research Group. Worcester Polytechnic Institute

Knowledge Elicitation Tool Classification. Janet E. Burge. Artificial Intelligence Research Group. Worcester Polytechnic Institute Page 1 of 28 Knowledge Elicitation Tool Classification Janet E. Burge Artificial Intelligence Research Group Worcester Polytechnic Institute Knowledge Elicitation Methods * KE Methods by Interaction Type

More information

Business. Pearson BTEC Level 1 Introductory in. Specification

Business. Pearson BTEC Level 1 Introductory in. Specification Pearson BTEC Level 1 Introductory in Business Specification Pearson BTEC Level 1 Introductory Certificate in Business Pearson BTEC Level 1 Introductory Diploma in Business Pearson BTEC Level 1 Introductory

More information

Seminar - Organic Computing

Seminar - Organic Computing Seminar - Organic Computing Self-Organisation of OC-Systems Markus Franke 25.01.2006 Typeset by FoilTEX Timetable 1. Overview 2. Characteristics of SO-Systems 3. Concern with Nature 4. Design-Concepts

More information

Different Requirements Gathering Techniques and Issues. Javaria Mushtaq

Different Requirements Gathering Techniques and Issues. Javaria Mushtaq 835 Different Requirements Gathering Techniques and Issues Javaria Mushtaq Abstract- Project management is now becoming a very important part of our software industries. To handle projects with success

More information

CAUL Principles and Guidelines for Library Services to Onshore Students at Remote Campuses to Support Teaching and Learning

CAUL Principles and Guidelines for Library Services to Onshore Students at Remote Campuses to Support Teaching and Learning CAUL Principles and Guidelines for Library Services to Onshore Students at Remote Campuses to Support Teaching and Learning Context The following guidelines have been developed as an aid for Australian

More information

THE WEB 2.0 AS A PLATFORM FOR THE ACQUISITION OF SKILLS, IMPROVE ACADEMIC PERFORMANCE AND DESIGNER CAREER PROMOTION IN THE UNIVERSITY

THE WEB 2.0 AS A PLATFORM FOR THE ACQUISITION OF SKILLS, IMPROVE ACADEMIC PERFORMANCE AND DESIGNER CAREER PROMOTION IN THE UNIVERSITY THE WEB 2.0 AS A PLATFORM FOR THE ACQUISITION OF SKILLS, IMPROVE ACADEMIC PERFORMANCE AND DESIGNER CAREER PROMOTION IN THE UNIVERSITY F. Felip Miralles, S. Martín Martín, Mª L. García Martínez, J.L. Navarro

More information

Exploring the Development of Students Generic Skills Development in Higher Education Using A Web-based Learning Environment

Exploring the Development of Students Generic Skills Development in Higher Education Using A Web-based Learning Environment Exploring the Development of Students Generic Skills Development in Higher Education Using A Web-based Learning Environment Ron Oliver, Jan Herrington, Edith Cowan University, 2 Bradford St, Mt Lawley

More information

Clicks, Bricks and Spondulicks

Clicks, Bricks and Spondulicks Please cite this paper as: Fisher, K. (2003), "Clicks, Bricks and Spondulicks", PEB Exchange, Programme on Educational Building, 2003/14, OECD Publishing. doi:10.1787/645201705763 PEB Exchange, Programme

More information

Implementing a tool to Support KAOS-Beta Process Model Using EPF

Implementing a tool to Support KAOS-Beta Process Model Using EPF Implementing a tool to Support KAOS-Beta Process Model Using EPF Malihe Tabatabaie Malihe.Tabatabaie@cs.york.ac.uk Department of Computer Science The University of York United Kingdom Eclipse Process Framework

More information

Evaluation of Learning Management System software. Part II of LMS Evaluation

Evaluation of Learning Management System software. Part II of LMS Evaluation Version DRAFT 1.0 Evaluation of Learning Management System software Author: Richard Wyles Date: 1 August 2003 Part II of LMS Evaluation Open Source e-learning Environment and Community Platform Project

More information

Teacher of English. MPS/UPS Information for Applicants

Teacher of English. MPS/UPS Information for Applicants Teacher of English MPS/UPS Information for Applicants Start date : Easter or September 2018 Weavers Academy Striving for success, focusing on learning Dear Applicant Thank you for showing an interest in

More information

Curriculum Policy. November Independent Boarding and Day School for Boys and Girls. Royal Hospital School. ISI reference.

Curriculum Policy. November Independent Boarding and Day School for Boys and Girls. Royal Hospital School. ISI reference. Curriculum Policy Independent Boarding and Day School for Boys and Girls Royal Hospital School November 2017 ISI reference Key author Reviewing body Approval body Approval frequency 2a Director of Curriculum,

More information

Ericsson Wallet Platform (EWP) 3.0 Training Programs. Catalog of Course Descriptions

Ericsson Wallet Platform (EWP) 3.0 Training Programs. Catalog of Course Descriptions Ericsson Wallet Platform (EWP) 3.0 Training Programs Catalog of Course Descriptions Catalog of Course Descriptions INTRODUCTION... 3 ERICSSON CONVERGED WALLET (ECW) 3.0 RATING MANAGEMENT... 4 ERICSSON

More information

Nottingham Trent University Course Specification

Nottingham Trent University Course Specification Nottingham Trent University Course Specification Basic Course Information 1. Awarding Institution: Nottingham Trent University 2. School/Campus: Nottingham Business School / City 3. Final Award, Course

More information

Nurturing Engineering Talent in the Aerospace and Defence Sector. K.Venkataramanan

Nurturing Engineering Talent in the Aerospace and Defence Sector. K.Venkataramanan Nurturing Engineering Talent in the Aerospace and Defence Sector K.Venkataramanan 1.0 Outlook of India's Aerospace &DefenceSector The Indian aerospace industry has become one of the fastest growing aerospace

More information

DSTO WTOIBUT10N STATEMENT A

DSTO WTOIBUT10N STATEMENT A (^DEPARTMENT OF DEFENcT DEFENCE SCIENCE & TECHNOLOGY ORGANISATION DSTO An Approach for Identifying and Characterising Problems in the Iterative Development of C3I Capability Gina Kingston, Derek Henderson

More information

Memorandum. COMPNET memo. Introduction. References.

Memorandum. COMPNET memo. Introduction. References. Memorandum To: CompNet partners CC: From: Arild Date: 04.02.99 Re: Proposed selection of Action Lines for CompNet Introduction In my questionnaire from Dec.98 I asked some questions concerning interests

More information

Swinburne University of Technology 2020 Plan

Swinburne University of Technology 2020 Plan Swinburne University of Technology 2020 Plan science technology innovation Swinburne University of Technology 2020 Plan Embracing change This is an exciting time for Swinburne. Tertiary education is undergoing

More information

Interdisciplinary Research - Challenges and Opportunities for Actuarial Profession. Aldona Skučaitė, lecturer Vilnius university

Interdisciplinary Research - Challenges and Opportunities for Actuarial Profession. Aldona Skučaitė, lecturer Vilnius university Interdisciplinary Research - Challenges and Opportunities for Actuarial Profession Aldona Skučaitė, lecturer Vilnius university Presentation outline Introduction Concept of Interdisciplinary research IDR

More information

Improving the impact of development projects in Sub-Saharan Africa through increased UK/Brazil cooperation and partnerships Held in Brasilia

Improving the impact of development projects in Sub-Saharan Africa through increased UK/Brazil cooperation and partnerships Held in Brasilia Image: Brett Jordan Report Improving the impact of development projects in Sub-Saharan Africa through increased UK/Brazil cooperation and partnerships Thursday 17 Friday 18 November 2016 WP1492 Held in

More information

GREAT Britain: Film Brief

GREAT Britain: Film Brief GREAT Britain: Film Brief Prepared by Rachel Newton, British Council, 26th April 2012. Overview and aims As part of the UK government s GREAT campaign, Education UK has received funding to promote the

More information

Harvesting the Wisdom of Coalitions

Harvesting the Wisdom of Coalitions Harvesting the Wisdom of Coalitions Understanding Collaboration and Innovation in the Coalition Context February 2015 Prepared by: Juliana Ramirez and Samantha Berger Executive Summary In the context of

More information

Global Convention on Coaching: Together Envisaging a Future for coaching

Global Convention on Coaching: Together Envisaging a Future for coaching IGCP National Symposium August 23, 2008 Global Convention on Coaching: Together Envisaging a Future for coaching Michael Cavanagh GCC Steering Committee 2 Overview: 1. What is the GCC? 2. What did it produce?

More information

1. Programme title and designation International Management N/A

1. Programme title and designation International Management N/A PROGRAMME APPROVAL FORM SECTION 1 THE PROGRAMME SPECIFICATION 1. Programme title and designation International Management 2. Final award Award Title Credit value ECTS Any special criteria equivalent MSc

More information

Development and Innovation in Curriculum Design in Landscape Planning: Students as Agents of Change

Development and Innovation in Curriculum Design in Landscape Planning: Students as Agents of Change Development and Innovation in Curriculum Design in Landscape Planning: Students as Agents of Change Gill Lawson 1 1 Queensland University of Technology, Brisbane, 4001, Australia Abstract: Landscape educators

More information

Designing a Rubric to Assess the Modelling Phase of Student Design Projects in Upper Year Engineering Courses

Designing a Rubric to Assess the Modelling Phase of Student Design Projects in Upper Year Engineering Courses Designing a Rubric to Assess the Modelling Phase of Student Design Projects in Upper Year Engineering Courses Thomas F.C. Woodhall Masters Candidate in Civil Engineering Queen s University at Kingston,

More information

Knowledge Synthesis and Integration: Changing Models, Changing Practices

Knowledge Synthesis and Integration: Changing Models, Changing Practices Knowledge Synthesis and Integration: Changing Models, Changing Practices Irvine, California March 16, 2009 Allan Best, Managing Partner, InSource University of British Columbia Diane Finegood, Simon Fraser

More information

Navitas UK Holdings Ltd Embedded College Review for Educational Oversight by the Quality Assurance Agency for Higher Education

Navitas UK Holdings Ltd Embedded College Review for Educational Oversight by the Quality Assurance Agency for Higher Education Navitas UK Holdings Ltd Embedded College Review for Educational Oversight by the Quality Assurance Agency for Higher Education February 2014 Annex: Birmingham City University International College Introduction

More information

Evaluating Collaboration and Core Competence in a Virtual Enterprise

Evaluating Collaboration and Core Competence in a Virtual Enterprise PsychNology Journal, 2003 Volume 1, Number 4, 391-399 Evaluating Collaboration and Core Competence in a Virtual Enterprise Rainer Breite and Hannu Vanharanta Tampere University of Technology, Pori, Finland

More information

COMMUNICATION STRATEGY FOR THE IMPLEMENTATION OF THE SYSTEM OF ENVIRONMENTAL ECONOMIC ACCOUNTING. Version: 14 November 2017

COMMUNICATION STRATEGY FOR THE IMPLEMENTATION OF THE SYSTEM OF ENVIRONMENTAL ECONOMIC ACCOUNTING. Version: 14 November 2017 1 COMMUNICATION STRATEGY FOR THE IMPLEMENTATION OF THE SYSTEM OF ENVIRONMENTAL ECONOMIC ACCOUNTING Version: 14 November 2017 2 1. Introduction The objective of this communication strategy is to increase

More information

What is Thinking (Cognition)?

What is Thinking (Cognition)? What is Thinking (Cognition)? Edward De Bono says that thinking is... the deliberate exploration of experience for a purpose. The action of thinking is an exploration, so when one thinks one investigates,

More information

MASTER S COURSES FASHION START-UP

MASTER S COURSES FASHION START-UP MASTER S COURSES FASHION START-UP Postgraduate Programmes Master s Course Fashion Start-Up 02 Brief Descriptive Summary Over the past 80 years Istituto Marangoni has grown and developed alongside the thriving

More information

5.7 Course Descriptions

5.7 Course Descriptions CATALOG 2013/2014 726 BINUS UNIVERSITY 5.7 Course Descriptions 5.7.1 MM Young Professional Business Management AY002 ESSENTIAL OF BUSINESS MANAGEMENT (3 SCU) Learning Outcomes: Upon successful completion

More information

PERFORMING ARTS. Unit 2 Proposal for a commissioning brief Suite. Cambridge TECHNICALS LEVEL 3. L/507/6467 Guided learning hours: 60

PERFORMING ARTS. Unit 2 Proposal for a commissioning brief Suite. Cambridge TECHNICALS LEVEL 3. L/507/6467 Guided learning hours: 60 2016 Suite Cambridge TECHNICALS LEVEL 3 PERFORMING ARTS Unit 2 Proposal for a commissioning brief L/507/6467 Guided learning hours: 60 Version 1 September 2015 ocr.org.uk/performingarts LEVEL 3 UNIT 2:

More information

Researcher Development Assessment A: Knowledge and intellectual abilities

Researcher Development Assessment A: Knowledge and intellectual abilities Researcher Development Assessment A: Knowledge and intellectual abilities Domain A: Knowledge and intellectual abilities This domain relates to the knowledge and intellectual abilities needed to be able

More information

MULTIDISCIPLINARY TEAM COMMUNICATION THROUGH VISUAL REPRESENTATIONS

MULTIDISCIPLINARY TEAM COMMUNICATION THROUGH VISUAL REPRESENTATIONS INTERNATIONAL CONFERENCE ON ENGINEERING AND PRODUCT DESIGN EDUCATION SEPTEMBER 4 & 5 2008, UNIVERSITAT POLITECNICA DE CATALUNYA, BARCELONA, SPAIN MULTIDISCIPLINARY TEAM COMMUNICATION THROUGH VISUAL REPRESENTATIONS

More information

Utilizing Soft System Methodology to Increase Productivity of Shell Fabrication Sushant Sudheer Takekar 1 Dr. D.N. Raut 2

Utilizing Soft System Methodology to Increase Productivity of Shell Fabrication Sushant Sudheer Takekar 1 Dr. D.N. Raut 2 IJSRD - International Journal for Scientific Research & Development Vol. 2, Issue 04, 2014 ISSN (online): 2321-0613 Utilizing Soft System Methodology to Increase Productivity of Shell Fabrication Sushant

More information

PAST EXPERIENCE AS COORDINATION ENABLER IN EXTREME ENVIRONMENT: THE CASE OF THE FRENCH AIR FORCE AEROBATIC TEAM

PAST EXPERIENCE AS COORDINATION ENABLER IN EXTREME ENVIRONMENT: THE CASE OF THE FRENCH AIR FORCE AEROBATIC TEAM PAST EXPERIENCE AS COORDINATION ENABLER IN EXTREME ENVIRONMENT: THE CASE OF THE FRENCH AIR FORCE AEROBATIC TEAM Cécile Godé Responsable de l équipe de management des organisations de Défense (EMOD) Chercheur

More information

Online Master of Business Administration (MBA)

Online Master of Business Administration (MBA) Online Master of Business Administration (MBA) Dear Prospective Student, Thank you for contacting the University of Maryland s Robert H. Smith School of Business. By requesting this brochure, you ve taken

More information

University of Toronto

University of Toronto University of Toronto OFFICE OF THE VICE PRESIDENT AND PROVOST Governance and Administration of Extra-Departmental Units Interdisciplinarity Committee Working Group Report Following approval by Governing

More information

PROVIDENCE UNIVERSITY COLLEGE

PROVIDENCE UNIVERSITY COLLEGE BACHELOR OF BUSINESS ADMINISTRATION (BBA) WITH CO-OP (4 Year) Academic Staff Jeremy Funk, Ph.D., University of Manitoba, Program Coordinator Bruce Duggan, M.B.A., University of Manitoba Marcio Coelho,

More information

Programme Specification

Programme Specification Programme Specification Title: Crisis and Disaster Management Final Award: Master of Science (MSc) With Exit Awards at: Postgraduate Certificate (PG Cert) Postgraduate Diploma (PG Dip) Master of Science

More information

University of Toronto

University of Toronto University of Toronto OFFICE OF THE VICE PRESIDENT AND PROVOST 1. Introduction A Framework for Graduate Expansion 2004-05 to 2009-10 In May, 2000, Governing Council Approved a document entitled Framework

More information

TEACHING QUALITY: SKILLS. Directive Teaching Quality Standard Applicable to the Provision of Basic Education in Alberta

TEACHING QUALITY: SKILLS. Directive Teaching Quality Standard Applicable to the Provision of Basic Education in Alberta Standards of Teaching Practice TEACHING QUALITY: SKILLS BASED ON: Policy, Regulations and Forms Manual Section 4 Ministerial Orders and Directives Directive 4.2.1 - Teaching Quality Standard Applicable

More information

Conceptual Framework: Presentation

Conceptual Framework: Presentation Meeting: Meeting Location: International Public Sector Accounting Standards Board New York, USA Meeting Date: December 3 6, 2012 Agenda Item 2B For: Approval Discussion Information Objective(s) of Agenda

More information

10.2. Behavior models

10.2. Behavior models User behavior research 10.2. Behavior models Overview Why do users seek information? How do they seek information? How do they search for information? How do they use libraries? These questions are addressed

More information

Customised Software Tools for Quality Measurement Application of Open Source Software in Education

Customised Software Tools for Quality Measurement Application of Open Source Software in Education Customised Software Tools for Quality Measurement Application of Open Source Software in Education Stefan Waßmuth Martin Dambon, Gerhard Linß Technische Universität Ilmenau (Germany) Faculty of Mechanical

More information

Unit 7 Data analysis and design

Unit 7 Data analysis and design 2016 Suite Cambridge TECHNICALS LEVEL 3 IT Unit 7 Data analysis and design A/507/5007 Guided learning hours: 60 Version 2 - revised May 2016 *changes indicated by black vertical line ocr.org.uk/it LEVEL

More information

AN INTRODUCTION (2 ND ED.) (LONDON, BLOOMSBURY ACADEMIC PP. VI, 282)

AN INTRODUCTION (2 ND ED.) (LONDON, BLOOMSBURY ACADEMIC PP. VI, 282) B. PALTRIDGE, DISCOURSE ANALYSIS: AN INTRODUCTION (2 ND ED.) (LONDON, BLOOMSBURY ACADEMIC. 2012. PP. VI, 282) Review by Glenda Shopen _ This book is a revised edition of the author s 2006 introductory

More information

HOW DO YOU IMPROVE YOUR CORPORATE LEARNING?

HOW DO YOU IMPROVE YOUR CORPORATE LEARNING? HOW DO YOU IMPROVE YOUR CORPORATE LEARNING? GAMIFIED CORPORATE LEARNING THROUGH BUSINESS SIMULATIONS MAX MONAUNI MARIE GUILLET ANGELA FEIGL DOMINIK MAIER 1 Using gamification elements in corporate learning

More information

First Line Manager Development. Facilitated Blended Accredited

First Line Manager Development. Facilitated Blended Accredited First Line Manager Development Facilitated Blended Accredited Why is First Line Manager development so critical? We combine The Oxford Group s expertise in leadership & management development and experienced

More information

UCEAS: User-centred Evaluations of Adaptive Systems

UCEAS: User-centred Evaluations of Adaptive Systems UCEAS: User-centred Evaluations of Adaptive Systems Catherine Mulwa, Séamus Lawless, Mary Sharp, Vincent Wade Knowledge and Data Engineering Group School of Computer Science and Statistics Trinity College,

More information

Bold resourcefulness: redefining employability and entrepreneurial learning

Bold resourcefulness: redefining employability and entrepreneurial learning Title Type URL Bold resourcefulness: redefining employability and entrepreneurial learning Report Date 2008 Citation Creators http://ualresearchonline.arts.ac.uk/671/ Ball, Linda (2008) Bold resourcefulness:

More information

Program Change Proposal:

Program Change Proposal: Program Change Proposal: Provided to Faculty in the following affected units: Department of Management Department of Marketing School of Allied Health 1 Department of Kinesiology 2 Department of Animal

More information

Math Pathways Task Force Recommendations February Background

Math Pathways Task Force Recommendations February Background Math Pathways Task Force Recommendations February 2017 Background In October 2011, Oklahoma joined Complete College America (CCA) to increase the number of degrees and certificates earned in Oklahoma.

More information

The Comparative Study of Information & Communications Technology Strategies in education of India, Iran & Malaysia countries

The Comparative Study of Information & Communications Technology Strategies in education of India, Iran & Malaysia countries Australian Journal of Basic and Applied Sciences, 6(9): 310-317, 2012 ISSN 1991-8178 The Comparative Study of Information & Communications Technology Strategies in education of India, Iran & Malaysia countries

More information

Friday, October 3, 2014 by 10: a.m. EST

Friday, October 3, 2014 by 10: a.m. EST REQUEST FOR PROPOSALS FOR MARKETING/EVENT PLANNING/CONSULTING SERVICES RFP No. 09-10-2014 SUBMISSIONS ARE DUE AT THE ADDRESS SHOWN BELOW NO LATER THAN Friday, October 3, 2014 by 10: a.m. EST At Woodmere

More information

Consent for Further Education Colleges to Invest in Companies September 2011

Consent for Further Education Colleges to Invest in Companies September 2011 Consent for Further Education Colleges to Invest in Companies September 2011 Of interest to college principals and finance directors as well as staff within the Skills Funding Agency. Summary This guidance

More information

Accounting & Financial Management

Accounting & Financial Management Accounting & Financial Management Your Guide to Academic and Professional Success School Leaver with minimum 3 x C at A-Level or equivalent and IELTS of 6.0 2-year undergraduate degree programme at the

More information

Three Strategies for Open Source Deployment: Substitution, Innovation, and Knowledge Reuse

Three Strategies for Open Source Deployment: Substitution, Innovation, and Knowledge Reuse Three Strategies for Open Source Deployment: Substitution, Innovation, and Knowledge Reuse Jonathan P. Allen 1 1 University of San Francisco, 2130 Fulton St., CA 94117, USA, jpallen@usfca.edu Abstract.

More information

ACTL5103 Stochastic Modelling For Actuaries. Course Outline Semester 2, 2014

ACTL5103 Stochastic Modelling For Actuaries. Course Outline Semester 2, 2014 UNSW Australia Business School School of Risk and Actuarial Studies ACTL5103 Stochastic Modelling For Actuaries Course Outline Semester 2, 2014 Part A: Course-Specific Information Please consult Part B

More information

COVER SHEET. This is the author version of article published as:

COVER SHEET. This is the author version of article published as: COVER SHEET This is the author version of article published as: Sivapalan, Siva and Cregan, Peter (2005) Value of online resources for learning by distance education. CAL-laborate 14:pp. 23-27. Copyright

More information

Study Abroad Housing and Cultural Intelligence: Does Housing Influence the Gaining of Cultural Intelligence?

Study Abroad Housing and Cultural Intelligence: Does Housing Influence the Gaining of Cultural Intelligence? University of Portland Pilot Scholars Communication Studies Undergraduate Publications, Presentations and Projects Communication Studies 2016 Study Abroad Housing and Cultural Intelligence: Does Housing

More information

An Example of an E-learning Solution for an International Curriculum in Manufacturing Strategy

An Example of an E-learning Solution for an International Curriculum in Manufacturing Strategy An Example of an E-learning Solution for an International Curriculum in Manufacturing Strategy Asbjørn ROLSTADÅS Norwegian University of Science and Technology, NO-7491 Trondheim, Norway Tel: +47-73593785;

More information

Understanding Co operatives Through Research

Understanding Co operatives Through Research Understanding Co operatives Through Research Dr. Lou Hammond Ketilson Chair, Committee on Co operative Research International Co operative Alliance Presented to the United Nations Expert Group Meeting

More information

Billett, S. (1994). Situating learning in the workplace: Having another look at Apprenticeships. Industrial and Commercial Training, 26(11) 9-16.

Billett, S. (1994). Situating learning in the workplace: Having another look at Apprenticeships. Industrial and Commercial Training, 26(11) 9-16. Billett, S. (1994). Situating learning in the workplace: Having another look at Apprenticeships. Industrial and Commercial Training, 26(11) 9-16. Situating learning in the workplace - having another look

More information

Summary and policy recommendations

Summary and policy recommendations Skills Beyond School Synthesis Report OECD 2014 Summary and policy recommendations The hidden world of professional education and training Post-secondary vocational education and training plays an under-recognised

More information

PUPIL PREMIUM POLICY

PUPIL PREMIUM POLICY PUPIL PREMIUM POLICY 2017-2018 Reviewed September 2017 1 CONTENTS 1. OUR ACADEMY 2. THE PUPIL PREMIUM 3. PURPOSE OF THE PUPIL PREMIUM POLICY 4. HOW WE WILL MAKE DECISIONS REGARDING THE USE OF THE PUPIL

More information

Approaches to Teaching Second Language Writing Brian PALTRIDGE, The University of Sydney

Approaches to Teaching Second Language Writing Brian PALTRIDGE, The University of Sydney Approaches to Teaching Second Language Writing Brian PALTRIDGE, The University of Sydney This paper presents a discussion of developments in the teaching of writing. This includes a discussion of genre-based

More information

Higher Education Review (Embedded Colleges) of Navitas UK Holdings Ltd. Hertfordshire International College

Higher Education Review (Embedded Colleges) of Navitas UK Holdings Ltd. Hertfordshire International College Higher Education Review (Embedded Colleges) of Navitas UK Holdings Ltd April 2016 Contents About this review... 1 Key findings... 2 QAA's judgements about... 2 Good practice... 2 Theme: Digital Literacies...

More information

Scenario Design for Training Systems in Crisis Management: Training Resilience Capabilities

Scenario Design for Training Systems in Crisis Management: Training Resilience Capabilities Scenario Design for Training Systems in Crisis Management: Training Resilience Capabilities Amy Rankin 1, Joris Field 2, William Wong 3, Henrik Eriksson 4, Jonas Lundberg 5 Chris Rooney 6 1, 4, 5 Department

More information

WE GAVE A LAWYER BASIC MATH SKILLS, AND YOU WON T BELIEVE WHAT HAPPENED NEXT

WE GAVE A LAWYER BASIC MATH SKILLS, AND YOU WON T BELIEVE WHAT HAPPENED NEXT WE GAVE A LAWYER BASIC MATH SKILLS, AND YOU WON T BELIEVE WHAT HAPPENED NEXT PRACTICAL APPLICATIONS OF RANDOM SAMPLING IN ediscovery By Matthew Verga, J.D. INTRODUCTION Anyone who spends ample time working

More information

Drs Rachel Patrick, Emily Gray, Nikki Moodie School of Education, School of Global, Urban and Social Studies, College of Design and Social Context

Drs Rachel Patrick, Emily Gray, Nikki Moodie School of Education, School of Global, Urban and Social Studies, College of Design and Social Context Learning and Teaching Investment Fund final report Building Capacity Through Partnerships: Embedding Aboriginal and Torres Strait Islander cultures, histories and perspectives at the School, College and

More information

OCR LEVEL 3 CAMBRIDGE TECHNICAL

OCR LEVEL 3 CAMBRIDGE TECHNICAL Cambridge TECHNICALS OCR LEVEL 3 CAMBRIDGE TECHNICAL CERTIFICATE/DIPLOMA IN IT SYSTEMS ANALYSIS K/505/5481 LEVEL 3 UNIT 34 GUIDED LEARNING HOURS: 60 UNIT CREDIT VALUE: 10 SYSTEMS ANALYSIS K/505/5481 LEVEL

More information