Bastrop Independent School District

Similar documents
Columbia County School System Preliminary Rezoning Proposal

Like much of the country, Detroit suffered significant job losses during the Great Recession.

COMMUNITY VITALITY DIRECTOR

December s Featured Business. In this issue. TAKE ACTION:

1.0 INTRODUCTION. The purpose of the Florida school district performance review is to identify ways that a designated school district can:

Closing the. Higher. Achievement. Education. Gap: Strategies. Ecosystems. from the Field

Welcome. Paulo Goes Dean, Eller College of Management Welcome Our region

TENNESSEE S ECONOMY: Implications for Economic Development

Michigan State University

An Introduction to School Finance in Texas

DELIVERING A DEMAND LED SYSTEM IN THE U.S. THE ALAMO COMMUNITY COLLEGES APPROACH

San Francisco County Weekly Wages

Educational Management Corp Chef s Academy

Keystone Opportunity Zone

Executive Summary. Curry High School

MEMORANDUM. Leo Zuniga, Associate Vice Chancellor Communications

Moving the Needle: Creating Better Career Opportunities and Workforce Readiness. Austin ISD Progress Report

PORTLAND VOCATIONAL ELECTRICAL

Transportation Equity Analysis

JOB OUTLOOK 2018 NOVEMBER 2017 FREE TO NACE MEMBERS $52.00 NONMEMBER PRICE NATIONAL ASSOCIATION OF COLLEGES AND EMPLOYERS

University of Central Florida Board of Trustees Finance and Facilities Committee

Graduate Division Annual Report Key Findings

21 st Century Apprenticeship Models

Measures of the Location of the Data

Higher Education. Pennsylvania State System of Higher Education. November 3, 2017

Teach For America alumni 37,000+ Alumni working full-time in education or with low-income communities 86%

8. UTILIZATION OF SCHOOL FACILITIES

Segmentation Study of Tulsa Area Higher Education Needs Ages 36+ March Prepared for: Conducted by:

Texas Libraries: Responding to the Needs of Job Seekers

Council of Educational Facilities Planners, International

Austin Community College SYLLABUS

Texas Bioscience Institute Educating Scientists For The Future. Nelda Howton

For the Ohio Board of Regents Second Report on the Condition of Higher Education in Ohio

A LIBRARY STRATEGY FOR SUTTON 2015 TO 2019

Pathways to Health Professions of the Future

FIVE-YEAR CAPITAL PLAN. Approved by the Collierville Board of Education January 27, 2015

CURRENT POSITION: Angelo State University, San Angelo, Texas

A Guide to Finding Statistics for Students

Texas Healthcare & Bioscience Institute

FY Matching Scholarship Grant Allocations by County Based on Free and Reduced Lunch (FRL) Population 1

PROGRAM REVIEW REPORT. Radiation Therapy Technology

Our installer John Stoddard was polite, courteous, and efficient. The order was exactly as we had placed it and we are very satisfied.

UW RICHLAND. uw-richland richland.uwc.edu

Two-thirds of APS Schools Increase on State CCRPI Scores

Algebra 2- Semester 2 Review

The Harlan County Project: Phase 16 Final Report

Puyallup School District # Capital Facilities Plan - DRAFT nd Street SE Puyallup, Washington 98372

Using the CU*BASE Member Survey

u Articulation and Transfer Best Practices

Statistical Peers for Benchmarking 2010 Supplement Grade 11 Including Charter Schools NMSBA Performance 2010

4.0 CAPACITY AND UTILIZATION

TCC Jim Bolen Math Competition Rules and Facts. Rules:

UCC2: Course Change Transmittal Form

IN-STATE TUITION PETITION INSTRUCTIONS AND DEADLINES Western State Colorado University

TABLE OF CONTENTS FOR MEETING OF THE BOARD

Review of Student Assessment Data

Governor s Office of Budget, Planning and Policy and the Legislative Budget Board. Texas A&M University - Corpus Christi

Draft Project Implementation Plan Measure E Bond. Board Meeting Presentation Updated August 26, 2016

Fruitvale Station Shopping Center > Retail

Wuhan Summer University (China) September 4 th 15 th 2017

Name Class Date. Graphing Proportional Relationships

STATE CAPITAL SPENDING ON PK 12 SCHOOL FACILITIES NORTH CAROLINA

HARLOW COLLEGE FURTHER EDUCATION CORPORATION RESOURCES COMMITTEE. Minutes of the meeting held on Thursday 12 May 2016

Collegiate Academies Response to Livingston School Facility RFA Submitted January 23, 2015

Michigan and Ohio K-12 Educational Financing Systems: Equality and Efficiency. Michael Conlin Michigan State University

Testimony in front of the Assembly Committee on Jobs and the Economy Special Session Assembly Bill 1 Ray Cross, UW System President August 3, 2017

BCTV Event Calendar November 2017

New Hanover County Schools Announce the Results for the READY Assessments and Report the Highest Graduation Rate to Date

proof of performance. a report to our community

INSURANCE INDUSTRY RESOURCE COUNCIL Career Awareness Campaign

EDUCATIONAL ATTAINMENT

Permit Activity Report: 07/31/2014 to 08/06/2014

RETAIL SECTOR CONTINUES SLOW RECOVERY AFTER A HARSH WINTER

Dr. Brent Benda and Ms. Nell Smith

Cuero Independent School District

A CONVERSATION WITH GERALD HINES

Health Literacy and Teach-Back: Patient-Centered Communication. Copyright 2011 NewYork-Presbyterian Hospital

Financial Accounting Concepts and Research

Lesson 17: Write Expressions in Which Letters Stand for Numbers

Russell M. Rhine. Education

MAGNET PROGRAM REVIEW. Authors : Anisa Rhea Ph.D., WCPSS Evaluation and Research Department Roger Regan Ph.D., WCPSS Magnet Programs ABSTRACT

Virginia Principles & Practices of Real Estate for Salespersons

2017 FALL PROFESSIONAL TRAINING CALENDAR

Financing Education In Minnesota

Public School Choice DRAFT

TSI Operational Plan for Serving Lower Skilled Learners

ALL-IN-ONE MEETING GUIDE THE ECONOMICS OF WELL-BEING

NET LEASE INVESTMENT OFFERING. ATI Physical Therapy 4765 Jackson Road Ann Arbor, MI 48103

Texas Public Libraries:

Lucintel. Publisher Sample


ACCOUNTING FOR MANAGERS BU-5190-AU7 Syllabus

Financial Plan. Operating and Capital. May2010

African American Male Achievement Update

Green Belt Curriculum (This workshop can also be conducted on-site, subject to price change and number of participants)

Research Update. Educational Migration and Non-return in Northern Ireland May 2008

2014 AIA State Cross Country

A Comparison of the ERP Offerings of AACSB Accredited Universities Belonging to SAPUA

Lesson M4. page 1 of 2

UIC HEALTH SCIENCE COLLEGES

Transcription:

Bastrop Independent School District Demographic Study Spring 2018 Learn from Yesterday Understand Today Plan for Tomorrow

Economic Conditions Austin-Round Rock (February 2018) 4.5% 49,789 new jobs National rate 1.8% Unemployment Rate 16,435 1,094 more starts than 1Q17 Job Growth U.S. 4.4% Texas 4.1% Austin MSA 3.0% Bastrop County 3.4% -0.5% Annual Home Starts Sources: Texas Workforce Commission & Metrostudy 2

Local Economic Update New Republic Film Studios 200 acre film studio in Bastrop purchased in 2017 by John Robinson Investing $170 million in making the studio a creative campus for promotion of Texas in film industry Includes 24,000 sq. ft. of sound stage, neighborhood sets, warehouse space, and three 30,000 sq. ft. stages Offer jobs to graduates with visual laboratory, radio, television, and film degrees New Bastrop County Emergency Complex 18,000 sq. ft. building will serve as county s Emergency Operations HQ Total cost- $2 million Approved by Bastrop County Commissioners July 2017 Construction anticipated to being July 2018 with building completed by summer 2019 Bastrop Road Development Bastrop EDC considering $3 million for extensions of Agnes St. and Technology Dr. $1.2 million for Seton s Short-Stay Hospital slated to open spring 2019 Est cost- $26 million Anticipated to employee ~20 people its 1 st year and ~35 by end of 2 nd year $1.6 million for extension of Technology Dr. from Bastrop Business and Industrial Park Sources: Bastrop EDC & Austin Statesman 3

Bastrop ISD Home Sales Average New vs. Existing Home Sale Price $300,000 Average Home Sale Price, 2010-2017 $250,000 $200,000 $150,000 $100,000 $50,000 $0 2010 2011 2012 2013 2014 2015 2016 2017 Avg New Home Avg Existing Home Avg New Home Avg Existing Home 2010 $154,568 $151,913 2011 $141,188 $167,969 2012 $177,349 $174,229 2013 $197,413 $170,224 2014 $201,795 $187,477 2015 $204,969 $200,786 2016 $253,121 $213,335 2017 $273,082 $234,691 Within BISD, the average sale price for a new home rose 77%, or $118,514 between 2010 and 2017 The average price for an existing home rose more than $82,775, or nearly 55% since 2010 4

Austin New Home Ranking Report ISD Ranked by Annual Closings 1Q18 Rank District Name Annual Starts Annual Closings VDL Future 1 Leander ISD 2,424 2,481 3,606 14,269 2 Austin ISD 1,806 1,789 1,731 10,979 3 Pflugerville ISD 1,611 1,532 2,110 10,869 4 Round Rock ISD 1,601 1,526 1,771 5,989 5 Hays CISD 1,438 1,390 2,172 20,581 6 Georgetown ISD 1,451 1,215 2,395 17,761 7 Manor ISD 1,210 987 1,226 15,912 8 Hutto ISD 928 911 1,049 5,006 9 Lake Travis ISD 808 888 1,758 5,343 10 Del Valle ISD 1,020 827 927 26,474 11 Liberty Hill ISD 676 704 1,924 11,589 12 Dripping Springs ISD 617 546 1,178 6,347 13 Jarrell ISD 306 332 278 7,034 14 San Marcos CISD 225 205 290 8,484 15 Bastrop ISD 142 131 1,387 19,087 16 Taylor ISD 60 62 76 674 17 Eanes ISD 31 45 124 154 18 Lago Vista ISD 43 43 533 3,861 19 Lockhart ISD 1 23 14 1,654 20 Wimberly ISD 1 13 39 0 *Metrostudy data does not include manufactured homes and MF units 5

Bastrop ISD Housing Overview Bastrop ISD has nearly 1,390 lots available to build on The district has more than 19,000 future planned lots Of those, groundwork is underway on nearly 350 lots 6

Active Development River s Bend at Pecan Park River s Bend at Pecan Park 687 total lots 408 future lots 97 occupied 32 U/C 134 VDL Groundwork underway on Sections 6A & 6B with estimated delivery fall 2018 Building 70-80 homes per year $220K - $270K Mina Elementary 7

Active Subdivision The Colony The Colony 3,338 approx. total lots 2,755 approx. future lots 438 occupied 14 U/C 120 VDL Groundwork underway on Phase 1 with 88 lots Building 20-30 homes a year $350K-$500K Split between Bluebonnet and Mina Elementary 88 lots 8

Future Subdivision Piney Creek Bend Piney Creek Bend 170 future lots Preliminary plats approved by the city in November 2017 No groundwork started at this time All lots will be located in the Emile Elementary attendance zone 9

Future Subdivision XS Ranch XS Ranch 8,219 total lots Development stalled at this time due to development company filing for bankruptcy Mina Elementary 10

Active Development MPH Capital Management, INC Clear Springs 32 total lots 22 occupied 10 VDL No time restrictions on home construction, as well as no deed restrictions Bluebonnet Elementary Cedar Creek Estates 107 total lots 5 U/C 102 VDL All streets paved, waiting on owners to build No time restrictions on home construction, as well as no deed restrictions Bluebonnet Elementary 11

Active Development MPH Capital Management, INC cont. Rio Vista Ranch 207 total lots 91 occupied 116 VDL No time restrictions on home construction, as well as no deed restrictions Current student yield: 1.2 Cedar Creek Elementary 12

County New Home Permit Update January 2017 February 2018 There were 328 new home permits issued within Bastrop ISD in 2017, including manufactured homes and site build homes There have been 24 new home permits issued year-to-date within the district 13

Ten Year Forecast By Grade Level Total Growth Year (Oct.) EE/PK K 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th Total 2013/14 398 643 727 735 728 722 716 726 719 761 864 715 589 532 9,575 2014/15 385 718 724 753 780 733 762 739 756 750 975 667 659 527 9,928 353 3.69% 2015/16 453 656 776 761 794 774 745 763 778 790 847 818 675 648 10,278 350 3.53% 2016/17 392 709 732 811 771 844 813 786 799 812 912 790 740 628 10,539 261 2.54% 2017/18 406 668 766 758 818 823 880 865 814 802 960 861 763 719 10,903 364 3.45% 2018/19 406 754 729 798 783 852 862 916 894 856 925 864 815 733 11,186 283 2.60% 2019/20 406 853 823 751 815 798 895 905 952 924 1,007 855 809 778 11,570 384 3.43% 2020/21 406 820 931 852 777 835 837 934 936 978 1,085 927 810 770 11,898 328 2.83% 2021/22 406 826 899 965 879 798 874 874 978 981 1,142 989 873 773 12,256 358 3.01% 2022/23 406 828 905 931 999 902 837 914 912 1,016 1,146 1,046 929 833 12,604 348 2.84% 2023/24 406 827 890 938 950 1,019 945 875 954 948 1,186 1,052 984 885 12,859 255 2.02% 2024/25 406 828 906 931 977 977 1,050 963 914 993 1,105 1,086 989 937 13,062 203 1.58% 2025/26 406 836 910 948 966 1,007 1,015 1,084 987 942 1,160 1,015 1,021 944 13,241 179 1.37% 2026/27 406 854 919 953 978 993 1,052 1,054 1,101 1,027 1,099 1,064 956 973 13,429 188 1.42% 2027/28 406 867 925 963 988 1,005 1,031 1,094 1,084 1,143 1,197 1,009 1,000 912 13,624 195 1.45% % Growth *Yellow box = largest grade per year *Green box = second largest grade per year Bastrop ISD will reach 11,000 students by 2018 5 year growth = 1,701 students 2022/23 enrollment = 12,604 10 year growth = 2,721 students 2027/28 enrollment = 13,624 14

Ten Year Forecast By Campus Capacity w/ HISTORY Nov 1 ENROLLMENT PROJECTIONS Campus portables 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 Bluebonnet Elementary 926 833 768 796 815 862 899 941 962 973 979 983 978 Cedar Creek Elementary 965 790 807 817 822 837 845 861 860 860 862 859 863 Emile Elementary 750 576 777 781 823 866 883 912 898 883 893 890 910 Lost Pines Elementary 882 750 631 657 682 687 703 731 732 709 693 686 672 Mina Elementary 750 616 613 627 663 718 785 845 895 926 968 999 1,036 Red Rock Elementary 838 694 643 644 641 651 658 681 683 674 678 686 695 ELEMENTARY SCHOOL TOTALS 4,259 4,239 4,322 4,446 4,621 4,773 4,971 5,030 5,025 5,073 5,103 5,154 Elementary Absolute Growth 45-20 83 124 175 152 198 59-5 48 30 51 Elementary Percent Growth 1.07% -0.47% 1.96% 2.87% 3.94% 3.29% 4.15% 1.19% -0.10% 0.96% 0.59% 1.00% Bastrop Intermediate 850 729 784 841 887 874 865 872 913 1,027 1,090 1,083 1,096 Cedar Creek Intermediate 894 866 955 930 907 891 876 873 901 980 1,003 1,016 1,023 INTERMEDIATE SCHOOL TOTALS 1,595 1,739 1,771 1,794 1,765 1,742 1,745 1,814 2,007 2,093 2,100 2,119 Intermediate Absolute Growth 88 144 32 22-29 -23 3 69 193 86 7 19 intermediate Percent Growth 5.84% 9.03% 1.86% 1.25% -1.62% -1.30% 0.20% 3.95% 10.65% 4.28% 0.32% 0.89% Bastrop Middle School 750 754 773 815 848 921 982 967 959 967 975 1,096 1,164 Cedar Creek Middle School 800 852 841 933 1,026 991 975 959 941 938 951 1,030 1,061 Gateway School (5th-8th) 9 8 8 8 8 8 8 8 8 8 8 8 MIDDLE SCHOOL TOTALS 1,615 1,622 1,756 1,881 1,920 1,965 1,934 1,908 1,913 1,934 2,134 2,233 Middle School Absolute Growth 46 7 134 125 39 44-31 -26 5 22 199 99 Middle School Percent Growth 2.93% 0.43% 8.26% 7.14% 2.08% 2.31% -1.56% -1.35% 0.27% 1.12% 10.30% 4.66% Bastrop High School 1,950 1,329 1,404 1,431 1,453 1,506 1,582 1,706 1,797 1,860 1,909 1,889 1,905 Cedar Creek High School 1,550 1,479 1,568 1,569 1,655 1,742 1,851 1,904 1,966 1,913 1,887 1,859 1,869 Gateway School (9th-12th) 60 19 21 21 21 21 21 21 21 21 21 21 21 Genesis High School 175 82 96 96 96 96 96 96 96 96 96 96 96 Colorado River Collegiate Acad 575 161 214 220 224 227 227 227 227 227 227 227 227 HIGH SCHOOL TOTALS 3,070 3,303 3,337 3,449 3,592 3,777 3,954 4,107 4,117 4,140 4,092 4,118 High School Absolute Growth 82 233 34 112 143 185 177 153 10 23-48 26 High School Percent Growth 2.74% 7.59% 1.03% 3.36% 4.15% 5.15% 4.69% 3.87% 0.24% 0.56% -1.16% 0.64% DISTRICT TOTALS 10,539 10,903 11,186 11,570 11,898 12,256 12,604 12,859 13,062 13,241 13,429 13,624 District Absolute Growth 261 364 283 384 328 358 348 255 203 179 188 195 District Percent Growth 2.5% 3.5% 2.6% 3.4% 2.8% 3.0% 2.8% 2.0% 1.6% 1.4% 1.4% 1.5% *Yellow box = Campus enrollment exceeds stated campus capacity 15

Summary Bastrop County s unemployment rate is below 3.5%. Bastrop ISD has nearly1,390 lots currently available to build on. Rivers Bend at Pecan Park anticipates building 70-80 new homes a year. The developer behind XS Ranch has filed for bankruptcy, and at this time the development is on hold. BISD can expect an increase of roughly 1,700 students during the next 5 years. 2022/23 enrollment projection = 12,604. Bastrop ISD is projected to have 13,624 students for the 2027/28 school year. 16