AC : ASSESSING AND IMPROVING A CAPSTONE DESIGN SE- QUENCE WITH INDUSTRIAL PROJECT MANAGEMENT TECHNIQUES

Similar documents
Major Milestones, Team Activities, and Individual Deliverables

Examining the Structure of a Multidisciplinary Engineering Capstone Design Program

Visit us at:

Infrared Paper Dryer Control Scheme

Process to Identify Minimum Passing Criteria and Objective Evidence in Support of ABET EC2000 Criteria Fulfillment

M55205-Mastering Microsoft Project 2016

Software Development Plan

Leader s Guide: Dream Big and Plan for Success

The open source development model has unique characteristics that make it in some

Professional Practices in Engineering, An Introduction for Second Year Civil Engineering Students

Focus on. Learning THE ACCREDITATION MANUAL 2013 WASC EDITION

EDIT 576 DL1 (2 credits) Mobile Learning and Applications Fall Semester 2014 August 25 October 12, 2014 Fully Online Course

Activities, Exercises, Assignments Copyright 2009 Cem Kaner 1

SAMPLE. PJM410: Assessing and Managing Risk. Course Description and Outcomes. Participation & Attendance. Credit Hours: 3

White Paper. The Art of Learning

AC : BIOMEDICAL ENGINEERING PROJECTS: INTEGRATING THE UNDERGRADUATE INTO THE FACULTY LABORATORY

CERTIFIED PROJECT MANAGEMENT SPECIALIST (CPMS) STUDY GUIDE

Generating Test Cases From Use Cases

Get with the Channel Partner Program

Software Maintenance

EDIT 576 (2 credits) Mobile Learning and Applications Fall Semester 2015 August 31 October 18, 2015 Fully Online Course

Computer Science and Information Technology 2 rd Assessment Cycle

Colorado State University Department of Construction Management. Assessment Results and Action Plans

Class Numbers: & Personal Financial Management. Sections: RVCC & RVDC. Summer 2008 FIN Fully Online

Prepared by: Tim Boileau

Curricular Innovations Outcomes Assessment and ABET 2000

Stakeholder Engagement and Communication Plan (SECP)

Enhancing Learning with a Poster Session in Engineering Economy

Guidelines for Project I Delivery and Assessment Department of Industrial and Mechanical Engineering Lebanese American University

GACE Computer Science Assessment Test at a Glance

Be aware there will be a makeup date for missed class time on the Thanksgiving holiday. This will be discussed in class. Course Description

Student Handbook 2016 University of Health Sciences, Lahore

MSW POLICY, PLANNING & ADMINISTRATION (PP&A) CONCENTRATION

August 30, Dear Dean Clover:

Presentation Advice for your Professional Review

Measurement & Analysis in the Real World

Graduate Program in Education

Designing a Rubric to Assess the Modelling Phase of Student Design Projects in Upper Year Engineering Courses

: USING RUBRICS FOR THE ASSESSMENT OF SENIOR DESIGN PROJECTS

Department of Geography Bachelor of Arts in Geography Plan for Assessment of Student Learning Outcomes The University of New Mexico

1 Use complex features of a word processing application to a given brief. 2 Create a complex document. 3 Collaborate on a complex document.

DESIGNPRINCIPLES RUBRIC 3.0

WHAT ARE VIRTUAL MANIPULATIVES?

RESPONSE TO LITERATURE

1 Instructional Design Website: Making instruction easy for HCPS Teachers Henrico County, Virginia

IBM Software Group. Mastering Requirements Management with Use Cases Module 6: Define the System

Designing a Computer to Play Nim: A Mini-Capstone Project in Digital Design I

Procedures for Academic Program Review. Office of Institutional Effectiveness, Academic Planning and Review

AB104 Adult Education Block Grant. Performance Year:

Grade 2: Using a Number Line to Order and Compare Numbers Place Value Horizontal Content Strand

Problem Solving for Success Handbook. Solve the Problem Sustain the Solution Celebrate Success

Name: STEP 1: Starting Questions. Description PSII Learner.. PSII Teacher.

TU-E2090 Research Assignment in Operations Management and Services

E-3: Check for academic understanding

CARITAS PROJECT GRADING RUBRIC

Curriculum Scavenger Hunt

School Leadership Rubrics

Doctoral Student Experience (DSE) Student Handbook. Version January Northcentral University

Justification Paper: Exploring Poetry Online. Jennifer Jones. Michigan State University CEP 820

Facing our Fears: Reading and Writing about Characters in Literary Text

Program Guidebook. Endorsement Preparation Program, Educational Leadership

E C C. American Heart Association. Basic Life Support Instructor Course. Updated Written Exams. February 2016

I. Standards for Promotion A. PROFESSOR

Unit Lesson Plan: Native Americans 4th grade (SS and ELA)

EECS 571 PRINCIPLES OF REAL-TIME COMPUTING Fall 10. Instructor: Kang G. Shin, 4605 CSE, ;

Professional Voices/Theoretical Framework. Planning the Year

Value Creation Through! Integration Workshop! Value Stream Analysis and Mapping for PD! January 31, 2002!

5 Star Writing Persuasive Essay

Implementing a tool to Support KAOS-Beta Process Model Using EPF

What's My Value? Using "Manipulatives" and Writing to Explain Place Value. by Amanda Donovan, 2016 CTI Fellow David Cox Road Elementary School

World s Best Workforce Plan

Section 3.4. Logframe Module. This module will help you understand and use the logical framework in project design and proposal writing.

Planning a research project

Process improvement, The Agile Way! By Ben Linders Published in Methods and Tools, winter

University of Waterloo School of Accountancy. AFM 102: Introductory Management Accounting. Fall Term 2004: Section 4

Introduction and Motivation

Natchitoches Parish School Board Special Education Progress Monitoring Procedures

INDEPENDENT STUDY PROGRAM

ECE-492 SENIOR ADVANCED DESIGN PROJECT

George Mason University Graduate School of Education Education Leadership Program. Course Syllabus Spring 2006

BUSINESS OPERATIONS RESEARCH EVENTS

Curriculum Design Project with Virtual Manipulatives. Gwenanne Salkind. George Mason University EDCI 856. Dr. Patricia Moyer-Packenham

Execution Plan for Software Engineering Education in Taiwan

Maintaining Resilience in Teaching: Navigating Common Core and More Online Participant Syllabus

Unit 3. Design Activity. Overview. Purpose. Profile

SAMPLE SYLLABUS. Master of Health Care Administration Academic Center 3rd Floor Des Moines, Iowa 50312

Welcome to the session on ACCUPLACER Policy Development. This session will touch upon common policy decisions an institution may encounter during the

Software Security: Integrating Secure Software Engineering in Graduate Computer Science Curriculum

Mathematics Success Grade 7

36TITE 140. Course Description:

Cambridge NATIONALS. Creative imedia Level 1/2. UNIT R081 - Pre-Production Skills DELIVERY GUIDE

STUDENT EXPERIENCE a focus group guide

Standards and Criteria for Demonstrating Excellence in BACCALAUREATE/GRADUATE DEGREE PROGRAMS

School Action Plan: Template Overview

COURSE INFORMATION. Course Number SER 216. Course Title Software Enterprise II: Testing and Quality. Credits 3. Prerequisites SER 215

STANDARDS AND RUBRICS FOR SCHOOL IMPROVEMENT 2005 REVISED EDITION

Experience Corps. Mentor Toolkit

End-of-Module Assessment Task

WARREN COUNTY PUBLIC SCHOOLS CUMULATIVE RECORD CHANGE CHANGE DATE: JULY 8, 2014 REVISED 11/10/2014

Senior Project Information

Transcription:

AC 2011-432: ASSESSING AND IMPROVING A CAPSTONE DESIGN SE- QUENCE WITH INDUSTRIAL PROJECT MANAGEMENT TECHNIQUES Stacy S. Wilson, Western Kentucky University Stacy S. Wilson is a professor in the Electrical Engineering Program at Western Kentucky University. Her research interests include controls, system identification, and wavelets. She is actively involved in the assessment process. Mark E Cambron, Western Kentucky University Michael L. McIntyre, Western Kentucky University c American Society for Engineering Education, 2011 Page 22.230.1

Assessing and Improving a Capstone Design Sequence with Industrial Project Management Techniques Introduction The Western Kentucky University Electrical Engineering Program requires each student to complete a senior capstone experience. Project management techniques were incorporated as a result of the program assessment process. Throughout the years of offering these courses, the student performance has continued to improve. However, it was noted that students continued to struggle with setting project milestones and faculty had not given adequate intermediate feedback to students during the year. Therefore it was determined through the course assessment that more formal milestone development and appraisal should be incorporated into the courses. In order to address the concerns exposed during the assessment process, the following changes were implemented: Require each team to create a Project Management Workbook; and Implement Score Card Rating System for Design Reviews. Embedded in this sequence are several mechanisms for students to report their work and to garner feedback from the faculty. These include status meetings, design reviews, and the project workbook. Project management techniques were incorporated into the design reviews through the score card rating system and the throughout the workbook. After these changes were implemented, faculty and student assessment were used to modify and revise this process. This paper includes a discussion of the initial changes to the senior project sequence, faculty and student assessment, and resulting revisions to the project management techniques. Additions to Senior Project Sequence In order to meet the needs revealed in the assessment process, project management techniques were added to the project documentation and a score card rating system was added to the design reviews. The Project Workbook is a document that contains the project planning and execution documents. The workbook contains three main sections: I. Project Management Plan; II. Requirements Documents; and III. Execution and Closing. Each of these sections will be described below. Page 22.230.2

In the Project Management Plan shown in Figure 1, the students define the attributes of the project in an effort create a detailed statement of work. A more thorough description of the components of the Project Management Plan is provided in the referenced documents. 1,2 I. Project Management Plan A. Project Requirements 1. High level overview of project 2. Identification of stakeholders a. Technical sponsor b. Faculty sponsors name B. Scope 1. Product description 2. Product acceptance criteria 3. Project deliverables 4. Project exclusions 5. Project constraints 6. Project assumptions 7. Preliminary budget 8. Project risks identified 9. Change control plan 10. Patent search C. Project Planning 1. Work Breakdown Structure (WBS) 2. Activity Sequencing 3. Gantt Chart 4. Roles and responsibilities Figure 1: Project Management Plan of Project Workbook The second part of the Project Workbook is developing the Requirements Documents shown below in Figure 2. In this section, the student design teams complete the design and analysis task associated with meeting the project deliverables. 1,2 Page 22.230.3

II. Requirements documents A. Functional block diagram (hardware and software) B. Hardware and Embedded System Tradeoff Analysis 1. Three possible solutions 2. Pugh Matrices C. Software Design 1. Software requirements specifics 2. Software design document including flow chart 3. Justification of embedded system solution D. Proof of Concept (Schematics) E. Agency Approval Requirements F. ABET Documentation G. Risk Management Plan H. Final Budget I. Demonstration of Design 1. Test plan 2. Test equipment requirements Figure 2: Requirements Documents of Project Workbook After the planning and design phase in the first two sections of the outline, the students complete the Execution and Closing section of the workbook at the end of the project sequence to document the execution and testing of the project design. 1,2 The components of this section are shown in the figure below. Page 22.230.4

III. Execution and Closing A. Final design B. Design Results 1. Input/output data, power requirements, etc. 2. Statement about compliance with recognized safety codes if appropriate 3. Statement of problems encountered in design and how problems were resolved 4. Discuss design changes 5. Schematics 6. Actual schedule of events 7. Cost of project C. Results of testing D. Conclusion E. User s manual F. Final presentation G. Spec sheets H. Status reports I. CD (includes all documentation, code, schematics, presentations, etc.) Figure 3: Execution and Closing section of Workbook Outline Design reviews occur throughout the year and are a forum for students to present sections of the workbook as completed and receive feedback from the faculty. From this feedback, the students are able to gauge the success of their project. A score card rating system was implemented to provide students with detailed feedback of the project status. During the design reviews, each faculty member is provided with a rubric customized to each project team with the specific deliverables for that particular design review. Shortly following the design review, the teams are provided with their rating for each deliverable and any additional faculty comments. Any item that receives a yellow or red rating is discussed weekly at each progress meetings and revisited at the next design review to ensure that the issue is corrected. If red or yellow items are not corrected satisfactorily, students can receive a failing grade for the course. By incorporating the score card rating system as part of the design review feedback, the design reviews have become a no/no-go gateway for student project teams. Page 22.230.5

Table 1: Score Card Rating System Rating Comments Red Major problem with checklist item No fix identified Specification change required to resolve issue Required to resolve to continue project Could cause failing grade for project Yellow Minor project with checklist item Fix identified Specification change not required to resolve issue Required to resolve issue to continue project Could cause an incomplete grade for project Green No issue with checklist item Blank Checklist item does not apply to this project Assessment of Project Management Techniques To assess of the additions to the senior project sequence, faculty and students were asked to complete a survey. On this survey, participants were asked to rate the effectiveness of the following items by considering the usefulness of each item in the completion of the senior project: Workbook structure; Completing sections of the workbook throughout the year; Design reviews; and Status reports and meetings. The results of this assessment are shown in the table below. Each item was rated on a scale of 1-10 (with 10 being the highest and 1 being the lowest). Page 22.230.6

Table 2: Assessment Results Average Students Standard Deviation Average Faculty Standard Deviation Workbook structure 8.42 1.38 8.67 0.58 Completion of sections of workbook throughout academic year 8.33 1.07 8.67 0.58 Design Reviews 8.75 0.87 9.00 1.00 Status reports and meetings 8.17 1.27 8.67 0.58 As seen from the table above, faculty and students both assessed these changes as useful to the completion of the senior project. Students were also given the opportunity to comment on several items. The following are student comments on the pace of senior project sequence: The sequence seemed rushed in the fall. The pace was fine. Even though we finished early, a faster pace might be needed the first semester The pace was set so that our team had to work diligently but it was nothing that couldn t be handled Just the right amount of work Course kept a good pace throughout the year. Faster at beginning than at end which I thought was good. Got the teams rolling in the beginning. It kept us on track to discuss everything weekly Everything came together well with the project Good pace The pace was okay for a two semester program Good pace for project to be completed Students also provided comments on the positive and negative aspects of the capstone design sequence which are listed below: I learned a lot. It was a great learning experience. It did make sure everything was done. The project planning was very useful Page 22.230.7

Lots of planning helps to prevent bad designs I learned a tremendous amount about the project design sequence and working with a team Working with a factory sponsor was a good experience for me. I like the set organizational structure at the beginning of the year There was a good flow of project. Everything was already lined out for us to do regarding the steps to take Gives good experience designing a project from start to finish Good experience for meeting deadlines and completing a project from beginning to finish Student also commented on the negative aspects of the capstone design sequence which are listed below: Some of the documents seemed repetitive Some of the workbook stuff seemed repetitive and unnecessary Parts of the workbook was overkill Some parts of the workbook were unnecessary Some work seemed unnecessary Sometimes status meetings were unnecessary Some redundancy in workbook There is some redundant information that we have to provide in workbook Faculty were given the opportunity to comment on same items. The following are faculty comments on the pace of senior project sequence: The students did a good job on moving projects forward toward completion. Groups had no major issues in completing projects. The students completed the planning portion of the outline during the fall semester and the execution and closing components during the spring semester. The students created a Work Breakdown Structure which broke the project into small tasks. These tasks were then sequenced and put into a Gantt Chart. The faculty provided comments on the positive and negative aspects of the capstone design sequence which are listed below: Students deal with economics, vendors, and timelines. Students are required to use skills developed from many different classes. Page 22.230.8

Students work on a team and interact with faculty and industrial sponsors. Some teams have difficulty working together. Some problems are difficult to solve during the time constraints of the course. The implementation of the Workbook outline and project management structure into the senior design sequence has resulted in a huge improvement in student time management and documentation. Faculty noted that more faculty monitoring was required throughout the semester. Significant constant monitoring of student work and documentation was required by the course administrator and faculty team sponsor. It was determined to continue with the project management techniques with some modification and revision because of the extremely positive results. However, it was noted that it would be easier for faculty to score the rubrics if more than three choices available. Refinements of Project Management Techniques Through the assessment process and the implementation of the project management techniques, faculty decided to modify the techniques to be more effective. First more rankings were added to the score card rating system for design reviews. Now faculty can choose from five rankings; green, chartreuse, yellow, orange, and red; to provide students with accurate assessments of their project progress. The more detailed rankings have proven to be an effective modification to the design reviews. Second, it was also determined that the Workbook Table of Contents should be modified for effectiveness and to remove redundancy in the required documents. The basic outline of the Project Management Plan remained the same except the second section of the workbook was divided into two sections: I. Project Management Plan II. Design Documents III. Supporting Documents IV. Execution and Closing The major changes to the workbook structure will be discussed. The required sections of the design documents of the workbook were simplified because of redundancy and for clarification. The table below shows a comparison of the original requirements compared to the new requirements. Page 22.230.9

Table 3: Revision of II. Design Documents Scope Outline Original Section Revised Section B. Scope B. Scope 1. Product description 1. Product description 2. Product acceptance criteria 2. Project deliverables 3. Project deliverables 3. Preliminary budget 4. Project exclusions 4. Project risks identified 5. Project constraints 5. Change control plan (to be provided) 6. Project assumptions 7. Preliminary budget 8. Project risks identified 9. Change control plan 10. Patent search 6. Patent search The project planning section remained the same except for the addition of the Activity Requirements Documents. This document is a table which lists the dates of design reviews and the proposed deliverables for the design review. The information in this table is gathered from the Gantt chart. The purpose of this document is to keep the students focused on the deliverables required at each design review and aid the faculty in locating the deliverables. The format for the Activity Requirements Document is shown in the table below. Table 4: Activity Requirements Document Template Design Review Date Deliverables I October II December III February IV March V April The second section of the outline was revised into two sections for clarity. The new outline is compared to the original outline in the table below. Page 22.230.10

Table 5: Revision of Requirements Documents Outline Original Section Revised Section II. Requirements documents II. Design Documents A. Functional block diagram (hardware and software) B. Hardware and Embedded System Tradeoff Analysis 1. Three possible solutions 2. Pugh Matrices C. Software Design 1. Software requirements specifics 2. Software design document including flow chart 3. Justification of embedded system solution D. Proof of Concept (Schematics) E. Agency Approval Requirements F. ABET Documentation G. Risk Management Plan H. Final Budget I. Demonstration of Design 1. Test plan 2. Test equipment requirements A. Hardware 1. Functional block diagram 2. Hardware Tradeoff Analysis (Pugh Matrix) 3. Justification of hardware solution B. Software 1. Embedded System Tradeoff Analysis (Pugh Matrix) 2. Justification of embedded system solution 3. Software requirements specifics 4. Functional block diagram 5. Software design document including flow chart C. Input/output data, power requirements, etc. D. Demonstration of Design 1. Test plan 2. Test equipment requirements III. Supporting Documents A. Compliance with recognized safety codes and standards B. ABET Documentation C. Risk Management Plan D. Final Budget The execution and closing section of the workbook was not modified. Page 22.230.11

Conclusion Assessment of student and faculty clearly showed where the sequence could be improved. These improvements removed redundancy from the required documentation. The changes to the design sequences have produced positive results. The student teams are more complete and thorough in the project planning process. Student project planning and execution continues to improve. The design sequences will continue to be assessed and refined. Bibliography 1 Wilson, Stacy and Michael McIntyre. Revitalizing a Capstone Design Sequence with Industrial Project Management Techniques, Proceedings of the ASEE National Conference, Louisville, KY, June 2010. 2 McIntyre, Michael and Stacy Wilson. Introducing Project Management Theory into a Capstone Design Sequence, Proceedings of the IEEE Annual Global Engineering Education Conference, Madrid, Spain, April 2010. Page 22.230.12