EXISTING JUNIOR HIGH SCHOOLS

Similar documents
Memo. All Campus Principals. Margarita Hernandez/ mth Assistant to Tom Gunnell, COO Operations Division Documents.

Centennial Middle School (CMS) Design Advisory Team (DAT)

3/6/2009. Residence Halls & Strategic t Planning Overview. Residence Halls Overview. Residence Halls: Marapai Supai Kachina

Council of Educational Facilities Planners, International

University of Central Florida Board of Trustees Finance and Facilities Committee

Appendix A Cost Estimates

HOLY CROSS CATHOLIC SCHOOL SCHOOL INFORMATION PROFILE 2015/2016 SCHOOL YEAR

Geographic Area - Englewood

Oakridge School District #76

Geographic Area - Englewood

A History of College Community Schools Present

Peterborough Eco Framework

Diocesan Review April 14, Catholic Athletic Trails West Catholic High School Catholic Central High School

CHELMSFORD SCHOOL COMMITTEE REGULAR MEETING October 8, 2013 Meeting Minutes

ADDENDUM F FACILITIES INFORMATION

The Paw Print McMeans Junior High Westheimer Parkway

K-12 EDUCATION. Statement of Qualifications

Katy Independent School District Paetow High School Campus Improvement Plan

The Paw Print McMeans Junior High Westheimer Parkway Katy, TX 77450

Chicago Public Schools 6 Month Asbestos Surveillance Fall

Columbia County School System Preliminary Rezoning Proposal

FY2018 ANNUAL CAPITAL BUDGET. University of Minnesota

BALTIMORE CITY PUBLIC SCHOOLS EDUCATIONAL SPECIFICATIONS PART 1: GENERAL REQUIREMENTS

ASMC PROGRAM REVIEW

Hampton Falls School Board Meeting September 1, W. Skoglund and S. Smylie.

Security & Technology. Track & Tennis. Repairs. Remodeling & Interior Repairs. Exterior Wall. Repairs

Keystone Opportunity Zone

January Tolsma Indoor Track

Augusta Independent Board of Education August 11, :00 PM 207 Bracken Street Augusta, KY

HOLY CROSS PREPARATORY SCHOOL TRAVEL PLAN School Travel Plan Holy Cross Preparatory School 1

APPROVAL AIDE MEMOIRE

Dyer-Kelly Elementary 1

Dyer-Kelly Elementary School School Accountability Report Card Reported Using Data from the School Year Published During

L E C O M. LECOM at BRADENTON HOSPITAL DAY 2017 MONDAY, AUGUST 21, 2017 The Ritz-Carlton Sarasota, FL

Design Principles to Set the Stage

THEODORE ROOSEVELT HIGH SCHOOL Home of the Roughriders since 1923 August 31 September 7, Student Section

LIVE MUSIC RETAIL EST atlanta dairies CREATIVE OFFICE RESTAURANTS 777 MEMORIAL DR.

Montfort del Rosario School of Architecture and Design AR 2204 Architectural Design II Semester 2/2015. Project II Performing Arts Learning Center

F O O T B A L L

New Town High. 9th Grade Bulletin H OW T O KEEP IN C O N TA CT? Today we learn, tomorrow we lead. A D M I N I S T R A T I O N

Draft Preliminary Master Plan April 18, 2012

UVA Office of University Building Official. Annual Report

PORTLAND VOCATIONAL ELECTRICAL

Hayward Unified School District Community Meeting #2 at

RMIT. Open Day. 10am 4pm Sunday 13 August Bundoora. openday.rmit.edu.au

A HISTORY OF THE SCHOOL IN 100 OBJECTS. Size: Overall: 10½in x 8½in x 2¾in /265mm x 215mm x 70mm. Pages: 10in x 8in / 255mm x 205mm

Frequently Asked Questions about Music Education at IU

2017 APPLICATION TO FLY BANNERS/FLAGS On CRA/DDB flagpoles and light posts CITY OF ORLANDO, COMMUNITY REDEVELOPMENT AGENCY, DOWNTOWN DEVELOPMENT BOARD

Executive Summary. Saint Francis Xavier

Speak with Confidence The Art of Developing Presentations & Impromptu Speaking

TULSA COMMUNITY COLLEGE IN SUPPORT OF THE COMPREHENSIVE CAMPUS MASTER PLANS

University of Virginia

Cincinnati Country Day Middle School Parents Athletics Handbook

For the Ohio Board of Regents Second Report on the Condition of Higher Education in Ohio

Carnegie Mellon University Student Government Graffiti and Poster Policy

Opening Doors. Strategic Plan 2016 through Bishop Dunne Catholic School

CITY COLLEGE OF SAN FRANCISCO. Facility Master Plan Meeting On Student Development December 5, 2016

Name Class Date. Graphing Proportional Relationships

Military Engineering Centre of Excellence (MILENG COE) Ingolstadt

LHS Club Information

Stipend Handbook

THE CLASS OF Congratulations!

The Study of Classroom Physical Appearance Effects on Khon Kaen University English Students Learning Outcome

NOVA STUDENT HANDBOOK N O V A

Registration Fee: $1490/Member, $1865/Non-member Registration Deadline: August 15, 2014 *Please see Tuition Policies on the following page

FRED DOUGLAS MASON III

Heavy Diesel Service Technician

Listening to your members: The member satisfaction survey. Presenter: Mary Beth Watt. Outline

About How Good is Estimation? Assessment Materials Page 1 of 12

Here are some helpful steps to guide you in completing the Contributor s Form below:

M I N U T E S ANNUAL GENERAL MEETING Wednesday 18 March 2015

George A. Buljan Middle School School Accountability Report Card Reported Using Data from the School Year Published During

2017 Polk County City Election Polling Locations

Program Proposal Construction Technology Construction Carpenter Diploma. Hazard Community and Technical College

FIVE-YEAR CAPITAL PLAN. Approved by the Collierville Board of Education January 27, 2015

Geothermal Training in Oradea, Romania

Dyer-Kelly Elementary 1

Welcome to Gongshang Primary School Primary One 2016 Orientation. 14 November 2015

Transportation Improvement Program

Foster City Elementary School

SLOAN-HENDRIX SCHOOL DISTRICT 2016 ANNUAL REPORT TO THE PUBLIC ADVANC-ED ACCREDITATION

been each get other TASK #1 Fry Words TASK #2 Fry Words Write the following words in ABC order: Write the following words in ABC order:

PE SPORT FUNDING AT IVY LANE SCHOOL September 2016 July 2017 A grant of 9,335 received EFFECTIVE USE OF FUNDING

2015 SUMMER SKILLS CAMPS

El Toro Elementary School

The City University of New York

Executive Summary. Lincoln Middle Academy of Excellence

DU PAGE COUNTY JUDICIAL AND PUBLIC SAFETY COMMITTEE FINAL SUMMARY. November 17, 2015 Regular Meeting 8:15 AM

Graphic Imaging Technology II - Part two of a two-year program designed to offer students skills in typesetting, art and pasteup,

Section 7, Unit 4: Sample Student Book Activities for Teaching Listening

FACILITIES & FINANCING: THE GOOD, THE BAD, AND THE UGLY... Jennifer Afdahl Rice Jonathan Dean, Ed. D. David Sciaretta, Ed. D.

Executive Summary. Curry High School

Report of Shree Sanaitha Primary School Kitchen and Dining Sanaitha-4, Siraha District Nepal.!!! Submitted to Kinderhilfe Nepal-Mitterfels e. V.

Higher Education. Pennsylvania State System of Higher Education. November 3, 2017

Unit: Human Impact Differentiated (Tiered) Task How Does Human Activity Impact Soil Erosion?

Zanesville Campus 1555 Newark Road Zanesville, OH 43701

GAINESVILLE BUILDING INSPECTION SERVICES COMMERCIAL & INDUSTRIAL PERMIT APPLICATIONS FROM 2/1/2016 TO 2/29/2016

KeyTrain Level 7. For. Level 7. Published by SAI Interactive, Inc., 340 Frazier Avenue, Chattanooga, TN

Mt Olive Recreation. Great enrichment programs

Kougar Kamp Basics. Early Bird Registration. Drop-off/Pick-up:

Transcription:

Long Range Facilities Plan EXISTING JUNIOR HIGH SCHOOLS INDEX Definitions... 6.2 Existing Junior High Schools Map... 6.3 Existing Junior High Schools Beck Junior High School... 6.4 Beckendorff Junior High School... 6.6 Cardiff Junior High School... 6.8 Cinco Ranch Junior High School... 6.10 Katy Junior High School... 6.12 Mayde Creek Junior High School... 6.14 McDonald Junior High School... 6.16 McMeans Junior High School... 6.18 Memorial Parkway Junior High School... 6.20 Morton Ranch Junior High School... 6.22 West Memorial Junior High School... 6.24 WoodCreek Junior High School... 6.26 Katy ISD Long Range Facilities Plan 2010 6.1

Definitions Projected costs for improvements at each campus are described by tables of which an annotated example is provided below. Planning Period Time frame the item is expected to be addressed: 1 2010-12 2 2013-15 3 2016-20 4 2021 5 Tabled for Future * Planning Period 1 has been priority ranked to indicate 1.1 as the highest priority within Planning Period 1 followed by 1.2. Rationale Primary reason item requires consideration. BI E G NF P RC SS T Building Integrity Energy Savings Growth Not Feasible Program Replacement Cycle Safety Security Technology Discipline General type of work of each item. A BE E M P T IAQ K LS O AG C G M&O Architectural Building Envelope Electrical Mechanical Plumbing Technology Indoor Air Quality Kitchen Life Safety Operations Athletic Grounds Curriculum Grounds Maintenance & Operations Estimated Cost associated with each line item. * See Note Below No. Facility Name Planning Period Item Description Rationale Discipline Source 2010 Cost Estimate 1 Hutsell Elem. 1.1 Replace carpeting. RC A M&O $432,120 2 Hutsell Elem. 1.1 Kitchen renovation. RC K Food Services $450,000 3 Hutsell Elem. 1.2 4 Hutsell Elem. 2 New playground equipment and add/develop space for soccer fields. Change out lights to T 5s for cafeterias, gyms, warehouse and other large areas for energy efficiency at selected campuses. P G Health Services $25,000 RC E M&O $39,000 5 Hutsell Elem. 3 Add awnings to prevent water intrusion entering the building at selected locations. BI IAQ M&O * 6 Hutsell Elem. 3 Repair waterproofing. RC A M&O * 7 Hutsell Elem. 3 Add Kronos clocks to selected kitchens for kitchen staff P K Food Services * 8 Hutsell Elem. 3 More acoustical panels in band P C Fine Arts * 9 Hutsell Elem. 3 Reconfigure Admin Area: Same as FE, JHE, PME, RAE, SCE, JWE P A Health Services * Note - * Item identified as a future need. Cost not identified due to unknown construction market conditions during future planning periods. Katy ISD Long Range Facilities Plan 2010 6.2

PEEK BARKER R HARDY KIRKWOOD While continuous efforts are made to ensure the accuracy of school district boundaries and school locations, it must be stressed that these are approximations and are for general information purposes only. To determine school locations or attendance, please visit www.katyisd.org. March 31, 2010 PATTISON 529 2855 SHARP BECKENDORF LONGENBAUGH FREEMAN RD KATY HOCKLEY KATY HOCKLEY CUTOFF PORTER PEEK BECKENDORF 529 FRY RD EXISTING ELEMENTARY SCHOOLS EXISTING HIGH SCHOOLS 1. Alexander Elem. 21. Wolfe Elem. 1. Cinco Ranch High School 2. Bear Creek Elem. 22. Kilpatrick Elem. 2. Katy High School 3. Cimarron Elem. 23. Rylander Elem. 3. Mayde Creek High School 4. Creech Elem. 24. Exley Elem. 4. Taylor High School 5. Fielder Elem. 25. Rhoads Elem. 5. Morton Ranch High School 6. Golbow Elem. 26. Franz Elem. 6. Seven Lakes High School 7. Hayes Elem. 27. Griffin Elem. 8. Hutsell Elem. 28. Stephens Elem. EXISTING SUPPORT FACILITIES 290 9. King Elem. 29. WoodCreek Elem. 10. Katy Elem. 30. Morton Ranch Elem. 1. Education Support Complex 11. Mayde Creek Elem. 31. Holland Elem. Leonard E. Merrell Center 12. McRoberts Elem. 32. Stanley Elem. L. D. Robinson Pavilion 13. Memorial Parkway Elem. 2. Kenneth D. Welch Outdoor Learning Center 14. Nottingham Country Elem. 3. Gerald D. Young Agricultural Sciences Center 15. Pattison Elem. 4. Miller Career and Technology Center 16. Schmalz Elem. 5. Opportunity Awareness Center / Raines H.S. 17. Sundown Elem. 6. Jack F. Rhodes Memorial Stadium 18. West Memorial Elem. 7. Franz Road Support Services Complex 19. Williams Elem. Food Service, Print Shop, Purchasing 20. Winborn Elem. Warehouse, West Maintenance West Transportation 8. East Transportation Center EXISTING JUNIOR HIGH SCHOOLS East Maintenance Center 1. Beck Junior High 9. Storage Annex 2. Cinco Ranch Junior High 10. Law Enforcement Center 3. Katy Junior High Maintenance & Operations Center 4. Mayde Creek Junior High 5. McDonald Junior High 6. McMeans Junior High 7. Memorial Parkway Junior High INDICATES LAND PURCHASE REQUIRED 8. West Memorial Junior High SPENCER RD 9. Morton Ranch Junior High 10. Beckendorff Junior High 11. Cardiff Junior High Approximate Location 12. WoodCreek Junior High LONGENBAUGH CYPRESS WEST RD W. LITTLE YORK 6 JACKRABBIT NEW ELEMENTARY SCHOOLS 1. Elementary No. 33 (8/12) 2. Elementary No. 34 (8/12) 3. Elementary No. 35 (8/12) 4. Elementary No. 36 (8/12) 5. Elementary No. 37 (8/13) 6. Elementary No. 38 (8/14) 7. Elementary No. 39 (8/14) 1960 8. Elementary No. 40 (8/15) 9. Elementary No. 41 (8/16) 10. Elementary No. 42 (8/17) 11. Elementary No. 43 (8/17) 12. Elementary No. 44 (8/17) NEW JUNIOR HIGH SCHOOLS 1. Junior High No. 13 (8/12) 2. Junior High No. 14 (8/12) 3. Junior High No. 15 (8/14) 4. Junior High No. 16 (8/16) 5. Junior High No. 17 (8/19) NEW HIGH SCHOOLS 1. High School No. 7 & Possible Stadium (8/13) 2. High School No. 8 (8/15) 3. High School No. 9 (8/17) ELDRIDGE PKWY N. JONES NEW COMPOSITE SCHOOLS 1. Wolf Elem. (K - 12 PROPOSED) NEW SUPPORT 529 FACILITIES 1. South Transportation Center / Satellite Maint. Facility (Cinco Ranch Area) CARDIFF MORRISON RD SCHLIFF RD PITTS AVE D CLAY RD 5 3 STOCKDICK SCHOOL RD PORTER PORTER MORTON RD FRANZ 3 ELROD MASON 5 9 PARK ROW Bear Creek 11 4 SAUMS KIETH HARROW BLVD GROESCHKE STATE HWY 6 CLAY RD PATTERSON TANNER ADDICKS RESERVOIR 90 U. S. HWY 90 10 PETERSON FULSHEAR RD 1093 1463 CORBITT 4 359 12 KATY - FLEWELLEN KATY - GASTON 2 CINCO RANCH 1 BAYHILL BLVD 2 10 99 CANAL PEEK 8 1 MASON WEST GREEN HIGHLAND KNOLLS 6 FRY 7 RD BEECHNUT KINGSLAND BLVD WESTPARK TOLL RD BAKER Buffalo Bayou WESTHEIMER PKWY BARKER RESERVOIR WEST PA RK TOLLWAY BEECHNUT WIN KLEMAN 6 INTERSTATE HWYS STATE HWYS TOLL ROADS F.M. ROADS 10 288 TOLLWAY 2920 MEMORIAL KATY ISD JUNIOR HIGH SCHOOL LOCATIONS LEGEND FREEWAYS TOLL ROADS MAJOR HWYS F.M. ROADS THOROUGHFARES N LIC. # 567 1411 W. ALABAMA, HOUSTON TX. 77006 PH (713) 522-7949 FAX (713) 523-5961 Or visit our web site at www.keymaps.com C KEY MAPS, INC. 2010 All Rights Reserved WILCREST MAP OF SHOWING JUNIOR HIGH SCHOOL LOCATIONS

Existing Beck Junior High School 5200 South Fry Road Katy, Texas 77450 All costs shown are in the year 2010 dollars. The cost of all projects executed after this date, should be corrected for inflation. No. Facility Name Planning Period Item Description Rationale Discipline Source 2010 Cost Estimate 1 Beck JH 1.1 Change out lights to T 5s for cafeterias, gyms, warehouse, and other large areas for energy efficiency at selected campuses. RC E M&O $39,000 2 Beck JH 1.1 Replace McQuay chiller (2) RC M&O M&O $873,600 3 Beck JH 1.1 Add awnings to prevent water intrusion entering the building at selected locations. BI IAQ M&O $7,500 4 Beck JH 1.2 Change out roll up doors (1) RC S M&O $8,000 5 Beck JH 1.2 Additional electrical panels at stage area RC M M&O $26,000 6 Beck JH 1.2 Transformer replacements near laundry & near library RC M M&O $13,000 7 Beck JH 1.2 Regulation high jump apron P AG Athletics $80,000 8 Beck JH 1.2 Upgrade tennis court lights SS E Athletics $234,000 9 Beck JH 2 Resurface tennis courts P AG Athletics $15,000 10 Beck JH 2 Building addition(s) to accommodate CTE, administration, and LGI. 15,500 sf of renovation and 12,700 sf of addition P A BJH $6,029,400 11 Beck JH 2 20X40X12 Storage for all campus departments P AG Ath/Camp $48,000 12 Beck JH 2 13 Beck JH 2 Roof cost, exterior waterproofing, through wall flashing, and A/E and bidding cost Art Room: Need one set of track lights 17 feet long with 6 lights BI A M&O $1,339,302 P E Fine Arts $5,000 14 Beck JH 2 Sound system update in competition gym RC E Athletics $26,000 15 Beck JH 2 Install non friction drive system to bleachers at Competition Gym SS A Athletics $10,000 16 Beck JH 2 Add Kronos clocks to selected kitchens for kitchen staff only P K Food Services $4,940 17 Beck JH 3 Replace ice maker RC K Food Services * 18 Beck JH 3 Fryers Replace with Winston units or ovens RC K Food Services * 19 Beck JH 3 Replace steamer RC K Food Services * 20 Beck JH 3 Replace wooden bakery table RC K Food Services * 21 Beck JH 3 Storm sewer area drains required at the intersection of Fry Mason. ( FT BEND COUNTY) Water ponding on the north side of the school BI M&O M&O * Katy ISD Long Range Facilities Plan 2010 6.4

Existing Beck Junior High School Katy ISD Long Range Facilities Plan 2010 6.5

Existing Beckendorff Junior High School 8200 South Fry Road Katy, Texas 77494 All costs shown are in the year 2010 dollars. The cost of all projects executed after this date, should be corrected for inflation. No. Facility Name Planning Period Item Description Rationale Discipline Source 2010 Cost Estimate 1 Beckendorff JH 1.1 Change out lights to T 5s for cafeterias, gyms, warehouse, and other large areas for energy efficiency at selected campuses. RC E M&O $39,000 2 Beckendorff JH 2 More acoustical panels in band P C Fine Arts $4,000 3 Beckendorff JH 2 20X40X12 Storage for all campus departments P AG Ath/Camp $48,000 4 Beckendorff JH 2 Resurface tennis courts P AG Athletics $15,000 5 Beckendorff JH 2 Install non friction drive system to bleachers at Competition Gym SS A Athletics $10,000 6 Beckendorff JH 2 Add Kronos clocks to selected kitchens for kitchen staff only P K Food Services $4,940 7 Beckendorff JH 3 Replace locks on lockers RC A BJH * 8 Beckendorff JH 3 Replace carpeting. RC A M&O * Katy ISD Long Range Facilities Plan 2010 6.6

Existing Beckendorff Junior High School Katy ISD Long Range Facilities Plan 2010 6.7

Existing Cardiff Junior High School 3900 Dayflower Drive Katy, Texas 77449 All costs shown are in the year 2010 dollars. The cost of all projects executed after this date, should be corrected for inflation. No. Facility Name Planning Period Item Description Rationale Discipline Source 2010 Cost Estimate 1 Cardiff JH 2 Resurface tennis courts P AG Athletics $15,000 2 Cardiff JH 2 Install non friction drive system to bleachers at Competition Gym SS A Athletics $10,000 Katy ISD Long Range Facilities Plan 2010 6.8

Existing Cardiff Junior High School Katy ISD Long Range Facilities Plan 2010 6.9

Existing Cinco Ranch Junior High School 23420 Cinco Ranch Boulevard Katy, Texas 77494 All costs shown are in the year 2010 dollars. The cost of all projects executed after this date, should be corrected for inflation. No. Facility Name Planning Period Item Description Rationale Discipline Source 2010 Cost Estimate 1 Cinco Ranch JH 1.1 Change out lights to T 5s for cafeterias, gyms, warehouse, and other large areas for energy efficiency at selected campuses. RC E M&O $39,000 2 Cinco Ranch JH 1.2 3 Cinco Ranch JH 1.2 4 Cinco Ranch JH 2 Art Room: Need to update sinks/need deeper than 6" and 4" (width is 16") Retrofit Competition and Practice Gym Bleacher Handrails to be removable Roof exterior waterproofing, through wall flashing, and A/E and bidding cost P P Fine Arts $4,000 RC A Athletics $32,500 BI A M&O $1,341,531 5 Cinco Ranch JH 2 Provide Curb ramps near football field BI AG M&O $3,000 6 Cinco Ranch JH 2 Resurface tennis courts P AG Athletics $15,000 7 Cinco Ranch JH 2 Install non friction drive system to bleachers at Competition Gym SS A Athletics $10,000 8 Cinco Ranch JH 2 20X40X12 Storage for all campus departments P AG Ath/Camp $48,000 9 Cinco Ranch JH 2 Replace carpeting. RC A M&O $257,205 10 Cinco Ranch JH 2 Large Group Instruction Area to accommodate a grade level P A CRJH $1,751,750 11 Cinco Ranch JH 2 Theatre room needs sound panels P A CRJH $4,000 12 Cinco Ranch JH 2 Update sound system in cafeteria RC E CRJH $26,000 13 Cinco Ranch JH 2 Practice Room 184.4 needs soundproofing P A CRJH $70,000 14 Cinco Ranch JH 2 Upgrade Instrument shelves in the band hall RC A CRJH $52,000 15 Cinco Ranch JH 2 Soundproof sight reading rooms P A CRJH $160,000 16 Cinco Ranch JH 2 17 Cinco Ranch JH 2 18 Cinco Ranch JH 3 Convert rooms 131, 141, 143 with electric and water for science Add Kronos clocks to selected kitchens for kitchen staff only Relocate tennis court lighting poles to allow lowering for fixture access. P A CRJH $138,450 P K Food Services $4,940 RC AG Athletics * Katy ISD Long Range Facilities Plan 2010 6.10

Existing Cinco Ranch Junior High School Katy ISD Long Range Facilities Plan 2010 6.11

Existing Katy Junior High School 5350 Franz Road Katy, Texas 77493 All costs shown are in the year 2010 dollars. The cost of all projects executed after this date, should be corrected for inflation. No. Facility Name Planning Period Item Description Rationale Discipline Source 2010 Cost Estimate 1 Katy JH 1.1 Change out lights to T 5s for cafeterias, gyms, warehouse, and other large areas for energy efficiency at selected campuses. RC E M&O $45,500 2 Katy JH 1.2 Generator replacement RC M&O M&O $130,000 3 Katy JH 1.2 Replace domestic water heater RC M&O M&O $26,000 4 Katy JH 1.2 More storage units. P A Athletics $48,000 5 Katy JH 2 1. Fire blankets and eye wash stations in each science room 2. All science rooms need lab tables, sinks, and cabinets to facilitate labs in curriculum SS A KJH $35,000 6 Katy JH 2 Sound system in gym RC E KJH $26,000 7 Katy JH 2 8 Katy JH 2 Fence practice field (north part of campus) to increase safety and limit access portables are vulnerable. Fencing portables. Building addition(s) to accommodate CTE and LGI; need storage closets original grade level storage converted to IDFs, MDF SS AG KJH $35,000 P A KJH $6,890,650 9 Katy JH 2 Resurface tennis courts P A Athletics $15,000 10 Katy JH 2 20X40X12 Storage for all campus departments P AG Ath/Camp $48,000 11 Katy JH 2 12 Katy JH 2 13 Katy JH 2 14 Katy JH 2 Covered walkways from gyms to 7th grade area. Use bldg for egress. Additional restroom space needed w/bldg addition due to campus growth (student and staff) New athletic lockers locker room Replace all PE and athletic lockers Add Kronos clocks to selected kitchens for kitchen staff only P A KJH $341,380 G A KJH $637,065 P A Athletics $202,800 P K Food Services $4,940 15 Katy JH 3 Replace carpeting. Partial. RC A M&O * 16 Katy JH 3 Replace steamer RC K Food Services * 17 Katy JH 3 Replace wooden bakery table RC K Food Services * 18 Katy JH 3 Impinger oven RC K Food Services * 19 Katy JH 3 Replace ice maker RC K Food Services * 20 Katy JH 3 Fence around PE fields P AG Athletics * 21 Katy JH 3 Covered outdoor eating area to accommodate additional seating reduce from 4 to 3 lunches; area like Katy High School P O KJH * Katy ISD Long Range Facilities Plan 2010 6.12

Existing Katy Junior High School Katy ISD Long Range Facilities Plan 2010 6.13

Existing Mayde Creek Junior High School 2700 Greenhouse Road Katy, Texas 77084 All costs shown are in the year 2010 dollars. The cost of all projects executed after this date, should be corrected for inflation. No. Facility Name Planning Period Item Description Rationale Discipline Source 2010 Cost Estimate 1 Mayde Creek JH 1.1 Admin Addition and renovation of Existing P A MCJH $884,085 2 Mayde Creek JH 1.1 Construct security/vestibule area P A Safety & Security $95,160 3 Mayde Creek JH 1.1 Change out lights to T 5s for cafeterias, gyms, warehouse, and other large areas for energy efficiency at selected campuses. RC E M&O $45,500 4 Mayde Creek JH 1.1 New motor/repair of bleachers in Competition Gym. Bleachers do not retract at all. with renovation. RC A M&O $30,000 5 Mayde Creek JH 1.1 Repair bleachers in practice Gym Scrapes the floor and some rows are broken. with renovation RC A M&O $25,000 6 Mayde Creek JH 1.1 Repair cracks in interior drywall and exterior brick veneer install root barriers at two locations NW and SE corners RC A M&O $75,000 7 Mayde Creek JH 1.2 8 Mayde Creek JH 1.2 9 Mayde Creek JH 1.2 10 Mayde Creek JH 1.2 Total building renovation MEP, Carpet and Finishes Replace carpet throughout building with renovation. Replace existing student lockers w/ new with renovation. Restroom renovations All existing building with renovation. RC A M&O $16,142,110 RC A M&O Roll up RC A M&O Roll up RC A M&O Roll up 11 Mayde Creek JH 1.2 Kitchen renovation with renovation. RC K Food Services Roll up 12 Mayde Creek JH 2 13 Mayde Creek JH 2 20X40X12 Storage for all campus departments Install new lockers with built in locks in both locker rooms P AG Ath/Camp $48,000 RC A Athletics Roll up 14 Mayde Creek JH 2 Resurface tennis courts RC AG M&O $15,000 15 Mayde Creek JH 2 Add Kronos clocks to selected kitchens for kitchen staff only P K Food Services $4,940 16 Mayde Creek JH 3 Resurface track (5 7 years out) RC AG M&O * Katy ISD Long Range Facilities Plan 2010 6.14

Existing Mayde Creek Junior High School Katy ISD Long Range Facilities Plan 2010 6.15

Existing McDonald Junior High School 3635 Lakes of Bridgewater Drive Katy, Texas 77449 All costs shown are in the year 2010 dollars. The cost of all projects executed after this date, should be corrected for inflation. No. Facility Name Planning Period Item Description Rationale Discipline Source 1 McDonald JH 1.1 Construct security/vestibule area P A Safety & Security 2010 Cost Estimate $95,160 2 McDonald JH 1.1 Change out lights to T 5s for cafeterias, gyms, warehouse, and other large areas for energy efficiency at selected campuses. RC E M&O $45,500 3 McDonald JH 1.2 Lockers with built in locks 1500 lockers All PE and athletic lockers RC A Athletics $202,800 4 McDonald JH 1.2 Art Room: Need sinks/tables/stools RC A Fine Arts $50,000 5 McDonald JH 2 Building addition(s) to accommodate CTE, LGI and Admin P A CTE $5,994,300 6 McDonald JH 2 Replace ice maker RC K Food Services $5,000 7 McDonald JH 2 Fryers Replace with Winston units or ovens RC K Food Services $4,000 8 McDonald JH 2 Replace steamer RC K Food Services $4,000 9 McDonald JH 2 Change the walk in freezer to be the cooler and the cooler to be the freezer RC K Food Services $10,000 10 McDonald JH 2 Serving line wells 2 main; 4 to 3 snack lines RC K Food Services $60,000 11 McDonald JH 2 Ovens need replacing RC K Food Services $35,000 12 McDonald JH 2 Gas lines Remove from storage room RC K Food Services $9,750 13 McDonald JH 2 Lighting in kitchen (dish room) and serving area inadequate RC K Food Services $9,750 14 McDonald JH 2 Replace wooden bakery table RC K Food Services $4,200 15 McDonald JH 2 Tennis courts resurfaced and relined P AG Athletics $15,000 16 McDonald JH 2 Add Kronos clocks to selected kitchens for kitchen staff only P K Food Services $4,940 17 McDonald JH 3 Replace carpets. Partial. RC A M&O * 18 McDonald JH 3 Need: High jump apron that is compliant with regulation measurements 50 x 100 P AG Athletics * Katy ISD Long Range Facilities Plan 2010 6.16

Existing McDonald Junior High School Katy ISD Long Range Facilities Plan 2010 6.17

Existing McMeans Junior High School 21000 Westheimer Parkway Katy, Texas 77450 All costs shown are in the year 2010 dollars. The cost of all projects executed after this date, should be corrected for inflation. No. Facility Name Planning Period Item Description Rationale Discipline Source 2010 Cost Estimate 1 McMeans JH 1.1 Change out lights to T 5s for cafeterias, gyms, warehouse, and other large areas for energy efficiency at selected campuses. RC E M&O $45,500 2 McMeans JH 1.2 Art Room: Update both art rooms an area of cabinet/casework from 24" to 32" to 36"L x 45"W RC A Fine Arts $25,000 3 McMeans JH 1.2 New bleachers for Competition gym P A Athletics $97,500 4 McMeans JH 2 Fenced off patio area SS A MMJH $10,000 5 McMeans JH 2 6 McMeans JH 2 Roof, exterior waterproofing, through wall flashing, and A/E and bidding cost Replace carpets. (All classrooms, corridors and Library) BI A M&O $1,490,373 RC M&O M&O $251,388 7 McMeans JH 2 LGI room for large groups to assemble, professional meetings, etc. P A Secondary Education $1,647,750 8 McMeans JH 2 Provide building addition/renovation for Admin and CTE P A Secondary Education $4,410,900 9 McMeans JH 2 Basketball goal motors need replacing on all goals RC A Athletics $15,000 10 McMeans JH 2 Resurface tennis courts RC AG Athletics $15,000 11 McMeans JH 2 Add Kronos clocks to selected kitchens for kitchen staff only P K Food Services $4,940 12 McMeans JH 3 Replace kiln RC A Fine Arts * Katy ISD Long Range Facilities Plan 2010 6.18

Existing McMeans Junior High School Katy ISD Long Range Facilities Plan 2010 6.19

Existing Memorial Parkway Junior High School 21203 Highland Knolls Katy, Texas 77450 All costs shown are in the year 2010 dollars. The cost of all projects executed after this date, should be corrected for inflation. No. Facility Name Planning Period Item Description Rationale Discipline Source 2010 Cost Estimate 1 Memorial Pkwy. JH 1.1 Create secure entrance P A MPJH $95,160 2 Memorial Pkwy. JH 1.1 Change out lights to T 5s for cafeterias, gyms, warehouse, and other large areas for energy efficiency at selected campuses. RC E M&O $45,500 3 Memorial Pkwy. JH 1.2 Replace carpets. (Partial) RC A M&O $257,407 4 Memorial Pkwy. JH 1.2 Front office/counselors' suite reconfigured renovate front office P A MPJH $347,750 5 Memorial Pkwy. JH 1.2 Replace exterior HM doors RC A M&O $40,000 6 Memorial Pkwy. JH 1.2 Replace track surface (3 lanes) RC A Athletics $109,460 7 Memorial Pkwy. JH 2 Resurface tennis courts RC AG Athletics $15,000 8 Memorial Pkwy. JH 2 Replace emergency generator RC E M&O $130,000 9 Memorial Pkwy. JH 2 Control package for entire school RC M&O M&O $581,100 10 Memorial Pkwy. JH 2 Hot water pump replacement and create mechanical room RC M&O M&O $130,000 11 Memorial Pkwy. JH 2 Renovation of kitchen RC M&O M&O Roll up 12 Memorial Pkwy. JH 2 20X40X12 Storage for all campus departments P AG Ath/Camp $48,000 13 Memorial Pkwy. JH 2 Pole vault runway P AG Athletics $97,500 14 Memorial Pkwy. JH 2 Replace kiln (one only) RC A Fine Arts $8,000 15 Memorial Pkwy. JH 2 16 Memorial Pkwy. JH 3 Add Kronos clocks to selected kitchens for kitchen staff only Total building renovation MEP, carpet and finishes P K Food Services $4,940 RC AG M&O $14,380,766 17 Memorial Pkwy. JH 3 New high jump apron P AG Athletics * 18 Memorial Pkwy. JH 3 Renovate existing mini Auditorium to LGI room for large groups to assemble, Secondary RC A professional meetings, etc. building Education * addition 19 Memorial Pkwy. JH 3 Need: Outdoor basketball courts P AG Athletics * Katy ISD Long Range Facilities Plan 2010 6.20

Existing Memorial Parkway Junior High School Katy ISD Long Range Facilities Plan 2010 6.21

Existing Morton Ranch Junior High School 2498 North Mason Road Katy, Texas 77449 All costs shown are in the year 2010 dollars. The cost of all projects executed after this date, should be corrected for inflation. No. Facility Name Planning Period Item Description Rationale Discipline Source 2010 Cost Estimate 1 Morton Ranch JH 1.1 Change out lights to T 5s for cafeterias, gyms, warehouse, and other large areas for energy efficiency at selected campuses. RC E M&O $45,500 2 Morton Ranch JH 1.2 Gate between MRJH and MRE to limit parent access to bus drive with possible signage at Franz entrance and a gate saying "Buses and District Employees 6:30 AM 7:30 AM 2 PM 4 PM On School Days" (get more information, i.e. location) SS A Transportation $5,000 3 Morton Ranch JH 2 20X40X12 Storage for all campus departments P AG Ath/Camp $48,000 4 Morton Ranch JH 2 Resurface tennis courts RC ATH Athletics $15,000 5 Morton Ranch JH 2 Install non friction drive system to bleachers at Competition Gym SS A Athletics $10,000 6 Morton Ranch JH 2 Convert Room 185 into computer lab and keep Room 190 as science P A M&O $70,135 7 Morton Ranch JH 3 Replace carpets. RC A M&O * Katy ISD Long Range Facilities Plan 2010 6.22

Existing Morton Ranch Junior High School Katy ISD Long Range Facilities Plan 2010 6.23

Existing West Memorial Junior High School 22311 Provincial Boulevard Katy, Texas 77450 All costs shown are in the year 2010 dollars. The cost of all projects executed after this date, should be corrected for inflation. No. Facility Name Planning Period Item Description Rationale Discipline Source 2010 Cost Estimate 1 West Memorial JH 1.2 Create central plant, and air handler rooms RC A M&O $1,560,000 2 West Memorial JH 1.2 Total Interior Renovation RC A M&O $13,701,643 3 West Memorial JH 1.2 Provide 6 Classroom Addition P A WMJH $2,323,100 4 West Memorial JH 2 Resuface Tennis Courts RC AG Athletics $30,000 5 West Memorial JH 2 6 West Memorial JH 2 Install new bleachers with non friction drive system at Competition Gym Add Kronos clocks to selected kitchens for kitchen staff only SS A Athletics $97,500 P K Food Services $4,940 Katy ISD Long Range Facilities Plan 2010 6.24

Existing West Memorial Junior High School Katy ISD Long Range Facilities Plan 2010 6.25

Existing WoodCreek Junior High School 1801 WoodCreek Bend Lane Katy, Texas 77494 All costs shown are in the year 2010 dollars. The cost of all projects executed after this date, should be corrected for inflation. No. Facility Name Planning Period Item Description Rationale Discipline Source 2010 Cost Estimate 1 WoodCreek JH 2 20X40X12 Storage for all campus departments Do we have this now? Yes. Additional lockers to cover protected growth and if bond does not pass P AG Ath/Camp $48,000 2 WoodCreek JH 2 Resuface Tennis Courts RC AG Athletics $15,000 3 WoodCreek JH 2 Install non friction drive system to bleachers at Competition Gym SS A Athletics $10,000 4 WoodCreek JH 2 Add Kronos clocks to selected kitchens for kitchen staff only P K Food Services $4,940 Katy ISD Long Range Facilities Plan 2010 6.26

Existing WoodCreek Junior High School Katy ISD Long Range Facilities Plan 2010 6.27

Katy ISD Long Range Facilities Plan 2010 6.28