SERVICE QUALITY SIX SIGMA CASE STUDIES

Similar documents
Module Title: Managing and Leading Change. Lesson 4 THE SIX SIGMA

Visit us at:

Certified Six Sigma Professionals International Certification Courses in Six Sigma Green Belt

APPENDIX A: Process Sigma Table (I)

For Portfolio, Programme, Project, Risk and Service Management. Integrating Six Sigma and PRINCE Mike Ward, Outperfom

ARKANSAS TECH UNIVERSITY

Expert Reference Series of White Papers. Mastering Problem Management

C2C Formal Telephone Discussion Ask the Contractor Teleconference

Measurement & Analysis in the Real World

IN-STATE TUITION PETITION INSTRUCTIONS AND DEADLINES Western State Colorado University

Student Transportation

Envision Success FY2014-FY2017 Strategic Goal 1: Enhancing pathways that guide students to achieve their academic, career, and personal goals

1.0 INTRODUCTION. The purpose of the Florida school district performance review is to identify ways that a designated school district can:

Software Development Plan

Certified Six Sigma - Black Belt VS-1104

Friday, October 3, 2014 by 10: a.m. EST

Enhancing Customer Service through Learning Technology

re An Interactive web based tool for sorting textbook images prior to adaptation to accessible format: Year 1 Final Report

Nearing Completion of Prototype 1: Discovery

Reduce the Failure Rate of the Screwing Process with Six Sigma Approach

KOMAR UNIVERSITY OF SCIENCE AND TECHNOLOGY (KUST)

STABILISATION AND PROCESS IMPROVEMENT IN NAB

2017 FALL PROFESSIONAL TRAINING CALENDAR

PROGRAM HANDBOOK. for the ACCREDITATION OF INSTRUMENT CALIBRATION LABORATORIES. by the HEALTH PHYSICS SOCIETY

ESSENTIAL SKILLS PROFILE BINGO CALLER/CHECKER

African American Male Achievement Update

HOUSE OF REPRESENTATIVES AS REVISED BY THE COMMITTEE ON EDUCATION APPROPRIATIONS ANALYSIS

4.0 CAPACITY AND UTILIZATION

Exercise Format Benefits Drawbacks Desk check, audit or update

3.7 General Education Homebound (GEH) Program

MSW Field Placement Manual Foundation and Advanced

Early Warning System Implementation Guide

Class Numbers: & Personal Financial Management. Sections: RVCC & RVDC. Summer 2008 FIN Fully Online

Running head: DELAY AND PROSPECTIVE MEMORY 1

Global Television Manufacturing Industry : Trend, Profit, and Forecast Analysis Published September 2012

JOB OUTLOOK 2018 NOVEMBER 2017 FREE TO NACE MEMBERS $52.00 NONMEMBER PRICE NATIONAL ASSOCIATION OF COLLEGES AND EMPLOYERS

Social Justice Practicum (SJP) Description

Evaluation of Respondus LockDown Browser Online Training Program. Angela Wilson EDTECH August 4 th, 2013

Charter School Reporting and Monitoring Activity

Evaluation of the Cocoa Beach Green Business Program

A LIBRARY STRATEGY FOR SUTTON 2015 TO 2019

Chapter 9 The Beginning Teacher Support Program

Update on the Affordable Care Act. Association of Business Administrators September 24, 2014

THE PENNSYLVANIA STATE UNIVERSITY SCHREYER HONORS COLLEGE DEPARTMENT OF MATHEMATICS ASSESSING THE EFFECTIVENESS OF MULTIPLE CHOICE MATH TESTS

Guidelines for Completion of an Application for Temporary Licence under Section 24 of the Architects Act R.S.O. 1990

University of Waterloo School of Accountancy. AFM 102: Introductory Management Accounting. Fall Term 2004: Section 4

The Application of Lean Six Sigma in Alleviating Water Shortage in Limpopo Rural Area to Avoid Societal Disaster

Study Board Guidelines Western Kentucky University Department of Psychological Sciences and Department of Psychology

Occupational Therapist (Temporary Position)

Georgia Tech College of Management Project Management Leadership Program Eight Day Certificate Program: October 8-11 and November 12-15, 2007

ScienceDirect. A Lean Six Sigma (LSS) project management improvement model. Alexandra Tenera a,b *, Luis Carneiro Pintoª. 27 th IPMA World Congress

IUPUI Office of Student Conduct Disciplinary Procedures for Alleged Violations of Personal Misconduct

How to Revitalize Your Financial Aid Compliance

Case Study Analysis of Six Sigma in Singapore Service Organizations

Association Between Categorical Variables

CERTIFIED PROJECT MANAGEMENT SPECIALIST (CPMS) STUDY GUIDE

For the Ohio Board of Regents Second Report on the Condition of Higher Education in Ohio

Practices Worthy of Attention Step Up to High School Chicago Public Schools Chicago, Illinois

Co-op Placement Packet

PROVIDING AND COMMUNICATING CLEAR LEARNING GOALS. Celebrating Success THE MARZANO COMPENDIUM OF INSTRUCTIONAL STRATEGIES

Green Belt Curriculum (This workshop can also be conducted on-site, subject to price change and number of participants)

The Future of Consortia among Indian Libraries - FORSA Consortium as Forerunner?

NORTH CAROLINA VIRTUAL PUBLIC SCHOOL IN WCPSS UPDATE FOR FALL 2007, SPRING 2008, AND SUMMER 2008

Probability Therefore (25) (1.33)

Registration Fee: $1490/Member, $1865/Non-member Registration Deadline: August 15, 2014 *Please see Tuition Policies on the following page

Rules of Procedure for Approval of Law Schools

SAP EDUCATION SAMPLE QUESTIONS: C_TPLM40_65. Questions. In the audit structure, what can link an audit and a quality notification?

Editor s Welcome. Summer 2016 Lean Six Sigma Innovation. You Deserve More. Lean Innovation: The Art of Making Less Into More

LEAD AGENCY MEMORANDUM OF UNDERSTANDING

SECTION I: Strategic Planning Background and Approach

Notice of Restraining Order under clause 46 (1) of the Private Career Colleges Act, 2005

SYLLABUS- ACCOUNTING 5250: Advanced Auditing (SPRING 2017)

ACTL5103 Stochastic Modelling For Actuaries. Course Outline Semester 2, 2014

Husky Voice enews. NJHS Awards Presentation. Northwood Students Fight Hunger - Twice

Financing Education In Minnesota

SEN SUPPORT ACTION PLAN Page 1 of 13 Read Schools to include all settings where appropriate.

On the Combined Behavior of Autonomous Resource Management Agents

AGS THE GREAT REVIEW GAME FOR PRE-ALGEBRA (CD) CORRELATED TO CALIFORNIA CONTENT STANDARDS

Article 15 TENURE. A. Definition

Len Lundstrum, Ph.D., FRM

Inventory management optimization using lean six-sigma Case of Spare parts Moroccan company

Academic Affairs Policy #1

Foothill College Summer 2016

Virginia Principles & Practices of Real Estate for Salespersons

EDUCATIONAL ATTAINMENT

Keeping our Academics on the Cutting Edge: The Academic Outreach Program at the University of Wollongong Library

Brockton Public Schools. Professional Development Plan Teacher s Guide

Effect of Cognitive Apprenticeship Instructional Method on Auto-Mechanics Students

Executive Guide to Simulation for Health

WSU LIBRARIES DECISION MATRIX FY

Youth Sector 5-YEAR ACTION PLAN ᒫᒨ ᒣᔅᑲᓈᐦᒉᑖ ᐤ. Office of the Deputy Director General

Tamwood Language Centre Policies Revision 12 November 2015

Clinical Quality in EMS. Noah J. Reiter, MPA, EMT-P EMS Director Lenox Hill Hospital (Rice University 00)

University of Essex Access Agreement

The Lean And Six Sigma Sinergy

Effective Recruitment and Retention Strategies for Underrepresented Minority Students: Perspectives from Dental Students

2 Lean Six Sigma Green Belt Skill Set

MKTG 611- Marketing Management The Wharton School, University of Pennsylvania Fall 2016

COURSE TITLE: FOOD & BEVERAGE OPERATIONS AND MANAGEMENT COURSE CODE: HP FB OM DESCRIPTION

Transcription:

SERVICE QUALITY SIX SIGMA CASE STUDIES Chris Bott Elizabeth Keim Six Sigma Black Belt Six Sigma Master Black Belt American Express Company Integrated Quality Resources, LLC 7701 Airport Center Parkway 4220 Pebble Beach Drive Greensboro, NC 27409 Niwot, CO 80503-8359 336-668-5799 lizkeim@netscape.net Sai Kim Lisa Palser Six Sigma Black Belt Six Sigma Master Black Belt American Express Company E.I. DuPont de Nemours, Inc. World Financial Center BMP 35-2315 200 Vesey Street P.O. Box 800035 New York, NY 10285-4525 Wilmington DE, 19880-0035 SUMMARY This presentation will discuss the effective use of Six Sigma tools to improve several service processes. Each case will cover the following five steps: Define the problem Measure the defect Analyze the data Improve the process Control the process KEYWORDS Case Studies, Service, Six Sigma INTRODUCTION Below are three cases studies, using the Six Sigma methodology for defect reduction using Define, Measure, Analyze, and Control, from American Express and DuPont. Each will discuss the nature and quantification of the problem and the benefits of resolving the problem. Then, each will describe the analysis done to determine the root cause and evaluate potential solutions to the problem. Lastly, each will discuss control mechanisms used to ensure sustainability and the results achieved. CASE STUDIES Reduce Closed Store Passive Suppression Uncallables at American Express Sai Kim, American Express Company

SUMMARY This presentation will discuss the effective use of the Six Sigma tools to improve external vendor processes. It will take you through a project American Express completed, Reduce Closed Store Passive Suppression Uncallables. This analysis will demonstrate how we applied Six Sigma techniques to reduce the defect rate from 8.0% to 2.8% with expected annual savings of $401,000. INTRODUCTION: Reduce Closed Store Passive Suppression Uncallables It is important that all American Express merchants place our point-of-purchase materials (POP) or decals on storefronts, cash registers, or check presenters. POP helps our card members, especially Corporate card members, identify service establishments that honor American Express cards. In addition to increased perception of coverage, POP increases merchant and card member satisfaction and revenues for both the merchant and American Express. Despite the benefits of placing POP, merchants place competitive POP and no American Express POP; we define these merchants as passive suppressors (merchants with at least 1 POP placed are defined as non-suppressors). To monitor passive suppression, we work with an external vendor. The vendor is responsible for placing POP in the market place and identifying passive suppressors, as well as, measuring placement and passive suppression rates. When we began our analysis, we learned that we had a 36% Uncallable rate, a rate at which we fail to visit merchants for various reasons such as the store is closed, address is incorrect, ownership has changed, etc. Applying Six Sigma tools, we focused on the largest factor contributing to Uncallables - closed stores. We were able to decrease our defect rate by 65%. DEFINE & MEASURE THE PROBLEM The objective of this project was to reduce closed store Uncallables (closed due to business hours), representing 27.4% of total Uncallables and 8.0% of 831,000 annual total attempted visits. The process represented a 2.9 sigma level and cost of poor quality of $615,000 annually. ANALYZE THE DATA We applied various Six Sigma tools to identify Vital X s or the root causes of the defect (critical to success). The Pareto Chart pointed to the Closed Store category, the number one reason for Uncallables. With the focus on closed stores, we identified the following potential Vital X s: Vendor Call Hours: By shadowing our vendor on merchant visits, we found that visits were completed from 8:00 AM to 6:00 PM. It was brought to our attention that 45% of closed stores fell in the retail segment and 16% in the restaurant segment. Since these two industry segments typically are not open for business at 8:00 AM (or even at 9:00 AM), we hypothesized that vendor call hours contributed to the high defect rate. Closed Store Inspection Process: After we mapped the vendor call process, we identified the second Vital X, the inspection process. The current policy states that a merchant with at least one POP placed is defined a non-suppressor. However, in spite of POP placement on the exterior of closed service establishments, the vendor was not collecting this information. In fact, the calls were immediately terminated without checking for externally placed POP and reported as Uncallable. As a

result, the same merchants were being pulled from our database and visited multiple times - all leading to rework. IMPROVE THE PROCESS After we identified two potential Vital X s, we had to test and validate our hypotheses. We changed the call hours for all visits to after 10:00 AM. Secondly, our vendor was required to continue the inspection process and audit exterior placement status (Amex POP only, Competitive POP only, All POP, etc.), regardless of regular business hours. As a result of new call hours, we were able to reduce the defect rate by 43.7%, from 8.0% to 4.5%. This reflects annual savings of $269,000. The second test, continued inspection, indicated that 35.4% of the remaining 4.5% closed stores had at least 1 American Express POP placed on the exterior of the establishment. We concluded that a little over a third of merchants in the closed store category were not suppressing American Express cards, information we did not collect in the past. Going forward, we can use this data to forecast the total number of attempts (merchant visits) needed to achieve a targeted number of Callables. The new inspection process is expected to save an additional $132,000 annually. In summary, the following chart outlines the combined test results: Closed Stores Baseline Test Results Defect Rate 8.0% 2.8% (Reduced by 65%) DPMO 80,000 28,000 COPQ $614K $215K Total Annual Savings - $401K Cost per Unit $9.25 $9.25 Sigma Level 2.9 3.2 CONTROL THE PROCESS To ensure that we perform within the acceptable limits on an on-going basis, it is important to monitor the new process. To achieve control status, we will be using the p chart, a tool that tracks proportions of closed stores over time. In addition, we have revised the vendor call report to reflect Uncallable rates by reason, which gives us the ability to monitor the defect rate on a monthly basis. CONCLUSION Later call hours and a continued inspection process for closed stores significantly enhanced efficiency. Moving forward, we can make 43,336 fewer vendor visits and still achieve the same absolute number of Callables as we did in past years. Also, we can expect $401,000 in annual savings with $0 project investment. In terms of key learnings, we found that it is important to shadow vendors periodically to identify areas for improvement or opportunities not readily evident to the vendor or the client. This will help us accommodate the changing marketplace and meet business objectives using more efficient processes. Eliminate Non-received Renewal Credit Cards

Chris Bott, American Express Company SUMMARY This presentation will discuss the effective use of Six Sigma tools to improve our plastic issuance processes. It will take you through a project American Express completed, Eliminate Non-received Renewal Credit Cards. This analysis will demonstrate how we applied Six Sigma techniques to reduce the defect rate with ongoing dollar savings. INTRODUCTION Eliminate Non-received Renewals - Returned Plastics Due to Change of Address. DEFINE & MEASURE THE PROBLEM On average (in 1999), American Express received 72,000 returned Renewal cards each month. Of these, 65% (47,356) are due to the fact that the card members changed their addresses and did not tell us (therefore the updated addresses are not in our database). The US Post Office calls these forwardable addresses. Please note: Amex does not currently notify a card member when we receive a returned plastic card. ANALYZE THE DATA We applied various Six Sigma tools to identify Vital X s or the root causes of the defect. The use of Chi Square indicated the following: By Type of Card/Plastic: we isolated significant differences in the causes of Returned Plastics between product types. Optimum, our revolving card product, had the highest incident of defects, but was not significantly different, in the percentage of defects, from the other card types. Issuance Reason: the tool proved overwhelmingly that Renewals had far and away the highest defect rate in the three areas in which we issue plastic - Replacement, Renewal and New Accounts. Validated Reason for Returned: Because we suffered scope creep early in the project, it was important for us to confirm what our initial data was telling us. After testing the five reasons for returns, returns with forwardable addresses were overwhelmingly the largest percentage and quantity of returns. IMPROVE THE PROCESS After identifying the potential Vital X s, we had to test and validate our hypothesis. An experimental pilot was run on all Renewal files issued. This bumping against the "The National Change of Address" service was implemented on all Renewal cards in mid August. This solution, due to the strict file matching criteria, will impact 33% of the remaining population (or 15,000 cards monthly). As a result of a successful pilot, we were able to reduce the defect rate by 44.5%, from 13,500 to 6,036 defects per million. This reflects annual savings of $1,228,000. In summary, the following chart outlines the combined test results:

Closed Stores Baseline Test Results Defect Rate 1.35%.6% DPMO 13552 6036 COPQ $3,360,000 Total Annual Savings $1,228,000 Cost per Unit $6.49 (weighted) Sigma Level 3.71 4.01 CONTROL THE PROCESS To ensure that we perform within the acceptable limits on an on-going basis, it is important to monitor the new process. To achieve control status, we will be using the p chart, a tool that tracks proportions of returns over time. In addition, our vendor has constructed reporting, which gives us the ability to monitor the defect rate on a monthly basis. The report will tell us if any credit cards that were bumped against the National Change of Address database were returned back to our warehouse. CONCLUSION Using the National Change of Address will enable over 180,000 card members to get their credit cards. Prior to this implementation, these card members would have never received their cards automatically. This will undoubtedly increase our revenue and customer satisfaction. Lisa Palser, E.I. DuPont de Nemours, Inc. Cycle Time Improvement for a Human Resources Process SUMMARY This presentation will discuss how Six Sigma was applied to improve cycle time for an employee s application for long-term disability benefits. This process was selected because the process owner was receiving customer complaints; the process's performance was not meeting customer expectations. The process starts at the time the application is sent to the benefit provider until an accept or deny decision is delivered. How Six Sigma was used with a third-party benefit supplier will also be discussed. INTRODUCTION Long-Term Disability Application Process The Long-Term Disability Application Process is initiated in the fifth (5 th ) month of the employee's six (6) month short-term disability leave of absence. The cycle time requirement of the corporation is to receive an approve/deny decision prior to the end of the short-term benefit. The financial cost of not having a timely decision is that the short-term benefit is extended, which costs the corporation more than the long-term benefit. The cycle time objective of this process is to perform within a 45-day upper specification.

MEASURE The project team included the process owner, subject matter experts, and the supplier's account managers. The project team mapped and documented the current process. Using the process map and experience, the project team and the supplier's claim processors developed a cause-effect diagram for the factors influencing the process outcome, the cycle time. The customers, represented by 12 randomly selected employment sites, were surveyed for their view of the process and the 45-day upper specification was validated. Their insights were added to the process map and the cause-effect diagram. In addition, they were asked about an 'ideal' outcome to determine other potential process improvements and potential future projects. Baseline data was collected from the selected sites. In addition to the overall cycle time measure for each application, the team gathered data related to the application at various milestone dates between the initial application and the decision so that we could assess where the significant breakdowns in the process occurred. ANALYZE The good news from the initial analysis was that mean cycle time was 30 days; the bad news was that there was significant variation resulting in a 0.83 Sigma value. Various analysis tools were applied to identify the root causes of the defects. We discovered that there is no significant difference in the cycle time at different DuPont sites, even though each site uses a slightly different process. The most significant factors affecting cycle times were: Incomplete medical and/or job information requiring frequent re-work to gather and process missing information. The benefit supplier's agent who processed the application. Delays in receiving objective medical information from the employee's physician. Substantiation of the employee s condition by an independent medical evaluation. Mail cycle time from the site to the benefit provider agent s desk. Note: The team identified opportunities to analyze data to determine if there is a similar rate of approval or denial for disability by business unit or site, if there are trends in disability incidence or diagnoses, etc, however these were not the focus of this project. IMPROVE There is no formal design of experiment being done in this project. Through the identification of the sources of variation and customer and benefit supplier feedback, several process improvements, training, and communications are underway. The process improvements addressing the sources of variation within the control of DuPont include: Electronic distribution of materials to employees and sites to reduce mail times. Implementation of fax server technology to process applications, eliminating mail times for new applications. Improvement of the application package, providing more complete directions and forms for the employee and site to complete when submitting the application. Improvement of the application package, providing more complete directions and forms for the employee s personal physician. The process improvements to address the sources of variation within the control of the benefit supplier include:

Staffing changes to reduce administrative burden on claims processors. Re-negotiation of contract terms for independent medical exam suppliers, to include tighter standards with financial penalties for poor performance. Implementation of e-mail confirmation and bi-weekly status reports on each case to the DuPont employment sites reminding all participants of required actions and preventing confusion over the status of a case. Addition of supplier and turn-around time reporting. Introduction of formal quarterly supplier process performance reporting to the DuPont process owner. CONTROL Several control mechanisms are being formally instituted to continually monitor and manage process performance. A new database is being established to track each application and to monitor the key sub-cycles. This database will be used by the process owner and be used to identify and react to 'out of control' cases before overall performance is affected. Supplier and total turn-around time reporting will be used to monitor and control case cycle times. In addition to the implementation training, periodic training will be provided to site HR personnel on benefits and benefit processing, particularly if there are benefit plan or process changes. In addition the training material will be add to and maintained in the corporate collaboration database, which is always available to site personnel for review, when personnel changes or refresher training is desired. CONCLUSION Applying the Six Sigma methodology provided factual information regarding the process performance and the sources of variation in a way that enabled rapid approval, from both DuPont and benefit supplier management, of the process improvements and information technology investments required to improve the process. The controls being implemented provide on-going measurement and managing by fact for the supplier services to specified service level standards and provide a clearer foundation for resolving any service issues. OVERALL CONCLUSION The Six Sigma problem solving methodology of Define, Measure Analyze, Improve, and Control can be used successfully in service processes to gain significant defect reductions. The use of data to guide decision-making ensures that the right root causes are identified and addressed. The Control phase ensures that the improvements are sustained. ACKNOWLEDGEMENTS American Express: Paul Winsick, Andy Cvitanov, Keith Siemek, Vickie Barefoot, Nick Apel, Jessica Shklar, and Chuck Aubrey DuPont: Don R. Linsenmann, Joanne M. Smith, and John P. McHugh