All-Vinyl Window Mull, Stack, or Mull & Stack Instructions Units with Integral Brickmould and J-Channel

Similar documents
Crestron BB-9L Pre-Construction Wall Mount Back Box Installation Guide

MESH TRAY. Automatic... p. 102 Standard UF... p. 106 Specific installations... p. 109 Accessories... p. 111 MESH TRAY. Scan me! JUNE 2017 CATALOGUE 99

IMPROVE THE QUALITY OF WELDING

Lesson Plans for Module

Friction Stops Motion

Introduction to Shielded Metal Arc Welding (WLDG 1428)

THE VIRTUAL WELDING REVOLUTION HAS ARRIVED... AND IT S ON THE MOVE!

SESSION 2: HELPING HAND

Power Generation Maintenance Mechanic Level Two

Ceramics 1 Course Summary Department: Visual Arts. Semester 1

Hard Drive 60 GB RAM 4 GB Graphics High powered graphics Input Power /1/50/60

tampa steel & supply ArchItecturAl MetAls QUICK REFERENCE CATALOG #7

Eggs-periments & Eggs-plorations

Registration Fee: $1490/Member, $1865/Non-member Registration Deadline: August 15, 2014 *Please see Tuition Policies on the following page

600 S PRODUCT IDENTIFICATION

Function Tables With The Magic Function Machine

Designed by Candie Donner

Standards Alignment... 5 Safe Science... 9 Scientific Inquiry Assembling Rubber Band Books... 15

Seeing is Believing. ACE Academy offers creative ways to learn; students give charter school rave reviews

CONTENTS. Getting Ready to Read: Anticipation Guide 2 Engaging in Reading: Visualizing 12. Generating Ideas: Adding Content (Pass It On) 18

Fashion Design & Merchandising Programs STUDENT INFORMATION & COURSE PARTICIPATION FORM

art history homework help

Ohio s Learning Standards-Clear Learning Targets

Program Proposal Construction Technology Construction Carpenter Diploma. Hazard Community and Technical College

Course Prerequisite: CE 2407 Adobe Illustrator or equivalent experience

Grade 2: Using a Number Line to Order and Compare Numbers Place Value Horizontal Content Strand

Building and Construction Skills 2019 v1.0

Blocks & Math. Candace Jaruszewicz, Ph.D. College of Charleston

If we want to measure the amount of cereal inside the box, what tool would we use: string, square tiles, or cubes?

Arizona s College and Career Ready Standards Mathematics

IMPROVED MANUFACTURING PROGRAM ALIGNMENT W/ PBOS

Paper 2. Mathematics test. Calculator allowed. First name. Last name. School KEY STAGE TIER

ODESSA COLLEGE TECHNICAL STUDIES & CURRICULUM DIVISION CULINARY ARTS DEPARTMENT. 201 West University Odessa, Texas COURSE SYLLABUS

ODESSA COLLEGE CULINARY ARTS. 201 West University Odessa, Texas COURSE SYLLABUS

Igneous Rock Formation

Exhibition Techniques

TRINITY VALLEY COMMUNITY COLLEGE COURSE SYLLABUS

RI.2.4 Determine the meaning of words and phrases in a text relevant to a grade 2 topic or subject area.

EDEXCEL NATIONALS UNIT 25 PROGRAMMABLE LOGIC CONTROLLERS. ASSIGNMENT No.1 SELECTION CRITERIA

Lancaster Lane CP School. The Importance of Motor Skills

Graphic Imaging Technology II - Part two of a two-year program designed to offer students skills in typesetting, art and pasteup,

TRINITY VALLEY COMMUNITY COLLEGE COURSE SYLLABUS

Drawing ART 220 Fall 2017 Monday, Tuesday, Thursday pm Location: Room 128 Name of Faculty: Ralph Larmann

The St. Marylebone Church of England Bridge School

Local Artists in Yuma, AZ

Spinners at the School Carnival (Unequal Sections)

Utilizing Soft System Methodology to Increase Productivity of Shell Fabrication Sushant Sudheer Takekar 1 Dr. D.N. Raut 2

2 nd Grade Math Curriculum Map

Diagnostic Test. Middle School Mathematics

5.1 Sound & Light Unit Overview

Grade 6: Correlated to AGS Basic Math Skills

A method to teach or reinforce concepts of restriction enzymes, RFLPs, and gel electrophoresis. By: Heidi Hisrich of The Dork Side

John Deere Tech 2017

Readyman Activity Badge Outline -- Community Group

Georgia Department of Education Georgia Standards of Excellence Framework GSE Sophisticated Shapes Unit 1

TEACHING Simple Tools Set II

Activities. Standards-Based Skill-Builders with Seasonal Themes. Written by Brenda Kaufmann. Sample file. Illustrated by Janet Armbrust

It is therefore both a practical AND theoretical subject so you will need to want to dance practically AND write.

Average Number of Letters

use different techniques and equipment with guidance

Word Segmentation of Off-line Handwritten Documents

Hardhatting in a Geo-World

Creating a Test in Eduphoria! Aware

The Abbey School Uniform Code From September 2016

Functional Skills Mathematics Level 2 assessment

Global School-based Student Health Survey (GSHS) and Global School Health Policy and Practices Survey (SHPPS): GSHS

Pentomino Problem. Use the 3 pentominos that are provided to make as many different shapes with 12 sides or less. Use the following 3 shapes:

Design Principles to Set the Stage

PORTLAND VOCATIONAL ELECTRICAL

Sleeping Coconuts Cluster Projects

ARC Architectural Series TURNCRAFT ARCHITECTURALLY CORRECT DETAILS WIDEST RANGE OF STYLES AND SIZES ANY WOOD SPECIES ALL ORDERS OF CLASSICAL COLUMNS

OCR for Arabic using SIFT Descriptors With Online Failure Prediction

Rover Races Grades: 3-5 Prep Time: ~45 Minutes Lesson Time: ~105 minutes

Notetaking Directions

172_Primary 4 Comprehension & Vocabulary-7th Pass 07/11/14. Practice. Practice. Study the flyer carefully and then answer questions 1 8.

Learning to Think Mathematically With the Rekenrek

Carnegie Mellon University Student Government Graffiti and Poster Policy

Peterborough Eco Framework

Using Blackboard.com Software to Reach Beyond the Classroom: Intermediate

Chicago Public Schools 6 Month Asbestos Surveillance Fall

ODESSA COLLEGE TECHNICAL STUDIES & CURRICULUM DIVISION CULINARY ARTS DEPARTMENT. 201 West University Odessa, Texas COURSE SYLLABUS

Playful Practice of Early Literacy Skills via Customized Digital Books and Apps. Barbara Culatta and Kendra Hall-Kenyon

Robot manipulations and development of spatial imagery

MADERA SCIENCE FAIR 2013 Grades 4 th 6 th Project due date: Tuesday, April 9, 8:15 am Parent Night: Tuesday, April 16, 6:00 8:00 pm

Firms and Markets Saturdays Summer I 2014

Introduction to Moodle

Intel-powered Classmate PC. SMART Response* Training Foils. Version 2.0

E C C. American Heart Association. Basic Life Support Instructor Course. Updated Written Exams. February 2016

AGS THE GREAT REVIEW GAME FOR PRE-ALGEBRA (CD) CORRELATED TO CALIFORNIA CONTENT STANDARDS

Fire safety in the home

How People Learn Physics

Proudly Presents. The 36 th ANNUAL JURIED SPRING ART SHOW & SALE. April 7 15, 2018

Module 9: Performing HIV Rapid Tests (Demo and Practice)

Algebra 2- Semester 2 Review

3/6/2009. Residence Halls & Strategic t Planning Overview. Residence Halls Overview. Residence Halls: Marapai Supai Kachina

PART C: ENERGIZERS & TEAM-BUILDING ACTIVITIES TO SUPPORT YOUTH-ADULT PARTNERSHIPS

(I couldn t find a Smartie Book) NEW Grade 5/6 Mathematics: (Number, Statistics and Probability) Title Smartie Mathematics

ASSESSMENT TASK OVERVIEW & PURPOSE:

Course Syllabus. Instructor Information. Course Description. Prerequisites/Corequisites. OCIs. Course Objectives

ADMN-1311: MicroSoft Word I ( Online Fall 2017 )

Transcription:

PLUMB PLATE All-Vinyl Window Mull, Stack, or Mull & Stack Instructions Units with Integral Brickmould and J-Channel MULLING INTERIOR MULL CLIP HEAD JOINING PLATE HEAD DRIP CAP PLUMB PLATE EXTERIOR MULL POST SILL DRIP CAP SILL JOINING PLATE Units viewed from the exterior. STACKING INTERIOR MULL CLIP JOINING PLATE STACK DRIP CAP EXTERIOR MULL POST Units viewed from the exterior. IMPORTANT: Please read before you begin. Part No.1239342 Install 288 5/09 2009 Shield Family Brands

Table of Contents and Tool/Material Requirements TABLE OF CONTENTS START PAGE About Mulling, Stacking & Mulling and Stacking............................ 2 Safety Precautions..................................................... 3 General Information.................................................... 4 Mull and Stack Components............................................. 5 Unit Preparation....................................................... 6 Tin Snips, Locking Pliers, Utility Knife Mull Clip and Mull Post Configuration..................................... 7 Measuring for Mull Clips and Mull Posts................................... 8 Tape Measure, Pencil, Paper to Record Measurements, Hack Saw, Utility Knife Mull Clip Installation Interior........................................... 9 High Quality Clear Exterior Silicone Sealant, Caulking Gun, Utility Knife, End Nipper Pliers, Wood Block, Clean Soft Rags, Denatured Alcohol, Spray Bottle, Soft-Faced Hammer, Mull Clips, 1/2" Diameter Foam Caulk Saver/Backer Rod Mull Post Installation Exterior......................................... 10 High Quality Clear Exterior Silicone Sealant, Caulking Gun, Utility Knife, End Nipper Pliers, Wood Block, Clean Soft Rags, Denatured Alcohol, Spray Bottle, Soft-Faced Hammer, Mull Posts, 1/2" Diameter Foam Caulk Saver/Backer Rod Apply Joining Plates; Install Plumb Plates Optional Procedure............ 14 Joining Plates, #8 x 1/2" Phillips Pan Head Stainless Steel Sheet Metal Screws, Power Drill with Screwdriver Bits Install Head Drip Cap.................................................. 15 Matching Drip Cap, Silicone Sealant, Caulking Gun, Measuring Tape, Pencil, End Nipper Pliers, Utility Knife, Sill Gaskets, Foam Backer Rod Seal Side and Sill Joints............................................... 18 Matching Drip Cap, Silicone Sealant, Caulking Gun, Measuring Tape, End Nipper Pliers, Utility Knife Schield Family Brands reserves the right, as necessary, to change product specifications, installation procedures, materials, prices and terms of purchase without notice. Before installing units check with local building codes for your area for proper compliance. 1

About Mulling, Stacking & Mulling and Stacking Stacking, mulling, or combinations of stacking and mulling may have installation restrictions and require additional reinforcement in your area. The window manufacturer recommends that the installer consult a registered Architect or local Structural Engineer for guidance to ensure the installation meets all codes and rules regarding installation of mulled, stacked, or mulled and stacked combinations. Stacked (Stacking) The process for mulling or stacking differs from mulling and stacking. Please observe the following definitions for terms used in the subsequent instructions: Mulled (Mulling): Joining two or more units together horizontally (). Also called horizontal mulling. Stacked (Stacking): Joining two or more units together vertically (). Also called vertical mulling. Mull and Stack: Joining three or more units together horizontally and vertically (). Mulled (Mulling) IMPORTANT: Thoroughly read and follow these instructions. Failure to assemble as recommended will void any warranty, expressed or implied. Check building codes for the area in which the windows are being installed before installation to ensure proper compliance. The instructions that follow are based on typical frame construction. Specific applications may differ. The window manufacturer recommends that you consult a qualified installation professional. The window manufacturer is not responsible for installation. Some local building codes may require the use of continuous head drip caps over mulled windows. Full length drip caps are available. The following instructions are for assembling individual window units into a mulled, stacked, or mulled and stacked configuration prior to installation. To actually install the newly combined unit into a rough opening, follow the installation instructions packed with one of the individual windows. 2

Safety Precautions Please note the following precautions for your safety and well being. Recognize this symbol. This is the Safety-Alert symbol. When you see this symbol be alert to the potential for personal injury or product damage. Falling from window opening may result in serious injury or death. DO NOT leave openings unattended when children are present. CUT HAZARD *Non-safety Glass. *May cause serious injuries if broken. *Do not install where tempered safety glass is required. Improper use of hand and power tools could result in personal injury and/or product damage. Follow equipment manufacturers instructions for safe operation. Always wear safety glasses. Weight of window and accessories will vary. Use a reasonable number of people with sufficient strength to lift, carry and install window unit(s) and accessories. Always consider site conditions and use appropriate techniques when installing. Screen will not stop children, any one or anything from falling out window. Keep children and objects away from open window. IMPORTANT High-quality, exterior, neutral-cure, clear, silicone sealant (compatible with vinyl) is to be used for all procedures in the following instructions which call for caulking or sealant. 3

General Information The following instructions are for completing a standard mull, stack, or mull and stack operation for vinyl windows. These instructions are for windows with an integral brickmould and J-Channel (). Units may come with an optional J-Channel filler, however, mulling and stacking procedures are the same. SIDE VIEW HEAD JAMB Contact your customer service representative for instructions for mull and mull stack operations on other unit types and configurations. To install a combined unit, follow the installation instructions packed with the individual windows. This booklet does not contain unit installation instructions. Nailing Fin J-Channel Nailing Fin J-Channel Optional J-Channel Filler Integral Brickmould Integral Brickmould EXTERIOR NOTE: If your unit looks like (FIGURE 2) do not use these instructions for mulling, stacking, or mulling and stacking. Obtain Install 226, Part No. 213568. FIGURE 2 SIDE VIEW HEAD JAMB Nailing Fin Stucco Lip 4

Mull and Stack Components Components to complete a mull and stack operation are shown in (). Each horizontally mulled unit requires a full length head drip cap and a partial sill drip cap. Stacked units require partial drip caps applied to the side jambs, where the units join. Four-way mull and stack requires a fulllength head drip cap, a partial sill drip cap, and side caps. Joining plates are used at mull and stack joints and are secured to the side jambs with #8 x 1/2" Phillips pan head stainless steel screws. The self-adhesive gaskets are applied to the back side of the nailing fin to help seal the gap between adjacent nail fins. They should be applied to the head, sides and sill joints as appropriate. The backer rod is inserted into the end of the mull post so it is 1/4" below mull post edges. The 1/4" gap is filled with silicone. Head Drip Cap With J-Channel Head Drip Cap For Casement & Awning Head Drip Cap With J-Channel Filler Mull Clip Mull Post Sill and Side Drip Cap With J-Channel Sill Drip Cap For Single Hung Sill and Side Drip Cap With J-Channel Filler Sill drip cap applied to a horizontal mull joint. Self-Adhesive Gasket Mull Post Joining & Plumb Plate ¼" Caulk Saver/Backer Rod Install ¼" Deep Into Mull Post Stack joint showing mull post, caulk backer rod, and joining plate. 5

Unit Preparation SCORE WITH UTILITY KNIFE 1A 1. Remove all packaging and screens. Place units to be mulled and/or stacked on a clean flat surface (exterior facing up) in the position that they will be assembled (). x x x x x x x x FIGURE 2 1B 2A IMPORTANT: Arrange individual units so the sills and or water weeps will all face the sill of the rough opening when the newly combined unit is installed. 2. Nailing fins must be removed from jambs that will be attached together (x s in FIG- URE 1). Identify these fins and score each fin, next to the jamb, with a utility knife (). Use a tin snips to make an initial cut into a fin (A). Bend the fin, adjacent to this cut, up and down with locking pliers until it breaks off (FIGURE 1B). Continue this method until all identified fins are removed. 3. If you will be mulling and stacking, use a rotary tool or utility knife to open the exterior accessory groove corners so the mull strips can run the full length of the assembly (FIGURES 2 & 2A). 4. For a horizontal mull, notch the head and sill exterior accessory grooves on adjoining units so the head and sill drip cap snap-in-legs will seat properly (FIGURES 3 & 4). 5. Turn individual units over and open the interior accessory groove corners, as in Step 3 above, for mull and stack. FIGURE 3 FIGURE 4 6

Mull Clip and Mull Post Configuration For A Horizontal Mull Mull connectors run the full height of the units (). FIGURE 2 For Stacked Units Mull connectors run the full width of the units (FIGURE 2). Stacked Units Mull Clips Run Full Width Horizontal Mull Clip Runs Full Height NOTE: Mull clips and mull posts should be arranged so they run the same direction on both interior and exterior. For A 3-Way Mull/Stack Combination The horizontal mull connectors install first and run the full width. The vertical connectors meet the horizontal pieces (FIGURE 3). 4-Way Mull/Stack Combination Vertical mull connectors run the full height of the combined units and are installed first. Horizontal mull connectors meet at the vertical pieces and are cut to the width of each individual unit (FIGURE 4). 4-WAY MULL/STACK COMBINATION FIGURE 3 FIGURE 4 Viewed from the exterior Vertical Mull Post Runs Full Height Horizontal Mull Clip Full Length Install First Vertical Mull Clip Meets Horizontal Install Second 7 Horizontal Mull Posts Meet at Vertical Post

Measuring for Mull Clips and Mull Posts Horizontal Mull Pieces 1. Lay units on a clean flat surface, exterior facing up, with the adjacent nail fins removed as previously instructed, and arranged as they will be installed. 2. Slide units tightly together so they touch. 3. Record all measurements. 4. For a Single Mull or Stack (FIGURES 1 & 2, Page 7) measure across the exterior accessory grooves see (FIGURES 1 & 2, below). FIGURE 2 Measure across exterior accessory grooves for each stack Measure across exterior accessory grooves for each horizontal mull 5. For a 3-Way Mull Stack Combination (FIGURE 3, Page 7) measure height as shown in (FIGURE 2, right). For width, measure across the top unit as in (, above). 6. For a 4-Way Mull Stack Combination (FIGURE 4, Page 7) measure height the full length of the combined units and add 1/2". For width, measure width of each unit, across the exterior accessory grooves, as in (, above). 7. Cut the mull clips and mull posts to length. FIGURE 3 FIGURE 4 Mull Clip Mull Post The smaller mull clip (FIGURE 3) is applied on the interior and the mull post (FIGURE 4) is installed from the exterior. Follow the correct procedures as explained in the following sections. 8

Mull Clip Installation Interior FIGURE 2 FIGURE 3 BACKER ROD Apply caulk beside snap-in-legs, full length of mull clip. 3A Cut back "½ Cut Back ½" on both ends SILICONE SEALANT ON TOP OF BACKER ROD 1. Place units on a clean, flat, protected surface with the interior facing up. Arrange units as they will be installed. All water weeps of the combined units must face toward the sill of the rough opening. Use 1/2" plywood spacer blocks to set units a uniform 1/2" apart. IMPORTANT: Use a straightedge or level to align units so they are square, straight, and even with each other. 2. For a 3 or 4-Way assembly, insert 5" long, 1/2" diameter caulk backer rod into the gap where the units meet (). Push backer rod down so there is at least 1/4" space above the rod. Fill this 1/4" space with silicone sealant applied over the backer rod (). 3. Using a utility knife, rotary tool, or end nipper pliers, cut the snap-in-legs back 1/2" on each end of the mull clip (FIGURE 2). 4. Apply a minimum 1/4" continuous bead of caulk the full length of each mull clip, along the side of each snap-in-leg before installing the clip (FIGURE 2). NOTE: If mulling and stacking, install the vertical mull clip first. Then install the horizontal mull clip(s). 5. Be sure units are still aligned with each other and then start the mull clip into one end of the accessory groove. With a rubber mallet (FIGURE 3), lightly tap so the clip snaps into the accessory grooves on both units (FIGURE 3A). Ensure that the mull clip has fully snapped into place along the unit s entire length. If needed, use a wood block and rubber mallet to tap mull clips tightly into place. 6. The shorter mull clips must fit tight against the longer clips at their intersection (FIG- URES 3 & 3A). 7. After installing all the interior mull clips, remove excess caulk with denatured alcohol dampened clean soft rags. 9

Mull Post Installation Exterior 3-Way Mull/Stack Combinations The horizontal mull post installs first and runs the full width of the unit (FIGURE 1). The vertical mull post fits tight against the horizontal mull post and runs to the bottom of the units. Horizontal Mull Post Full Length Install First IMPORTANT: Use an adequate number of people, clamps, and supports to prevent units from separating. 1. Turn units over so the exterior side is facing up on a flat, clean, uniformly supporting surface. 2. Check length of mull posts, cut in Step 7 Page 8, against the the window units. Adjust lengths as needed. Mull Post Preparation 3. Cut back the snap-in-legs by 1/2" on each end of the mull post (FIGURE 3). 4. Cut back the mull post body by 1/8" on each end (FIGURE 3). Vertical Mull Post Meets Horizontal Install Second FIGURE 3 Cut back snap-in-legs 1/2" on both ends. Snap-in-leg 4-Way Mull Combination The vertical mull post is installed first (FIGURE 2) and must run the full height of the units. The horizontal mull posts are cut to the width of each individual window unit (FIGURE 2). Cut back mull post body 1/8" on both ends. Mull Post Body FIGURE 2 Vertical Mull Post Runs Full Height Horizontal Mull Posts Meet at Vertical Post 10

Mull Post Installation Exterior (cont.) For a 1-Way Mull or Stack the mull post runs the full length of the unit(s). For a 3 or 4-Way Assembly: The shorter mull posts, that meet the full-length mull post, must have the ends that join with the full-length post prepared prior to installation. The preparation is necessary to ensure a weather-tight seal at the joint. The full-length mull post is installed first. 5. For the full-length mull post, apply a minimum 1/4" continuous silicone bead the full length, along the snap-in legs on each side of each mull post before installing (FIGURE 4). FIGURE 4 Apply caulk on both sides of mull post along inside edge of snap-in-legs. Place mull strip in between units. Use rubber mallet to seat snap-in-legs into the accessory grooves. Accessory Grooves 6. Place a caulked mull post between the units and align one end flush with top or bottom of window frame. FIGURE 5 7. Start one end of the mull post into the accessory grooves. Tap along the mull post to seat the snap-in-legs into both units (FIGURE 5). Ensure mull posts are fully snapped into place along the unit s entire length. If necessary, use a wood block and rubber mallet to tap mull posts tightly into place. Repeat for all fulllength mull posts. 11

Mull Post Installation Exterior (cont.) For a 3 or 4-Way Assembly: 8. Insert a 1/2" diameter 2" long caulk backer rod into the mull post cavity on the end that meets the full-length mull post (FIGURE 6). Push backer rod into the mull post so there is at least 1/4" space above the backer rod. Fill this 1/4" space with silicone sealant (FIGURE 7). Sealant should overfill the cavity. Apply sealant to snapin-legs of mull post and to exterior accessory grooves (see Step 5 above). FIGURE 6 Mull Post Caulk Saver/Backer Rod Install ¼" Deep Into Mull Post ¼" FIGURE 7 Mull Post Fill void above backer rod with sealant. Allow excess to form at end of mull post to help seal against full length mull post. 9. Place shorter mull post into the space between the units, with the prepared end toward the full-length mull post just installed (FIGURE 8). Butt the shorter mull post tightly against the full-length post and tap the snap-in-legs down into the exterior accessory grooves. Ensure mull posts are fully snapped into place. If necessary, use a wood block and rubber mallet to tap mull posts tightly into place. Repeat for all short mull posts. 10. Remove excess silicone with clean soft rags dampened with denatured alcohol. FIGURE 8 VERTICAL MULL POST FULL LENGTH BACKER ROD SEALANT FROM BACKER ROD TO END OF HORIZONTAL MULL POST HORIZONTAL MULL POST MEETS VERTICAL 12

Mull Post Installation Exterior (cont.) Fill Gap Between Units 11. There will be a hollow in the mull post at the head, and sill on mulled units and at side jambs on stacked units (FIGURES 9 & 9A). 12. Push a foam backer rod into each mull post hollow leaving 1/4" space above the backer rod (FIGURES 9A & 10). 13. Completely fill area above the backer rod with silicone (1). FIGURE 9 FIGURE 9A Add Caulk Saver Add Caulk Saver Add Caulk Saver Add Caulk Saver 0 1 Install backer rod into mull post so it is recessed at least 1/4" Completely fill area above backer rod with silicone sealant. 14. After sealant application, attach a self-adhesive gasket to the interior side of the nailing fin and frame to cover the mull gap (FIGURES 12 & 13). 2 3 13

Apply Joining Plates MULL POST #8 X ½" SCREWS (typ) BACKER ROD SEALANT JOINING PLATE 1. Use a level or straightedge to check that units are still aligned with each other. They must be square, even, and straight. Make necessary adjustments. 2. After mull clips & mull posts are installed, caulked, and gaskets applied, install a joining plate over each stacked and/or mulled joint (). Apply a joining plate at the head, sill, and sides based on mull type. NOTE: Be sure backer rod, caulk, and gaskets are applied before installing joining plates. 3. Align plate so it straddles the joint and attach with at least eight screws, four on each side of mull or stack joint. Use #8 x 1/2" Phillips, pan head stainless steel sheet metal screws (). Install Plumb Plates Optional Procedure Mull Joint Viewed From Above To help plumb the window while installing, attach additional joining plates on each side of each mull (top and bottom) or stack joint (both sides) (FIGURES 1 & 2). These plates will help you attain a more accurate alignment of the units with the rough opening. After the window is installed the plates are bent at a right angle and fastened to the framing members. FIGURE 2 Stack Joint Viewed From the Side 14

Install Head Drip Cap IMPORTANT: Head drip cap runs full width of mulled unit(s). NOTE: There is a separate drip cap for J-Channel windows and those with the optional J-Channel filler. Be sure your drip cap is the proper type (). Nailing Fin SIDE VIEW HEAD JAMB with Drip Caps Optional J-Channel Filler Integral Brickmould EXTERIOR 1. Measure overall width of mulled assembly across outside edges of integral brickmould. 2. Cut a vinyl drip cap to this length. IMPORTANT: Be sure accessory grooves at mull joint are opened. See Page 6 Step 4. 3. Trim excess weld build-up at the frame corners on the top of the units. 4. Caulk mull joints at the top of each window frame (FIGURE 2). Caulk top of window frames for full length of mulled assembly and at each end of head jamb (FIGURE 3). FIGURE 2 FIGURE 3 15

Install Head Drip Cap (cont.) FIGURE 4 5. Center drip cap on the width of the combined unit and place the edge of the snapin-leg into the exterior accessory groove (FIGURE 4). 6. Work along width of unit, pulling drip cap up and over nailing fin (FIGURE 5) while firmly pushing the drip cap down into the J-Channel pocket (FIGURE 6). Ensure snap-in-leg fully seats in exterior accessory groove along drip cap s full length. FIGURE 5 FIGURE 6 16

Install Head Drip Cap (cont.) FIGURE 7 Drip Cap Folded Edge Nailing Fin Fold flap down into J-Channel Cut inward, on these seams, until flush with the bottom of the J-Channel. 7. Cut the drip cap, only the part extending beyond the head J-Channel pocket, inward along its seams as shown in (FIGURE 7) and fold the resulting flap down into the J-Channel pocket. This allows for siding to be placed into the J-Channel. 8. Use a shop towel dampened with denatured alcohol to clean-off excess caulk. IMPORTANT: Allow the caulk to set up before handling, moving, or installing the assembled unit. 17

Seal Side and Sill Joints 1. Cut a 6" long piece of drip cap for the sill and/or sides. See Page 5 to select the right shaped drip cap. Notch snap-in leg at center of drip cap to provide clearance for the mull post or mull clip (). 2. Caulk the exterior as shown below in (FIGURE 2). Caulk the sill joint on a mulled unit and the sides on a stacked unit. 3. Install drip caps as appropriate for your assembly. NOTCH DRIP CAP MULL POST FIGURE 2 ONE SIDE OF A STACKED UNIT FIGURE 2 ONE SIDE OF A STACKED UNIT COMPLETED. SILL WOULD BE SIMILAR Mull or mull and stack assembly is now complete. Allow caulk to set up before installing window. To install the new mulled or stacked unit, follow installation instructions packed with one of the individual windows. 18

Notes 19