Gregory J. Walker, FACHE President & CEO December 8, A multi-year cultural change journey through leadership and teamwork. Session Objectives

Similar documents
Certified Six Sigma - Black Belt VS-1104

Module Title: Managing and Leading Change. Lesson 4 THE SIX SIGMA

We Are a Place People Can Call Their Medical Home

Visit us at:

HSC/SOM GOAL 1: IMPROVE HEALTH AND HEALTHCARE IN THE POPULATIONS WE SERVE.

STABILISATION AND PROCESS IMPROVEMENT IN NAB

Value of Athletics in Higher Education March Prepared by Edward J. Ray, President Oregon State University

Introduction on Lean, six sigma and Lean game. Remco Paulussen, Statistics Netherlands Anne S. Trolie, Statistics Norway

Executive Guide to Simulation for Health

2. Related Documents (refer to policies.rutgers.edu for additional information)

Lean Six Sigma Innovative Safety Management

Longitudinal Integrated Clerkship Program Frequently Asked Questions

Orange Elementary School FY15 Budget Overview. Tari N. Thomas Superintendent of Schools

JOB OUTLOOK 2018 NOVEMBER 2017 FREE TO NACE MEMBERS $52.00 NONMEMBER PRICE NATIONAL ASSOCIATION OF COLLEGES AND EMPLOYERS

Massachusetts Hospital Lean Network

ADDIE: A systematic methodology for instructional design that includes five phases: Analysis, Design, Development, Implementation, and Evaluation.

Marketing Committee Terms of Reference

Expert Reference Series of White Papers. Mastering Problem Management

VOL VISION 2020 STRATEGIC PLAN IMPLEMENTATION

Tools to SUPPORT IMPLEMENTATION OF a monitoring system for regularly scheduled series

Study Abroad: Planning and Development, Successes and Challenges

For Portfolio, Programme, Project, Risk and Service Management. Integrating Six Sigma and PRINCE Mike Ward, Outperfom

Green Belt Curriculum (This workshop can also be conducted on-site, subject to price change and number of participants)

Expanded Learning Time Expectations for Implementation

Program Change Proposal:

Strategic Planning Summer Working Group Report Revenue and Reputation Enhancements through Short Course and Certificate Program Activity August, 2015

Contract Language for Educators Evaluation. Table of Contents (1) Purpose of Educator Evaluation (2) Definitions (3) (4)

2015 Annual Report to the School Community

Case Study Analysis of Six Sigma in Singapore Service Organizations

Intervention in Struggling Schools Through Receivership New York State. May 2015

Partnerships and sponsorships: beverage pouring rights, on-campus ATMs and banking center, athletics sponsorships.

Certified Six Sigma Professionals International Certification Courses in Six Sigma Green Belt

Milton Public Schools Fiscal Year 2018 Budget Presentation

Early Career Awards (ECA) - Overview

The Lean And Six Sigma Sinergy

JUNE 15, :30 PM 9:15 PM

Problem Solving for Success Handbook. Solve the Problem Sustain the Solution Celebrate Success

THE BROOKDALE HOSPITAL MEDICAL CENTER ONE BROOKDALE PLAZA BROOKLYN, NEW YORK 11212

July 17, 2017 VIA CERTIFIED MAIL. John Tafaro, President Chatfield College State Route 251 St. Martin, OH Dear President Tafaro:

Clinical Quality in EMS. Noah J. Reiter, MPA, EMT-P EMS Director Lenox Hill Hospital (Rice University 00)

Citation for published version (APA): de Koning, H., Does, R. J. M. M., & de Mast, J. (2005). Lean Six Sigma. Kwaliteit in bedrijf, 21(8),

Envision Success FY2014-FY2017 Strategic Goal 1: Enhancing pathways that guide students to achieve their academic, career, and personal goals

UIC HEALTH SCIENCE COLLEGES

Executive Summary. Laurel County School District. Dr. Doug Bennett, Superintendent 718 N Main St London, KY

Buffalo School Board Governance

SANTIAGO CANYON COLLEGE STUDENT PLACEMENTOFFICE PROGRAM REVIEW SPRING SEMESTER, 2010

Lean Six Sigma Report - No. 03

May From the Principal s Desk. Infuse your life with planned action that stems from a vision. Dear Parents,

ACADEMIC ALIGNMENT. Ongoing - Revised

APPENDIX A: Process Sigma Table (I)

About the College Board. College Board Advocacy & Policy Center

Sight Word Assessment

NATIONAL CENTER FOR EDUCATION STATISTICS

1. Amend Article Departmental co-ordination and program committee as set out in Appendix A.

Nursing Students Conception of Clinical Skills Training Before and After Their First Clinical Placement. Solveig Struksnes RN, MSc Senior lecturer

Financial Plan. Operating and Capital. May2010

March 28, To Zone Chairs and Zone Delegates to the USA Water Polo General Assembly:

Paramedic Science Program

Full-time MBA Program Distinguish Yourself.

Position Statements. Index of Association Position Statements

Innovation of communication technology to improve information transfer during handover

Book Review: Build Lean: Transforming construction using Lean Thinking by Adrian Terry & Stuart Smith

CLASS EXODUS. The alumni giving rate has dropped 50 percent over the last 20 years. How can you rethink your value to graduates?

The Consistent Positive Direction Pinnacle Certification Course

2017 FALL PROFESSIONAL TRAINING CALENDAR

MEDICAL COLLEGE OF WISCONSIN (MCW) WHO WE ARE AND OUR UNIQUE VALUE

Targetsim Toolbox. Business Board Simulations: Features, Value, Impact. Dr. Gudrun G. Vogt Targetsim Founder & Managing Partner

PROGRAM REVIEW REPORT EXTERNAL REVIEWER

Editor s Welcome. Summer 2016 Lean Six Sigma Innovation. You Deserve More. Lean Innovation: The Art of Making Less Into More

Iowa School District Profiles. Le Mars

Barriers and Enablers of Lean Tools in Medical Laboratory Industry: A Case of Namibia

Volunteer State Community College Strategic Plan,

OFFICE OF ENROLLMENT MANAGEMENT. Annual Report

Student Transportation

Current Position Information (if applicable) Current Status: SPA (Salary Grade ) EPA New Position

AIS/RTI Mathematics. Plainview-Old Bethpage

Pharmaceutical Medicine

Leadership Development at

UNIVERSITY OF MASSACHUSETTS MINUTES OF THE MEETING OF THE ADVANCEMENT COMMITTEE

2010 ANNUAL ASSESSMENT REPORT

Ministry of Education, Republic of Palau Executive Summary

Patient/Caregiver Surveys

DESIGNPRINCIPLES RUBRIC 3.0

Trends in College Pricing

BHA 4053, Financial Management in Health Care Organizations Course Syllabus. Course Description. Course Textbook. Course Learning Outcomes.

FREQUENTLY ASKED QUESTIONS

Executive Summary. Walker County Board of Education. Dr. Jason Adkins, Superintendent 1710 Alabama Avenue Jasper, AL 35501

1.0 INTRODUCTION. The purpose of the Florida school district performance review is to identify ways that a designated school district can:

Strategic Planning for Retaining Women in Undergraduate Computing

It s a lean life! The Journey

Guidelines for the Use of the Continuing Education Unit (CEU)

Capital Campaign Progress Report. June 2015

Alvin Elementary Campus Improvement Plan

LEN HIGHTOWER, Ph.D.

An Introduction to Simio for Beginners

Physics/Astronomy/Physical Science. Program Review

Process improvement, The Agile Way! By Ben Linders Published in Methods and Tools, winter

Options for Tuition Rates for 2016/17 Please select one from the following options, sign and return to the CFO

Administrators. in Higher Education Salary Report. Key Findings, Trends, and Comprehensive Tables for the Academic Year

Review Panel Report Oregon State University. Science and Mathematics Education Graduate Program

Transcription:

A Systematic Approach to Process Improvement Gregory J. Walker, FACHE President & CEO December 8, 2014 A multi-year cultural change journey through leadership and teamwork 1 Session Objectives 1. Describe a systematic executive led approach to process improvement (branded Operations Excellence). 2. Understand the key success factors in leading this cultural change initiative. 3. See the results achieved by engaging the Health System in this journey. This presenter has nothing to disclose 2 1

Organizational Overview 178 bed non-profit acute care hospital Located in the seacoast area of New Hampshire 2300 employees, 1700 FTEs 300 member medical staff Clinical Affiliations Massachusetts General Hospital Children s Hospital at Dartmouth Regional Cancer Center 50,000 Emergency Room visits 7,000 Admissions 1,100 Births A Bond Rated 3 1998-2002: Total Quality Management - Deming Methodology Successful but can be very slow 2003-2007: IHI Collaborative Participation 1. Reducing Mortality 2. TCAB - Transforming Care at the Bedside 3. ED Flow 4. 100,000 Lives Campaign Enthusiasm and buy-in from medical staff and clinical staff What happened next? Our Quality Journey 4 2

Board Approved New Vision for our System in 2008 Be the highest quality, cost-effective integrated healthcare system in New Hampshire and Southern Maine What do we need to do differently? 5 Our Quality Journey Test Lean Six Sigma utilizing outside consultant 2010-2011: 21 Lean Six Sigma projects 1. Reduce Stroke/TIA Lab turnaround time 2. Reduce ER Door to Triage time 3. Improve Hand-Off Communication Benefits of Quality, Satisfaction, and Cost Created organizational pull Engagement Clinical and non-clinical processes Methodology and toolbox worked for us Explored various approaches and selected Lean Six Sigma 6 3

Operations Excellence 2012 - Present: Branded Operations Excellence Top down, organizational wide, strategic cultural transformation initiative. A mind-set and thinking process on how we orient to project work and problem solving: o The way we get things done, data driven o Clearly define projects up front and in measurable terms o Efficient project execution and sustain the gains Self-funded funded (2012 Present) Financial Value $ 5.5MM (Vetted by Finance) Deployment Costs $1.5MM ROI >3.6 Conservative, only count financial value for 1 year Approximately 40% of projects have measured financial value Operations Excellence is the outcome we want to achieve 7 Operations Excellence Standard methods and a single tool box to successfully (on-time and meeting goal) complete projects. Problem Solving Projects: Utilize Lean Six Sigma methods and tools: o Reduce variability and waste and eliminate defects Known Solution Projects: Utilize a standard Project Management method and tools: o Process to manage a project with a known solution to achieve its desired outcome on time Use the right tool for the job - avoid square peg in round hole 8 4

Operations Excellence Leadership Commitment to Cultural Change Journey Pick a methodology and tools and stay with it Establish clear measures of success (People, Projects, Results) Constantly monitor progress utilizing a monthly dashboard Hold leaders accountable o Own targets and timeframe for projects (priority) o Regardless of cause Create alignment and make it meaningful o Chief Performance Officer is a member of the Executive Team o Link OE accountability to compensation Executive bonus for OE is 20% Senior Management bonus is based on measurable goals Champions and Belts - Rewards, Recognition, Celebrations Success starts and ends with leadership commitment 9 Medical Staff and Nursing Buy-In Operations Excellence Ensure Chief Medical Officer and Chief Nursing Officer are engaged and on-board. Identify and engage formal and informal leaders. Run projects important to them: 1. Hospitalists: Reduce non-productive work burden 2. Neurologists: Stroke care 3. Medical Oncologists: Information systems and flow enhancements resulting in increased utilization of Infusion Room 4. Nursing: Locating equipment when it is needed, staffing levels at best practice acuity standards and productivity standards Ensure collaboration between Chief Medical Officer, Chief Nursing Officer, and Chief Performance Officer: o Integration of OE with the Physician Education Leadership Institute (PELI) Program Engage and get buy-in from medical staff 10 5

Operations Excellence People Selection: o Best and brightest, pre-testing to quality candidates o Formal and informal leaders o Dedicated staff who can commit time to doing project work Project Selection: o Early wins to get buy-in; quality and safety projects first o Later include projects with financial benefits Invest in Infrastructure: o Pick strategic departments to train OE resources (Champions, Belts, Project Managers) o Train based on just in time needs, not for the sake of training: Expectation of completing projects o Steering Committee with senior leadership including CEO Make Conscious decisions on People and Project Selection 11 Operations Excellence Mature Infrastructure OE Steering Committee (CEO, Select VPs and CPO - develop strategy, direct deployment) Chief Performance Officer (Deployment Leader, Master Black Belt) (hired consultant as employee) Project Champions ( Own the Project, establish measurable goals, remove barriers) > 35 Champions throughout the organization Master Black Belts (high priority projects) 2 Master Black Belts Black Belts (cross-functional strategic projects) 5 Black Belts Green Belts (departmental projects) 20 Green Belts Project Managers ( known solution projects) 20 PMs Team Members (Process Owners, Subject Matter Experts, Users, 3-6 per team) 5 year role out - stable infrastructure 12 6

Summary of Results Early Roll Out Mature Successful = On-time (within 2 weeks) + Met Goal (within 20%) 13 Summary of Results Over 500 employees have participated in an OE project in past 2 years 14 7

Summary of Results Triple AIM is framework of our Strategic Long Range Plan 15 2014 Operations Excellence Measurable Goals 1. Complete 43 successful OE projects across organization (49 latest estimate) 2. Self-fund OE deployment with OE project savings of $1.0 MM budgeted reduction target ($2.2 MM latest estimate) 3. Maintain OE infrastructure: 25 Champions, 2 Master Black Belts, 5 Black Belts, 25 Green Belts, and 20 Project Managers 16 8

2014 OE Monthly Dashboard - Sept 17 Recipient of 2014 National Award from Health Facilities Management and the Association for the Healthcare Environment (AHE) Based on 3 OE Projects: 1. Environmental Services Work Flow Design 2. High Touch Point Cleaning 3. Electronic Clean Bed Notification Project Example: Environmental Services 18 9

Project Objective: Design and implement streamlined, effective, and efficient work processes to clean an additional 100,000 net square feet of space using the same 2100 hrs/wk by February 22, 2013. Results: Cost Avoidance of 14 FTEs ($450k salary & benefits annual expense) Below 50 th percentile Truven productivity benchmark 99 th percentile Press-Ganey (cleanliness) Sustaining the Gain! Environmental Services Work Process Design Productivity Before Building Opening Productivity After 19 Project Example: Express Care Project Objective: Decrease the daily median visit duration from 73 minutes to 60 minutes by October 31, 2014. Result: 46 minute visit duration! Set visit duration expectations by chief complaint Instituted second provider call process SBAR (Situation, Background, Assessment, Recommendation) huddles during day Resolved technical issues of Status Board Resolved PACs delay viewing X-rays 46 minutes 73 minutes 20 10

Project Example: Stroke/TIA Lab Turn Around Time Proportion 1.0 0.8 0.6 0.4 0.2 0.0 17 Proportion of Labs turned around in 45 minutes or less BASELINE CONTROL NOW 22 P=0.581 42 47 Tests performed with unequal sample sizes P=0.783 52 5 WEEK 10 15 P=0.903 20 25 Individual Value 60 50 40 30 Improvement from 58% to 90% labs turned around within 45 minutes BASELINE CONTROL NOW X=44.22 I Chart of TAT by STAGE X=33.74 X=29.12 Reduction in the average turnaround time from 44 minutes to 29 minutes 20 17 22 42 47 52 5 WEEK 10 15 20 25 21 The question is not. Can I afford to do Quality Improvement? The question is. Can I afford not to? Questions? 22 11