Mira Mesa High School

Similar documents
3/6/2009. Residence Halls & Strategic t Planning Overview. Residence Halls Overview. Residence Halls: Marapai Supai Kachina

University of Central Florida Board of Trustees Finance and Facilities Committee

Centennial Middle School (CMS) Design Advisory Team (DAT)

Security & Technology. Track & Tennis. Repairs. Remodeling & Interior Repairs. Exterior Wall. Repairs

HOLY CROSS CATHOLIC SCHOOL SCHOOL INFORMATION PROFILE 2015/2016 SCHOOL YEAR

Diocesan Review April 14, Catholic Athletic Trails West Catholic High School Catholic Central High School

Oakridge School District #76

K-12 EDUCATION. Statement of Qualifications

Graphic Imaging Technology II - Part two of a two-year program designed to offer students skills in typesetting, art and pasteup,

Geographic Area - Englewood

ADDENDUM F FACILITIES INFORMATION

Design Principles to Set the Stage

UVA Office of University Building Official. Annual Report

BALTIMORE CITY PUBLIC SCHOOLS EDUCATIONAL SPECIFICATIONS PART 1: GENERAL REQUIREMENTS

Council of Educational Facilities Planners, International

The term of the agreement will be from July 1, 2014 to June 30, 2015.

A History of College Community Schools Present

University of Virginia

Junior Scheduling Assembly. February 22, 2017

Dyer-Kelly Elementary School School Accountability Report Card Reported Using Data from the School Year Published During

Geographic Area - Englewood

Here are some helpful steps to guide you in completing the Contributor s Form below:

Hayward Unified School District Community Meeting #2 at

FY2018 ANNUAL CAPITAL BUDGET. University of Minnesota

Executive Summary. Hamilton High School

Preparing for Tomorrow s Careers

Dyer-Kelly Elementary 1

Program Proposal Construction Technology Construction Carpenter Diploma. Hazard Community and Technical College

Kougar Kamp Basics. Early Bird Registration. Drop-off/Pick-up:

-MBCX & Lighting Retrofits have led to savings upwards of 124k/year, despite the longer operating hours of RIMAC (open until 1AM Sun-Thurs).

FACILITIES & FINANCING: THE GOOD, THE BAD, AND THE UGLY... Jennifer Afdahl Rice Jonathan Dean, Ed. D. David Sciaretta, Ed. D.

San Luis Coastal Unified School District

Program Review Part 2: Linking Planning to Budget

LIVE MUSIC RETAIL EST atlanta dairies CREATIVE OFFICE RESTAURANTS 777 MEMORIAL DR.

Oakland High School An International Baccalaureate World School

of DoDDS Pacific/DDESS Guam) Inspiring &preparing our students for success in a global environment. Department of Defense Education Activity: DoDEA

SimCity 4 Deluxe Tutorial. Future City Competition

Augusta Independent Board of Education August 11, :00 PM 207 Bracken Street Augusta, KY

University of Phoenix - Office of Student Services and Admissions - Course Transfer Guide. Fashion Institute of Design & Merchandising

ASMC PROGRAM REVIEW

Opening Doors. Strategic Plan 2016 through Bishop Dunne Catholic School

Lakeview High School CURRICULUM NIGHT 2017

Montfort del Rosario School of Architecture and Design AR 2204 Architectural Design II Semester 2/2015. Project II Performing Arts Learning Center

FIVE-YEAR CAPITAL PLAN. Approved by the Collierville Board of Education January 27, 2015

Building and Construction Skills 2019 v1.0

Azusa Pacific University Azusa, CA

Heavy Diesel Service Technician

OHIO COUNTY BOARD OF EDUCATION SALARY SCHEDULES Revised 7/3/12

JUNIOR HIGH SPORTS MANUAL GRADES 7 & 8

Eit levande laboratorie-eksperiment

Stipend Handbook

FY16 UW-Parkside Institutional IT Plan Report

APPROVAL AIDE MEMOIRE

Bachelor of Science in Mechanical Engineering with Co-op

2018 ELO Handbook Year 7

Chicago Public Schools 6 Month Asbestos Surveillance Fall

Cobham Hall Residential Programme

APRIL 11, 2016 OLATHE PLANNING COMMISSION

L E C O M. LECOM at BRADENTON HOSPITAL DAY 2017 MONDAY, AUGUST 21, 2017 The Ritz-Carlton Sarasota, FL

Executive Summary. Hialeah Gardens High School

Evening and Weekend College. College on YOUR time!

Keystone Opportunity Zone

Educational Management Corp Chef s Academy

CHELMSFORD SCHOOL COMMITTEE REGULAR MEETING October 8, 2013 Meeting Minutes

DU PAGE COUNTY JUDICIAL AND PUBLIC SAFETY COMMITTEE FINAL SUMMARY. November 17, 2015 Regular Meeting 8:15 AM

Executive Summary. Gautier High School

Appendix A Cost Estimates

There is a standards-based nutrition curriculum, health education curriculum, or other curriculum that includes nutrition.

CURRICULUM VITAE FOR ANNET NSIIMIRE

KeyTrain Level 7. For. Level 7. Published by SAI Interactive, Inc., 340 Frazier Avenue, Chattanooga, TN

Executive Summary. Curry High School

The Teaching and Learning Center

Schenectady County Is An Equal Opportunity Employer. Open Competitive Examination

Report of activities 2015

LHS Club Information

Dyer-Kelly Elementary 1

Wellness Committee Action Plan. Developed in compliance with the Child Nutrition and Women, Infant and Child (WIC) Reauthorization Act of 2004

St. John Fisher College Rochester, NY

Welcome to Georgia Tech!

Committee Member Responsibilities

Shakespeare Festival

Anyone with questions is encouraged to contact Athletic Director, Bill Cairns; Phone him at or

Birmingham City University BA (Hons) Interior Design

Close Up. washington, Dc High School Programs

St Mary s Diocesan School. Junior Options Book

THEODORE ROOSEVELT HIGH SCHOOL Home of the Roughriders since 1923 August 31 September 7, Student Section

2016 BAPA Scholarship Application

Diablo Vista Middle 1

Avon Park Youth Academy Demo

SLOAN-HENDRIX SCHOOL DISTRICT 2016 ANNUAL REPORT TO THE PUBLIC ADVANC-ED ACCREDITATION

10-Year Priority List

Peterborough Eco Framework

Military Engineering Centre of Excellence (MILENG COE) Ingolstadt

The Spartan Hall of Fame

Mt Olive Recreation. Great enrichment programs

College of William and Mary Williamsburg, VA

CITY COLLEGE OF SAN FRANCISCO. Facility Master Plan Meeting On Student Development December 5, 2016

OFFICE OF DISABILITY SERVICES FACULTY FREQUENTLY ASKED QUESTIONS

CIS 121 INTRODUCTION TO COMPUTER INFORMATION SYSTEMS - SYLLABUS

INFORMATION TECHNOLOGY AND TELECOMMUNICATIONS A $10.00 fee will be assessed for all computer education classes.

Transcription:

Mira Mesa High School 10510 Marauder Way San Diego, CA 92126 3 4 2 6 Sub-district: A Cluster: Mira Mesa Year School Opened: 1976 Grades: 9-12 2 1 7 1 Turf Field and All-weather Track 5 6 2 3 4 5 Arts Media & Entertainment Production Facility Computerized Graphic Design and Screen Printing Production Lab Culinary Arts Stadium Improvements 6 Solar System 7 Whole Site Modernization Mira Mesa High School, is located in the heart of San Diego County. Located on busy Mira Mesa Blvd., it is located near Miramar College, two middle schools, several elementary and pre-schools, and Marine Corps Miramar Air Station. Opened in 1976, the almost 50-acre campus is comprised of three main classroom buildings, a theatre, state-of-the-art video production studio, library, gymnasium with wrestling and dance rooms, weight training building, and 53 portables. The 14 permanent buildings are primarily masonry construction, and the total building area is more than 300,000 square feet. The center quad and front of campus are landscaped to mimic an urban park. At almost one square mile, the school site includes shaded lunch areas, tennis courts, natural grass playing fields, and a stadium with synthetic turf and rubberized all-weather track. Updated January 2018

Mira Mesa HS Synthetic Turf Field & All-weather Track Completed: July 2009 Funding: Proposition S Mira Mesa s former dirt track and natural grass field were replaced with an all-weather rubberized track and synthetic turf field that supports football and soccer. Additional improvements included grading and field drainage system.

Mira Mesa HS Arts Media & Entertainment Production Facility

Mira Mesa HS Arts Media & Entertainment Production Facility Completed: February 2013 Funding: Proposition S and Proposition 1D The existing 4,350-square-foot broadcast studio was completely renovated to include a high-definition television broadcast studio designed by industry experts and constructed using sound-insulated concrete block. This industrystandard Career, College, and Technical Education facility supports live broadcasts and webcasts and will prepare students for careers in the arts, media, and entertainment industries.

Mira Mesa HS Arts Media & Entertainment Production Facility The state-of-the-art facility features: An 819 square-foot, two-set broadcast studio Three professional video cameras with attached teleprompters An adjacent 235 square-foot, eightworkstation control room with professional -grade equipment A 309-square-foot lab and attached 84 square-foot editing room A 1,135 square-foot audio-visual classroom Upgrades to theater lighting and control room, as well as the addition of acoustical enhancements Control room View from set

Mira Mesa HS Arts Media & Entertainment Production Facility Editing room Audio-visual classroom Theater with lighting and acoustic upgrades Control room

Mira Mesa HS Computerized Graphic Design & Screen Printing Production Lab

Mira Mesa HS Computerized Graphic Design & Screen Printing Production Lab Completed: February 2013 Funding: Proposition S and Proposition 1D The state-of-the-art, 4,316 square-foot Computerized Graphic Design & Screen Printing Production Lab at Mira Mesa High School houses the CCTE Computerized Graphic Production Program, which provides career and technical education in graphic production technologies for the manufacturing and product development industry. Students gain hands-on experience with industry standard graphics software screen printing, offset printing, digital duplicating, dye sublimation, wide-format printing, vinyl cutting, and heat transfer. The facility features: Remodeled existing, outdated graphic arts classroom into a new in-screen printing/graphics classroom New computer lab and a full print production classroom Upgraded ventilation system Upgraded technology infrastructure to support current computer needs Physical and visual link with the main classroom

Mira Mesa HS Computerized Graphic Design & Screen Printing Production Lab Flash dryer and multi-station screen printing presses Conveyor dryer Heat press transfer machine station Computer lab

Mira Mesa High School Culinary Arts Completion August 2016 Funding: Propositions S and Z The new Culinary Arts facility project entailed remodeling and reconstructing the existing food and nutrition classrooms into the new program space to include: Full commercial kitchen including new food service equipment Culinary classroom Food science lab Nutrition classroom Faculty office Culinary garden with covered patio The interior work in this project also included new walls, doors, flooring and ceiling finishes; a new faculty restroom; all new plumbing for kitchen equipment; upgraded electrical for kitchen equipment support and lighting. A roof top HVAC system installed along with fume hoods for the kitchen. New audio visual (A/V) equipment in all three classrooms which is linked to existing broadcast system. To align with safety and security regulations a new fire safety system will be installed. Modernized Culinary Classroom Courtesy of Stephen Whalen Photography

Mira Mesa High School Culinary Arts Courtesy of Stephen Whalen Photography Courtesy of Stephen Whalen Photography New Food Service Lab with butcher top workstations New Hospitality Room Courtesy of Stephen Whalen Photography Courtesy of Stephen Whalen Photography New Baking Area with commercial kitchen equipment New Culinary Garden with garden patio equipment and wall garden

Mira Mesa High School Solar System Estimated Completion: Spring 2018 Funding: Proposition Z A Solar Photovoltaic System will be installed at Mira Mesa High School. The proposed system for this campus will have solar panels that are mounted on tilt elevated canopies within the existing parking lots. These canopies will provide shade structures and under-mount LED lighting for parking lots. This system will create an energy-efficient and renewable power source. It will deliver a clean energy supply during both the academic year and school vacations. All elements of installation will include, but not limited to: Solar PV modules Inverters All electrical connectors, cabling and components necessary for a complete solar system All mounting systems Solar Arrays on the Northeast parking lot Solar Arrays on the Southeast parking lot

Mira Mesa High School Stadium Improvements Estimated Completion Spring 2018 Funding: Proposition S and Z This project will include new entrance Plaza to the stadium and surrounding renovated and new athletic facilities. All athletic facility upgrades are compliant with the Americans with Disabilities Act (ADA) and follow the district's health, safety and security standards. The project will include: Providing ADA access to all areas of the stadium from the various parking areas and designated campus area to the stadium field area and baseball/softball field area as well as lighted accessible paths to the athletic facilities. Upgrading girls softball field to meet Title 9 Requirements New synthetic turf practice field New scoreboards at softball, baseball and football fields. New shot-put and discus areas Renovation of the existing home and visitors side bleachers, press box, home side entrance, restrooms and snack bar New structures to stadium area: elevator for access to press box, ticket booths, softball dugouts and bull pen New lighting for Athletic Field, Plaza exterior and security New Alumni Paver Plaza at entrance of home side to provide donor brick fundraising opportunities for alumni and other stakeholders Plaza area to be enclosed by new ornamental fencing Security cameras, public address system and assisting listening devices along with controls at the press box location Schematic design of the Alumni Paver Plaza

Mira Mesa High School Site Modernization Estimated Completion Spring 2020 Funding: Proposition Z The Site Modernization project will make improvements to the learning environment, health, safety and security of the students as well as upgrade accessibility to comply with American s with Disabilities Act (ADA). The following are the items being proposed: New construction to the campus - Removal of 22 existing portable classroom structures from the campus Build a new instructional classroom building (approx. 17,000 sf) with 12-14 classrooms and support rooms Build a new music building (approx. 14,000 sf) to include a Band Rehearsal Room, Orchestra Rehearsal Room, and spaces for practice, storage, faculty and building support systems Site improvements to the campus - Upgrades to the public address system Upgrades to the fire alarm systems Upgrades to the ADA Path-of-Travel VoIP Solar System i21 suites in new classrooms Remodel/Renovate of existing classroom spaces, campus wide Resurface existing parking lots with new Asphalt Proposed aerial of site plan

Mira Mesa High School Site Modernization Proposed plan of new classroom buildings Rendering of outdoor classroom Rendering of courtyard of new classroom buildings Rendering of new classroom interiors

Mira Mesa High School Site Modernization Renderings of the new Music Building: Exteriors Site plan Interior