How to Develop and Evaluate an Engineering Services Proposal

Similar documents
Red Flags of Conflict

Hentai High School A Game Guide

What is an internship?

How to make an A in Physics 101/102. Submitted by students who earned an A in PHYS 101 and PHYS 102.

Naviance / Family Connection

Getting Started with Deliberate Practice

The Success Principles How to Get from Where You Are to Where You Want to Be

West s Paralegal Today The Legal Team at Work Third Edition

A Study of the Effectiveness of Using PER-Based Reforms in a Summer Setting

MENTORING. Tips, Techniques, and Best Practices

A non-profit educational institution dedicated to making the world a better place to live

How we look into complaints What happens when we investigate

Diagnostic Test. Middle School Mathematics

Book Review: Build Lean: Transforming construction using Lean Thinking by Adrian Terry & Stuart Smith

MAILCOM Las Vegas. October 2-4, Senior Director, Proposal Management BrightKey, Inc.

TU-E2090 Research Assignment in Operations Management and Services

The Foundations of Interpersonal Communication

Study Group Handbook

Writing Center Workshops (Must choose at least one)

CLASS EXODUS. The alumni giving rate has dropped 50 percent over the last 20 years. How can you rethink your value to graduates?

Lesson 1: Job Advertisements (18-25 minutes)

Testing A Moving Target: How Do We Test Machine Learning Systems? Peter Varhol Technology Strategy Research, USA

Formative Assessment in Mathematics. Part 3: The Learner s Role

MADERA SCIENCE FAIR 2013 Grades 4 th 6 th Project due date: Tuesday, April 9, 8:15 am Parent Night: Tuesday, April 16, 6:00 8:00 pm

DEPARTMENT OF KINESIOLOGY AND SPORT MANAGEMENT

CLASSROOM PROCEDURES FOR MRS.

International Business BADM 455, Section 2 Spring 2008

SESSION 2: HELPING HAND

TACOMA HOUSING AUTHORITY

TOPIC VN7 PAINTING AND DECORATING

PROMOTION MANAGEMENT. Business 1585 TTh - 2:00 p.m. 3:20 p.m., 108 Biddle Hall. Fall Semester 2012

a) analyse sentences, so you know what s going on and how to use that information to help you find the answer.

How To Take Control In Your Classroom And Put An End To Constant Fights And Arguments

COMMUNICATION & NETWORKING. How can I use the phone and to communicate effectively with adults?

E C C. American Heart Association. Basic Life Support Instructor Course. Updated Written Exams. February 2016

White Paper. The Art of Learning

Best Practices in Internet Ministry Released November 7, 2008

PGCE Secondary Education. Primary School Experience

Nottingham Trent University Course Specification

TUESDAYS/THURSDAYS, NOV. 11, 2014-FEB. 12, 2015 x COURSE NUMBER 6520 (1)

LEADERSHIP AND COMMUNICATION SKILLS

Experience Corps. Mentor Toolkit

Why Pay Attention to Race?

Aviation English Training: How long Does it Take?

University of Waterloo School of Accountancy. AFM 102: Introductory Management Accounting. Fall Term 2004: Section 4

Fearless Change -- Patterns for Introducing New Ideas

A Systems Approach to Principal and Teacher Effectiveness From Pivot Learning Partners

EFFECTIVE CLASSROOM MANAGEMENT UNDER COMPETENCE BASED EDUCATION SCHEME

Should a business have the right to ban teenagers?

Notetaking Directions

PREVIEW LEADER S GUIDE IT S ABOUT RESPECT CONTENTS. Recognizing Harassment in a Diverse Workplace

Fundraising 101 Introduction to Autism Speaks. An Orientation for New Hires

Course Content Concepts

School Leadership Rubrics

Guidelines for Writing an Internship Report

University of Florida ADV 3502, Section 1B21 Advertising Sales Fall 2017

Multi-genre Writing Assignment

Life and career planning

LEARNER VARIABILITY AND UNIVERSAL DESIGN FOR LEARNING

Community Power Simulation

No Parent Left Behind

WELCOME PATIENT CHAMPIONS!

Seasonal Goal Setting Packet

Writing the Personal Statement

The Future of Consortia among Indian Libraries - FORSA Consortium as Forerunner?

ALL-IN-ONE MEETING GUIDE THE ECONOMICS OF WELL-BEING

National Survey of Student Engagement at UND Highlights for Students. Sue Erickson Carmen Williams Office of Institutional Research April 19, 2012

content First Introductory book to cover CAPM First to differentiate expected and required returns First to discuss the intrinsic value of stocks

Friday, October 3, 2014 by 10: a.m. EST

Create A City: An Urban Planning Exercise Students learn the process of planning a community, while reinforcing their writing and speaking skills.

OFFICE OF ENROLLMENT MANAGEMENT. Annual Report

Exploration. CS : Deep Reinforcement Learning Sergey Levine

have professional experience before graduating... The University of Texas at Austin Budget difficulties

INSTRUCTIONAL TECHNIQUES. Teaching by Lecture

ADDIE: A systematic methodology for instructional design that includes five phases: Analysis, Design, Development, Implementation, and Evaluation.

GREAT Britain: Film Brief

teacher, paragraph writings teacher about paragraph about about. about teacher teachers, paragraph about paragraph paragraph paragraph

Essay on importance of good friends. It can cause flooding of the countries or even continents..

high writing writing high contests. school students student

Synthesis Essay: The 7 Habits of a Highly Effective Teacher: What Graduate School Has Taught Me By: Kamille Samborski

Foothill College Summer 2016

Assessment and Evaluation for Student Performance Improvement. I. Evaluation of Instructional Programs for Performance Improvement

i didnt do my homework poem

LONGVIEW LOBOS HIGH SCHOOL SOCCER MANUAL

A Note on Structuring Employability Skills for Accounting Students

Three Strategies for Open Source Deployment: Substitution, Innovation, and Knowledge Reuse

Investigate the program components

Houghton Mifflin Online Assessment System Walkthrough Guide

My husband and I hope that the resources we offer to use along with the What s in the Bible? DVD series will be a blessing to you and your family.

Loudoun Scholarship Application

Video Marketing Strategy

STUDENT PERCEPTION SURVEYS ACTIONABLE STUDENT FEEDBACK PROMOTING EXCELLENCE IN TEACHING AND LEARNING

Section 3.4. Logframe Module. This module will help you understand and use the logical framework in project design and proposal writing.

Writing for the AP U.S. History Exam

Options for Elementary Band and Strings Program Delivery

Designing a Rubric to Assess the Modelling Phase of Student Design Projects in Upper Year Engineering Courses

Date: 9:00 am April 13, 2016, Attendance: Mignone, Pothering, Keller, LaVasseur, Hettinger, Hansen, Finnan, Cabot, Jones Guest: Roof

Husky Voice enews. NJHS Awards Presentation. Northwood Students Fight Hunger - Twice

WHY GRADUATE SCHOOL? Turning Today s Technical Talent Into Tomorrow s Technology Leaders

Guidelines for Mobilitas Pluss top researcher grant applications

Transcription:

Improving your community s engineering proposal and selection process

Contents Introduction...2 Who gets your RFP/Q?...3 The Basics...4 Evaluating RFP/Q responses... 6 Increasing your odds of success... 9 1

Introduction James R. Hegarty, PE is a civil engineer, project manager, grants specialist and a member of Grand Rapids-based consulting engineering firm s Executive Committee. He is a past president of the Michigan Section of the American Society of Civil Engineers, and speaks and writes frequently about grants, project financing and other industry issues. Have you ever been disappointed with an engineering firm s work? Did it ever occur to you that your hiring process might have unwittingly set your project up for failure from the start? Over the last 20 years, I have responded to hundreds of requests for proposals and qualifications (RFP/Qs) issued by communities. Unfortunately, I have seen many examples where a wellintentioned community short-changed itself with either a poorly conceived and written RFP/Q or an inadequate evaluation process. This white paper offers proven tips to help communities succeed in writing effective RFP/Qs and evaluating engineering firms based on their responses to them. 2

Who gets your RFP/Q? When you re hunting for the perfect engineering consultant for your project, it s better to hunt with a rifle than a shotgun. It s clear to me that some communities still use the shotgun approach. Sending your RFP/Q to everyone in the Yellow Pages, industry lists, and trade magazine advertisers tells recipients of your RFP/Q that you are willing to work with anybody. The most qualified firms often don t spend their time and money to respond to these shotgun RFP/Qs, leaving you with a less-than-optimal pool of respondents. You d be better served to do your homework first. Certainly, you know one or more firms that do the type of work you re planning. You may also know one or two firms that you don t want. If you want to invite a quality list of firms, ask people you trust in other communities who they would recommend inviting for a particular type of project. You ll save yourself a lot of time and get better results for your community. 3

The Basics Every RFP/Q should answer these basic questions: On what date and time is it due? At what address? To whose attention should it be addressed? How many copies will you need? Have you considered receiving these in digital form? Who is available to answer technical questions? Administrative questions? What is your review and selection schedule? What is your proposed project and your expectations for it? What information do you want included in responses? How would you like the response to be organized? And, since serious respondents always ask the following questions, you should also address them in your RFP/Q: What is your selection criteria and weighting? Who received the RFP/Q? Who will review the RFP/Q responses? What have you budgeted for the project? Is additional information about the project available? Studies, maps, surveys, etc.? When will you make your selection decision? Always ask for relevant information But, be careful what you ask for! Reading a stack of engineering proposals can be a mind-numbing task. Avoid asking for information that does not directly relate to your needs. Eliminate opportunities to read voluminous boiler-plate responses and fluff. Know your project manager Assuming you have invited responses from firms with good reputations, the most critical element in every project is the proposed project manager. Ask to see relevant information about his or her experience with the specific type of project you re planning. This is the person with whom you and your community will interact during the project, so it s critically important to know as much as you can about him or her. Ask for a written work plan This is the consultants opportunity to share with you the process they will use to design your project, and to describe any unique approaches or ideas they will apply to it. The work plan both reveals the proposers enthusiasm for your project and their level of preparation for and understanding of your needs. Demand to see references This is especially important for your project manager. The materials you receive in proposals merely reflect a firm s style. Sometimes the project manager doesn t even write the proposal! Reference checks will reveal true substance if your project manager has it. Ditch the pre-proposal meeting Transparency and fairness are fine qualities, but they do not always help you get the most out of your proposal process. While pre-proposal meetings may appear to be an efficient way to share information with a large number of firms, they are not an effective way for you to improve the quality of the proposals you receive. Group settings like this seriously stifle creativity because most proposers have no interest in sharing their insightful questions with their competitors. If you re interested in receiving quality proposals, you need to meet with each serious firm 4

face-to-face. This is the engineering professional s diagnostic opportunity to really understand your needs and respond with valuable solutions to them. I have noted a troubling recent trend of asking all firms to submit questions in writing so you can share the question and answer with all firms in an addendum. This may make your job easier, but it does not make for better proposals. You need to be willing to meet individually with each firm, allowing a free exchange of questions, thoughts and ideas, so you can get the maximum benefit out of the proposals you receive. 5

Evaluating RFP/Q Responses Cover Letter When a cover letter opens with a phrase like enclosed herewith please find, skip it and go to the proposal. More often, the cover letter is an executive summary of the firm s approach to your project and how you ll benefit from selecting them. Did the letter capture your concerns and issues? Or miss the mark? Did it focus on your needs as opposed to their deeds? Executive Summary Sometimes the letter provides the executive summary. Sometimes it s separate. Is it easy to read and understand? Is it short enough to keep your attention? Would your board members understand it? Project Manager The proposed project manager will make or break your project. Has he or she managed this type of project before? Been the design leader on similar projects? Read their resume and their relevant project summaries carefully. Make sure their role on example projects is the same as their proposed role on your project. Project Team Is the project manager used to working with and leading other technical team members? Read the technical team s qualifications carefully, too. How deep is their experience? Has this same team done this type of work before? Does someone other than the project manager have most or all of the experience with this type of project? Why is that person not leading your team? If not, will that person have a significant role on your project, or is their resume included as window dressing? If some of the team s work experience is from other firms or past employers, is that information properly attributed? It s important to read resumes and project histories carefully to discern your proposed team s actual experience. If the written materials are not crystal clear as to a person s role on past projects, assume nothing. Ask! Look at the project manager s work history. How long has he or she been with this firm? Other firms? Ask any owner about their bad project experiences and you ll find that changing project managers in the middle of a project will rank near the top of the list. If your selection process includes an interview, insist that the project manager lead the interview. Since this is the person who will lead your project and interact with you and your public during it, why allow someone else who is a smooth talker dominate the interview? You may never see that person again. Project Experience The only experience that really matters is that of your proposed professional team on projects like yours. Firm experience is nice, but unless your team members served key roles on similar projects does it really matter to you? Don t let superfluous marketing 6

materials fool you! You should be able to connect the dots directly between your proposed team and their project experience. Check References I am surprised how often communities don t check references, especially on price-based selections. Your reference checks should focus on the project manager and key technical team members. And, don t just call the people listed in their proposal. Call your colleagues in other communities. Google the project manager to see where else they ve worked, and contact those communities. Read the news articles in the Google search results. What you learn may validate your impressions, but it also can surprise you! It s well worth the few minutes it takes to check and verify references. Price Proposals While it may sound self-serving for an engineer to say that the selection of professional service providers based on price is a bad idea, I ll say it. Price proposals are a bad idea. There is a popular website that claims, When banks compete, you win! which is fine once you have won the bank s money. I d go so far as to say When engineers compete (on price), you lose. How is this so? First, while engineering fees are a small fraction of an overall project s cost, engineering decisions not only influence a project s initial cost; they also affect your overall, long-term cost of ownership. Price-based selections often result in what I call hitand-run engineering. Let s start with an example of an engineering decision that affects a project s initial cost. We were asked for the cost to design a pedestrian bridge over a creek adjacent to an existing road bridge. The owner had two options. The first was to evaluate the existing bridge s capability to hang a pedestrian bridge off one side, while the other was to design a free-standing bridge. The design fees for a free-standing bridge are fairly modest if you decide to use a pre-engineered, prefabricated bridge product. Conversely, the design effort to evaluate the effect of additional loads and width to an existing bridge is far more involved and costly. When design cost drives your decision, you ll end up with a free-standing bridge because it s easier to design. Unfortunately, it may cost you twice as much to build the freestanding bridge than if you had gone with the other option that was more costly to design. While you set out to save money in your engineering fee, you ended up spending more on the project. You lose. Ideally, you want your engineer to keep your best interests in mind, but by placing an undue emphasis on design costs, you may actually end up paying far more than you should. The only way to lower engineering fees is to cut back on time spent in design and/or the experience level of the designer. You deserve better. Qualifications and Experience Experience matters, and inexperience can cost you dearly. My personal philosophy is to spend as little of a client s money as possible developing a potential solution before discovering it is not feasible. Here are two examples illustrating what I mean. One Michigan community spent $80,000 on engineering for a sewer project around a lake before developing a cost estimate for potential customers. When customers learned the cost, they killed the project, and the community was out $80,000. They could have gotten a reliable cost estimate for $5,000, but the engineer s approach of developing detailed information only postponed the inevitable at a significant cost to the community. 7

Another community, searching for a new site for a drinking water well, invested $50,000 drilling a test well before it learned that the local water quality was poor. They could have learned that in the first $1,000 they spent by checking local well records, but the project work plan was poorly devised. Getting the best deal for your community The best way to hire an engineer, or any other professional services firm for that matter, is by using the Qualifications-Based-Selection (QBS) process. Using QBS, you evaluate firms on their qualifications, and negotiate a fair scope of work and price for the work with the firm you deem the most qualified. You ll see the QBS process outlined in the sidebar. You also can learn more at the Michigan QBS website: http://www.qbsmi.org/ How the QBS Process Works 1. Identify the project and scope of work. 2. Request qualifications statements from firms. 3. Evaluate qualifications statements. 4. Develop short-list of qualified firms. 5. Interview short-listed firms. 6. Score the interviews. 7. Negotiate detailed scope of work with topranked firm. 8. Negotiate fees with top ranked firm. 9. If you cannot agree, begin negotiations with second -ranked firm, and so on 8

Increasing your odds of success In summary, your project s success will be enhanced greatly if you do these things: Write a clear RFP/Q, and target its recipients. Focus your evaluation on the proposed project manager. Check references, including those not listed. Hire for value and experience and not price. If you don t do these things, you risk being victim to hit and run engineering. 9