Standard distribution curve with mean, sigma values and four sigma tolerances. DPMO = Defect Per Million Opportunities

Similar documents
Visit us at:

Green Belt Curriculum (This workshop can also be conducted on-site, subject to price change and number of participants)

Certified Six Sigma Professionals International Certification Courses in Six Sigma Green Belt

Certified Six Sigma - Black Belt VS-1104

Introduction to the Practice of Statistics

Module Title: Managing and Leading Change. Lesson 4 THE SIX SIGMA

APPENDIX A: Process Sigma Table (I)

Introduction on Lean, six sigma and Lean game. Remco Paulussen, Statistics Netherlands Anne S. Trolie, Statistics Norway

Minitab Tutorial (Version 17+)

Major Milestones, Team Activities, and Individual Deliverables

The Lean And Six Sigma Sinergy

An Introduction to Simio for Beginners

Probability and Statistics Curriculum Pacing Guide

For Portfolio, Programme, Project, Risk and Service Management. Integrating Six Sigma and PRINCE Mike Ward, Outperfom

Reduce the Failure Rate of the Screwing Process with Six Sigma Approach

Shockwheat. Statistics 1, Activity 1

Generating Test Cases From Use Cases

Statistical Analysis of Climate Change, Renewable Energies, and Sustainability An Independent Investigation for Introduction to Statistics

White Paper. The Art of Learning

Problem Solving for Success Handbook. Solve the Problem Sustain the Solution Celebrate Success

What is this species called? Generation Bar Graph

Mathematics (JUN14MS0401) General Certificate of Education Advanced Level Examination June Unit Statistics TOTAL.

Decision Analysis. Decision-Making Problem. Decision Analysis. Part 1 Decision Analysis and Decision Tables. Decision Analysis, Part 1

UK Institutional Research Brief: Results of the 2012 National Survey of Student Engagement: A Comparison with Carnegie Peer Institutions

How to make an A in Physics 101/102. Submitted by students who earned an A in PHYS 101 and PHYS 102.

READY TO WORK PROGRAM INSTRUCTOR GUIDE PART I

Curriculum Design Project with Virtual Manipulatives. Gwenanne Salkind. George Mason University EDCI 856. Dr. Patricia Moyer-Packenham

Lesson M4. page 1 of 2

Digital Fabrication and Aunt Sarah: Enabling Quadratic Explorations via Technology. Michael L. Connell University of Houston - Downtown

Grade 2: Using a Number Line to Order and Compare Numbers Place Value Horizontal Content Strand

Centre for Evaluation & Monitoring SOSCA. Feedback Information

Running Head: STUDENT CENTRIC INTEGRATED TECHNOLOGY

Measuring physical factors in the environment

On Human Computer Interaction, HCI. Dr. Saif al Zahir Electrical and Computer Engineering Department UBC

Meriam Library LibQUAL+ Executive Summary

The CTQ Flowdown as a Conceptual Model of Project Objectives

SESSION 2: HELPING HAND

Unit 1: Scientific Investigation-Asking Questions

AGS THE GREAT REVIEW GAME FOR PRE-ALGEBRA (CD) CORRELATED TO CALIFORNIA CONTENT STANDARDS

Contents. Foreword... 5

Evidence for Reliability, Validity and Learning Effectiveness

Functional Skills Mathematics Level 2 assessment

AP Statistics Summer Assignment 17-18

Leveraging MOOCs to bring entrepreneurship and innovation to everyone on campus

Measures of the Location of the Data

Edexcel GCSE. Statistics 1389 Paper 1H. June Mark Scheme. Statistics Edexcel GCSE

Paper Reference. Edexcel GCSE Mathematics (Linear) 1380 Paper 1 (Non-Calculator) Foundation Tier. Monday 6 June 2011 Afternoon Time: 1 hour 30 minutes

Copyright Corwin 2015

IMPROVE THE QUALITY OF WELDING

Unit 3: Lesson 1 Decimals as Equal Divisions

Naviance / Family Connection

University of Groningen. Systemen, planning, netwerken Bosman, Aart

Graduate Division Annual Report Key Findings

Tap vs. Bottled Water

In how many ways can one junior and one senior be selected from a group of 8 juniors and 6 seniors?

The Application of Lean Six Sigma in Alleviating Water Shortage in Limpopo Rural Area to Avoid Societal Disaster

An Empirical Analysis of the Effects of Mexican American Studies Participation on Student Achievement within Tucson Unified School District

AGENDA Symposium on the Recruitment and Retention of Diverse Populations

Science Fair Project Handbook

Testing A Moving Target: How Do We Test Machine Learning Systems? Peter Varhol Technology Strategy Research, USA

Getting Started with Deliberate Practice

Presentation skills. Bojan Jovanoski, project assistant. University Skopje Business Start-up Centre

Secret Code for Mazes

The Success Principles How to Get from Where You Are to Where You Want to Be

LEGO MINDSTORMS Education EV3 Coding Activities

2 Lean Six Sigma Green Belt Skill Set

1. Lesson and Activities. a. Power Point Agenda i. A great means of keeping things organized and keeping your rehearsal or class running smoothly

Measurement & Analysis in the Real World

An ICT environment to assess and support students mathematical problem-solving performance in non-routine puzzle-like word problems

Physics 270: Experimental Physics

JOB OUTLOOK 2018 NOVEMBER 2017 FREE TO NACE MEMBERS $52.00 NONMEMBER PRICE NATIONAL ASSOCIATION OF COLLEGES AND EMPLOYERS

Dublin City Schools Mathematics Graded Course of Study GRADE 4

GCSE Mathematics B (Linear) Mark Scheme for November Component J567/04: Mathematics Paper 4 (Higher) General Certificate of Secondary Education

Using Proportions to Solve Percentage Problems I

POLITICAL SCIENCE 315 INTERNATIONAL RELATIONS

STT 231 Test 1. Fill in the Letter of Your Choice to Each Question in the Scantron. Each question is worth 2 point.

Six Sigma Goals and Metrics

CONSISTENCY OF TRAINING AND THE LEARNING EXPERIENCE

Rover Races Grades: 3-5 Prep Time: ~45 Minutes Lesson Time: ~105 minutes

CHAPTER 4: REIMBURSEMENT STRATEGIES 24

The Flaws, Fallacies and Foolishness of Benchmark Testing

C O U R S E. Tools for Group Thinking

A Survey on Six Sigma Implementation in Singapore Service Industries

Different Requirements Gathering Techniques and Issues. Javaria Mushtaq

If we want to measure the amount of cereal inside the box, what tool would we use: string, square tiles, or cubes?

Case Study Analysis of Six Sigma in Singapore Service Organizations

Spinners at the School Carnival (Unequal Sections)

Proficiency Illusion

IDENTIFYING AND DESCRIBING HIGH QUALITY SECONDARY SCHOOL SPANISH INSTRUCTION. Greg Duncan, InterPrep Myriam Met, Consultant

Higher Education. Pennsylvania State System of Higher Education. November 3, 2017

Get with the Channel Partner Program

Classify: by elimination Road signs

Finding, Hiring, and Directing e-learning Voices Harlan Hogan, E-learningvoices.com

OKLAHOMA 4-H SHOOTING SPORTS POLICY Revised June 2010 Revised June 2007 Original 1994

OCR for Arabic using SIFT Descriptors With Online Failure Prediction

State University of New York at Buffalo INTRODUCTION TO STATISTICS PSC 408 Fall 2015 M,W,F 1-1:50 NSC 210

ScienceDirect. A Lean Six Sigma (LSS) project management improvement model. Alexandra Tenera a,b *, Luis Carneiro Pintoª. 27 th IPMA World Congress

Managerial Decision Making

THE VIRTUAL WELDING REVOLUTION HAS ARRIVED... AND IT S ON THE MOVE!

Mathematics Success Grade 7

Transcription:

What is Six Sigma? The concepts surrounding the drive to Six Sigma quality are essentially those of statistics and probability. In simple language, these concepts boil down to, How confident can I be that what I planned to happen actually will happen? Basically, the concept of Six Sigma deals with measuring and improving how close we come to delivering on what we planned to do. Anything we do varies, even if only slightly, from the plan. Since no result can exactly match our intention, we usually think in terms of ranges of acceptability for whatever we plan to do. Those ranges of acceptability (or tolerance limits) respond to the intended use of the product of our labors the needs and expectations of the customer. Here s an example. Consider how your tolerance limits might be structured to respond to customer expectations in these two instructions: Cut two medium potatoes into quarter-inch cubes. and Drill and tap two quarter-inch holes in carbon steel brackets. What would be your range of acceptability or tolerances for the value quarter-inch? (Hint: a 5/16 potato cube probably would be acceptable; a 5/16 threaded hole probably would not.)another consideration in your manufacture of potato cubes and holes would be the inherent capability of the way you produce the quarter inch dimension the capability of the process. Are you hand-slicing potatoes with a knife or are you using a special slicer with preset blades? Are you drilling holes with a portable drill or are you using a drill press? If we measured enough completed potato cubes and holes, the capabilities of the various processes would speak to us. Their language would be distribution curves. Distribution curves tell us not only how well our processes have done; they also tell us the probability of what our process will do next. Statisticians group those probabilities in segments of the distribution curve called standard deviations from the mean. The symbol they use for standard deviation is the lower-case Greek letter sigma. For any process with a standard distribution (something that looks like a bell-shaped curve), the probability is 68.26% that the next value will be within one standard deviation from the mean. The probability is 95.44% that the same next value will fall within two standard deviations. The probability is 99.73% that it will be within three sigma; and 99.994% that it will be within four sigma. Four sigma design specification width Few Defects (about 60 DPMO) Few Defects (about 60 DPMO) -6σ -5σ -4σ -3σ -2σ -1σ 0 1σ 2σ 3σ 4σ 5σ 6σ Standard distribution curve with mean, sigma values and four sigma tolerances. DPMO = Defect Per Million Opportunities

If the range of acceptability, or tolerance limit, for your product is at or outside the four sigma point on the distribution curve for your process, you are virtually assured of producing acceptable material every time provided, of course, that your process is centered and stays centered on your target value. Unfortunately, even if you can center your process once, it will tend to drift. Experimental data show that most processes that are in control still drift about 1.5 sigma on either side of their center point over time. This means that the real probability of a process with tolerance limits at four sigma, producing acceptable material is actually more like 98.76%, not 99.994%. To reach near-perfect process output, the process capability curve must fit inside the tolerances such that the tolerances are at or beyond six standard deviations, or Six Sigma, on the distribution curve. That is why we call our goal Six Sigma quality. Quality makes us strong In the past, conventional wisdom said that high levels of quality cost more in the long run than poorer quality, raising the price you had to ask for your product and making you less competitive. Balancing quality with cost was thought to be the key to economic survival. The surprising discovery of companies which initially developed Six Sigma, or world-class, quality is that the best quality does not cost more. It actually costs less. The reason for this is something called cost-of-quality. Cost-of-quality is actually the cost of deviating from quality paying for things like rework, scrap and warranty claims. Making things right the first time even if it takes more effort to get to that level of performance actually costs much less than creating then finding and fixing defects.

Shooting for Six Sigma: An illustrative fable The underlying logic of Six Sigma quality involves some understanding of the role of statistical variation. Here s a story about that. Robin Hood is out in the meadow practicing for the archery contest to be held next week at the castle. After Robin s first 100 shots, Friar Tuck, Robin s Master Black Belt in archery, adds up the number of hits in the bull s eye of each target. He finds that Robin hit within the bull s eye 68% of the time. Friar Tuck plots the results of Robin s target practice on a chart called a histogram. The results look something like this. Note that the bars in the chart form a curve that looks something like a bell, says the friar. This is a standard distribution curve. Every process that varies uniformly around a center point will form a plot that looks like a smooth bell curve, if you make a large enough number of trials or, in this case, shoot enough arrows. Robin scratches his head. Friar Tuck explains that Robin s process involves selecting straight arrows (raw material); holding the bow steady and smoothly releasing the bowstring (the human factor); the wood of the bow and the strength of the string (machinery); and the technique of aiming to center the process on the bull s eye (calibration and statistical process control). The product of Robin s process is an arrow in a target. More specifically, products that satisfy the customer are arrows that score. Arrows outside the third circle on these targets don t count, so they are defects. Robin s process appears to be 100% within specification. In other words, every product produced is acceptable in the eyes of the customer. You appear to be a three- to four-sigma archer, the friar continues. We d have to measure a lot more holes to know for sure, but let s assume that 99.99% of your shots score, that you re a four sigma shooter. Robin strides off to tell his merry men. The next day, the wind is constantly changing directions; there is a light mist. Robin thinks he feels a cold coming on. Whatever the reason, his process doesn t stay centered on the mean the way it did before. In fact, it drifts unpredictably as much as 1.5 sigma either side of the mean. Now, instead of producing no defects, after a hundred shots, Robin has produced a defect, a hole outside the third circle. In fact, instead of 99.99% of his shot scoring only 99.38% do. While this may not seem as if much has changed, imagine that, instead of shooting at targets, Robin was laser-drilling holes in turbine blades. Let s say there were 100 holes in each blade. The probability of producing even one defect-free blade would not be good. (Because the creation of defects would be random, his process would produce some good blades as well as some blades with multiple defects.) Without inspecting everything many times over (not to mention spending an enormous amount for rework and rejected material), Robin, the laser driller, would find it virtually impossible to ever deliver even one set of turbine blades with properly drilled holes.

Overall Yield vs. Six Sigma Quality Level (Distribution Shifted +/- 1.5σ) Number of parts or steps +/- 4σ +/- 6σ 1 99.379% 99.99966% 7 95.733% 99.9976% 10 93.96% 99.9966% 20 88.29% 99.9932% 40 77.94% 99.9864% 60 68.81% 99.9796% 80 60.75% 99.9728% 100 53.64% 99.966% 150 39.38% 99.949% 200 28.77% 99.932% 300 15.43% 99.898% 400 8.28% 99.864% 500 4.44% 99.830% 600 2.38% 99.796% 700 1.28% 99.762% 800 0.69% 99.729% 900 0.37% 99.695% 1,000 0.20% 99.661% 1,200 0.06% 99.593% 5,000-98.314% 20,000-96.656% 70,000-78.820% Since defects are cumulative, as more parts or more operations are added, the chance of producing a defective product goes up. With process drift as a factor, if the number of parts or process steps exceeds 1200, foursigma processes are virtually incapable of making one good product. On the other hand, a Six Sigma process with 1200 parts or steps would still be producing a yield of 99.593% good products. Not only would the four-sigma producer have to spend much time and money finding and fixing defects before products could be shipped, but since inspection cannot find all the defects, she would also have to fix problems after they got to the customer. The Six Sigma producer, on the other hand, would be able to concentrate on only a handful of defects to further improve the process. How can the tools of Six Sigma quality help? If Robin the archer were to use those tools to become a Six Sigma sharpshooter instead of a four-sigma marksman, when he went out into the wind and rain, he would still make every shot score. Some arrows might now be in the second circle, but they would all still be acceptable to the customer, guaranteeing first prize at the contest. Robin the laser driller would also succeed; he would be making virtually defect free turbine blades. The steps on the path to Six Sigma quality: 1. Measurement Six Sigma quality means attaining a business wide standard of making fewer than 3.4 mistakes per million opportunities to make a mistake. This quality standard includes design, manufacturing, marketing, administration, service, support all facets of the business. Everyone has the same quality goal and essentially the same method to reach it. While the application to engine design and manufacturing is obvious, the goal of Six Sigma performance and most of the same tools also apply to the softer, more administrative processes as well. After the improvement project has been clearly defined and bounded, the first element in the process of quality improvement is the measurement of performance. Effective measurement demands taking a statistical view of all the processes and all the problems. This reliance on data and logic is crucial to the pursuit of Six Sigma quality. The next step is, knowing what to measure. The determination of sigma level is essentially based on counting defects, so we must measure the frequency of defects. Mistakes or defects in a manufacturing process tend to be relatively easy to define simply a failure to meet a specification. To broaden the application to other processes and to further improve manufacturing, a new definition is helpful: a defect is any failure to meet a customer satisfaction requirement, and the customer is always the next person in the process. In this beginning phase, you would select the critical-to-quality characteristics you plan to improve. These would be based on an analysis of your customer s requirements (usually using a tool like Quality Function Deployment.) After you clearly define your performance standards and validate your measurement system (with gage reliability and repeatability studies), you would then be able to determine short-term and long-term process capability and actual process performance (Cp and Cpk). 2. Analysis The second step is to define performance objectives and identify the sources of process variation. As a business, we have set Six Sigma performance of all processes within five years as our objective. This must be translated into specific

objectives in each operation and process. To identify sources of variation, after counting the defects we must determine when, where and how they occur. Many tools can be used to identify the causes of the variation that creates defects. These include tools that many people have seen before (process mapping, Pareto charts, fishbone diagrams, histograms, scatter diagrams, run charts) and some that may be new (affinity diagrams, box-and-whisker diagrams, multivariate analysis, hypothesis testing). 3. Improvement This phase involves screening for potential causes of variation and discovering interrelationships between them. (The tool commonly used in this phase is Design of Experiment or DOE.) Understanding these complex interrelationships, then allows the setting of individual process tolerances that interact to produce the desired result. 4. Control In the Control Phase, the process of validating the measurement system and evaluating capability is repeated to insure that improvement occurred. Steps are then taken to control the improved processes. (Some examples of tools used in this phase are statistical process control, mistake proofing and internal quality audits.) Words of Wisdom about Quality If you believe it is natural to have defects, and that quality consists of finding defects and fixing them before they get to the customer, you are just waiting to go out of business. To improve speed and quality, you must first measure it and you must use a common measure. The common business-wide measures that drive our quality improvement are defects per unit of work and cycle time per unit of work. These measures apply equally to design, production, marketing, service, support and administration. Everyone is responsible for producing quality; therefore, everyone must be measured and accountable for quality. Measuring quality within an organization and pursuing an aggressive rate of improvement is the responsibility of operational management. Customers want on-time delivery, a product that works immediately, no early life failures and a product that is reliable over its lifetime. If the process makes defects, the customer cannot easily be saved from them by inspection and testing. A robust design (one that is well within the capabilities of existing processes to produce it) is the key to increasing customer satisfaction and reducing cost. The way to a robust design is through concurrent engineering and integrated design processes. Because higher quality ultimately reduces costs, the highest quality producer is most able to be the lowest cost producer and, therefore, the most effective competitor in the marketplace. Steven Bonacorsi is a Certified Lean Six Sigma Senior Master Black Belt instructor and coach. Steven Bonacorsi has trained hundreds of Master Black Belts, Black Belts, Green Belts, and Project Sponsors and Executive Leaders in Lean Six Sigma DMAIC and Design for Lean Six Sigma process improvement methodologies. He has led some of the largest deployments in the world and has saved hundreds of millions with his project teams results. The AIT Group, Inc. Steven Bonacorsi, Vice President, MBA, MS-CIS, PMP Lean Six Sigma Master Black Belt 3135 South Price Road, Suite 115 Chandler, AZ 85248-3549 Phone: +(1) 888.826.2484 sbonacorsi@comcast.net http://www.linkedin.com/in/stevenbonacorsi http://www.theaitgroup.com