Centennial Middle School (CMS) Design Advisory Team (DAT)

Similar documents
3/6/2009. Residence Halls & Strategic t Planning Overview. Residence Halls Overview. Residence Halls: Marapai Supai Kachina

Security & Technology. Track & Tennis. Repairs. Remodeling & Interior Repairs. Exterior Wall. Repairs

Chicago Public Schools 6 Month Asbestos Surveillance Fall

Augusta Independent Board of Education August 11, :00 PM 207 Bracken Street Augusta, KY

HOLY CROSS CATHOLIC SCHOOL SCHOOL INFORMATION PROFILE 2015/2016 SCHOOL YEAR

FY2018 ANNUAL CAPITAL BUDGET. University of Minnesota

Oakridge School District #76

UVA Office of University Building Official. Annual Report

ASMC PROGRAM REVIEW

Geographic Area - Englewood

ADDENDUM F FACILITIES INFORMATION

Hampton Falls School Board Meeting September 1, W. Skoglund and S. Smylie.

Diocesan Review April 14, Catholic Athletic Trails West Catholic High School Catholic Central High School

Eit levande laboratorie-eksperiment

Dyer-Kelly Elementary 1

Montfort del Rosario School of Architecture and Design AR 2204 Architectural Design II Semester 2/2015. Project II Performing Arts Learning Center

Council of Educational Facilities Planners, International

Opening Doors. Strategic Plan 2016 through Bishop Dunne Catholic School

Program Proposal Construction Technology Construction Carpenter Diploma. Hazard Community and Technical College

Hayward Unified School District Community Meeting #2 at

Listening to your members: The member satisfaction survey. Presenter: Mary Beth Watt. Outline

Appendix A Cost Estimates

Geographic Area - Englewood

Dyer-Kelly Elementary School School Accountability Report Card Reported Using Data from the School Year Published During

Carnegie Mellon University Student Government Graffiti and Poster Policy

K-12 EDUCATION. Statement of Qualifications

ECO 210. Macroeconomics

George A. Buljan Middle School School Accountability Report Card Reported Using Data from the School Year Published During

Here are some helpful steps to guide you in completing the Contributor s Form below:

CHELMSFORD SCHOOL COMMITTEE REGULAR MEETING October 8, 2013 Meeting Minutes

ENG 203. American Literature Survey

APPROVAL AIDE MEMOIRE

Design Principles to Set the Stage

San Luis Coastal Unified School District

Seeing is Believing. ACE Academy offers creative ways to learn; students give charter school rave reviews

STRUCTURAL ENGINEERING PROGRAM INFORMATION FOR GRADUATE STUDENTS

BALTIMORE CITY PUBLIC SCHOOLS EDUCATIONAL SPECIFICATIONS PART 1: GENERAL REQUIREMENTS

Medway Library Board of Trustees November 15, :00 p.m. Medway Library

Dyer-Kelly Elementary 1

Medway Library Board of Trustees Tuesday, September 5, :00 p.m.

JUNIOR HIGH SPORTS MANUAL GRADES 7 & 8

ARTICULATION AGREEMENT

San Ignacio-Santa Elena Municipal Profile

Heavy Diesel Service Technician

ASRAMA KOLEJ UNIVERSITI TUNKU ABDUL RAHMAN Managed by : Delta Pride (M) Sdn Bhd (399277A)

Building and Construction Skills 2019 v1.0

MINUTES OF BOARD OF EDUCATION. Regular East Butler School 6:30 P.M. May 9, 2012 Kind of Meeting Meeting Place Time Month Day Year

Schenectady County Is An Equal Opportunity Employer. Open Competitive Examination

School Improvement Fieldbook A Guide to Support College and Career Ready Graduates School Improvement Plan

THEODORE ROOSEVELT HIGH SCHOOL Home of the Roughriders since 1923 August 31 September 7, Student Section

Class of 2018 Junior Proposal for Senior Project. Make the Most of Your Journey

FRAMINGHAM SCHOOL COMMITTEE MEETING MINUTES Superintendent s Conference Room July 15, 2014

NOVA STUDENT HANDBOOK N O V A

St. Paul, St. Michael, Our Lady of Lourdes: Pupil Accommodation Review. December 7, 2016

University of Central Florida Board of Trustees Finance and Facilities Committee

L E C O M. LECOM at BRADENTON HOSPITAL DAY 2017 MONDAY, AUGUST 21, 2017 The Ritz-Carlton Sarasota, FL

You Gotta Go Somewhere Prep for College Calendar

PUBLIC SPEAKING, DISTRIBUTION OF LITERATURE, COMMERCIAL SOLICITATION AND DEMONSTRATIONS IN PUBLIC AREAS

Lesson Plan. Preliminary Planning

SPCH 1315: Public Speaking Course Syllabus: SPRING 2014

American Association of University Women Manhattan Branch KSU Scholarship Fund

BARTHOLOMEW CONSOLIDATED SCHOOL CORPORATION SCHOOL BOARD MEETING, MONDAY, JANUARY 14, 2013, MINUTES

Mt Olive Recreation. Great enrichment programs

How to Take Accurate Meeting Minutes

SOCIAL STUDIES GRADE 1. Clear Learning Targets Office of Teaching and Learning Curriculum Division FAMILIES NOW AND LONG AGO, NEAR AND FAR

Birmingham City University BA (Hons) Interior Design

Northland Pioneer College Cosmetology Advisory Board Minutes Monday, October 7, :30 6:00 p.m.

GREATER DES MOINES SISTER CITIES COMMISSION 400 Robert D. Ray Drive Des Moines, Iowa Phone: (515) FAX: (515)

Quiz for Teachers. by Paul D. Slocumb, Ed.D. Hear Our Cry: Boys in Crisis

FORT HAYS STATE UNIVERSITY AT DODGE CITY

IN-STATE TUITION PETITION INSTRUCTIONS AND DEADLINES Western State Colorado University

KeyTrain Level 7. For. Level 7. Published by SAI Interactive, Inc., 340 Frazier Avenue, Chattanooga, TN

Texas Board of Professional Engineers Professional Practice Update / Ethics

Readyman Activity Badge Outline -- Community Group

La Grange Park Public Library District Strategic Plan of Service FY 2014/ /16. Our Vision: Enriching Lives

NOTES FROM THE EDITOR

WEST VIRGINIA UNIVERSITY

Positive turning points for girls in mathematics classrooms: Do they stand the test of time?

A HISTORY OF THE SCHOOL IN 100 OBJECTS. Size: Overall: 10½in x 8½in x 2¾in /265mm x 215mm x 70mm. Pages: 10in x 8in / 255mm x 205mm

Oklahoma State University Policy and Procedures

Moodle Student User Guide

Computer Science Self-Study Report for APC Review Fall 2007

VOL. XXI, PAGE 85. Inverness, Florida January 13, 2015

Circulation information for Community Patrons and TexShare borrowers

YWCA Volunteer Opportunities

Clearfield Elementary students led the board and audience in the Pledge of Allegiance.

Kansas Adequate Yearly Progress (AYP) Revised Guidance

Catalog Supplement Pasco Yakima A Learning Site of Pasco

Strategic Planning for Retaining Women in Undergraduate Computing

6 Financial Aid Information

Dublin City Schools Career and College Ready Academies FAQ. General

For international students wishing to study Japanese language at the Japanese Language Education Center in Term 1 and/or Term 2, 2017

John F. Kennedy Middle School

Tamil Nadu RURAL. School enrollment and out of school children. Young children in pre-school and school

CONTINUUM OF SPECIAL EDUCATION SERVICES FOR SCHOOL AGE STUDENTS

Ferris State University. Gwathmey Siegel & Associates Architects llc

MISSISSIPPI STATE UNIVERSITY SUG FACULTY SALARY DATA BY COLLEGE BY DISCIPLINE

BCTV Event Calendar November 2017

Arthur E. Wright Middle School

LIVE MUSIC RETAIL EST atlanta dairies CREATIVE OFFICE RESTAURANTS 777 MEMORIAL DR.

Transcription:

Centennial Middle School (CMS) Design Advisory Team (DAT) Project No: 281.003 Meeting Date: 11-01-10 Issue Date: 11-29-10 Page: 1 of 4 MEETING MINUTES Project: Boulder Valley School District - Centennial MS Addition & Remodel Meeting: DAT Meeting #4 Location: Project Site Date: November 1, 2010 Attendees: Bill Schmoker - Teacher Dave Compton Facilities Dept BVSD Jill Hudson - Teacher Doug Hagen - H+L Architecture Debra Kennedy - Counselor Rob Biesk - H+L Architecture Ali Fig - Teacher Kay Rasmussen - Saunders Construction Matt Adams - Teacher David Cone - Saunders Construction Bud Thompson - Parent Kenny Deemer - Saunders Construction Marco Cornacchione - Teacher Cheryl Scott - School Principal Chris Meyer - Assist Principal Dawne Owen - Principal s Assistant Distribution: Dave Compton, Cheryl Scott & Saunders / H+L Team Members For corrections or clarifications, contact author: Doug Hagen, dhagen@hlarch.com ITEM A. DISCUSSION 1.1 Doug led a PowerPoint presentation including these topics: A. Agenda for DAT #4 meeting: 1) Review & Refinement of Project Plan & Vision (including new Options 2A & 2B) 2) Overall Project Layout - Building & Site (to extent possible) 3) Discussions on Materiality, Finishes & Image B. Review of Prioritization Study - Part A 1) Deliver program improvements as told to taxpayers a. new Main Gym b. new Phys Ed Lockers c. Art & Science Improvements 2) Deliver facility requirements as told to taxpayers a. replace boilers b. replace intercom / PA system c. electrical improvements d. plumbing and H&V improvements e. site / ground improvements

Centennial Middle School - DAT #4 Page 2 f. roof repairs or replacement g. restroom ADA accessibility h. interior signage improvements i. interior finish improvements j. exterior finish improvements 3) Deliver site requirements as told to taxpayers a. new outdoor basketball courts b. replace bleachers at play field C. Review of Prioritization Study - Part B 1) Heating & ventilation improvements building-wide 2) Improve visitor check-in at main entry 3) Correct chronic aging problems at specific locations d. replace failing floor tile and abate ACM e. correct problem with freezing piping 4) Study site circulation (vehicle) in planning new additions 5) Study congestion at student lockers in planning remodeling 1.2 Dave Cone & Kay presented the Budget Status report including cost estimating for items discussed in DAT #3 meeting or included in District s 2006 List A. Bond Requirements 1) $ 377,600-1958 Locker Room Remodel 2) $ 57,200 - Add New Entry Vestibule & Limited Remodel School Office 3) $ 38,800 - Parent Drop-off 4) $ 628,400 - Science Labs & Art Suite Remodel 5) $3,282,400 - New Gym, Locker Rooms & Art Room over Activity Lobby 6) $ 39,900 - ADA Accessibility 7) $ 47,300 - Redistribute Student Lockers from Corridor 100 8) $ 34,000 - Resurface Existing Outdoor Basketball Courts 9) $ 7,600 - Replace Outdoor Bleachers 10) $ 18,300 - Replace Floor Tile on Upper Floor Corridors 11) $ 108,300 - Replace Landscape Irrigation System 12) $ 50,700 - Replace Unit Ventilators in Cafeteria & 2 CR s 13) $ 27,900 - Replace Gym Ventilation 14) $ 228,000 - Replace Boiler System 15) $ 36,200 - Replace Exterior Building Lighting 16) $ 29,500 - Recoat Exterior Concrete Structure 17) $ 258,100 - Replace Electrical Branch Wiring 18) $ 9,900 - Add Electrical Surge Protection 19) $ 114,400 - Replace Intercom / PA System 20) $ 30,400 - Add Emergency Shower / Eye Wash 21) $ 8,000 - Replace Gas Valves 22) $ 9,500 - Close up Electrical Penetrations in Walls 23) $ 6,100 - Add Exit Signs B. Summary 1) At this early stage, the cost total exceeds the budget by $39,281 2) This is not a serious issue since most of the totals are budget estimates 3) Plenty of time exists to fine tune the scope of work to fit the budget C. Dave presented Budget Status cost information for the New Addition 1) Option 1 - $3,233,000 including remodel of existing Boys & Girls Lockers a. Cost includes $377,600 for locker remodel 2) Option 2 - $3,243,000 without remodel of existing Boys & Girls Lockers

Centennial Middle School - DAT #4 Page 3 1) Add cost up to $377,600 for locker remodel D. Dave added that reroofing costs for the Existing Main Gym need to be included in his itemization 1.3 Doug reviewed Option 2 from DAT #3 meeting: A. This was only for comparison - a starting point for discussing new developments 1.4 Doug presented two more developed Options for the proposed New Addition based on comments from DAT members in DAT #3 meeting: A. Option 2A - New Main Gym matching Floor Elevation of Existing Cafeteria 1) New Activity Lobby adjoining New Main Gym to Cafeteria & Corridor 150 2) New Boys & Girls Locker Rooms & Toilet Rooms (student & visitor use) 3) Outdoor Ramp & Steps at West Entry (7-6 vertical level change) 4) Shift Link Corridor to abut existing Applied Tech Lab exterior wall 5) New Art Addition over New Activity Lobby 6) Connect Art Addition & Existing CR 227 for combined Art Suite 7) Science 224, 226 & 228 Remodel B. Option 2B - New Main Gym at split-level 45 lower than Existing Cafeteria 1) New Upper & Lower Activity Lobby to serve ADA access to both Levels 2) ADA Entry needed to access Toilets, Main Gym & Link Corridor 3) ADA Entry needed to Access Activity Lobby and Cafeteria & Corridor 150 4) New Boys & Girls Locker Rooms & Toilet Rooms (student & visitor use) 5) Shift Link Corridor to abut existing Applied Tech Lab exterior wall 6) Ramp indoors at Link Corridor (3-9 vertical level change) to Access Activity Lobby to Main Gym southwest doors 7) Outdoor Ramp & Steps at West Entry (3-9 vertical level change) 8) New Art Addition over New Activity Lobby 9) Connect Art Addition & Existing CR 227 for combined Art Suite 10) Science 224, 226 & 228 Remodel C. Main Gym Area preliminary layout discussed 1) 6,956 SF - Gym (with 50 x 74 basketball court & bleachers) 2) 1,196 SF - Boys Locker Area 3) 1,196 SF - Girls Locker Area 4) 25 Clear Dimension in Gym - District needs 24 5) 4 rows of retractable bleachers 6) Mat Hoist is needed (budget cost is $9,500 each) 7) Volleyball Nets (3) needed (retractable cost is $15,000 each) 8) Day Lighting on north wall is preferred by the District (Dave) D. Locker Area preliminary layout discussed 1) 100 locker units shown 2) 5 shower stalls, 3 Toilets (WC s) & 3 Lavatories 3) Small Teacher Reporting Room 4) Small Teacher Dressing / Shower / Toilet Room E. In-progress Revit Model drawings shown for each Option 1) Existing 1958 Cafeteria Façade 2) 3D perspectives of Options 2A & 2B 1.5 Doug discussed early building material preferences F. Gym walls 1) Pre-Cast Concrete (no masonry) 2) Masonry with Stucco Upper Section (matching 1986 Addition motif) G. Activity & Art Addition walls 1) Metal Composite Panels with generous storefront

Centennial Middle School - DAT #4 Page 4 2) Architectural Sheet Metal Panel (also with generous windows) 1.2 DAT discussion after PowerPoint presentation A. Option 2A outscored Option 2B for DAT appeal 1) Idea of 1 level floor was the difference 2) Some concern if 7-6 grade change will impact cost of construction 3) Substantial discussion about desirability & affordability of using Pre-Cast Concrete - architect s are flexible to use Masonry & Stucco (upper section) 4) Dave Cone will investigate Pre-Cast but cost-to-date is based on Masonry 5) Art Room proposed Addition had solid DAT acceptance 6) Science Room scope was not discussed in detail (ready for Focus Meetings) B. Option 2B seemed complicated and split-level circulation wasn t totally solved 1) Doug realized ADA circulation & access to both Male / Female Toilets needs fine tuning - promised to resolve 2) Reason for studying Option 2B was due to concern for 7-6 grade change with Option 2A C. New Locker Rooms 1) Maximize number of locker units (Matt) 2) Request for Teacher Room with view into Gym (Chris) 3) Discussion about separate or attached Dressing / Teacher Room (Doug) 4) No concern for special changing room for referees (Matt) 5) Discussion about supervision of all student lockers (Doug) 6) Less concern for viewing lockers than for viewing into Gym (Matt) D. Existing 1958 Lockers 1) No discussion E. New Vestibule at Front Entry 1) Could this qualify for additional funding? (Cheryl) 2) Possibly - need to check with Safety or Risk Management at the District (Dave) 3) F. Site Items 1) In good weather, may have up to 110 bicycles stored 2) Upcoming grant from City of Boulder - to relocate this under front Entry canopy 3) 1.5 Cheryl revisited concerns for unfunded HVAC needs building-wide A. Dave Compton suggested itemizing the specific issues with the HVAC system B. Cheryl referred to the CMS survey - isn t that enough? C. Doug indicated that the A/E team won t be dealing with that survey until the Focus Meetings during Design Development (DD) Phase D. Dave indicated that CBAC meets November 4 and again in January 1) Cheryl & Dave can meet to discuss best approach to District / CBAC 2) Cheryl needs to strategize any request additional reserve funds E. Would the building-wide HVAC scope be something the engineers will do? (Bud) 1) Dave answered yes - that the design would cost extra 1.6 Next Meeting is Monday, November 8 at 3:30 pm at the school. Attachments: None END OF MEETING MINUTES

Centennial Middle School - DAT #4 Page 5 Recipients are asked to notify the Architect, in writing, of any additions, corrections, or deletions within five (5) calendar days of receipt. R:\BVSD.281\281.003 Centennial Middle School Baseline Campus\3 Meetings\3.04 User Group\2010-11-01 DAT #4