Details of applications under Right to Information Act 2005:- 1 (a) Supply of information relating to Periodical Maintenance works under State Roads Project, HPRIDC. (b) Period to which the information related from 01-01-2007 to 31-12-2007 & 01-01-2008 to 31-11- Periodical Maintenance Works. 06-02-2009 Case transferred to PIO O/O Engineerin-Chief, HPPWD, Shimla vide this office letter 5941-42 dated February 07, 2009. 2008. (c) Description of the information required under Public Interest. 2 Drawing of Khasra 405 & 406 Una- Aghar Road acquisition whether acquired or Not. Land Acquisition. 23-04-2009 3 Drawing of Khasra 405 & 406 Una- Aghar Road acquisition whether acquired of land act. 4 दरख व त दर सत ल ख र ज खसर न0 7811 व 155 क स मन क सड़क च ड़ ई बमश: 12 व 10 कमर ह न क प ष ट क ह 5 ऊन अग घ र न रच क मण ड स पर ह ईव सड़क क व त र करन क लए भ म अ जर त करन पर प न वच र करन ब र 6 खसर न0 7811 व 155 क स मन क सड़क च ड़ ई बमश: 12 व 10 कमर ब र म थर न पऽ 7 required is work executed under (PMGSY). 19-05-2009. Land Acquisition. 22-06-2009 20-07-2009. Land Acquisition. 22-10-2009 office letter 6059-61 dated 26-10-2009. Land Acquisition. 02-12-2009 Reply sent by post to office letter 5413-15 dated 08-12-2009. Land Acquisition. 23-10-2009 office letter 6059-61 dated 19-01- PMGSY Works. 27-03-2009
8 (1) ऊन अग घ र मण ड र ड क ज नक र ब र म? ट क क ठ RDN क भ म सड़क क लए 10 जनवर 2008 क खसर न0 129, 157 व 372 म बत य ह य न (म प फ ईल) इन खसर नम बर क कस भ तरह क भ म द न ब र नह बत य फर भ आपक वभ ग ल ग क न ज भ म र पय द कर क य खर द रह ह (2) खसर न0 129, 157 व 372 क न ज यज कब ज हट कर वभ ग र ड बन रह ह न ज यज कब ज क Road map क कब ज म क य नह दय गय ह (3) ट क क ठ म नज व सरक र कतन मक न, ह डपम प, डन ग ब ऊनडर हट ई गई उनक खच र अलग Ð अलग (4) र ड बन न क लए र ल र ग ल शन क त 9 (i) Which product use as wire crates by the Himachal Govt. (ii) Himachal Pradesh schedule of rates 1999 with all amendments. (iii) Period to which the information relates month and year 1999 to 2010 as latest. 10 (i) Which item approved as wire crates as per HPSRP. Land Acquisition / Encroachments. office letter 7216 dated 30-03- 09-04-2010 office letter 95-95 dated 29-04- 08-05-2010 office letter 08-05-2010
(ii) Provide details of items which used as wire crates. (iii) In World Bank Aided Projects who decide the specification of material used in site. (iv) Provide address/telephone/e-mail etc. with their guidelines about wire crates. (v) List of road work to whom awarded for work. (vi) Letter of Department where permission granted to use Non ISI/substandard/ material to contractors. 11 (i) Name and complete address of consultant for Himachal roads. (ii) Name and complete address of contractors. (iii) Provide the list item approved as wire crates / gabion approved by NHAI/ HPSRP/ World Bank or any other technical authority etc. (iv) Detail of wore crates / Gabion specification. (v) With the detail of wire crates/fencing item specification. 12 (i) Which product use as wire crates by the Himachal Govt.. (ii) Himachal Pradesh schedule of rates with all amendments. (iii) Himachal Pradesh schedule of rates 2009 with all amendments.. 13 (a) Schedule of specification. (b) Period to which the information relates month and year. (c) Schedule of specification for wire crates. 14 (a) List of consultants and specifications. office letter 09-05-2010 Additional charges for information requested to the office letter 2154 dated 30-06- 2010, have not been deposited by the applicant. 08-05-2010 office letter 08-05-2010 office letter 18-05-2010
(b) Period to which the information relates month and year 2009-10- 11. 15 Provide list of Contractors/Designer/ Engineer/Arbitrator. 16 What are the benefits to the State Govt. by ISO certification of HPRIDC. &Necessity of ISO certification in the HPRIDC and total expenditure is to occur. Explain how much have been paid & how much is still to be paid. (i) Whether adequate facilities with regards to parameters of ISO certification in HPRIDC are available or not. 17 Acquisition of land for construction of Shimla Theog-Kotkhai Hatkoti road at village Gajot / Bhot in Tehsil Theog, Shimla. 18 Acquisition of land for construction of Shimla Theog-Kotkhai Hatkoti road at village Gajot / Bhot in Tehsil Theog, Shimla. 19 Acquisition of land for construction of Shimla Theog-Kotkhai Hatkoti road at village Gajot / Bhot in Tehsil Theog, Shimla. 20 Acquisition of land for construction of Shimla Theog-Kotkhai Hatkoti road at village Gajot / Bhot in Tehsil Theog, Shimla. 21 Acquisition of land for construction of Shimla Theog-Kotkhai Hatkoti road at village Gajot / Bhot in Tehsil Theog, Shimla. office letter 18-05-2010 office letter ISO Certification. 10-06-2010 office letter 3715 dated 14-09- Land Acquisition. 09-07-2010 05-08- Land Acquisition. 09-07-2010 applicant dated 13-08- Land Acquisition. 09-07-2010 13-08- Land Acquisition. 09-07-2010 13-08- Land Acquisition. 09-07-2010 13-08-
22 शमल स ह टक ट र ड कस तरह क 27-08-2010 Package 5 (Thoeg ज क ट ह और कतन समय क लए Kotkhai Hatkoti road) कम पन क दय गय ह कतन र पय क office letter ह कम पन क पन ज करण, ल इस न स पत स हत ज नक र द 4179 dated 11-10- 23 The term & condition of work, amount and the completion of schedule. 24 Subject matter on information 01-04- 2008 to 31-03-2010 if the budget are not sufficient for their day to day requirement. 25 खसर न0 1176 रकव 0-03-84 ह क ट यर स कतन म टर क द र पर आपक वभ ग क कब ज नध र रत ह 26 (1) R & R principles, policy frame work and entitlement matrix for World Bank funded project. (2) HPSRP Model linth area rates in r/o replacement of structures. 27 Quality control monitoring of roads construction by MNC in Himachal Pradesh. 28 The construction being done in the downstream of the culvert on Mehatpur Una Amb road. 29-10-2010 office letter 4961-62 dated 26-11- Budget. 31-08-2010 ------ Application not accepted vide this office letter 3991-93 dated 29-09- 2010 being not in conformity with the provision of said act. Encroachment. 03-11-2010 office letter 4816 dated 16-11- Resettlement & Rehabilitation Action Plan for Package 5 (Thoeg Kotkhai Hatkoti road) System of Quality Control. Package 1 (Mehatpur Una Amb road) 18-10-2010 19-11- 20-08-2010 office letter 4790 dated 15-11- 16-11-2010 office letter
29 नम र ण ध न स पर एल स स ह इव ऊन भ ट अग घ र ज ह मण ड र ड ब र ज नक र ह त 30 Record entry in the MB/ Theog to Rohru road. a) R/D Km. 48.700 to 49.000 Km. b) R/D Km. 49.000 to 49.660 Km. c) R/D Km. 52.110 to 53.000 Km. 31 (i) Please furnish details of quality control checks; exercised by the Employer in the construction of roads before releasing payment to the contractors. (ii) Please furnish details of the payment released to the contractors from 01-04-2010 to date. (iii) What are the technical / quality control checks exercised by the employer to monitor the quality of the road? (iv) What are the qualifications of the staff of the employer who exercises checks over and above the consultants for these road projects? (v) Please furnish the original time limit for completion of all these World Bank Aided Projects. If extensions have been granted the detailed reasons for granting extensions may be furnished. 32 Copy of AKX of SNSG road recently prepared on which land is to be acquired Package 2, 3 & 4. Measurements. Land Acquisition & 5153 dated 06-12- 06-12-2010 office letter 5665 dated 05-01- 2011. 13-12-2010 Intimated to the Till date fees has not applicant vide letter been deposited. 5758 dated January 15, 2011 for depositing the extra fees. 13-12-2010 --------------- Application rejected vide letter 5315-16 dated December 16, 2010 vide which Section 3 (2) of HP RTI rules of 2006 framed under RTI Act 2005 states that A separate application shall be made in respect of each subject and in respect of each year to which the information relates. 31-12-2010 -------------- Application rejected vide letter 5663
in Km. 67.500 to Km. 68.000 with central line and offset on both side of each RD. 33 Regarding survey report conducted by various agencies for widening the Draman-Sihunta road during the period 2008 to till date at the portion village Balana RD 3/320 to 3/360. 34 Total width of road where land measuring 00-00-14 Sqm. Out of Khsara 1347/4 of village Lal SInghi Tehsil & Distt. Una belonging to Smt. Shashi Bala W/o Sh. Jagdish Lal Dhiman has been acquired? 35 (1) Date of completion of Una- Bhota-Jahu Road. (2) How much distance will be reduced? (3) How much cost per Kilometer? (4) What will be the width of road? (5) Whether the proposal of this highway is with in the Jahu- Bazar or by pass is proposed? 36 (1) कन Ð 2 कम प नय व ठ क द र क Sub Tender / Work order दए गए (2) कन Ð 2 कम प नय व सप ल यर स म ल लय गय (3) कतन धन व कस म ध यम स कम प नय व सप ल यर क दय (4) इस road म कस Ð 2 क यर क लए धन क कतन Ð 2 व यव थ थ और road क अ त रक त और कन Ð 2 क य र म धन खचर ह आ प णर ज नक र उपलब ध करव ई ज ए Measurement. dated January 05, 2011 vide which RTI fees as specified is not attached as per Clause 5. office letter 6328 dated 09-02- 2011. Land Acquisition office letter 3389 dated 19-09- 2011. office letter 4102 dated 24-10- 2011. office letter 5554 dated 03-01- 2012.
37 How many daily waged worker / motor mate engaged in HPPPWD w.e.f. October, 2001 to September, 2002. Establishment office letter 5641-42 dated 05-01-2012. 38 (1) Supply the list of name supplier of water for the purpose of sprinkler on the Unmetalled Road to prevent soil pollution with Rate Charges per Tanker Mehatpur, Rakkar Colony and Una Headquarter. (2) If having Vehicles Numbers then shown engaged (a) With owner and address. (b) Earned money (c) Year 2011-2012. office letter 6852 dated 06-03- 2012. 39 (1) हम चल द श म ऊन स र ष र श य र जम गर बन न क आडर र एक च न क कम पन क दय गय ह (2) (i) च न क मऽ द श क ण म न ह न पर भ स म वत र क ष ऽ म सड़क बन न क क म द न म क य र ष र श य स रक ष उप य क म पदण ड बन य गय थ? (ii) इस कम पन न क यर म कतन भ रत य, कतन च न क व कतन ल कल नव स क यर पर लग य? (iii) उनक रहन क क य व यव थ और (iv) स रक ष क द ष ट स उन पर क य office letter 7118-20 dated 19-03-2012.
नगर न रक ख ज त ह? (3) क य इसक लए कस भ रत य कम पन क ट ण डर नह आय थ? य द आय थ त च न क कम पन क ट ण डर म क य अन तर थ? (4) इस क यर क प णर करन क क य क ई अव ध नध र रत थ और इस अव ध म यह क यर प र न ह न पर कम पन क वर द ध क य क यर व ह क गई? यह क यर कब तक प र ह ग इस क यर प तर क वलम ब क क रण जनत क ज पर श न ह ग उसक ववरण ह त क य कदम उठ य गय? 40 Land has already stand in the name of HPPWD about 72 fit width in the road. But reason to acquisition to the extra private land at RD 101/750 to 880. The name of authority and reason to acquisition the printer land may be intimated. 41 (1) DPR म R/wall, B/wall क न Ð क न स R/D म वध न ह व कतन लग ई गई ह (2) ज प र न ड ग व प लय उख ड गई ह, उसस कतन Recovery क ट Land Acquisition. office letter 7190-91 dated 22-03-2012. office letter 7405-06 dated 29-03-2012 and 430-31 dated 27-04-2012.
गई, MB स हत ब य र भ ज (3) R/wall व B/wall म दर र आई ह उसक ग णवत क ज च कह ह ए, ब य र द (4) मट फ कन क लए ज ड प ग स ईट च ह नत ह उनक R/D स हत ब य र द (5) सड़क पर ब स ग क हल क स ख य व प न नम र ण क ब र म बत ए (6) ड ग क जम न स न च कतन गहर ई रख गई ह व प र न प लय क स थ ज डन क वध न ह स र ब य र द (7) कतन डम पर क ट ग ह न थ, क ट ग स ह ए न क स न [ज स उपज ऊ जम न क ध व त ह न, कल नय क र त बन द ह न, मक न क ध व त ह न, प र न ब व डय क ध व त ह न ] क भरप ई क न कर ग व कम पन क ज न क व द इस क भरप ई क जम म व र ह ग (8) सड़क क म ट लग स ध सड़क और म ड पर इस क च ड ई कतन म टर च ह नत ह, स र ब य र द Sd/- Public Information Officer, O/o Chief Engineer-cum-Project Director, State Roads Project, HPRIDC, Nirman Bhawan, Nigam Vihar, Shimla-2.