Completed Projects- Haryana S. No. Name of the Projects Town Implementing Agecny Estimated cost (Rs. in Cr) Loan Sanctioned (Rs. in Cr.) Total Loan Released (Rs. in Cr) Total Expenditure Reported by the Implementing Agencies (Rs. in Cr.) Land Development Projects 1 Development of residential sector 2, 2 Residential scheme of Sector 64, 3 Development of residential sector 38, 4 Residential sector 2, Sonepat Sonepat 5 Residential scheme of Sector 7 & 8 (part), Sonepat Sonepat 6 Development of residential sector 9 and 9A, 7 Development of residential sectors 11 & 12, 8 Development of residential sectors 13 & 17, 9 Development of residential sectors 18, 10 Development of residential sectors 24, 11 Development of residential sectors 2 & 3 (part), Rohtak 12 Development of residential sectors 2, 3 and 4 (part), Rohtak Rohtak Rohtak 13 Development of residential sector 2, Palwal Palwal 14 Development of Brass Market, 15 Development of residential sector 3 (part II), 16 Development of shopping centre at sector 3, 17 Development of residential sector 4, 18 Shopping Centre at sector 6, Dharuhera Dharuhera 19 Development of residential sectors 4 & 7, 20 Development of residential sectors 32 and part sector 39, 21 Development of residential sector 40, 22 Development of residential sector 39, 23 Development of industrial sector 59, 24 Development of industrial sector 58, 34.57 23.93 22.93 33.19 35.86 26.89 21.73 33.34 156.24 61.62 61.62 94.14 40.47 13.99 12.99 20.83 73.89 47.83 39.43 60.95 124.19 26.44 26.44 38.95 6.86 3.61 2.74 8.68 44.98 16.46 16.46 21.94 26.65 19.86 19.86 28.78 64.15 18.59 18.59 26.07 17.37 5.32 5.32 7.11 23.88 10.75 10.75 20.89 15.02 11.24 11.24 15.43 1.83 0.27 0.27 0.86 11.79 3.76 3.76 5.04 0.28 0.07 0.07 0.31 10.76 8.06 8.06 13.06 0.44 0.08 0.08 1.35 3.79 0.75 0.25 3.45 18.80 3.50 3.50 4.38 31.20 13.28 13.28 17.84 29.08 13.66 13.66 18.25 34.71 9.30 9.30 13.76 24 Development of industrial sector 58, 31.17 23.37 21.37 34.04
25 Development of Sectors 15 (industrial), 18, 19 and 20 at 26 Development of industrial sector 25 (phase II) for informal sector, 27 Development of industrial sector 7, 28 Development of Growth Centre, Bawal Bawal Haryana State Industrial & 29 Development of Industrial Model Township Phase-I at Manesar Manesar Haryana State Industrial & 30 Industrial Estate, Barhi (Gannaur) Barhi Haryana State Industrial & 31 32 Development of Industrial Estate, Ph. IV at Kundli Development of Sector-2 (Resd.) at Kundli Haryana State Industrial & 5.85 4.81 2.30 18.10 3.54 0.65 0.65 0.48 6.93 1.08 1.08 4.15 178.68 25.5 25.50 182.50 564.57 134.19 115.00 349.34 111.00 48.47 20.00 21.37 122.29 60.37 60.37 56.5200 44.13 24.81 17.01 30.06 33 Development of Sector-62 (Residential) at 65.52 47.28 39.81 57.99 34 Development of Sector-65, 66.33 47.86 40.24 60.28 35 Development of Sector-27, 23.91 16.81 12.31 25.08 36 Development of Sector-28, 16.25 11.45 8.52 16.46 Sub Total 36 No. 2046.98 785.89 686.47 1344.97 Trasport Sector Projects 37 Widening/ re-alignment of Badkhal - Surajkund road starting from Ankhir Chowk to Prahladpur (Delhi border), 5.47 2.60 2.60 4.23 38 Construction of external link road connecting with sector 17, 39 Widening & strengthening of existing Mehrauli road from National Highway 8 to - Delhi border, side 2.90 4.83 1.13 1.13 1.83 3.60 2.25 5.25 40 Widening & strengthening of Old Delhi Road from Dundahera border to National Highway 8, from Atul Kataria Chowk to Mahavir Chowk and from Mahavir Chowk upto Management Development Institute, 9.33 6.90 3.00 11.04 41 Upgradation of Roads in the NCR - Haryana Palwal, Nooh PWD (B&R), Haryana 63.07 47.31 47.31 52.12 42 Construction of Transport Nagar at 43 Construction of Road from Northern Byepass Rohtak to NH-71 (to be used as slip road), in Rohtak district 0.94 0.46 0.46 0.93 Rohtak PWD (B&R), Haryana 4.04 3.03 3.03 3.58
44 Wiidening and strengthening of road from NH- 71 to NH-10 via Singhpura Kalan to Singpura Khurd, Bahujamalpur in Rohtak district 45 Construction of 2 lane Road Over Bridge in lieu of level crossing No. 45-A/T-3 at Km. 60/6-7 near Hailly Mandi Kulana Road East cabin on Delhi- Section 46 Construction of 2 lane Road Over Bridge in lieu of level crossing No. 25B at Km. 31/8-9 on Delhi Railway Line on Daulatabad Section 47 Construction of 2 lane Road Over Bridge in lieu of level crossing No. 28 on Delhi Section at crossing of Farrukh Nagar Jhajjar road at. Rohtak PWD (B&R), Haryana 6.24 4.68 4.68 6.204 Haily mandi PWD (B&R), Haryana 15.31 5.76 5.76 18.21 PWD (B&R), Haryana 16.05 6.043 6.04 20.97 PWD (B&R), Haryana 18.11 6.81 6.81 16.95 48 Construction of two lane ROB at l.c no. 58B on Delhi- Bhatinda Railway line and 1B on Rohtak Gohana ' Railway Line at RD 1.20 km of circular road, Rohtak Rohtak PWD (B&R), Haryana 28.84 12.38 12.38 21.00 49 Construction of 4 lane RoB at level crossing No. 61A on Delhi- Bhatinda Railway line at Rd. 89.7 Km of Rohtak- Bhiwani road 50 Construction of 2 lanes RoB at level crossing no. 59A on Delhi-Bhatinda railway line at 51 Rohtak Construction of Bypass in Kharkhoda in Sonepat district Rohtak PWD (B&R), Haryana 36.53 20.86 20.86 Rohtak PWD (B&R), Haryana 24.68 10.02 10.02 kharkhoda PWD (B&R), Haryana 16.74 12.555 12.555 14.55 25.69 17.55 Sub Total 15 No. 253.09 144.13 138.88 220.10 Water Sector Projects 52 53 54 Laying of Internal water distribution system in town, Haryana Rohtak district, Haryana Jhajjhar district, Haryana PHED Haryana 5.21 3.91 3.91 Rohtak PHED Haryana 21.25 15.93 15.93 Jhajjhar PHED Haryana 31.22 23.41 23.41 5.14 37.33 34.1200 55 district (Non-Mewat), Haryana PHED Haryana 11.72 8.80 8.80 11.06 56 district, Haryana PHED Haryana 18.42 13.81 13.81 17.74 57 Sonepat district, Haryana Sonipat PHED Haryana 34.94 26.19 26.19 34.08 58 district, Haryana PHED Haryana 19.55 14.70 14.21 18.71 59 district, Haryana PHED Haryana 25.00 18.75 15.63 25.18
60 61 62 63 64 65 66 67 68 69 70 71 72 73 Augmentation of Water Supply in Rohtak, Haryana Providing water supply and sewerage for Phases II, III and IV Industrial Model Township Manesar, Augmentation of water supply at sectors serviced by Municipal Augmentation of Water Supply of (HUDA Sectors) by HUDA Rohtak PHED Haryana 59.00 44.25 44.25 Manesar Haryana State Industrial & Municipal of (MCF) 215.40 161.55 10.00 60.91 125.80 21.48 16.00 16.00 27.15 21.48 16.10 6.75 26.79 Construction of second phase of main waterworks comprising of one treatment plant of capacity 20 MGD, storage and sedimentation tank and clear water tank near 6.00 4.50 1.10 5.96 Sub Total 13 No. 490.67 367.90 199.99 429.97 Sewer Sector Projects Augmentation & Extension of Water Supply and Sewerage facilities in various towns of Haryana[ 8 projects included] PHED Haryana 71.55 53.66 53.66 71.77 Providing Master Sewerage Scheme for Trunk Sewer No. 4 Urban Estate, Providing sewerage system to new approved colonies in Gohana Town, Dist Sonipat, Haryana 24.14 18.00 4.50 Gohana PHED Haryana 2.72 2.04 2.04 16.7431 2.72 Sub Total 3 No. 98.41 73.70 60.20 91.24 Power Sector Projects Creation of power infrastructure in & Bahadurgh, Haryana & Haryana Vidyut Prasaran 89.91 67.43 67.43 90.56 Strengthening and Upgradation of Subtransmission & Distribution Network, Strengthening of sub-transmission and distribution network, Bawal, Dharuhera, Pali (Gothra), Buroli, Kosli and (District ) Strengthening of sub-transmission and distribution network, Sohna, Nuh, Ferozepur Jhirka, Taoru, Manesar, Pataudi, Farukhnagar & Badshahpur (distt.) Reinforcement of Power infrastructure in and districts & Haryana Vidyut Prasaran 40.16 30.12 25.00 33.33 23.05 17.29 17.29 23.05 14.44 10.83 10.83 15.84 9.27 6.95 6.95 10.43 Strengthening of Transmission & Distribution Network in Rohtak Circle by Uttar Haryana Bijli Vitran Ltd. Rohtak Uttar Haryana Bijli Vitran 11.11 8.33 7.57 9.46 Sub Total 6 No. 187.95 140.96 135.08 182.67 TOTAL 73 No. 3077.09 1512.58 1220.61 2268.95