1 Energy Saving Policies and Energy Efficiency Obligation Scheme D7.1: ENSPOL Dissemination Strategy (1 st Version) Project Coordinator: Joint Implementation Network - JIN Work Package 7 Leader Organization: UPRC September 2014 The sole responsibility for the content of this [webpage, publication etc.] lies with the authors. It does not necessarily reflect the opinion of the European Union. Neither the EACI nor the European Commission are responsible for any use that may be made of the information contained therein.
2 D.7.1 ENSPOL Dissemination Strategy (1 st Version)
3 Preface ENSPOL is an EU-funded project targeting the effective and proper implementation of Article 7 of the Energy Efficiency Directive in all Member States and beyond. Major objective of ENSPOL is the establishment, revision and implementation of robust Energy Efficiency Obligation Schemes or alternative policy measures to each Member State. At the same time the project envisages the provision of appropriately refined information and supportive strategic tools to all targeted stakeholders. The project is coordinated by the research organization Joint Implementation Network. The strong involvement of all relevant stakeholders will enable a more thorough understanding of the variables at play, an identification and prioritisation of necessary policy prerequisites. The dissemination strategy lays a special emphasis on reaching European-wide actors and stakeholders, well, beyond the target area region. PROJECT PARTNERS No Participant name Short Name Country code Partners logos CO1 Joint Implementation Network JIN NL CB2 Center for Renewable Energy Sources and Saving CRES EL CB3 Italian Federation for Rational Use of Energy FIRE IT CB4 Vlaamse Instelling voor Technologisch Onderzoek VITO BE CB5 Polish National Energy Conservation Agency KAPE PL CB6 Energy Saving Trust EST UK CB7 Austrian Energy Agency AEA AT CB8 University of Oxford OUCE UK CB9 University of Piraeus Research Center UPRC EL CB10 Stockholm Environment Institute/ University of York SEI UK CB11 Association of Bulgarian Energy Agencies ABEA BG CB12 Danish Energy Association DEA DK CB13 French Environment and Energy Management Agency ADEME FR D.7.1 ENSPOL Dissemination Strategy (1 st Version)
4 D.7.1 ENSPOL Dissemination Strategy (1 st Version)
5 Table of Contents EXECUTIVE SUMMARY INTRODUCTION ENSPOL DISSEMINATION STRATEGY SHARING KNOWLEDGE VIA ENSPOL WEBSITE ENSPOL Website Stakeholders Web Platform ENSPOL DISSEMINATION MEANS Project Logo ENSPOL Templates Leaflets Newsletters Articles and Press Releases Social Media Tools Interventions & Publications Interventions Publications Policy Briefs ENSPOL EVENTS General Strategy of the Project s Events Kick - Off Meeting Regional workshop in Vienna Capacity Building Workshops EU Observatory Workshops National Observatory Meetings Training Courses Policy Event Final Conference D.7.1 ENSPOL Dissemination Strategy (1 st Version) Page 1
6 Figures Figure 1: Target groups... 7 Figure 2: Tailor Made Dissemination Strategy... 9 Figure 3: ENSPOL Website Design Figure 4: Final Project Logo Figure 5: 1 st ENSPOL Leaflet Figure 6: ENSPOL Social Media Accounts Figure 7: ENSPOL Kick off Meeting Tables Table 1: Dissemination Objectives for each Target Groups... 8 Table 2: Dissemination Activities Table 3: A List of all the Workshops/Meetings D.7.1 ENSPOL Dissemination Strategy (1 st Version) Page 2
7 EXECUTIVE SUMMARY This document describes the Dissemination Strategy of the consortium for the ENSPOL project. The Dissemination Strategy sets out a clear predefinition of the dissemination actions and events, so as to meet the needs of the stakeholders target groups and make the best out of the final aim, which is awareness raising and motivation to action in regard to ENSPOL outcomes. The Dissemination Strategy of ENSPOL project will be based on the following key elements: To publicize expected results, accumulated knowledge and gained experience; To raise awareness and motivation to action in regard to ENSPOL outcomes; To implement a variety of dissemination activities envisaged by the periodic dissemination and communication plan, promoting networking activities and fostering potential co-operations. A pro-active Dissemination Strategy was elaborated to be undertaken, so as the main outputs of all project results to be effectively disseminated to the following categories of related stakeholders: Policy makers Regulatory authorities Energy supply (energy sales companies) Transmission System Operators (TSOs) Distribution System Operators (DSOs) Regional and local authorities Industry Associations Financial Institutions Professionals and their associations Associations of consumers / General public All the aforementioned actors will be continuous recipients of a series of dissemination activities, which will aim to keep them informed for a number of issues concerning the ENSPOL project according to their special nature and interest: D.7.1 ENSPOL Dissemination Strategy (1 st Version) Page 3
8 The development of the web based stakeholders platform for the exchange of information and experience and for fostering the dialogue among key players and project s consortium The creation of the project s web site that will aim to present project s deliverables and to be a referenced site containing all the dissemination material. Production and distribution of promotional material of the project s results, progress and potential benefits will be produced and offered during the publicity campaign - e.g. leaflets, newsletters etc. Presentations of the project s objectives and results through articles / press releases / policy briefs and also using Social media tools targeting stakeholders and the general public. Interventions / announcements at international conferences / forums / events of ongoing initiatives, in order to diffuse the project s results with the Final Conference in Brussels to be the ultimate dissemination event In addition to the capacity building workshops in all participating countries, as well as the regional workshop in Vienna for the countries aiming to implement an EEO, all participating countries will carry out training courses. In addition to the 3 EU Observatory workshops, eight national observatory meetings will be held back to back with the above capacity building workshops. Collaboration with related projects and EU initiatives from the aspect of creating dialogue in order to avoid duplication, exploit synergies and disseminate results. The main added value of ENSPOL is linked to the following: ENSPOL has multiple European dimensions: cooperation across geographical regions, expertise in different thematic fields. ENSPOL focuses on practical implementation of energy efficiency obligation schemes and alternative policies. ENSPOL covers a wide range of different policy circumstances and takes into account contemporary conditions in the EU. ENSPOL will assesses potential synergies and limitations from an EU perspective taking into consideration multiple EU MS. ENSPOL will involve multiple stakeholders in an interactive way, securing the wide transferability of projects results. D.7.1 ENSPOL Dissemination Strategy (1 st Version) Page 4
9 1 INTRODUCTION ENSPOL project intends to enable the active communication and information exchange of EU MS on the Energy Efficiency Directive, and more specifically on Article 7. Through this, MS can identify ways to achieve their Energy Efficiency targets through implementing Energy Efficiency Obligation or alternative policy schemes domestically. Given the multitude of policies and perceptions for such goals, ENSPOL will take into account the requirements and experiences of each MS on such schemes in order to derive relevant and appropriate policy conclusions for policy makers and market actors. Thus, the involvement of a large variety of stakeholders is necessary and will be guaranteed throughout the duration of the project. Efficient dissemination is a fundamental and horizontal activity in any process, since the success of these dissemination activities contributes decisively to the utilization of project outcomes by all interested actors and target groups. The project s work programme will conclude to a comprehensive dissemination programme. The programme complements the stakeholder consultation and serves to assure a successful dissemination of the ENSPOL project outcomes and results to the targeted audience. For this purpose, a series of specific and concrete actions will be launched throughout the whole duration of the project. The objective of deliverable D7.1 ENSPOL Dissemination Strategy is to identify and organize the activities required to be performed in order to promote and disseminate the ENPSOL project results and ensure the effective engagement of national and EU level key stakeholders, through a series of specific actions. These actions will be elaborated by the project consortium so as the main outputs of all project results to be effectively disseminated. In addition to the dissemination approach that will be applied, this deliverable also provides the necessary guidance for an efficient dissemination strategy, while also offering the necessary templates for a professional awareness strategy. The dissemination strategy will be refined and communicated to all project partners. Corrective actions on this will be taken regularly in order to assure appropriate communication and targeted dissemination. Dissemination and exploitation activities will be carried out for discussion refinement and dissemination of the results from the case studies. The plan defines the targets and the activities carried out, with their timing and implementation details. In order to ensure the application of a successful dissemination plan that will diffuse information but also contribute to the team s reputation building, the detailed dissemination plan has been based on the replies of the following critical issues: D.7.1 ENSPOL Dissemination Strategy (1 st Version) Page 5
10 What is our action aiming to clarify? Who is or should be interested in the results? What are we hoping to achieve by disseminating this action? long term goals; shorter-term goals. Who will we target in our dissemination activities? Who can use our outcomes? (primary audience, secondary audience) This document, apart from the executive summary and the introduction, consists of five additional Sections, as follows: Section 2 sets the basis for the development of the dissemination strategy of ENSPOL to be outlined in the following Sections. Section 3 illustrates the strategy to be followed for the development, enhancement, finalisation and continuous maintenance of ENSPOL website and stakeholders platform. Section 4 is devoted to the major dissemination means that will be created and used by all Consortium partners. These include the project logo, press releases, leaflets and other dissemination material. Section 5 provides some organizational hints about the ENSPOL workshops and meetings that will be organized during the project s implementation. D.7.1 ENSPOL Dissemination Strategy (1 st Version) Page 6
11 2 ENSPOL DISSEMINATION STRATEGY The ENSPOL project is envisaged to be beneficial for various target groups that are either directly interested in the project or influenced by the project or can impact the project s success or are considered as stakeholders to the project. An initial mapping of the stakeholders has been done by the proposal phase of ENSPOL. Then an internal workshop has been held, back to back with the kick of meeting, to present the stakeholder mapping approach. Figure 1: Target groups Those stakeholders identified who have interest in the project outcomes, and therefore are prime dissemination targets, are policy makers, advisors and decision makers (management of utilities, TSOs, DSOs, Energy Supply industry, financial institutions etc. local and regional authorities, regulatory authorities etc.), ESCOs and business/ consumer associations. The objectives of dissemination to each target group and the message to be communicated are outlined in the following table: D.7.1 ENSPOL Dissemination Strategy (1 st Version) Page 7
12 Table 1: Dissemination Objectives for each Target Groups Target group Dissemination objectives Message Policy makers (EU and National level) and Regulatory authorities Energy supply (energy sales companies) Transmission System Operators (TSOs) and Distribution System Operators (DSOs) Regional and local authorities Industry Associations Financial Institutions Professionals and their associations Streamlining of market and regulatory frameworks Analysis of EEOs and alternative measures capacity, implementation and design Development of policy guidelines with regard to EEOs and alternative support schemes Facilitate policy dialogue at EU and National level Enhance understanding of EEOS and alternative measures and demonstrate different ways of exploiting/conforming with latter Introduce/Propose practices best Analysis of the effect of noneconomic barriers on EE investment decisions Avoid undue market distortions and excessive costs Enhance understanding on the potential benefits that their communities will gain from the implementation of EEOs and alternative schemes Consider EEOs schemes and alternative measures Increase awareness for the utilization of EEO schemes and alternative measures Develop new financial tools to finance EE projects and/or the means to deal with uncertain cash flow within EEO schemes Optimized policy instruments to further improve EE market penetration in all EU-27 MS Critical parameters for the effective and efficient application of EEOs and alternative EE support schemes Interactions of policy instruments Coordinated different approaches to EEOs and alternatives, in the framework of a harmonized European EE policy framework Policy recommendations and proposed actions to facilitate policy making into future formulations of EEO schemes Energy Efficiency Obligation schemes and alternative measures prospects and opportunities Stimulation of economic growth through an enhanced deployment of EEOs and alternative policies Demonstration of effectiveness of EEOs schemes in comparison to alternative policy measures Importance of the required enforcement context for support obligation schemes and alternative measures Benefits of efficient application of EEOs and alternative support schemes Tailor made EEO schemes and alternative policy instruments solutions for specific sectors D.7.1 ENSPOL Dissemination Strategy (1 st Version) Page 8
13 Associations of consumers / General public Increasing awareness raising on EEOs and alternative policy instruments Improve perception of EEOs schemes Increase willingness to pay Increase willingness to act Impact of the above on the improvement of community wellbeing and on global environment Awareness on costs and benefits of EEOs and other supporting measures In order to trigger the interest of an extensive range of target groups, a tailor made dissemination approach will be adopted (Figure 2). The relevant activities will be developed according to the following axes: who is the audience we want to reach; what is the message we want to communicate that is relevant for the audience we want to reach, and; what is the best/most efficient communication tool to reach that audience with that message (e.g. newsletter, , workshop, presentation in a relevant conference, etc). Figure 2: Tailor Made Dissemination Strategy D.7.1 ENSPOL Dissemination Strategy (1 st Version) Page 9
14 This highly diversified dissemination, as regards the various forms and mechanisms such as articles, workshops, events, website, stakeholders platform, policy briefs, conferences and dissemination material, is expected to address the various target groups of ENSPOL, by fully respecting their particularities (e.g. policy makers due to their limited time availability will find very useful the one-page targeted policy notes). More analytically, an overview of all the dissemination activities is presented in the following table: Table 2: Dissemination Activities No. Communication action When/ Where Target Groups addressed 1. Design of ENSPOL Logo Month 2 Stakeholders* and general public 2. Leaflets Month 6, 29 Stakeholders 3. Newsletters Month 6, 12, 18, 24, 30 Stakeholders 4. Articles and press releases Month 6 30 Stakeholders and general public 5. Social media tools 5.1 Upload information on collaborative projects (e.g. Wikipedia) 5.2 Social Networks (e.g. Creation of Group at LinkedIn, Twitter etc. ) - driving traffic to ENSPOL website, articles, workshops etc. 6. Interventions / announcements at international conferences / forums / events of on-going initiatives in the same area etc. organization of at least 2 side events at the occasion of conferences in EU etc. Month Month Month 1 to 30 Stakeholders and general public Stakeholders and general public Stakeholders 7. Articles of a Special Issue of a knowledgeable International Journal on the EEOs and alternative support policies Month 30 Stakeholders (managers, policy makers, planners, consultants, energy companies, academics etc.) 8. ENSPOL Policy Briefs (to be prepared by CRES and VITO respectively) Month 8, 18, and 30 Policy makers (EU and National level) D.7.1 ENSPOL Dissemination Strategy (1 st Version) Page 10
15 3 SHARING KNOWLEDGE VIA ENSPOL WEBSITE 3.1 ENSPOL Website The website development is of significant importance for the effective promotion of the project concept, results and stakeholder engagement. In this way, a website will be developed in parallel to the other WPs and it will be dedicated to the ENSPOL project activities providing information regarding meetings schedules, newsletters, etc. It is the intention of the consortium to keep the web site running and updated for at least two years after the project end. The website contains at a minimum (but not limited to) the following: Information about the project, including: Objectives, Organisation, Participants etc.; Project deliverables will be uploaded whenever ready and major improvements and additions of the web-site are planned on a regular basis, biannually. Information about the partners and links to their web pages. The website s address has been reserved and is the following: The initial website s architecture is structured along the following domains: Home The Action About ENSPOL Expected Results Objectives Organization Events News Library Members Area Useful Links Contact Site Map Kick off Meeting Capacity Building Workshops EU Observatory Workshops National Training Courses Regional Workshop Stakeholder Dialogues D.7.1 ENSPOL Dissemination Strategy (1 st Version) Page 11
16 Figure 3: ENSPOL Website Design The purpose of the project website is to provide access to project results at two levels: one public and one private (i.e. password protected) for project partners (Members Area) respectively. Visitors of the ENSPOL project website can view all the site material excluding the one hosted in the Members Area. Home domain welcomes visitors to the ENSPOL project and has a slideshow which will be enhanced with photos from ENSPOL s events. Moreover, it has the Newsletter Sign-Up section which provides the ability to register to receive newsletters. Moreover, links to the social media (LinkedIn, Twitter, Facebook, MyEuropa, RSS) are incorporated in the Home page. The Action domain includes all the information relating to ENSPOL project: The About ENSPOL page provides a small description of the project and its aims. The Expected Results page presents briefly the major outputs and expected results of ENSPOL. D.7.1 ENSPOL Dissemination Strategy (1 st Version) Page 12
17 The Objectives page includes ENSPOL scope and major specific objectives. The Organization domain includes the consortium information in the website, incorporates a list of partners, along with their country of origin, logo, principle scientific contact person and website address. At the Events page all relevant organization details of the project workshops can be uploaded, as well as photos from the events. The Events domain consists of webpages for each type of ENSPOL event, namely, Kick off Meeting, Capacity Building Workshops, EU Observatory Workshops, National Training Courses, Regional Workshop, Stakeholder Dialogues including all the informational material (agenda, presentations, photos). The News domain provides news and articles concerning the project, as well as newsletters produced by the ENSPOL project. In addition, announcement of the project workshops will take place through the particular domain. Other relative events at national and European level will be also announced. The Library page will constitute an information page including useful material such as ENSPOL policy briefs, related studies and other related publications. The Members Area section provides access to project partners including technical documents produced within each WP by the consortium stored and shared among the partners. Moreover, Members Area will include all the informational material from the project s Kick-Off Meeting and other meetings (agenda, minutes, presentations, etc.) as well as material relating to administrative issues. The Contact section is the basis of an online form that a user can fill with questions or remarks relevant to the ENSPOL activities. The Contact page includes also contact information about Project Coordinator, Dissemination Leader and Contact Person. A Useful Links webpage has been developed where useful and relevant links are presented. More particularly, the webpage has been recently enhanced with logos and links of relating initiatives with which ENSPOL has created synergies (Towards2030-dialogue, DIA- CORE, POLIMP, APRAISE, etc.). It is the intention of the consortium to keep the web site running for at least two years after the project end. D.7.1 ENSPOL Dissemination Strategy (1 st Version) Page 13
18 3.2 Stakeholders Web Platform Under the ENSPOL project an interactive web platform will be developed for sharing the valuable pieces of information, experience, knowledge and competence of key national and EU level stakeholders about the past experiences and current challenges of EEO schemes and alternative EE policy support measures. The stakeholders web platform will serve as a central repository of information and signpost to other relevant information, scientific research and websites. The platform will bring together all the knowledge relating to implementation of Article 7 in one place as well as disseminate reports, relevant projects deliverables, peer-reviewed papers summaries and articles in the electronic press to support the exchange of information. It is worth mentioning that each deliverable of the project will have a template, which the responsible partner will fill, producing in this way a mini document, in order to be easy for the guests of the ENSPOL web platform to read. This mini document will be also linked with the whole deliverable for a detailed reading. The work flow for the development of the platform consists of the following tasks: Assessment of stakeholders needs. Designing the information architecture of the web platform Development of the web platform Operation and maintenance of the platform The platform will be interactive and attractive and on the other hand easy to navigate and fast in providing information. The platform will be officially launched on July The operation includes regular uploads of information provided by project partners and all the other interactive and ad hoc materials. The platform will be continuously monitored for availability and reliability. Much of the content of the platform will be available to non-registered users. However anyone wishing to post content will be asked to sign-up and join as per other social networking areas enabling us to analyse and report on who is using it and why. Within the national trainings an introduction to the platform session could be included so that participating policy makers become easily familiar with its use. Interested parties will access the platform using any standard web browser on Internet access and will be specified D.7.1 ENSPOL Dissemination Strategy (1 st Version) Page 14
19 and linked with ENSPOL project website. Also the platform will be disseminated through all ENSPOL means. D.7.1 ENSPOL Dissemination Strategy (1 st Version) Page 15
20 4 ENSPOL DISSEMINATION MEANS In order to ensure the application of a successful dissemination plan that will diffuse information but also contribute to the recognition of all project deliverables, at the project start, a detailed development methodology of the plan for the implementation of information dissemination actions has been prepared and the main dissemination means are presented in the following chapters. 4.1 Project Logo An important action in order to establish the project s identity is to design a project logo, which will be associated and included in all documentation (paper or electronic) and publicity material relating to the project. The identity of the project is guaranteed by the project logo. To achieve this, a number of alternative project logos were created and examined with the aim of best representing the project scope in the simplest way. The official project logo was decided through an electronically voting procedure among the Consortium. The final choice was made with the following criteria: The logo should be self-representative; It should be printed and distinguished in high quality on a colour and greyscale format; It should be easily conceived; It should be memory grasping. The several alternative logos that have been prepared and discussed among the partners are presented in Annex A. In the following figure is illustrated the logo that was finally selected by the consortium. The final version of the selected logo is the result of several attempts to communicate the ENSPOL s goals and it has distributed to all consortium partners in high quality copies (Annex B Graphic Guidelines Handbook). Figure 4: Final Project Logo D.7.1 ENSPOL Dissemination Strategy (1 st Version) Page 16
21 4.2 ENSPOL Templates Templates for ENSPOL have been prepared for all the reports/deliverables and presentations. In addition, within dropbox folder Templates, there is an institutional presentation of ENSPOL project that could serve as the basis for relevant dissemination activities. This presentation is considered to be a prototype to be adapted by each partner according to the audience of each event, special targets, etc. 4.3 Leaflets ENPSOL has already produced a leaflet, for dissemination among stakeholders, in a number of early events, with an introduction to the project and contact information. It should be noted that additional leaflets will be designed and distributed before the project workshops with brief descriptions of project s progress and results. Figure 5: 1 st ENSPOL Leaflet D.7.1 ENSPOL Dissemination Strategy (1 st Version) Page 17
22 4.4 Newsletters A coloured Newsletter in English will be produced at 6-montly intervals within the project s duration for internal and external distribution to summarize all project advances. The newsletter is a custom mean for European projects to address a bigger audience both expert and non-expert and the general public. The first issue of ENSPOL Newsletter will introduce the project, the project s objectives, the consortium partners, providing contact points to obtain further information. The other newsletters will be used to provide updates on project progress, the project s results, potential impacts and benefits, support the projects activities and achievements, and encourage participation in forthcoming initiatives and events. These newsletters will be electronically distributed through a mailchip template and made available on the project website. The first issue of the ENSPOL Newsletter is expected to be published by the end of November The procedure for issuing the newsletter is the following: the editor (UPRC) will issue a draft table of contents for each newsletter which in turn will be communicated to partners, which will be asked to contribute to a specific content of the newsletter. Each partner will contribute with related scientific work shaping the main context of the newsletter. The contributors will send their articles/contributions to the editor in two weeks period. Then the editor will have another two weeks to compile the contributions and develop the final newsletter. The newsletters will be distributed on a wide scale to all identified target groups and concerned actors to ensure high visibility of the project progress. The newsletter shall be send to all registered members, who are interested in receiving the newsletter, via the mailing list through . This way the members can better keep up with the ENSPOL progress. Last but not least the newsletter will be available through the ENSPOL website to address the general public. 4.5 Articles and Press Releases A draft press release for the project will be created in English in order to present the ENSPOL concept to a larger audience through magazines or e-press. The press release comes out in different sizes to fit better in alternate means of press. It could also be translated in selected native languages of the partners within the Consortium and efforts will be provided in order D.7.1 ENSPOL Dissemination Strategy (1 st Version) Page 18
23 to be published at least once per participating country. It is expected that these press releases will raise public awareness about the project start, the project objectives, the project website, the ENSPOL activities and events, the project outcomes etc. Through these press releases information will be diffused and thoughts will be exchanged regarding the ENSPOL project to groups of stakeholders, several players strongly related to the energy efficiency sector as well as to all potential interested in the initiative parties but also will contribute to the reputation building of the project team. Press releases will be made when there is progress to report and will also be planned in conjunction with project events. The info of these releases will also be available on the stakeholders platform. Articles of a Special Issue of a knowledgeable International Journal on the EEOs and alternative support policies will also be published. 4.6 Social Media Tools Social Media has become a platform that is easily accessible to anyone with internet access. Increased communication for organizations fosters brand awareness. Additionally, social media serves as a relatively inexpensive platform for organizations to implement marketing campaigns and effectively disseminate outcomes and associated information. With the proliferation of niche sites and communities on the Internet, it s becoming increasingly important to target long tail search terms and cast a wide net. In this framework exploiting all the assets social media has to offer, while paying attention to the related risks could be truly beneficial in successfully disseminating ENSPOL scope, activities and outcomes. Some preliminary ideas include the use of social media networking and social media collaborative projects. Upload information on collaborative projects (e.g. Wikipedia) ENSPOL will gain wide access to the power of web publishing to non-technical users costeffectively, while Wikipedia users will drive traffic to ENSPOL website and platform, articles, workshops, etc. D.7.1 ENSPOL Dissemination Strategy (1 st Version) Page 19
24 Use Social Networks (e.g. LinkedIn, Twitter) Along these lines visibility of ENSPOL will be increased, while members of the consortium will improve their connectivity with stakeholders and enhance participation in stakeholders workshops. ENSPOL uses: Facebook ( Twitter ( LinkedIn ( ?home=&gid= &trk=anet_ug_hm) MyEuropa ( enspol-energy-saving-policies-and-energy-efficiency-obligation-schemel) Figure 6: ENSPOL Social Media Accounts D.7.1 ENSPOL Dissemination Strategy (1 st Version) Page 20
25 4.7 Interventions & Publications Based on ENSPOL outputs and the overall knowledge obtained, the consortium aims to make interventions in various events (conferences, workshops, information days, etc) at national, regional and international level. Furthermore, in order to ensure the quality of the project results from a scientific point of view a special issue will be published, in order to enhance the interest of policy makers, the academic community and professionals to the outputs of ENSPOL Interventions Presentation of the project s objectives and results in forthcoming events, forums and international conferences is considered essential. Main scope is to inform governmental, academic and other interested bodies and groups, to raise awareness of key energy market players regarding the ENSPOL progress and outcomes, to present and outline forthcoming events, to facilitate the exchange of information, as well as guidance towards the efficient implementation of the dissemination strategy and promoting the exploitation of the project s results. The consortium will identify possible conferences, workshops and other national or regional events that ENSPOL shall aim to be present. In addition, energy policy forums will also be identified, so as in the margin of these occasions the main points arising from the ENSPOL project to be presented. ENSPOL dissemination packs, containing information on the project outcomes and progress will be timely prepared and delivered during all the events, while targeted presentations will be conducted by the ENSPOL experts Publications A special issue of a knowledgeable International Journal will be published in order to strengthen the exchange of knowledge and experience and to ensure a better knowledge and understanding of the EEOs and alternative support policies. The aim of the special issue is to enhance the interest of policy makers, the academic community and professionals to the outputs of ENSPOL project. In addition, the ENSPOL consortium envisages a series of publications on technical topics, case studies and outcomes. All publications will contribute to the augmentation of the D.7.1 ENSPOL Dissemination Strategy (1 st Version) Page 21
26 scientific and interested community s interest to the outcomes of the ENSPOL project, while main content will involve the key outcomes of the overall procedure. Regarding publications all standard ethics shall be respected by the consortium partners (i.e. if project results are to be published all contributing partners to a specific component, have to agree and be acknowledged with regard to authorship, all scientific sources shall be properly cited etc.). Electronic copies of all project publications will be collected by UPRC. The contact person for this activity is Dr. Chara Karakosta, chakara@unipi.gr. 4.8 Policy Briefs Taking into account that a "hot topic" is addressed by this project, an important aspect of dissemination activities will be to facilitate policy dialogue at EU and National level. In this respect, SEI, with the assistance of CRES, JIN and AEA will write and compile policy briefs for formulating EEO schemes in specific country context, summarising the main outcomes of the project. Each policy brief will be available before the consultation workshops (WP2, WP3 and WP5), policy makers workshop (WP3) and the final conference (WP6) of the project and will be made available through the project webpage and all project dissemination means and channels to policy makers. Furthermore, in view of the Final Conference, a policy event at the European Parliament, will take place in order to communicate our key messages and results directly to the European decision makers. Given the unique standpoint of the European parliament members, their feedback will be particularly precious in order to fine-tune our recommendations on the needs and priorities of EU. D.7.1 ENSPOL Dissemination Strategy (1 st Version) Page 22
27 5 ENSPOL EVENTS 5.1 General Strategy of the Project s Events During the project s lifetime an extensive consultation with market operators at the national level will take place, for achieving the levels of buy-in required to reach the targets of Article 7. The idea behind the organization of various kinds of events is to ensure that the project outcomes are of immediate interest and match the needs of different stakeholder categories. The ENSPOL events will add to the interactive nature of the project by establishing an effective dialogue with the stakeholders from the initial stages and throughout the project duration. In the table below a list of the ENSPOL workshops/meetings is provided. Table 3: A List of all the Workshops/Meetings Communication action When/ Where Target Groups addressed ENSPOL Kick - off Meeting Month 1-1 Regional workshop Brussels (EU) (organized by AEA under WP3) Month 11/12 Stakeholders (emphasis to policy makers national), financing institutions, investors, associations, TSOs, regulators etc.) from member-countries aiming to implement an EEO (Austria, Belgium, Bulgaria, Greece, The Netherlands, Poland) 2 Capacity building workshops (national) in NL, GR, IT, PL, BE, UK, AU, and BG Month 17,23 Stakeholders (emphasis to policy makers, national authorities, regulators, governmental agencies etc.) D.7.1 ENSPOL Dissemination Strategy (1 st Version) Page 23
28 Communication action When/ Where Target Groups addressed 3 EU Observatory Workshops (Vienna and Brussels) Month 11/12,25,30 EC Stakeholders 3 National observatory meeting (one per year) in NL, GR, IT, PL, BE, UK, AU, and BG, held back to back with the capacity building workshops Month 17, 23, 27 Stakeholders (emphasis to national authorities, regulators, financing institutions, investors, energy companies etc.) from MS 10 Training courses for policy makers and other stakeholder participants nationally in all ENSPOL participating countries. Month 27 Stakeholders (emphasis to policy makers, national authorities, regulators, governmental agencies etc.) Policy event (audition) at the European Parliament (organized by VITO) Month 30 Policy makers Final Conference in Brussels (to be the ultimate dissemination and communication event) (organized by VITO) Month 30 Stakeholders (emphasis to policy makers (EC, National), financing institutions, investors, associations, TSOs, regulators etc.) 5.2 Kick - Off Meeting Since April 2014, when the project officially started, the first initial dissemination activities and events have already taken place. Starting with the Kick-Off Meeting (14-15 April 2014 in Brussels, Belgium), the partners of the project set the framework of the implementation strategy so as the best results to be achieved. Main objective of the kick-off meeting was to streamline and coordinate work among project partners towards meeting with the overall aim of the project, which is to support Member States (MS) who intend to set up new EEO schemes, and also facilitate (MS) countries with existing EEO schemes to improve it, learning from and building on existing experiences. To this end, a stakeholder engagement training workshop was held during the second day of D.7.1 ENSPOL Dissemination Strategy (1 st Version) Page 24
29 the kick-off meeting by project partner EST, presenting the stakeholder mapping approach and ensuring project partners understand the role and importance of the national stakeholder engagement plans. The agenda and list of participants can be found in Annex C and Annex D, respectively. Figure 7: ENSPOL Kick off Meeting 5.3 Regional workshop in Brussels A one day workshop with country representatives will be organized in Brussels (month 11 or 12) back to back with the 1 st EU Observatory Workshop. The total number of participants will not exceed 30 people. The following issues will be tackled: What considerations lead to the choice of a certain implementation option in different MS? What criteria were used? What are the main barriers to the implementation of EEOs and alternatives? What are the key methodological and policy design features adopted to comply with art 7 EED? What could be done to overcome these barriers? The results of this workshop will contribute to a better understanding of the barriers to introducing an EEO and of alternatives that are available to MS. D.7.1 ENSPOL Dissemination Strategy (1 st Version) Page 25
30 5.4 Capacity Building Workshops Those workshops deal with the enhancement of the capacity of MS to either explore the possibilities of implementing an EEO scheme or gather practical information regarding EEO mechanism, compare the EEO with alternatives by answering questions, raise stakeholders awareness, knowledge and skills for an effective implementation of Article 7. Regarding more experienced MS, The workshops may fine tune existing policy by learning from other countries or enhance the capacity in implementing the scheme, administering it and explore synergies with other policies. Capacity building workshops will take place in the 8 out of 10 countries (NL, GR, IT, PL, BE, UK, AU, BG) of ESPOL, the first and second year of the project. 5.5 EU Observatory Workshops The complexity and variety of EEO schemes suggest the need to create a European Observatory to facilitate the dialogue with policy makers and stakeholders in order to ensure an effective exchange of ideas and experiences for the duration of the project. There will be 3 official meetings of the European Observatory with accompanying actions and on-going dialogue maintained outside of the meetings via the web based stakeholder platform. Every meeting will be focused on a particular topic within the EEO framework and will be preceded by national surveys aimed at collecting data, issues and questions in order to target the discussion and make it practical and useful. The 1 st EU Observatory Workshop will most probably and the Regional Workshop will be held back to back with the CA EED Committee meeting taking place in February/March 2015 in Brussels. 5.6 National Observatory Meetings ENSPOL will organise three national meetings (or bilateral dialogues) one per year, in all participating countries, in which to discuss national EEO or alternative policy implementation issues, opportunities of improvement, statistics and market data, monitoring of EEO effects, etc., together with accompanying measures. It is essential that both, the leader stakeholders in the sector and the best in practical implementation of EE schemes in in market sector, will participate in the meetings. D.7.1 ENSPOL Dissemination Strategy (1 st Version) Page 26
31 The first and second National Observatory meeting will be held back to back with the relative capacity building workshops. The third one will be held with the national training course. 5.7 Training Courses Ten (10) national training courses will be developed. Each training course will provide policy makers and other stakeholders participants with detailed information on how the available schemes work, on the main experiences in Europe, on the different design strategies, and on the opportunity to choose among tradable white certificates or simple obligations or other incentive schemes. The training course will provide substantial support to policy makers in deciding the best design for their country, as well as in acquiring a better knowledge on the effects of some design criteria adopted in other MS. The attendants will not exceed the number of 20 and will be selected policy makers and stakeholders. The specific needs for every MS will be established through a dedicated survey and the results will be used to define the training course programme and structure. 5.8 Policy Event In view of the Final Conference, a Policy Event (audition) will be organized by VITO in order to communicate our key messages and results directly to the European decision makers. Given the unique standpoint of the European parliament members, their feedback will be particularly precious in order to fine-tune our recommendations on the needs and priorities of the European Union. Preferably this event will take place at the European Parliament in the form of an audition of a selected group of researchers of the consortium. Therefore MEPs of the Committee on Industry, Research and Energy (ITRE) will be contacted via the project partners of the countries they reside in. The idea of the event will be proposed and assayed with these MEPs in order to create a platform. If an event in the European Parliament is not feasible an alternative will be created by a separate workshop for politicians at the premises of the Final Conference. The date of the Final Conference is then preferably aligned with the Meetings Schedule of the ITRE Committee. VITO will organize the programme and logistics for this policy event. D.7.1 ENSPOL Dissemination Strategy (1 st Version) Page 27
32 5.9 Final Conference The ultimate dissemination event of ENPOL will be a Final Conference to be organized in Brussels during the last month of the project. Summarizing the whole project, this full-day conference will present the key results and discuss them with top-level keynote speakers and high level stakeholders identified within WP4 and will be aimed to spread the project results. The conference will be organized by VITO. To ensure a large number of attendees and a high level program, the event will build on the ENSPOL outputs and the overall knowledge of the project team and will rely on the experienced personnel of VITO who will undertake the timely organization and implementation of all required tasks: i) set-up of a conference board which includes key partners of the ENSPOL project. The board gives advice about and follows up on a regular basis the content and the organisation of the conference. VITO will be the driving force of this board; ii) elaboration of a conference programme; iii) identification of invited speakers and experts; iv) announcement of the conference and dissemination of the conference s programme; v) organization of all the logistics required for the implementation of the conference; vi) preparation and distribution of the Conference Proceedings. Each partner will advertise the event at a national scale and suggest which stakeholders from their country will be invited to attend (number of attendants per partner will be decided in consultation with the project officer). A key stakeholders panel will be organized in the end of the Conference, so as to provide an overall assessment as regards to what extent support schemes can help Europe achieve its EE targets in a cost effective and mutual beneficial way, to discuss implications at local, national and regional level and finally to provide recommendations for further action in order to ensure the sustainability of the project. D.7.1 ENSPOL Dissemination Strategy (1 st Version) Page 28
33 Annex A - ENSPOL Alternative Logos D.7.1 ENSPOL Dissemination Strategy (1 st Version) Page 29
34 Annex B - Graphic Guidelines Handbook D.7.1 ENSPOL Dissemination Strategy (1 st Version) Page 30
35 D.7.1 ENSPOL Dissemination Strategy (1 st Version) Page 31
36 D.7.1 ENSPOL Dissemination Strategy (1 st Version) Page 32
37 Annex C - ENSPOL Kick off Meeting - Agenda D.7.1 ENSPOL Dissemination Strategy (1 st Version) Page 33
38 D.7.1 ENSPOL Dissemination Strategy (1 st Version) Page 34
39 Annex D ENSPOL Kick off Meeting - List of Participants D.7.1 ENSPOL Dissemination Strategy (1 st Version) Page 35
WP 2: Project Quality Assurance. Quality Manual
Ask Dad and/or Mum Parents as Key Facilitators: an Inclusive Approach to Sexual and Relationship Education on the Home Environment WP 2: Project Quality Assurance Quality Manual Country: Denmark Author:
More informationD.10.7 Dissemination Conference - Conference Minutes
Project No. 540346-LLP-1-2013-1-GR-LEONARDO-LNW D.10.7 Dissemination Conference - Conference Minutes Effective Writers & Communicators Project September 2015 This project has been funded with support from
More informationPROJECT PERIODIC REPORT
D1.3: 2 nd Annual Report Project Number: 212879 Reporting period: 1/11/2008-31/10/2009 PROJECT PERIODIC REPORT Grant Agreement number: 212879 Project acronym: EURORIS-NET Project title: European Research
More informationCouncil of the European Union Brussels, 4 November 2015 (OR. en)
Council of the European Union Brussels, 4 November 2015 (OR. en) 13631/15 NOTE From: To: General Secretariat of the Council JEUN 96 EDUC 285 SOC 633 EMPL 416 CULT 73 SAN 356 Permanent Representatives Committee/Council
More informationInTraServ. Dissemination Plan INFORMATION SOCIETY TECHNOLOGIES (IST) PROGRAMME. Intelligent Training Service for Management Training in SMEs
INFORMATION SOCIETY TECHNOLOGIES (IST) PROGRAMME InTraServ Intelligent Training Service for Management Training in SMEs Deliverable DL 9 Dissemination Plan Prepared for the European Commission under Contract
More informationNavitas UK Holdings Ltd Embedded College Review for Educational Oversight by the Quality Assurance Agency for Higher Education
Navitas UK Holdings Ltd Embedded College Review for Educational Oversight by the Quality Assurance Agency for Higher Education February 2014 Annex: Birmingham City University International College Introduction
More informationBaku Regional Seminar in a nutshell
Baku Regional Seminar in a nutshell STRUCTURED DIALOGUE: THE PROCESS 1 BAKU REGIONAL SEMINAR: PURPOSE & PARTICIPANTS 2 CONTENTS AND STRUCTURE OF DISCUSSIONS 2 HOW TO GET PREPARED FOR AN ACTIVE PARTICIPATION
More informationWHAT IS AEGEE? AEGEE-EUROPE PRESENTATION EUROPEAN STUDENTS FORUM
WHAT IS AEGEE? AEGEE-EUROPE PRESENTATION EUROPEAN STUDENTS FORUM 1) What is AEGEE? 2) AEGEE s Identity 3) AEGEE s History 4) How we work 5) AEGEE s Impact CONTENT 6) Supporters and Memberships in Platforms
More informationHigher Education Review (Embedded Colleges) of Navitas UK Holdings Ltd. Hertfordshire International College
Higher Education Review (Embedded Colleges) of Navitas UK Holdings Ltd April 2016 Contents About this review... 1 Key findings... 2 QAA's judgements about... 2 Good practice... 2 Theme: Digital Literacies...
More informationEvaluation Report Output 01: Best practices analysis and exhibition
Evaluation Report Output 01: Best practices analysis and exhibition Report: SEN Employment Links Output 01: Best practices analysis and exhibition The report describes the progress of work and outcomes
More informationFACULTY OF PSYCHOLOGY
FACULTY OF PSYCHOLOGY STRATEGY 2016 2022 // UNIVERSITY OF BERGEN STRATEGY 2016 2022 FACULTY OF PSYCHOLOGY 3 STRATEGY 2016 2022 (Adopted by the Faculty Board on 15 June 2016) The Faculty of Psychology has
More informationEuropean Higher Education in a Global Setting. A Strategy for the External Dimension of the Bologna Process. 1. Introduction
European Higher Education in a Global Setting. A Strategy for the External Dimension of the Bologna Process. 1. Introduction The Bologna Declaration (1999) sets out the objective of increasing the international
More informationNational and Regional performance and accountability: State of the Nation/Region Program Costa Rica.
National and Regional performance and accountability: State of the Nation/Region Program Costa Rica. Miguel Gutierrez Saxe. 1 The State of the Nation Report: a method to learn and think about a country.
More informationSOCRATES PROGRAMME GUIDELINES FOR APPLICANTS
SOCRATES PROGRAMME GUIDELINES FOR APPLICANTS The present document contains a description of the financial support available under all parts of the Community action programme in the field of education,
More informationContents. (1) Activities Units of learning outcomes and expert interviews... 2
Contents (1) Activities... 2 Units of learning outcomes and expert interviews... 2 Allocation of ECVET-points and assessment of learning outcomes... 2 Meeting of EASYMetal advisory committee... 2 Meeting
More informationDICE - Final Report. Project Information Project Acronym DICE Project Title
DICE - Final Report Project Information Project Acronym DICE Project Title Digital Communication Enhancement Start Date November 2011 End Date July 2012 Lead Institution London School of Economics and
More informationPROJECT DESCRIPTION SLAM
PROJECT DESCRIPTION SLAM STUDENT LEADERSHIP ADVANCEMENT MOBILITY 1 Introduction The SLAM project, or Student Leadership Advancement Mobility project, started as collaboration between ENAS (European Network
More informationH2020 Marie Skłodowska Curie Innovative Training Networks Informal guidelines for the Mid-Term Meeting
H2020 Marie Skłodowska Curie Innovative Training Networks Informal guidelines for the Mid-Term Meeting These guidelines are not an official document of the Research Executive Agency services. June 2016
More informationCOMMISSION OF THE EUROPEAN COMMUNITIES RECOMMENDATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL
EN EN EN COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 9.4.2008 COM(2008) 180 final 2008/0070 (COD) RECOMMENDATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL on the establishment of the European
More informationEOSC Governance Development Forum 4 May 2017 Per Öster
EOSC Governance Development Forum 4 May 2017 Per Öster per.oster@csc.fi Governance Development Forum Enable stakeholders to contribute to the governance development A platform for information, dialogue,
More informationCEN/ISSS ecat Workshop
ISSS/WS-eCAT/02/001Rev. CEN/ISSS ecat Workshop Business Plan (v.10) Source: ISSS Secretariat and TermNet Status: Approved Date: 4 December 2002 1 1) Title of the proposed Workshop Multilingual Catalogue
More informationInterview on Quality Education
Interview on Quality Education President European University Association (EUA) Ultimately, education is what should allow students to grow, learn, further develop, and fully play their role as active citizens
More informationStakeholder Engagement and Communication Plan (SECP)
Stakeholder Engagement and Communication Plan (SECP) Summary box REVIEW TITLE 3ie GRANT CODE AUTHORS (specify review team members who have completed this form) FOCAL POINT (specify primary contact for
More informationCOMMUNICATION STRATEGY FOR THE IMPLEMENTATION OF THE SYSTEM OF ENVIRONMENTAL ECONOMIC ACCOUNTING. Version: 14 November 2017
1 COMMUNICATION STRATEGY FOR THE IMPLEMENTATION OF THE SYSTEM OF ENVIRONMENTAL ECONOMIC ACCOUNTING Version: 14 November 2017 2 1. Introduction The objective of this communication strategy is to increase
More informationb) Allegation means information in any form forwarded to a Dean relating to possible Misconduct in Scholarly Activity.
University Policy University Procedure Instructions/Forms Integrity in Scholarly Activity Policy Classification Research Approval Authority General Faculties Council Implementation Authority Provost and
More informationEUROPEAN UNIVERSITIES LOOKING FORWARD WITH CONFIDENCE PRAGUE DECLARATION 2009
EUROPEAN UNIVERSITIES LOOKING FORWARD WITH CONFIDENCE PRAGUE DECLARATION 2009 Copyright 2009 by the European University Association All rights reserved. This information may be freely used and copied for
More informationSchool Inspection in Hesse/Germany
Hessisches Kultusministerium School Inspection in Hesse/Germany Contents 1. Introduction...2 2. School inspection as a Procedure for Quality Assurance and Quality Enhancement...2 3. The Hessian framework
More informationInterim Review of the Public Engagement with Research Catalysts Programme 2012 to 2015
Interim Review of the Public Engagement with Research Catalysts Programme 2012 to 2015 A report for Research Councils UK March 2016 FULL REPORT Report author: Ruth Townsley, Independent Researcher Summary
More informationehealth Governance Initiative: Joint Action JA-EHGov & Thematic Network SEHGovIA DELIVERABLE Version: 2.4 Date:
ehealth Governance Initiative: Joint Action JA-EHGov & Thematic Network SEHGovIA DELIVERABLE JA D4.1.1 Strategy & Policy Alignment Documents I WP4 (JA) - Policy Development and Strategy Alignment Version:
More informationImproving the impact of development projects in Sub-Saharan Africa through increased UK/Brazil cooperation and partnerships Held in Brasilia
Image: Brett Jordan Report Improving the impact of development projects in Sub-Saharan Africa through increased UK/Brazil cooperation and partnerships Thursday 17 Friday 18 November 2016 WP1492 Held in
More informationA European inventory on validation of non-formal and informal learning
A European inventory on validation of non-formal and informal learning Finland By Anne-Mari Nevala (ECOTEC Research and Consulting) ECOTEC Research & Consulting Limited Priestley House 12-26 Albert Street
More informationGuidelines for the Use of the Continuing Education Unit (CEU)
Guidelines for the Use of the Continuing Education Unit (CEU) The UNC Policy Manual The essential educational mission of the University is augmented through a broad range of activities generally categorized
More informationKnowledge Sharing Workshop, Tiel The Netherlands, 20 September 2016
Knowledge Sharing Workshop, Tiel The Netherlands, 20 September 2016 General Overview On 20 September 2016, the FORTRESS 1 consortium together with six other EU projects (INTACT 2, PREDICT 3, SECTOR 4,
More informationNavigating in a sea of risks: MARISCO, a conservation planning method used in risk robust and ecosystem based adaptation strategies
Navigating in a sea of risks: MARISCO, a conservation planning method used in risk robust and ecosystem based adaptation strategies CC & Nature Conservation in Europe 25-27 June 2013, Bonn/Germany Stefan
More informationReferencing the Danish Qualifications Framework for Lifelong Learning to the European Qualifications Framework
Referencing the Danish Qualifications for Lifelong Learning to the European Qualifications Referencing the Danish Qualifications for Lifelong Learning to the European Qualifications 2011 Referencing the
More informationto Club Development Guide.
Club Development Guide Welcome to the Welsh Triathlon Introduction to Club Development Guide. With the continued growth and popularity of Triathlon we wish to support your club and volunteers to ensure
More informationIndividual Interdisciplinary Doctoral Program Faculty/Student HANDBOOK
Individual Interdisciplinary Doctoral Program at Washington State University 2017-2018 Faculty/Student HANDBOOK Revised August 2017 For information on the Individual Interdisciplinary Doctoral Program
More informationHigher education is becoming a major driver of economic competitiveness
Executive Summary Higher education is becoming a major driver of economic competitiveness in an increasingly knowledge-driven global economy. The imperative for countries to improve employment skills calls
More informationAUTHORITATIVE SOURCES ADULT AND COMMUNITY LEARNING LEARNING PROGRAMMES
AUTHORITATIVE SOURCES ADULT AND COMMUNITY LEARNING LEARNING PROGRAMMES AUGUST 2001 Contents Sources 2 The White Paper Learning to Succeed 3 The Learning and Skills Council Prospectus 5 Post-16 Funding
More informationProgramme Specification. MSc in International Real Estate
Programme Specification MSc in International Real Estate IRE GUIDE OCTOBER 2014 ROYAL AGRICULTURAL UNIVERSITY, CIRENCESTER PROGRAMME SPECIFICATION MSc International Real Estate NB The information contained
More informationEXPO MILANO CALL Best Sustainable Development Practices for Food Security
EXPO MILANO 2015 CALL Best Sustainable Development Practices for Food Security Prospectus Online Application Form Storytelling has played a fundamental role in the transmission of knowledge since ancient
More informationLIFELONG LEARNING PROGRAMME ERASMUS Academic Network
SOCRATES THEMATIC NETWORK AQUACULTURE, FISHERIES AND AQUATIC RESOURCE MANAGEMENT 2008-11 LIFELONG LEARNING PROGRAMME ERASMUS Academic Network Minutes of the WP 1 Core Group Meeting (year 2) May 31 st June
More informationGeneral rules and guidelines for the PhD programme at the University of Copenhagen Adopted 3 November 2014
General rules and guidelines for the PhD programme at the University of Copenhagen Adopted 3 November 2014 Contents 1. Introduction 2 1.1 General rules 2 1.2 Objective and scope 2 1.3 Organisation of the
More informationPartnership Agreement
Bestyrelsesmøde nr. 41, 15. september 2009 Pkt. 07 Bilag 1.2. Draft August 21, 2009 Partnership Agreement Between Graduate University of Chinese Academy of Sciences (GUCAS) and University of Copenhagen
More informationDRAFT - Meeting Agenda Schwerin 13 th of Novembre till 14 th of Novembre 2014
DRAFT - Meeting Agenda Schwerin 13 th of Novembre till 14 th of Novembre 2014 PROJECT STAY IN PROJECT NUMBER LLP-LDV-TOI-13-AT-0010 Location of accommodation: All partners are hosted at the InterCity Hotel
More informationChapter 2. University Committee Structure
Chapter 2 University Structure 2. UNIVERSITY COMMITTEE STRUCTURE This chapter provides details of the membership and terms of reference of Senate, the University s senior academic committee, and its Standing
More informationPROJECT RELEASE: Towards achieving Self REgulated LEArning as a core in teachers' In-SErvice training in Cyprus
PROJECT RELEASE: Towards achieving Self REgulated LEArning as a core in teachers' In-SErvice training in Cyprus Presentation made by Frosoula Patsalidou, researcher, University of Cyprus and Prof. Mary
More informationHigher Education Review (Embedded Colleges) of Kaplan International Colleges UK Ltd
Higher Education Review (Embedded Colleges) of Kaplan International Colleges UK Ltd June 2016 Contents About this review... 1 Key findings... 2 QAA's judgements about Kaplan International Colleges UK Ltd...
More informationGOING GLOBAL 2018 SUBMITTING A PROPOSAL
GOING GLOBAL 2018 SUBMITTING A PROPOSAL Going Global provides an open forum for world education leaders those in the noncompulsory education sector with decision making responsibilities to debate issues
More informationQuality in University Lifelong Learning (ULLL) and the Bologna process
Quality in University Lifelong Learning (ULLL) and the Bologna process The workshop will critique various quality models and tools as a result of EU LLL policy, such as consideration of the European Standards
More informationEPA RESOURCE KIT: EPA RESEARCH Report Series No. 131 BRIDGING THE GAP BETWEEN SCIENCE AND POLICY
EPA RESOURCE KIT: BRIDGING THE GAP BETWEEN SCIENCE AND POLICY Resource 1 BRIDGE: Tools for science-policy communication EPA RESEARCH Report Series No. 131 Developed by Professor Anna Davies Dr. Joanne
More informationCollege of Business University of South Florida St. Petersburg Governance Document As Amended by the College Faculty on February 10, 2014
College of Business University of South Florida St. Petersburg Governance Document As Amended by the College Faculty on February 10, 2014 Administrative Structure for Academic Policy Purpose: The administrative
More informationThe IDN Variant Issues Project: A Study of Issues Related to the Delegation of IDN Variant TLDs. 20 April 2011
The IDN Variant Issues Project: A Study of Issues Related to the Delegation of IDN Variant TLDs 20 April 2011 Project Proposal updated based on comments received during the Public Comment period held from
More informationProgram Change Proposal:
Program Change Proposal: Provided to Faculty in the following affected units: Department of Management Department of Marketing School of Allied Health 1 Department of Kinesiology 2 Department of Animal
More informatione-portfolios in Australian education and training 2008 National Symposium Report
e-portfolios in Australian education and training 2008 National Symposium Report Contents Understanding e-portfolios: Education.au National Symposium 2 Summary of key issues 2 e-portfolios 2 e-portfolio
More informationState Parental Involvement Plan
A Toolkit for Title I Parental Involvement Section 3 Tools Page 41 Tool 3.1: State Parental Involvement Plan Description This tool serves as an example of one SEA s plan for supporting LEAs and schools
More informationSummary BEACON Project IST-FP
BEACON Brazilian European Consortium for DTT Services www.beacon-dtt.com Project reference: IST-045313 Contract type: Specific Targeted Research Project Start date: 1/1/2007 End date: 31/03/2010 Project
More informationTHE QUEEN S SCHOOL Whole School Pay Policy
The Queen s Church of England Primary School Encouraging every child to reach their full potential, nurtured and supported in a Christian community which lives by the values of Love, Compassion and Respect.
More informationAudit Documentation. This redrafted SSA 230 supersedes the SSA of the same title in April 2008.
SINGAPORE STANDARD ON AUDITING SSA 230 Audit Documentation This redrafted SSA 230 supersedes the SSA of the same title in April 2008. This SSA has been updated in January 2010 following a clarity consistency
More informationA GENERIC SPLIT PROCESS MODEL FOR ASSET MANAGEMENT DECISION-MAKING
A GENERIC SPLIT PROCESS MODEL FOR ASSET MANAGEMENT DECISION-MAKING Yong Sun, a * Colin Fidge b and Lin Ma a a CRC for Integrated Engineering Asset Management, School of Engineering Systems, Queensland
More informationEarly Warning System Implementation Guide
Linking Research and Resources for Better High Schools betterhighschools.org September 2010 Early Warning System Implementation Guide For use with the National High School Center s Early Warning System
More information06-07 th September 2012, Constanta Romania th Sept 2012
Cerintele actuale pentru pregatirea specialistilor din industria alimentara din Europa si strategii pentru viitorul acestei cariere - rezultate ale proiectului european fp7 Track Fast Training Requirements
More informationSpecial Educational Needs Policy (including Disability)
Special Educational Needs Policy (including Disability) To be reviewed annually Chair of Governors, Lyn Schlich Signed January 2017 East Preston Infant School SPECIAL EDUCATION NEEDS [SEN] POLICY CONTENTS
More informationEUROPEAN COMMISSION DG RTD
EUROPEAN COMMISSION DG RTD SEVENTH FRAMEWORK PROGRAMME THEME 7 TRANSPORT - SST SST.2007.4.1.2: Human physical and behavioral components GA No. 218740 COVER Coordination of Vehicle and Road Safety Initiatives,
More informationThe Referencing of the Irish National Framework of Qualifications to EQF
The Referencing of the Irish National Framework of Qualifications to EQF National Qualifications Frameworks in an International perspective Brussels 30 November 2009 Dr Jim Murray National Qualifications
More informationEuropean Cooperation in the field of Scientific and Technical Research - COST - Brussels, 24 May 2013 COST 024/13
European Cooperation in the field of Scientific and Technical Research - COST - Brussels, 24 May 2013 COST 024/13 MEMORANDUM OF UNDERSTANDING Subject : Memorandum of Understanding for the implementation
More informationGUIDE TO EVALUATING DISTANCE EDUCATION AND CORRESPONDENCE EDUCATION
GUIDE TO EVALUATING DISTANCE EDUCATION AND CORRESPONDENCE EDUCATION A Publication of the Accrediting Commission For Community and Junior Colleges Western Association of Schools and Colleges For use in
More informationTailoring i EW-MFA (Economy-Wide Material Flow Accounting/Analysis) information and indicators
Tailoring i EW-MFA (Economy-Wide Material Flow Accounting/Analysis) information and indicators to developing Asia: increasing research capacity and stimulating policy demand for resource productivity Chika
More informationDavidson College Library Strategic Plan
Davidson College Library Strategic Plan 2016-2020 1 Introduction The Davidson College Library s Statement of Purpose (Appendix A) identifies three broad categories by which the library - the staff, the
More informationThis Access Agreement is for only, to align with the WPSA and in light of the Browne Review.
University of Essex Access Agreement 2011-12 The University of Essex Access Agreement has been updated in October 2010 to include new tuition fee and bursary provision for 2011 entry and account for the
More informationUniversity of Toronto
University of Toronto OFFICE OF THE VICE PRESIDENT AND PROVOST 1. Introduction A Framework for Graduate Expansion 2004-05 to 2009-10 In May, 2000, Governing Council Approved a document entitled Framework
More information2 ND BASIC IRRS TRAINING COURSE
2 ND BASIC IRRS TRAINING COURSE INTERNATIONAL ATOMIC ENERGY AGENCY VIENNA, 6-9 OCTOBER 2014 INFORMATION BROCHURE 1 Basic IRRS Training (BIT) Table of Contents I. GENERAL INFORMATION... 2 II. AGENDA OF
More informationEUROPEAN COMMISSION SEVENTH FRAMEWORK PROGRAMME THEME SME Research for benefits of SME Association
EUROPEAN COMMISSION SEVENTH FRAMEWORK PROGRAMME THEME SME-2011-2 Research for benefits of SME Association GA No. 286830 Classification of retreated truck tyres in order to comply with future environmental
More informationECE-492 SENIOR ADVANCED DESIGN PROJECT
ECE-492 SENIOR ADVANCED DESIGN PROJECT Meeting #3 1 ECE-492 Meeting#3 Q1: Who is not on a team? Q2: Which students/teams still did not select a topic? 2 ENGINEERING DESIGN You have studied a great deal
More informationEXEM ECVET Profile for the European Expert in Energy Management
ECVET Profile for the European Expert in Energy Management Project number 539327-LLP-1-2013-1-IT-LEONARDO-LMP Kick-off meeting Florence 14-15 November 2013 Project # 539327 LLP-1-2013-1- IT-LEONARDO-LMP
More informationIntellectual Property
Intellectual Property Section: Chapter: Date Updated: IV: Research and Sponsored Projects 4 December 7, 2012 Policies governing intellectual property related to or arising from employment with The University
More information5 Early years providers
5 Early years providers What this chapter covers This chapter explains the action early years providers should take to meet their duties in relation to identifying and supporting all children with special
More informationLeadership Guide. Homeowner Association Community Forestry Stewardship Project. Natural Resource Stewardship Workshop
Homeowner Association Community Forestry Stewardship Project Advancing Advocacy and Best Management Practices Through Training and Education Leadership Guide Natural Resource Stewardship Workshop This
More informationWELCOME WEBBASED E-LEARNING FOR SME AND CRAFTSMEN OF MODERN EUROPE
WELCOME WEBBASED E-LEARNING FOR SME AND CRAFTSMEN OF MODERN EUROPE Authors Helena Bijnens, EuroPACE ivzw, Belgium, Johannes De Gruyter, EuroPACE ivzw, Belgium, Ilse Op de Beeck, EuroPACE ivzw, Belgium,
More informationSelf Assessment. InTech Collegiate High School. Jason Stanger, Director 1787 Research Park Way North Logan, UT
Jason Stanger, Director 1787 Research Park Way North Logan, UT 84341-5600 Document Generated On June 13, 2016 TABLE OF CONTENTS Introduction 1 Standard 1: Purpose and Direction 2 Standard 2: Governance
More informationEQE Candidate Support Project (CSP) Frequently Asked Questions - National Offices
EQE Candidate Support Project (CSP) Frequently Asked Questions - National Offices What is the EQE Candidate Support Project (CSP)? What is the distribution of Professional Representatives within EPC member
More informationMarie Skłodowska-Curie Actions in H2020
Marie Skłodowska-Curie Actions in H2020 Paris 23 May 2014 Oscar Barreiro Research Executive Agency European Commission Date: in 12 pts Horizon 2020 Why a People programme? Industry? Academia? Who produces
More informationCharacteristics of Collaborative Network Models. ed. by Line Gry Knudsen
SUCCESS PILOT PROJECT WP1 June 2006 Characteristics of Collaborative Network Models. ed. by Line Gry Knudsen All rights reserved the by author June 2008 Department of Management, Politics and Philosophy,
More informationGREAT Britain: Film Brief
GREAT Britain: Film Brief Prepared by Rachel Newton, British Council, 26th April 2012. Overview and aims As part of the UK government s GREAT campaign, Education UK has received funding to promote the
More informationUniversity of Toronto
University of Toronto OFFICE OF THE VICE PRESIDENT AND PROVOST Governance and Administration of Extra-Departmental Units Interdisciplinarity Committee Working Group Report Following approval by Governing
More informationCambridge NATIONALS. Creative imedia Level 1/2. UNIT R081 - Pre-Production Skills DELIVERY GUIDE
Cambridge NATIONALS Creative imedia Level 1/2 UNIT R081 - Pre-Production Skills VERSION 1 APRIL 2013 INDEX Introduction Page 3 Unit R081 - Pre-Production Skills Page 4 Learning Outcome 1 - Understand the
More informationPosition Statements. Index of Association Position Statements
ts Association position statements address key issues for Pre-K-12 education and describe the shared beliefs that direct united action by boards of education/conseil scolaire fransaskois and their Association.
More informationPolitics and Society Curriculum Specification
Leaving Certificate Politics and Society Curriculum Specification Ordinary and Higher Level 1 September 2015 2 Contents Senior cycle 5 The experience of senior cycle 6 Politics and Society 9 Introduction
More informationNovember 17, 2017 ARIZONA STATE UNIVERSITY. ADDENDUM 3 RFP Digital Integrated Enrollment Support for Students
November 17, 2017 ARIZONA STATE UNIVERSITY ADDENDUM 3 RFP 331801 Digital Integrated Enrollment Support for Students Please note the following answers to questions that were asked prior to the deadline
More informationFRESNO COUNTY INTELLIGENT TRANSPORTATION SYSTEMS (ITS) PLAN UPDATE
FRESNO COUNTY INTELLIGENT TRANSPORTATION SYSTEMS (ITS) PLAN UPDATE DELIVERABLE NO. 1 PROJECT PLAN FRESNO COUNTY, CALIFORNIA Prepared for Fresno Council of Governments 2035 Tulare Street, Suite 201 Fresno,
More informationThe recognition, evaluation and accreditation of European Postgraduate Programmes.
1 The recognition, evaluation and accreditation of European Postgraduate Programmes. Sue Lawrence and Nol Reverda Introduction The validation of awards and courses within higher education has traditionally,
More informationGALICIAN TEACHERS PERCEPTIONS ON THE USABILITY AND USEFULNESS OF THE ODS PORTAL
The Fifth International Conference on e-learning (elearning-2014), 22-23 September 2014, Belgrade, Serbia GALICIAN TEACHERS PERCEPTIONS ON THE USABILITY AND USEFULNESS OF THE ODS PORTAL SONIA VALLADARES-RODRIGUEZ
More informationCourse Specification Executive MBA via e-learning (MBUSP)
LEEDS BECKETT UNIVERSITY Course Specification Executive MBA via e-learning 2017-18 (MBUSP) www.leedsbeckett.ac.uk Course Specification Executive MBA via e-learning Faculty: School: Faculty of Business
More informationEducation and Training Committee, 19 November Standards of conduct, performance and ethics communications plan
Education and Training Committee, 19 November 2015 Standards of conduct, performance and ethics communications plan Executive summary and recommendations Introduction At its meeting in September 2015,
More informationStudy on the implementation and development of an ECVET system for apprenticeship
Study on the implementation and development of an ECVET system for apprenticeship Thomas Reglin Gabriele Fietz Forschungsinstitut Betriebliche Bildung (f-bb) ggmbh Nuremberg Isabelle Le Mouillour BIBB,
More informationRuggiero, V. R. (2015). The art of thinking: A guide to critical and creative thought (11th ed.). New York, NY: Longman.
BSL 4080, Creative Thinking and Problem Solving Course Syllabus Course Description An in-depth study of creative thinking and problem solving techniques that are essential for organizational leaders. Causal,
More informationProgramme Specification. BSc (Hons) RURAL LAND MANAGEMENT
Programme Specification BSc (Hons) RURAL LAND MANAGEMENT D GUIDE SEPTEMBER 2016 ROYAL AGRICULTURAL UNIVERSITY, CIRENCESTER PROGRAMME SPECIFICATION BSc (Hons) RURAL LAND MANAGEMENT NB The information contained
More informationSME Academia cooperation in research projects in Research for the Benefit of SMEs within FP7 Capacities programme
SME Academia cooperation in research projects in Research for the Benefit of SMEs within FP7 Capacities programme European Commission Research and Innovation DG Aim of the study Background of the study
More informationDate Re Our ref Attachment Direct dial nr 2 februari 2017 Discussion Paper PH
IAASB Attn. Prof. Arnold Schilder, RA Chairman 529 Fifth Avenue, 6th Floor New York, New York 10017 USA Submitted via website Date Re Our ref Attachment Direct dial nr 2 februari 2017 Discussion Paper
More informationThe European Higher Education Area in 2012:
PRESS BRIEFING The European Higher Education Area in 2012: Bologna Process Implementation Report EURYDI CE CONTEXT The Bologna Process Implementation Report is the result of a joint effort by Eurostat,
More information