1 American International Journal of Social Science Vol. 4, No. 6; December 2015 Does The Scrum Methodology Always Work? Eðvald Möller The School of Business University of Iceland Abstract In a traditional project management methodology, the whole process of project is organised from the beginning to the end. Goal, scope, cost and time schedules, risk and project closure are usually defined, as an example. When working on a project for software companies, part of the work is creative and the scope of the project and its closure are not, therefore, always predictable at the beginning of the project. The goal can be clear at the beginning but, as the project progresses, the process may change with regard to the customer swishes. Therefore, a traditional project management methodology may not always be suitable. The Scrum methodology is based upon the agile ideology and is popular in projects that focus on software development because it acknowledges the importance of the human factor and that the skill of those involved in the project is crucial to the project s success. The Scrum methodology needs the cooperation of those involved in the project. The main objective of this article is to introduce the conclusion of a study conducted in 2014, to examine if the Scrum methodology could make it easier for Icelandic companies to have better control over projects. Keywords: Scrum, Agile, traditional project management, processes, sprint, Scrum master, Scrum team Research methodology Many projects are set up where the final product or service is not defined at the beginning but progresses over time. This happens in an environment where fast changes can happen in a project and the direction of the project might change rapidly while working on it. In this kind of environment, there is much need of flexibility and a quick response. More often than not, in software and product development, the final product is not always known, therefore the more traditional project management methods are not always the most suitable. A large part of the data and references were retrieved from a qualitative study conducted with selected individuals and organisations. Qualitative research is a method that provides descriptive data in the participants own words and behaviours (Bogdan and Taylor, 1998).In his book, Interviews, Steinar Kvale (1996) describes the purpose of qualitative research interviews is to collect information and obtain description of the participant s world view. He states that an interview is a conversation between two people and their common interest. He considers it a special form of human interaction, in which knowledge evolves and moves between the participants in the conversation. The selection of participants was in accordance with their interest in, and involvement with, the Scrum methodology. Our long interviews were conducted with seven participants within six companies which have a thorough knowledge of Scrum, either as professionals or users within the companies that had applied the methodology. The author believed this method was the best way to reach those who had the most knowledge of, and interest in, the subject. What is Scrum? Introduction Scrum was developed in 1986 by Hirotaka Takeuchi and Nonaka Ikujiro, as they wanted to find a new way of increasing speed and flexibility in the production process of a new product. They compared this new method to a rugby game, in which the team tries to reach the end of the pitch by passing the ball between them so that the whole team moves steadily up the pitch, working together for the desired goal. Members of the team are responsible for their own work but there is a strong emphasis on team commitment rather than on the results of one player (Larson and Gray, 2014). The Scrum methodology is now based on another methodology, called Agile. In February 2001, 17 people met in the Wasatch Mountains in Utah. They all worked as software developers and were all pioneers in their field. 62

2 ISSN (Print), (Online) Center for Promoting Ideas, USA Their common goal was to develop a new methodology to manage projects that required flexibility. The group reached an agreement on a new strategy, called Agile. The group agreed on the following guidelines: We seek better ways to develop software by constantly improving it and helping others uses the method. With this work we have come to appreciate: Individuals and interactions over processes and tools working software over comprehensive documentation Customer collaboration over contract negotiation responding to change over following a plan. That is, while there is value in the items on the right, we value the items on the left more. In addition, therewere 12 principleslistedfor softwaredevelopment (Beck et al., 2001). The Method/Methodology The methodology has evolved greatly and enjoyed great popularity within high-tech and software development projects because it is easy to learn and understand. However, when new innovations are introduced, such as this methodology, it may take some time to learn them and implement them into the culture of the company. In addition, the methodology is still young and does not have a strong theoretical foundation; the majority of its development has taken place inside companies not in the academic environment. The methodology is therefore not thoroughly defined and has thus taken on various forms but this does not change the fact that it is very popular (Conboy, 2009). Group that operates according to the Scrum methodology will base its work on short sprints, where the aim is to deliver a usable product or service, or finish a certain part of a project with each sprint. At the end of the sprint, the product is reviewed in terms of its capabilities and then new goals are made for the next sprint, until the project is completed and the product is delivered to the customer (Rising and Janoff, 2000). It is said that predictability is the main difference between traditional project management and Scrum. Traditional project management is predictable and organised from the beginning until expected adjustments are needed in the project. Scrum, on the other hand, is unconventional project management, where unpredictable events are expected in the work process. At the beginning of the project, a task list or wish list is made and then certain product backlog items are selected that are important to develop from the start. Scrum-controlled projects are then continuously reviewed and improved during the work process (James, 2014; Larson and Gray, 2014). Process and Roles Scrum methodology is based on three key roles or characters: Project Owner or Project Manager, Scrum Master and group members, i.e., participants with other expertise that are involved in the project. The owner of the project is called the Product Manager. The role of the owner is to communicate the customer s requirements to the Scrum team, and they need to carry out a robust analysis of the customer s needs so the results will be in accordance with their wishes. The owner of the project makes a list and logs everything that needs to be done, sometimes called user stories. That list describes exactly what will be done and why. The owner presents the project to the project team and helps to make a plan for each sprint; this is an important part of the process and each sprint can last from one to four weeks (Figure1). Figure1. Scrum sprints At the beginning of each sprint, the owner and the team go over the products that need to be delivered at the end of each sprint and, when all participants have agreed upon the product list, it cannot be edited. When the sprint has started, the owner of the project cannot change their mind, they cannot change when the process has started in each sprint. At the end of each sprint, a meeting takes place where the team presents the product to the owner and other appropriate individuals. 63

3 American International Journal of Social Science Vol. 4, No. 6; December 2015 The owner agrees whether the task has been satisfactorily completed or not and meeting is then held regarding possible improvements to the product and possible changes by the owner (James, 2014). The role of the Scrum Master is comparable to a project manager. They are not the manager of the team; rather they help the team to control itself. The Scrum Master is typically part of the team, works in the team and is responsible for ensuring that the team follows the Scrum methodology. They are the main contact person for the owner of the project and assist the team to create a work schedule, organise daily meetings and plan each sprint. One of their roles is to take care of the team, make sure communications flow, and see that everyone works well together, knows their part in the project, shows responsibility, and has a clear vision of the project. The Scrum Master has to resolve disputes that may arise without warning and hold daily Scrum meetings. The meetings usually start at the beginning of the day, short and coordinated, lasting about 15 minutes, and held in a circle in front of the project board. The team goes through a list of questions and each member of the team is asked to answer the following questions: What have you done since the last Scrum meeting? What will you do after this meeting until our next meeting? Have any problems arisen that are delaying your part in the project? The Scrum Master can therefore pay attention to the progress of the project but the aim of the meeting is to enable all the team members in the project to respond to any obstacles (Beck et al., 2001). The Scrum methodology uses a project white board to plan each sprint so it is possible to have an overview of the sprint in question, in a simple and convenient way. The team can see how each work phase is progressing in each sprint in the project. The project white board is usually divided into three columns: work to do, work in progress and work completed. Work phases (user stories) are written on Post-it notes with the name of the team member who is working on it. In this way, team members obtain a good overview of how the work phase is progressing within sprints and gain satisfaction when assignments move between columns (Ionel, 2009). The requirements may change if appropriate, and stakeholders are asked to give their opinions on the project. Afterwards a meeting is scheduled where possible improvements to or changes in the product are discussed and changes in the needs of the owners. The meeting is primarily an opportunity to review and assess whether the project meets the requirements of the customer and assess whether the demands and parts of the project are re-evaluated. Before each new sprint starts, a meeting is held to review lessons learned from the last sprint, what went well and what could have been done better. Each team member outlines those activities they think is crucial for the next sprint or project. If a change is decided upon, then they are brought up in the next sprint meeting for process and implementation. In each project, there is a record of the product and the sprints; the owner keeps the records of the product and the development team keeps the records of the sprints (Rising and Janoff, 2000; Cervone, 2011; Larson and Gray, 2014). The progress of the sprint or the project is, more often than not, shown by a graph that illustrates show much work is complete and how much work is left to do (Figure 2). In this way, the Scrum Master can estimate the completion date by examining the performance of the team and making it possible for all the members to see their performance and success. The graph informs the team whether it is on schedule or not (Schwaber, 2004). The Customer 64 Figure2: Burndown chart At the beginning of the project, the customer decides upon the requirements and defines what the final product should be.

4 ISSN (Print), (Online) Center for Promoting Ideas, USA The project is carried outto meet these requirements and, as a result, it is important that communications with the customer between sprints are effective,to make the right decisions in the project s processes. If changes are necessary for the customer, the product owner has the option to change features and prioritiesat the end of each sprint, if desired.the methodology forbids communications taking place by and insists that meetings with the customer are formal, documented and filed. As a result, meetings with stakeholders are coordinated in a way that explains anomalies (if they exist) and theprogress made since the last sprint. Only in this waywill the product improve, when all participants that have an interest in the product strive to achieve a common goal and benefit from its success. It can be concluded thata customer s involvement with the owner and theteam is the main prerequisite for a successful project, where the customer describes in detail what they have in mind and what they want to achieve; in other words, customer input shapes priority-setting activities. Items that are important to the customer have the highest priority(rising and Janoff, 2000; Cervone, 2011). Goal Setting The main difference between goal setting with Scrum and with a traditional project management method is that, with Scrum, everyone in the project is well-informed about the project s objectives and each sprint makes this crucial (Nicholls et al., 2015). It is important to obtain exact details about what the customer wants to achieve with the project and it does not matter if traditional project management method is used or not (Möller, 2014). Usually, it is the project manager who has complete overview of the project s objectives and passes tasks to others to develop at the beginning of the project. However, the Scrum methodology is not considered as following a traditional goal-setting process but is based on the actual progress of the sprints. Consequently, the aim of the project is continually evolving. When every sprint finishes the process is evaluated and next steps are planned (Wang, 2013). Planning The team works toward a plan, in cooperation with the owner of the project. The Scrum methodology estimates the cost and time schedule between sprints and these schedules change as the project progresses. Later in the project, and when certain stages have been reached in the development of the product, the requirements of the project may change and this can directly impact the schedule. The techniques that are used for planning are based first and foremost on the knowledge and the experience of the working team, and on meetings where elements of the project are discussed, and cost and time schedules are made for each work phase. This in the spirit of a traditional work schedule and a main project plan should be in place before the project starts. The work regarding the project plan starts with the owner of the project describing the work phases for the team and the team will then create the project plan. Each work phase is then discussed in groups and questions are answered if necessary. When the group has reached a shared vision, the work of the project plan starts and each and every member of the team estimates from their perspective how long and how complicated each phase will be. Each member will then write down their estimates but does not show it to the other team members. When everyone has written down their estimation the notes are all viewed together and, if there is a difference of opinion, each estimate is examined in more detail. If team members greatly disagree, they are asked to explain in more detail why they estimated the work phase in particular way. When a conclusion has been reached the team members review the work phase again and discuss it until they have reached a consensus. It is believed that this method increases the likelihood that all team members have the same view of the project, are aware of the scope and cost, and aim for a common goal(heikkilä et al., 2015; Rising and Janoff, 2000). It is said that one of the biggest advantages of this method is that there is no need to make plans for the whole project in detail or even know all the phases of the project at the start. It has been suggested that this methodology is actually closer to reality than traditional project management planning and estimations (Nicholls et al., 2015). So far, the emphasis for Scrum has been on software projects. In these projects, the aim may change quickly and requirements need to be reviewed regularly during the work phase, primarily because there is tremendously rapid development taking place in the software market. The biggest difference between Scrum and traditional project management is that, with Scrum, the project is composed of many small phases, each worked on for a short time, which makes it easier for the continual review of the project. Each phase has to be completed before taking on the next unit; as a result it is possible to make the necessary changes in a timely manner instead of using traditional project management where each phase is worked simultaneously and changes are difficult to make since the work has already begun (Cervone, 2011). 65

5 American International Journal of Social Science Vol. 4, No. 6; December 2015 Findings and discussion The main objective of this article is to present the results of a study carried out to examine whether the Scrum methodology could help Icelandic companies gain a better control of projects. Judging by the answers from the participants, they all agree that this methodology is here to stay. The method works well as an in house tool, the method is used within and between departments in a company where cost requirement is not the prime issue. When discussing this with representatives of service and software companies, they all agreed that this method was the best way to connect with their customers. A software house was very satisfied with the use of the methodology in the partnership with their customer. Customers got the solution they wanted; however, some of them said that the solutions they received were good but considerably more expensive than they had anticipated at the start. After the project had started, there was no point of return, the cost increased and it would have been too expensive to cancel the project. Those who used the Scrum methodology agreed that they would never build their own house with a contractor who used Scrumfor project planning because it would be too expensive and the additional cost for small modifications would rocket. Participants believe that Scrum is an ideal method for projects which can be solved with a team of four to 10. The method has become very popular in the software sector and it has come to light that it fosters innovation and allows project to be developed during the process. Most agreed that it could be difficult to follow the time and cost schedules that are set up in the beginning, since they can change in the process of the project and between sprints, but the methodology is said to give the best product to the customer, even a product that they perhaps did not even think they wanted or needed. The question is whether the cost of development and the final product will always be in accordance with expectations in all situations. The answer is no, but the participants commented that the customer is satisfied. The Scrum methodology owes its success also to the customers who participate in the production process, which ensures that the product meets their demands and needs. However, it is clear that the customer must be willing to pay for the product. When participants were asked about the cost exceeding the budget they did not want to mention any figures except when it came to projects within their own companies. Projects which were prepared using the Scrum methodology were often 20% to 60% over budget and products were often more expensive. Several participants said that the only way to reduce uncertainty was to use traditional project management with the planning of the project, setting up time and cost schedules and milestones where the sprints would occur. In this way, they had considerably more success since they and the customer would be more aware of the time and cost. As one participant noted, there are no blank cheques. The success of the Scrum methodology is mainly due to the customer being involved in the process from the beginning to end, which ensures that the product or service provided meets the needs and requirements of the customer. It is therefore necessary that each project is well organised, efficient and effective in utilising the available resources in each case as much as possible. The participants agreed that customers could be more active in the process from the beginning and would have a full understanding of what the final product should be, which is what the Scrum methodology requires(cervone, 2011). It was stated by participants that they did not give themselves enough time to analyse the scope of the project in the beginning but that it evolved with time. When discussing the problems with the Scrum methodology they stated that the level of uncertainty was high and it was difficult to establish accurate time and cost schedules. Nevertheless, they agreed that the methodology had many benefits since the speed of projects was often highland increased flexibility was needed between sprints. It was stated that the sprints increased transparency in the project and improved the potential of seeing the delays ahead and responding in advance, accordingly. The participants indicated that the sprints could easily go off course if there was a lack of discipline and consistency but, with the right training, the only way to build up consistency within the company is with the support of the management. The author believes that this methodology is suitable for entire projects within companies, such as sales and marketing, change management and lean management. This list, however, could go on and on, assuming that all stakeholders can meet regularly and use the Scrum methodology. With regards to meetings, constant reviews of the project and improvements; it is possible to say that the methodology is appropriate for all kinds of projects, except for simple, short-term projects. The author suggests that Icelandic companies look into this methodology so it may become a part of their culture. 66

6 ISSN (Print), (Online) Center for Promoting Ideas, USA References Bogdan, R. C. and Taylor, S. J. (1998). Introduction to qualitative research methods: A guidebook and resource (3rd edn). New York: John Wiley & Sons. Beck, K.., Beedle, M., Bennekum, A.V., Cockburn, A., Cunningham, W., and Fowler (2001). Manifesto for Agile software development. Cervone, H. F. (2011). Understanding Agile project management methods using Scrum. OCLC Systems & Services, 27(1), Conboy, K. (2009). Agility from first principles: Reconstructing the concept of agility in information systems development. Information Systems Research, 20(3), Heikkilä, V.T., Paasivaara, M., Rautiainen, K., Lassenius, C., Toivola, T., and Järvinen, J. (2015).Operational release planning in large-scale Scrum with multiple stakeholders - A longitudinal case study at F-Secure Corporation. Inf. Softw. Technol. 57, 116. Ionel, N. (2009). Agile software development methodologies: An overview of the current state of research. Annals of Faculty of Economics, 4(1), 381. James, M. (2014).Scrum reference card. Kvale, S. (1996).Inter Views: An introduction to qualitative research interviewing. Thousand Oaks, CA: Sage. Larson, E. W. and Gray, C. F. (2014).Project management. New York, NY: McGraw-Hill. Möller,E. (2014). Verkefnastjórnunogverkfærið MS Project. Garðabær: DHB. Nicholls, G.M., Lewis, N.A., and Eschenbach, T. (2015).Determining when simplified agile project management is right for small teams.eng. Manag. J.27, Rising, L. and Janoff, N.S. (2000).The Scrum software development process for small teams. IEEE Softw. 17, Schwaber, K. (2004). Agile project management with Scrum. Redmond: Microsoft Press. Wang, G. (2013, 16 September). Manage objectives, actions, and uncertainty in Scrum. 67

The Role of Architecture in a Scaled Agile Organization - A Case Study in the Insurance Industry

The Role of Architecture in a Scaled Agile Organization - A Case Study in the Insurance Industry Master s Thesis for the Attainment of the Degree Master of Science at the TUM School of Management of the Technische Universität München The Role of Architecture in a Scaled Agile Organization - A Case

More information

Deploying Agile Practices in Organizations: A Case Study

Deploying Agile Practices in Organizations: A Case Study Copyright: EuroSPI 2005, Will be presented at 9-11 November, Budapest, Hungary Deploying Agile Practices in Organizations: A Case Study Minna Pikkarainen 1, Outi Salo 1, and Jari Still 2 1 VTT Technical

More information

IT4305: Rapid Software Development Part 2: Structured Question Paper

IT4305: Rapid Software Development Part 2: Structured Question Paper UNIVERSITY OF COLOMBO, SRI LANKA UNIVERSITY OF COLOMBO SCHOOL OF COMPUTING DEGREE OF BACHELOR OF INFORMATION TECHNOLOGY (EXTERNAL) Academic Year 2014/2015 2 nd Year Examination Semester 4 IT4305: Rapid

More information

It's Not Just Standing Up: Patterns for Daily Stand-up Meetings

It's Not Just Standing Up: Patterns for Daily Stand-up Meetings It's Not Just Standing Up: Patterns for Daily Stand-up Meetings Jason Yip, ThoughtWorks, Inc. jcyip@thoughtworks.com Introduction The daily stand-up meeting is simple to describe: the whole team meets

More information

A Model to Detect Problems on Scrum-based Software Development Projects

A Model to Detect Problems on Scrum-based Software Development Projects A Model to Detect Problems on Scrum-based Software Development Projects ABSTRACT There is a high rate of software development projects that fails. Whenever problems can be detected ahead of time, software

More information

Process improvement, The Agile Way! By Ben Linders Published in Methods and Tools, winter

Process improvement, The Agile Way! By Ben Linders Published in Methods and Tools, winter Process improvement, The Agile Way! By Ben Linders Published in Methods and Tools, winter 2010. http://www.methodsandtools.com/ Summary Business needs for process improvement projects are changing. Organizations

More information

10.2. Behavior models

10.2. Behavior models User behavior research 10.2. Behavior models Overview Why do users seek information? How do they seek information? How do they search for information? How do they use libraries? These questions are addressed

More information

Field Experience Management 2011 Training Guides

Field Experience Management 2011 Training Guides Field Experience Management 2011 Training Guides Page 1 of 40 Contents Introduction... 3 Helpful Resources Available on the LiveText Conference Visitors Pass... 3 Overview... 5 Development Model for FEM...

More information

Research Proposal: Making sense of Sense-Making: Literature review and potential applications for Academic Libraries. Angela D.

Research Proposal: Making sense of Sense-Making: Literature review and potential applications for Academic Libraries. Angela D. Research Proposal: Making Sense of Sense-Making 1 Running Head: Research Proposal: Making Sense of Sense-Making Research Proposal: Making sense of Sense-Making: Literature review and potential applications

More information

The open source development model has unique characteristics that make it in some

The open source development model has unique characteristics that make it in some Is the Development Model Right for Your Organization? A roadmap to open source adoption by Ibrahim Haddad The open source development model has unique characteristics that make it in some instances a superior

More information

An Introduction to Simio for Beginners

An Introduction to Simio for Beginners An Introduction to Simio for Beginners C. Dennis Pegden, Ph.D. This white paper is intended to introduce Simio to a user new to simulation. It is intended for the manufacturing engineer, hospital quality

More information

Measurement & Analysis in the Real World

Measurement & Analysis in the Real World Measurement & Analysis in the Real World Tools for Cleaning Messy Data Will Hayes SEI Robert Stoddard SEI Rhonda Brown SEI Software Solutions Conference 2015 November 16 18, 2015 Copyright 2015 Carnegie

More information

Planning a research project

Planning a research project Planning a research project Gelling L (2015) Planning a research project. Nursing Standard. 29, 28, 44-48. Date of submission: February 4 2014; date of acceptance: October 23 2014. Abstract The planning

More information

Chamilo 2.0: A Second Generation Open Source E-learning and Collaboration Platform

Chamilo 2.0: A Second Generation Open Source E-learning and Collaboration Platform Chamilo 2.0: A Second Generation Open Source E-learning and Collaboration Platform doi:10.3991/ijac.v3i3.1364 Jean-Marie Maes University College Ghent, Ghent, Belgium Abstract Dokeos used to be one of

More information

Executive Guide to Simulation for Health

Executive Guide to Simulation for Health Executive Guide to Simulation for Health Simulation is used by Healthcare and Human Service organizations across the World to improve their systems of care and reduce costs. Simulation offers evidence

More information

A Study of Metacognitive Awareness of Non-English Majors in L2 Listening

A Study of Metacognitive Awareness of Non-English Majors in L2 Listening ISSN 1798-4769 Journal of Language Teaching and Research, Vol. 4, No. 3, pp. 504-510, May 2013 Manufactured in Finland. doi:10.4304/jltr.4.3.504-510 A Study of Metacognitive Awareness of Non-English Majors

More information

From Scrum to Kanban: Introducing Lean Principles to a Software Engineering Capstone Course

From Scrum to Kanban: Introducing Lean Principles to a Software Engineering Capstone Course From Scrum to Kanban: Introducing Lean Principles to a Software Engineering Capstone Course VILJAN MAHNIČ Faculty of Computer and Information Science, University of Ljubljana, Večna pot 113, 1000 Ljubljana,

More information

Qualification handbook

Qualification handbook Qualification handbook BIIAB Level 3 Award in 601/5960/1 Version 1 April 2015 Table of Contents 1. About the BIIAB Level 3 Award in... 1 2. About this pack... 2 3. BIIAB Customer Service... 2 4. What are

More information

A pilot study on the impact of an online writing tool used by first year science students

A pilot study on the impact of an online writing tool used by first year science students A pilot study on the impact of an online writing tool used by first year science students Osu Lilje, Virginia Breen, Alison Lewis and Aida Yalcin, School of Biological Sciences, The University of Sydney,

More information

Show and Tell Persuasion

Show and Tell Persuasion Communication Teacher Vol. 18, No. 1, January 2004, pp. 28 30 Show and Tell Persuasion Virgil R. Miller Objective: To engage in the process of formulating compelling persuasive arguments Type of speech:

More information

Group Assignment: Software Evaluation Model. Team BinJack Adam Binet Aaron Jackson

Group Assignment: Software Evaluation Model. Team BinJack Adam Binet Aaron Jackson Group Assignment: Software Evaluation Model Team BinJack Adam Binet Aaron Jackson Education 531 Assessment of Software and Information Technology Applications Submitted to: David Lloyd Cape Breton University

More information

Triple P Ontario Network Peaks and Valleys of Implementation HFCC Feb. 4, 2016

Triple P Ontario Network Peaks and Valleys of Implementation HFCC Feb. 4, 2016 Triple P Ontario Network Peaks and Valleys of Implementation HFCC Feb. 4, 2016 WHO WE ARE. Triple P Ontario Network - multi-sectoral - voluntary - 10 years + Halton Region - York Region and Simcoe County

More information

Red Flags of Conflict

Red Flags of Conflict CONFLICT MANAGEMENT Introduction Webster s Dictionary defines conflict as a battle, contest of opposing forces, discord, antagonism existing between primitive desires, instincts and moral, religious, or

More information

PROPOSED MERGER - RESPONSE TO PUBLIC CONSULTATION

PROPOSED MERGER - RESPONSE TO PUBLIC CONSULTATION PROPOSED MERGER - RESPONSE TO PUBLIC CONSULTATION Paston Sixth Form College and City College Norwich Vision for the future of outstanding Post-16 Education in North East Norfolk Date of Issue: 22 September

More information

Short inspection of Maria Fidelis Roman Catholic Convent School FCJ

Short inspection of Maria Fidelis Roman Catholic Convent School FCJ Ofsted Piccadilly Gate Store Street Manchester M1 2WD T 0300 123 4234 www.gov.uk/ofsted 23 December 2016 Mrs Helen Gill Headteacher Maria Fidelis Roman Catholic Convent School FCJ 34 Phoenix Road London

More information

Five Challenges for the Collaborative Classroom and How to Solve Them

Five Challenges for the Collaborative Classroom and How to Solve Them An white paper sponsored by ELMO Five Challenges for the Collaborative Classroom and How to Solve Them CONTENTS 2 Why Create a Collaborative Classroom? 3 Key Challenges to Digital Collaboration 5 How Huddle

More information

What is PDE? Research Report. Paul Nichols

What is PDE? Research Report. Paul Nichols What is PDE? Research Report Paul Nichols December 2013 WHAT IS PDE? 1 About Pearson Everything we do at Pearson grows out of a clear mission: to help people make progress in their lives through personalized

More information

Different Requirements Gathering Techniques and Issues. Javaria Mushtaq

Different Requirements Gathering Techniques and Issues. Javaria Mushtaq 835 Different Requirements Gathering Techniques and Issues Javaria Mushtaq Abstract- Project management is now becoming a very important part of our software industries. To handle projects with success

More information

Title: Improving information retrieval with dialogue mapping and concept mapping

Title: Improving information retrieval with dialogue mapping and concept mapping Title: Improving information retrieval with dialogue mapping and concept mapping tools Training university teachers to use a new method and integrate information searching exercises into their own instruction

More information

Team Dispersal. Some shaping ideas

Team Dispersal. Some shaping ideas Team Dispersal Some shaping ideas The storyline is how distributed teams can be a liability or an asset or anything in between. It isn t simply a case of neutralizing the down side Nick Clare, January

More information

Internship Department. Sigma + Internship. Supervisor Internship Guide

Internship Department. Sigma + Internship. Supervisor Internship Guide Internship Department Sigma + Internship Supervisor Internship Guide April 2016 Content The place of an internship in the university curriculum... 3 Various Tasks Expected in an Internship... 3 Competencies

More information

Effectiveness of Electronic Dictionary in College Students English Learning

Effectiveness of Electronic Dictionary in College Students English Learning 2016 International Conference on Mechanical, Control, Electric, Mechatronics, Information and Computer (MCEMIC 2016) ISBN: 978-1-60595-352-6 Effectiveness of Electronic Dictionary in College Students English

More information

Ministry of Education, Republic of Palau Executive Summary

Ministry of Education, Republic of Palau Executive Summary Ministry of Education, Republic of Palau Executive Summary Student Consultant, Jasmine Han Community Partner, Edwel Ongrung I. Background Information The Ministry of Education is one of the eight ministries

More information

Motivation to e-learn within organizational settings: What is it and how could it be measured?

Motivation to e-learn within organizational settings: What is it and how could it be measured? Motivation to e-learn within organizational settings: What is it and how could it be measured? Maria Alexandra Rentroia-Bonito and Joaquim Armando Pires Jorge Departamento de Engenharia Informática Instituto

More information

WORK OF LEADERS GROUP REPORT

WORK OF LEADERS GROUP REPORT WORK OF LEADERS GROUP REPORT ASSESSMENT TO ACTION. Sample Report (9 People) Thursday, February 0, 016 This report is provided by: Your Company 13 Main Street Smithtown, MN 531 www.yourcompany.com INTRODUCTION

More information

P. Belsis, C. Sgouropoulou, K. Sfikas, G. Pantziou, C. Skourlas, J. Varnas

P. Belsis, C. Sgouropoulou, K. Sfikas, G. Pantziou, C. Skourlas, J. Varnas Exploiting Distance Learning Methods and Multimediaenhanced instructional content to support IT Curricula in Greek Technological Educational Institutes P. Belsis, C. Sgouropoulou, K. Sfikas, G. Pantziou,

More information

Carolina Course Evaluation Item Bank Last Revised Fall 2009

Carolina Course Evaluation Item Bank Last Revised Fall 2009 Carolina Course Evaluation Item Bank Last Revised Fall 2009 Items Appearing on the Standard Carolina Course Evaluation Instrument Core Items Instructor and Course Characteristics Results are intended for

More information

Outreach Connect User Manual

Outreach Connect User Manual Outreach Connect A Product of CAA Software, Inc. Outreach Connect User Manual Church Growth Strategies Through Sunday School, Care Groups, & Outreach Involving Members, Guests, & Prospects PREPARED FOR:

More information

CONCEPT MAPS AS A DEVICE FOR LEARNING DATABASE CONCEPTS

CONCEPT MAPS AS A DEVICE FOR LEARNING DATABASE CONCEPTS CONCEPT MAPS AS A DEVICE FOR LEARNING DATABASE CONCEPTS Pirjo Moen Department of Computer Science P.O. Box 68 FI-00014 University of Helsinki pirjo.moen@cs.helsinki.fi http://www.cs.helsinki.fi/pirjo.moen

More information

Case study Norway case 1

Case study Norway case 1 Case study Norway case 1 School : B (primary school) Theme: Science microorganisms Dates of lessons: March 26-27 th 2015 Age of students: 10-11 (grade 5) Data sources: Pre- and post-interview with 1 teacher

More information

Paper 2. Mathematics test. Calculator allowed. First name. Last name. School KEY STAGE TIER

Paper 2. Mathematics test. Calculator allowed. First name. Last name. School KEY STAGE TIER 259574_P2 5-7_KS3_Ma.qxd 1/4/04 4:14 PM Page 1 Ma KEY STAGE 3 TIER 5 7 2004 Mathematics test Paper 2 Calculator allowed Please read this page, but do not open your booklet until your teacher tells you

More information

Mike Cohn - background

Mike Cohn - background Agile Estimating and Planning Mike Cohn August 5, 2008 1 Mike Cohn - background 2 Scrum 24 hours Sprint goal Return Return Cancel Gift Coupons wrap Gift Cancel wrap Product backlog Sprint backlog Coupons

More information

Geo Risk Scan Getting grips on geotechnical risks

Geo Risk Scan Getting grips on geotechnical risks Geo Risk Scan Getting grips on geotechnical risks T.J. Bles & M.Th. van Staveren Deltares, Delft, the Netherlands P.P.T. Litjens & P.M.C.B.M. Cools Rijkswaterstaat Competence Center for Infrastructure,

More information

Book Review: Build Lean: Transforming construction using Lean Thinking by Adrian Terry & Stuart Smith

Book Review: Build Lean: Transforming construction using Lean Thinking by Adrian Terry & Stuart Smith Howell, Greg (2011) Book Review: Build Lean: Transforming construction using Lean Thinking by Adrian Terry & Stuart Smith. Lean Construction Journal 2011 pp 3-8 Book Review: Build Lean: Transforming construction

More information

Study Group Handbook

Study Group Handbook Study Group Handbook Table of Contents Starting out... 2 Publicizing the benefits of collaborative work.... 2 Planning ahead... 4 Creating a comfortable, cohesive, and trusting environment.... 4 Setting

More information

A TRAINING COURSE FUNDED UNDER THE TCP BUDGET OF THE YOUTH IN ACTION PROGRAMME FROM 2009 TO 2013 THE POWER OF 6 TESTIMONIES OF STRONG OUTCOMES

A TRAINING COURSE FUNDED UNDER THE TCP BUDGET OF THE YOUTH IN ACTION PROGRAMME FROM 2009 TO 2013 THE POWER OF 6 TESTIMONIES OF STRONG OUTCOMES A TRAINING COURSE FUNDED UNDER THE TCP BUDGET OF THE YOUTH IN ACTION PROGRAMME FROM 2009 TO 2013 THE POWER OF 6 TESTIMONIES OF STRONG OUTCOMES 1 TRAINING COURSE: THE POWER OF NON FORMAL EDUCATION In 2009,

More information

White Paper. The Art of Learning

White Paper. The Art of Learning The Art of Learning Based upon years of observation of adult learners in both our face-to-face classroom courses and using our Mentored Email 1 distance learning methodology, it is fascinating to see how

More information

IMPORTANT STEPS WHEN BUILDING A NEW TEAM

IMPORTANT STEPS WHEN BUILDING A NEW TEAM IMPORTANT STEPS WHEN BUILDING A NEW TEAM This article outlines essential steps in forming a new team. These steps are also useful for existing teams that are interested in assessing their format and effectiveness.

More information

Unit 7 Data analysis and design

Unit 7 Data analysis and design 2016 Suite Cambridge TECHNICALS LEVEL 3 IT Unit 7 Data analysis and design A/507/5007 Guided learning hours: 60 Version 2 - revised May 2016 *changes indicated by black vertical line ocr.org.uk/it LEVEL

More information

Utilizing Soft System Methodology to Increase Productivity of Shell Fabrication Sushant Sudheer Takekar 1 Dr. D.N. Raut 2

Utilizing Soft System Methodology to Increase Productivity of Shell Fabrication Sushant Sudheer Takekar 1 Dr. D.N. Raut 2 IJSRD - International Journal for Scientific Research & Development Vol. 2, Issue 04, 2014 ISSN (online): 2321-0613 Utilizing Soft System Methodology to Increase Productivity of Shell Fabrication Sushant

More information

An Industrial Technologist s Core Knowledge: Web-based Strategy for Defining Our Discipline

An Industrial Technologist s Core Knowledge: Web-based Strategy for Defining Our Discipline Volume 17, Number 2 - February 2001 to April 2001 An Industrial Technologist s Core Knowledge: Web-based Strategy for Defining Our Discipline By Dr. John Sinn & Mr. Darren Olson KEYWORD SEARCH Curriculum

More information

Conceptual Framework: Presentation

Conceptual Framework: Presentation Meeting: Meeting Location: International Public Sector Accounting Standards Board New York, USA Meeting Date: December 3 6, 2012 Agenda Item 2B For: Approval Discussion Information Objective(s) of Agenda

More information

STUDENTS' RATINGS ON TEACHER

STUDENTS' RATINGS ON TEACHER STUDENTS' RATINGS ON TEACHER Faculty Member: CHEW TECK MENG IVAN Module: Activity Type: DATA STRUCTURES AND ALGORITHMS I CS1020 LABORATORY Class Size/Response Size/Response Rate : 21 / 14 / 66.67% Contact

More information

5. UPPER INTERMEDIATE

5. UPPER INTERMEDIATE Triolearn General Programmes adapt the standards and the Qualifications of Common European Framework of Reference (CEFR) and Cambridge ESOL. It is designed to be compatible to the local and the regional

More information

Frequently Asked Questions Archdiocesan Collaborative Schools (ACS)

Frequently Asked Questions Archdiocesan Collaborative Schools (ACS) Frequently Asked Questions Archdiocesan Collaborative Schools (ACS) Question: What is the rationale for the development of the Archdiocesan Collaborative School (ACS) model? Answer: As the Blue Ribbon

More information

How to make an A in Physics 101/102. Submitted by students who earned an A in PHYS 101 and PHYS 102.

How to make an A in Physics 101/102. Submitted by students who earned an A in PHYS 101 and PHYS 102. How to make an A in Physics 101/102. Submitted by students who earned an A in PHYS 101 and PHYS 102. PHYS 102 (Spring 2015) Don t just study the material the day before the test know the material well

More information

Visit us at:

Visit us at: White Paper Integrating Six Sigma and Software Testing Process for Removal of Wastage & Optimizing Resource Utilization 24 October 2013 With resources working for extended hours and in a pressurized environment,

More information

Memorandum. COMPNET memo. Introduction. References.

Memorandum. COMPNET memo. Introduction. References. Memorandum To: CompNet partners CC: From: Arild Date: 04.02.99 Re: Proposed selection of Action Lines for CompNet Introduction In my questionnaire from Dec.98 I asked some questions concerning interests

More information

Life and career planning

Life and career planning Paper 30-1 PAPER 30 Life and career planning Bob Dick (1983) Life and career planning: a workbook exercise. Brisbane: Department of Psychology, University of Queensland. A workbook for class use. Introduction

More information

Use of Online Information Resources for Knowledge Organisation in Library and Information Centres: A Case Study of CUSAT

Use of Online Information Resources for Knowledge Organisation in Library and Information Centres: A Case Study of CUSAT DESIDOC Journal of Library & Information Technology, Vol. 31, No. 1, January 2011, pp. 19-24 2011, DESIDOC Use of Online Information Resources for Knowledge Organisation in Library and Information Centres:

More information

Planning for Preassessment. Kathy Paul Johnston CSD Johnston, Iowa

Planning for Preassessment. Kathy Paul Johnston CSD Johnston, Iowa Planning for Preassessment Kathy Paul Johnston CSD Johnston, Iowa Why Plan? Establishes the starting point for learning Students can t learn what they already know Match instructional strategies to individual

More information

Editor s Welcome. Summer 2016 Lean Six Sigma Innovation. You Deserve More. Lean Innovation: The Art of Making Less Into More

Editor s Welcome. Summer 2016 Lean Six Sigma Innovation. You Deserve More. Lean Innovation: The Art of Making Less Into More Summer 2016 Lean Six Sigma Innovation Editor s Welcome Lean Innovation: The Art of Making Less Into More Continuous improvement in business is about more than just a set of operational principles to increase

More information

First Line Manager Development. Facilitated Blended Accredited

First Line Manager Development. Facilitated Blended Accredited First Line Manager Development Facilitated Blended Accredited Why is First Line Manager development so critical? We combine The Oxford Group s expertise in leadership & management development and experienced

More information

Digital Fabrication and Aunt Sarah: Enabling Quadratic Explorations via Technology. Michael L. Connell University of Houston - Downtown

Digital Fabrication and Aunt Sarah: Enabling Quadratic Explorations via Technology. Michael L. Connell University of Houston - Downtown Digital Fabrication and Aunt Sarah: Enabling Quadratic Explorations via Technology Michael L. Connell University of Houston - Downtown Sergei Abramovich State University of New York at Potsdam Introduction

More information

PROCESS USE CASES: USE CASES IDENTIFICATION

PROCESS USE CASES: USE CASES IDENTIFICATION International Conference on Enterprise Information Systems, ICEIS 2007, Volume EIS June 12-16, 2007, Funchal, Portugal. PROCESS USE CASES: USE CASES IDENTIFICATION Pedro Valente, Paulo N. M. Sampaio Distributed

More information

Institutionen för datavetenskap. Hardware test equipment utilization measurement

Institutionen för datavetenskap. Hardware test equipment utilization measurement Institutionen för datavetenskap Department of Computer and Information Science Final thesis Hardware test equipment utilization measurement by Denis Golubovic, Niklas Nieminen LIU-IDA/LITH-EX-A 15/030

More information

Quality in University Lifelong Learning (ULLL) and the Bologna process

Quality in University Lifelong Learning (ULLL) and the Bologna process Quality in University Lifelong Learning (ULLL) and the Bologna process The workshop will critique various quality models and tools as a result of EU LLL policy, such as consideration of the European Standards

More information

The Rise and Fall of the

The Rise and Fall of the The Rise and Fall of the Town Hall Meeting NCSL Fall Forum December 11, 2009 Katie Ziegler Women's Legislative Network of NCSL The Legislator as Convener Town Hall Meetings Legislator's role is to listen.

More information

Thought and Suggestions on Teaching Material Management Job in Colleges and Universities Based on Improvement of Innovation Capacity

Thought and Suggestions on Teaching Material Management Job in Colleges and Universities Based on Improvement of Innovation Capacity Thought and Suggestions on Teaching Material Management Job in Colleges and Universities Based on Improvement of Innovation Capacity Lihua Geng 1 & Bingjun Yao 1 1 Changchun University of Science and Technology,

More information

E 31 The Innovative Reflective Thinking Process In Solving Calculus Problems

E 31 The Innovative Reflective Thinking Process In Solving Calculus Problems E 31 The Innovative Reflective Thinking Process In Solving Calculus Problems 1 In Abdullah, 2 Hery Suharna 1,2 Study Program of Mathematics Education 1,2 Faculty of Teacher Training and Education. Khairun

More information

Core Strategy #1: Prepare professionals for a technology-based, multicultural, complex world

Core Strategy #1: Prepare professionals for a technology-based, multicultural, complex world Wright State University College of Education and Human Services Strategic Plan, 2008-2013 The College of Education and Human Services (CEHS) worked with a 25-member cross representative committee of faculty

More information

Me on the Map. Standards: Objectives: Learning Activities:

Me on the Map. Standards: Objectives: Learning Activities: Me on the Map Grade level: 1 st Grade Subject(s) Area: Reading, Writing, and Social Studies Materials needed: One sheet of construction paper per child, yarn or string, crayons or colored pencils, pencils,

More information

Lucintel. Publisher Sample

Lucintel.  Publisher Sample Lucintel http://www.marketresearch.com/lucintel-v2747/ Publisher Sample Phone: 800.298.5699 (US) or +1.240.747.3093 or +1.240.747.3093 (Int'l) Hours: Monday - Thursday: 5:30am - 6:30pm EST Fridays: 5:30am

More information

Circuit Simulators: A Revolutionary E-Learning Platform

Circuit Simulators: A Revolutionary E-Learning Platform Circuit Simulators: A Revolutionary E-Learning Platform Mahi Itagi Padre Conceicao College of Engineering, Verna, Goa, India. itagimahi@gmail.com Akhil Deshpande Gogte Institute of Technology, Udyambag,

More information

Higher education is becoming a major driver of economic competitiveness

Higher education is becoming a major driver of economic competitiveness Executive Summary Higher education is becoming a major driver of economic competitiveness in an increasingly knowledge-driven global economy. The imperative for countries to improve employment skills calls

More information

Laboratory Notebook Title: Date: Partner: Objective: Data: Observations:

Laboratory Notebook Title: Date: Partner: Objective: Data: Observations: Laboratory Notebook A laboratory notebook is a scientist s most important tool. The notebook serves as a legal record and often in patent disputes a scientist s notebook is crucial to the case. While you

More information

Instructional Coaching. Jim Knight Instructional Coaching Group

Instructional Coaching. Jim Knight Instructional Coaching Group Instructional Coaching Jim Knight Instructional Coaching Group My first teaching experience My first teaching experience NONE One of the main barriers... to turning knowledge into action is the tendency

More information

The Good Judgment Project: A large scale test of different methods of combining expert predictions

The Good Judgment Project: A large scale test of different methods of combining expert predictions The Good Judgment Project: A large scale test of different methods of combining expert predictions Lyle Ungar, Barb Mellors, Jon Baron, Phil Tetlock, Jaime Ramos, Sam Swift The University of Pennsylvania

More information

INFORMATION PACKAGE FOR PRINCIPAL SAINTS CATHOLIC COLLEGE JAMES COOK UNIVERSITY

INFORMATION PACKAGE FOR PRINCIPAL SAINTS CATHOLIC COLLEGE JAMES COOK UNIVERSITY INFORMATION PACKAGE FOR PRINCIPAL SAINTS CATHOLIC COLLEGE JAMES COOK UNIVERSITY Saints Residential College is situated on James Cook University s Townsville campus. The college offers a vibrant home-away-from-home

More information

Summer Reading Novels English I. *Honors students are required to read both novels.

Summer Reading Novels English I. *Honors students are required to read both novels. Est. 1909 Summer Reading Novels English I Night Elie Wiese' (Honors) Between Shades of Gray Ruta Sepetys (Honors) *Honors students are required to read both novels. All students are to complete the attached

More information

Virtual Meetings with Hundreds of Managers

Virtual Meetings with Hundreds of Managers Group Decision and Negotiation 13: 211 221, 2004 VIRTUAL MEETINGS WITH HUNDREDS OF 2004 MANAGERS Kluwer Academic Publishers. Printed in the Netherlands 211 Virtual Meetings with Hundreds of Managers HARRY

More information

Designing a Case Study Protocol for Application in IS research. Hilangwa Maimbo and Graham Pervan. School of Information Systems, Curtin University

Designing a Case Study Protocol for Application in IS research. Hilangwa Maimbo and Graham Pervan. School of Information Systems, Curtin University Designing a Case Study Protocol for Application in IS research Hilangwa Maimbo and Graham Pervan School of Information Systems, Curtin University Correspondence: Graham.Pervan@cbs.curtin.edu.au Abstract

More information

OPAC and User Perception in Law University Libraries in the Karnataka: A Study

OPAC and User Perception in Law University Libraries in the Karnataka: A Study ISSN 2229-5984 (P) 29-5576 (e) OPAC and User Perception in Law University Libraries in the Karnataka: A Study Devendra* and Khaiser Nikam** To Cite: Devendra & Nikam, K. (20). OPAC and user perception

More information

Software Security: Integrating Secure Software Engineering in Graduate Computer Science Curriculum

Software Security: Integrating Secure Software Engineering in Graduate Computer Science Curriculum Software Security: Integrating Secure Software Engineering in Graduate Computer Science Curriculum Stephen S. Yau, Fellow, IEEE, and Zhaoji Chen Arizona State University, Tempe, AZ 85287-8809 {yau, zhaoji.chen@asu.edu}

More information

Major Milestones, Team Activities, and Individual Deliverables

Major Milestones, Team Activities, and Individual Deliverables Major Milestones, Team Activities, and Individual Deliverables Milestone #1: Team Semester Proposal Your team should write a proposal that describes project objectives, existing relevant technology, engineering

More information

Inquiry Learning Methodologies and the Disposition to Energy Systems Problem Solving

Inquiry Learning Methodologies and the Disposition to Energy Systems Problem Solving Inquiry Learning Methodologies and the Disposition to Energy Systems Problem Solving Minha R. Ha York University minhareo@yorku.ca Shinya Nagasaki McMaster University nagasas@mcmaster.ca Justin Riddoch

More information

MASTER S COURSES FASHION START-UP

MASTER S COURSES FASHION START-UP MASTER S COURSES FASHION START-UP Postgraduate Programmes Master s Course Fashion Start-Up 02 Brief Descriptive Summary Over the past 80 years Istituto Marangoni has grown and developed alongside the thriving

More information

Evaluation of Hybrid Online Instruction in Sport Management

Evaluation of Hybrid Online Instruction in Sport Management Evaluation of Hybrid Online Instruction in Sport Management Frank Butts University of West Georgia fbutts@westga.edu Abstract The movement toward hybrid, online courses continues to grow in higher education

More information

Introduction to CRC Cards

Introduction to CRC Cards Softstar Research, Inc Methodologies and Practices White Paper Introduction to CRC Cards By David M Rubin Revision: January 1998 Table of Contents TABLE OF CONTENTS 2 INTRODUCTION3 CLASS4 RESPONSIBILITY

More information

Fearless Change -- Patterns for Introducing New Ideas

Fearless Change -- Patterns for Introducing New Ideas Ask for Help Since the task of introducing a new idea into an organization is a big job, look for people and resources to help your efforts. The job of introducing a new idea into an organization is too

More information

Business. Pearson BTEC Level 1 Introductory in. Specification

Business. Pearson BTEC Level 1 Introductory in. Specification Pearson BTEC Level 1 Introductory in Business Specification Pearson BTEC Level 1 Introductory Certificate in Business Pearson BTEC Level 1 Introductory Diploma in Business Pearson BTEC Level 1 Introductory

More information

Version Number 3 Date of Issue 30/06/2009 Latest Revision 11/12/2015 All Staff in NAS schools, NAS IT Dept Head of Operations - Education

Version Number 3 Date of Issue 30/06/2009 Latest Revision 11/12/2015 All Staff in NAS schools, NAS IT Dept Head of Operations - Education Schools E-Safety Policy Document Title Schools E-Safety Policy Reference Number Version Number 3 Date of Issue 30/06/2009 Latest Revision 11/12/2015 Distribution All Staff in NAS schools, NAS IT Dept Owner

More information

Programme Specification. MSc in International Real Estate

Programme Specification. MSc in International Real Estate Programme Specification MSc in International Real Estate IRE GUIDE OCTOBER 2014 ROYAL AGRICULTURAL UNIVERSITY, CIRENCESTER PROGRAMME SPECIFICATION MSc International Real Estate NB The information contained

More information

MAINTAINING CURRICULUM CONSISTENCY OF TECHNICAL AND VOCATIONAL EDUCATIONAL PROGRAMS THROUGH TEACHER DESIGN TEAMS

MAINTAINING CURRICULUM CONSISTENCY OF TECHNICAL AND VOCATIONAL EDUCATIONAL PROGRAMS THROUGH TEACHER DESIGN TEAMS Man In India, 95(2015) (Special Issue: Researches in Education and Social Sciences) Serials Publications MAINTAINING CURRICULUM CONSISTENCY OF TECHNICAL AND VOCATIONAL EDUCATIONAL PROGRAMS THROUGH TEACHER

More information

Modeling user preferences and norms in context-aware systems

Modeling user preferences and norms in context-aware systems Modeling user preferences and norms in context-aware systems Jonas Nilsson, Cecilia Lindmark Jonas Nilsson, Cecilia Lindmark VT 2016 Bachelor's thesis for Computer Science, 15 hp Supervisor: Juan Carlos

More information

Contact: For more information on Breakthrough visit or contact Carmel Crévola at Resources:

Contact: For more information on Breakthrough visit  or contact Carmel Crévola at Resources: Carmel Crévola is an independent international literary consultant, author, and researcher who works extensively in Australia, Canada, the United Kingdom, and the United States. Carmel Crévola s presentation

More information

Note Taking Handbook Mount Aloysius College Disability Services

Note Taking Handbook Mount Aloysius College Disability Services Note Taking Handbook Mount Aloysius College Disability Services Why does Mount Aloysius College have student note takers? Students at Mount Aloysius College with documented disabilities can receive a variety

More information

On the Combined Behavior of Autonomous Resource Management Agents

On the Combined Behavior of Autonomous Resource Management Agents On the Combined Behavior of Autonomous Resource Management Agents Siri Fagernes 1 and Alva L. Couch 2 1 Faculty of Engineering Oslo University College Oslo, Norway siri.fagernes@iu.hio.no 2 Computer Science

More information

The Keele University Skills Portfolio Personal Tutor Guide

The Keele University Skills Portfolio Personal Tutor Guide The Keele University Skills Portfolio Personal Tutor Guide Accredited by the Institute of Leadership and Management Updated for the 2016-2017 Academic Year Contents Introduction 2 1. The purpose of this

More information

MULTIDISCIPLINARY TEAM COMMUNICATION THROUGH VISUAL REPRESENTATIONS

MULTIDISCIPLINARY TEAM COMMUNICATION THROUGH VISUAL REPRESENTATIONS INTERNATIONAL CONFERENCE ON ENGINEERING AND PRODUCT DESIGN EDUCATION SEPTEMBER 4 & 5 2008, UNIVERSITAT POLITECNICA DE CATALUNYA, BARCELONA, SPAIN MULTIDISCIPLINARY TEAM COMMUNICATION THROUGH VISUAL REPRESENTATIONS

More information