1 SEATTLE PUBLIC SCHOOLS Operations and Maintenance Schematic Design Review Meeting Minutes Project: GENESEE HILL Meeting No.: 001 Date: August 5, :00 p.m. 5:30 p.m. Location: Hiawatha Community Center MEETING MINUTES ATTENDEES Name From Initials Tiffani Melake Hiawatha TM Bob Yeasting GSNC BY Kerrie Schurr GSNC KS Dave Allen SPS Parent DA Jacqueline Frazier Teacher JF Liz Dunn Teacher LD Gerrit Kischner Principal GK Liora Minkin Asst Principal LM Anita Hornby SPS AH Eric Becker SPS EB David Pool BLRB DP Tom Bates BLRB TB Lorraine Pai TRA LP Alex Petersen Heery AP Additional Distribution Name Company Initials GHES File Seattle Public Schools 1 of 6
2 CORRECTIONS TO PREVIOUS MEETING Mtg - Item Discussion / Action Item Responsibility Deadline No corrections noted. OLD BUSINESS Mtg - Item Discussion / Action Item Responsibility Deadline No old business. NEW BUSINESS This is only For Action Items Mtg - Item Discussion / Action Item Responsibility Deadline TB welcomed the group and gave an overview of the project since the last meeting. He stated that the design team has been busy and is looking for feedback on the revised design. The design team has been working through a significant budget issue (the original design estimate was 4+M over budget). This was driven by multiple factors, including the site challenges (slope, unsuitable soils, etc). He stated that a lot of value engineering has gone into the design to identify potential items that could save cost. TB stated that even with all the VE items, there was not enough savings. The District directed BLRB to reorganize the building layout in a more cost effective manner. The design team has been working on this the last couple months. Additional geotechnical surveys have also been completed and showed that there are very poor soils on the site which has further affected the budget EB gave an overview of the cost savings list (aka Value Engineering list) and asked if the group had any questions. GK asked where the delta came from. TB stated this was from multiple items: primarily the site, building layout, Mech system, and additional items TB stated that multiple schemes were considered to lower costs. The current design was chosen to be the most cost effective. The design was also vetted by SPS Operations and Maintenance DP stated the first approach to lower cost was to decrease the amount of exterior wall, the amount of bridges, and the lower building height to minimize soil work EB stated that the East side of the site has undocumented fill and is unsuitable to build on A question was asked if it would be possible to use this area for another propose, such as play. TB stated yes this would be possible, but this is not within the project criteria set by the SDAT TB stated that the objective was to put the building and the play area on the same level up on the plateau. The primary change is that the lower building has 2 of 6
3 been integrated into the main upper building Additional changes include: All play is now on the same elevation The turnaround in the upper parking lot has been removed (a comment was made that this is a major loss of functionality, a further comment was made that there is disagreement in the SDAT that the turnaround provides an important function). TB stated Childcare was ok with the change. The distance between the road and building has become tighter concern that this will create a dark canyon area that is difficult for the neighbors to monitor. EB and DP explained the grade condition along the eastside of the building. The building shifting East has allowed the courtyard to become larger and more functional A question was asked if the covered play would be open to the community after hours as this would impact the location. EB stated that in his experience they are usually locked. DP stated they are also proposing to fence the complete site and showed the group the proposed fencing locations on the site plan GK asked if it would be possible to shift the lower parking lot to the Southeast corner as this would make the open space area more usable and the neighbors would likely prefer the open space. Concern was voiced that the teachers would have to walk further and that this may not be approved by the Fire Marshall. DP stated he would have to check with the Fire Marshall for approval DP stated that the new scheme minimizes the impact to the slope. TB stated that this helps with the permitting and review process with the city A question was asked if there will be a ramp from the lower parking lot for Teacher to bring up their stuff? TB stated that yes there is one in the design currently (330 + ADA ramp) and that an elevator is also being considered. LP stated that a metal pile structure may be a possibility on the slope, but would be expensive Concern was voiced that the stairs from 51st to school are too narrow. A suggestion was made to add a landing at the top of the stairs with benches for children to wait for pickup GK asked if narrowing the streets has been proposed with SDOT on 51 st? Do so would help slow traffic and also create a landing at the top of the stairs A question was asked if the lower parking lot was smaller than in the prior design and whether this was the minimum. DP, yes this is the minimum assuming the bleachers are removed DP stated that the fire access drive is no longer needed per the Fire Marshall GK, asked where the kindergarten play area is located? DP stated there is space on the south play area but they currently do not have a separate area. The group stated they would like the design team to study the possibility of locating them 3 of 6
4 next to the K classrooms TB presented the floor plan and reviewed the changes. The primary program move is the flex classroom which is now adjacent to the learning commons A question was asked about how wide the hallways are? DP stated they were able to widen them due to the increased layout efficiency. The main hallway at the commons is now 15 wide TB the biggest change is the building is now three stories TB stated that the roof terrace has also been removed The art/science room no longer as an operable wall, it is now a solid wall with double doors. The SDAT group stated they would like to have the operable wall, GK stated this is important to the flexibility for the space. TB suggested this would be a good alternate bid item. GK stated he is also concerned that the closets interfere with the space. TB stated it is possible to delete the closets and instead have built-in storage around the art/science rooms instead BY asked if SPS operates any other three story elementary schools? EB stated that yes there are several DP stated that the computer lab does still have the operable wall. The gym/commons, gym, and stage also have operable walls A question was asked about having the Art/Science rooms open to the outside BLRB gave the group printed handouts of both the original and new site plans and building plans TB opened the floor for questions: Concern was voiced that the trees in the lower parking lot have been removed. DP stated this was a VE item and also the O&M department did not want trees in the parking lot because they are difficult to maintain and they are not allowed to use a leaf blower during schools hours. The SDAT stated that they would prefer to keep trees in this area and suggested choosing a tree that minimizes maintenance. An additional comment was made that the neighbors would prefer tree in the parking lot as well. The group as whole felt strongly that there should be trees onsite including in the lower parking area. DP Concern was voiced that the raingarden in the lower parking lot is not easily accessible for teachers to take kids there as a learning opportunity A comment was made that the original scheme had each classroom getting quality daylighting with either northern or southern light and in the new design this is no longer true, is there a way to improve this. TB suggested they will study this further A suggestion was made to angle the admin and self contained classroom to create a better relation between the commons and classroom spaces. DP stated 4 of 6
5 this was studied, but was not developed further because of space constraints. DP and TB stated they would restudy the suggestion A question was asked if it would be possible to expose the Mech systems as a learning opportunity. TB stated the system is mainly in the basement, but there may be opportunities elsewhere in the building A question was asked if the rainwater collection system was still in design. EB stated this was removed to meet budget A question was asked if the District takes the site into account for the budget of the building. EB stated that per the District the budget is fixed A question was asked if it is possible to angle the entire admin and classroom wing GK asked if the model shows the maximum amount of glazing? DP measured the model and stated the model has the classroom windows drawn at 15 instead of the proposed 18 in length and is 7 high TB stated the brick has been changed to concrete masonry units (CMU) with an integral color. He stated these can look very similar to brick both in color and in size/scale A question was asked to how roof access will be secured. This is currently an issue at the existing school The group voiced concern over the monolithic nature and lack of windows on the façade on 51 st. A suggestion was made that this could be a good location for a mural The group stated concern over the scale of the three story portion of the building in relation to the neighborhood. They stated that the current design accentuates the height instead of the minimizing it. Additionally, concern was voiced over vertical parapet walls accentuating the height and looking dated quickly. The group preferred the roof design in the prior concept The group stated concern that building looks very institutional and is not as well integrated with the site as it was in the prior design. TB stated they would look at options to bring back some of the design elements from the prior design in an effort to decrease the scale of the building and make it the aesthetics more similar to the prior concept TB stated that the design team is currently considering either a ramp or an elevator to provide ADA access to the lower lot. The group stated they would prefer to have all ADA parking in the upper lot. LP stated that she spoke with the building permit official for the project concerning the requirement to provide ADA accessibility from the lower lot, and that he stated that if the design team can make a case why they parking cannot be located on the upper level then it may be possible to get a departure. GK stated at the current school they have 4 ADA spots and they are used. 5 of 6
6 GK suggested making a few of the spaces in the upper lot 15 minute drop off only spots for teachers to use as an unloading area A suggestion was made to have short term street parking for loading / drop off on Dakota? The design team stated this area is currently planned for special needs buses to queue A suggestion was made to have stairs from Dakota to the parking lot (across from entry) A comment made that the new scheme does feel more like one school compared to the prior scheme with the bridges A question was asked if it is possible to make the entry way larger. Or increase the outside covered area? As this would encourage parents and students to congregate and interact A comment was made that the hallways look tight, is there any way to widen? Also, are lockers proposed in the hallways? No lockers. The hallways at the existing school are currently 11 same as the new design TB asked is group is ok with the new design and moving forward. Yes, the group approved the design and to proceed EB stated that another estimate will be completed and the Value Engineering process will also happen again. He stated this is part of the requirements to receive state funding assistance. He further said that it is also possible to include some items as bid alternates that way they can be added back in if the construction bids come in under budget. GK asked if the SDAT will help make the alternates priority list. TB stated yes A question was asked about the option of changing to a synthetic field instead of grass. EB stated the District does not like to use unless in a high use environment (some middle schools and high schools have, not common at elementary schools) TB stated that the first landmarks meeting is on Wednesday 8/7/13 at 3:30PM Next meeting: TBD ATTACHMENTS / RELATED DOCUMENTS No. Item Dated Action Required 1. END OF MINUTES: The above summarizes the Seattle Public School s interpretation of the items discussed and decisions reached during this meeting. Additions or corrections above must be submitted in writing to the author within three days of receipt; otherwise the minutes will stand as written. 6 of 6
Centennial Middle School (CMS) Design Advisory Team (DAT)
Centennial Middle School (CMS) Design Advisory Team (DAT) Project No: 281.003 Meeting Date: 11-01-10 Issue Date: 11-29-10 Page: 1 of 4 MEETING MINUTES Project: Boulder Valley School District - Centennial
More information3/6/2009. Residence Halls & Strategic t Planning Overview. Residence Halls Overview. Residence Halls: Marapai Supai Kachina
Residence Halls & Strategic t Planning Overview District Governing Board 3.10.09 Residence Halls Overview Residence Halls: Marapai Supai Kachina 1 Supai Hall Kachina Hall Marapai Hall Marapai Hall 1968
More informationColorado State University Department of Construction Management. Assessment Results and Action Plans
Colorado State University Department of Construction Management Assessment Results and Action Plans Updated: Spring 2015 Table of Contents Table of Contents... 2 List of Tables... 3 Table of Figures...
More informationAPRIL 11, 2016 OLATHE PLANNING COMMISSION
APRIL, 206 OLATHE PLANNING COMMISSION CASE LOCATIONS WARD 2 SU-6-00 ^_ ^_ P-6-0 WARD 4 WARD WARD 3 4 User: gradyrm Date: 04/06/206 ^_ Case Applications Highway Arterial Street City of Olathe Lakes Stream
More informationSoftware Maintenance
1 What is Software Maintenance? Software Maintenance is a very broad activity that includes error corrections, enhancements of capabilities, deletion of obsolete capabilities, and optimization. 2 Categories
More informationKeystone Opportunity Zone
BEGINNING OF PART 2 OF 6 PARTS The Keystone Opportunity Zone, Zone created in 1999, 1999 became accessible to auto traffic with the completion of Keystone Boulevard in 2003. It is zoned for offices and
More informationHOLY CROSS CATHOLIC SCHOOL SCHOOL INFORMATION PROFILE 2015/2016 SCHOOL YEAR
HOLY CROSS CATHOLIC SCHOOL SCHOOL INFORMATION PROFILE 2015/2016 SCHOOL YEAR SCHOOL INFORMATION PROFILE Facility Profile Date: November 21, 2016 School Name Holy Cross Catholic School Street Address 18
More informationReport of Shree Sanaitha Primary School Kitchen and Dining Sanaitha-4, Siraha District Nepal.!!! Submitted to Kinderhilfe Nepal-Mitterfels e. V.
Report of Shree Sanaitha Primary School Kitchen and Dining Sanaitha-4, Siraha District Nepal.!!! Submitted to Kinderhilfe Nepal-Mitterfels e. V. Submitted by German Nepalese Help Association (Deutsch-Nepalische
More informationEnglish Language Arts Summative Assessment
English Language Arts Summative Assessment 2016 Paper-Pencil Test Audio CDs are not available for the administration of the English Language Arts Session 2. The ELA Test Administration Listening Transcript
More informationSecurity & Technology. Track & Tennis. Repairs. Remodeling & Interior Repairs. Exterior Wall. Repairs
Overview District Needs Facilities Improvements (Question #1) Technology Capital Project Levy (Question #2) Security & Technology Track & Tennis Repairs Remodeling & Interior Repairs Facilities Improvements
More informationListening to your members: The member satisfaction survey. Presenter: Mary Beth Watt. Outline
Listening to your members: The satisfaction survey Listening to your members: The member satisfaction survey Presenter: Mary Beth Watt 1 Outline Introductions Members as customers Member satisfaction survey
More informationTransportation Equity Analysis
2015-16 Transportation Equity Analysis Each year the Seattle Public Schools updates the Transportation Service Standards and bus walk zone boundaries for use in the upcoming school year. For the 2014-15
More informationMaster Plan OAKLAND HOSPITAL
Master Plan OAKLAND HOSPITAL Oakland Hospital & Campus Master Plan AGENDA FOR COMMUNITY FORUM 9.12.2011 Introductions: Sean Logan, Vice President of Community Relations, Oakland Campus Vision: John Innocenti,
More informationCarnegie Mellon University Student Government Graffiti and Poster Policy
Carnegie Mellon University Student Government Graffiti and Poster Policy 5 10 15 20 25 30 35 40 45 Article I. Purpose and Scope. A. Carnegie Mellon University is a community where many different opportunities
More informationMINUTES VILLAGE OF LA GRANGE BOARD OF TRUSTEES REGULAR MEETING. Town Meeting Spring Avenue School (Gymnasium) 1001 Spring Avenue La Grange, IL 60525
MINUTES VILLAGE OF LA GRANGE BOARD OF TRUSTEES REGULAR MEETING 1. CALL TO ORDER AND ROLL CALL Town Meeting Spring Avenue School (Gymnasium) 1001 Spring Avenue La Grange, IL 60525 Monday, September 22,
More informationLakewood Board of Education 200 Ramsey Avenue, Lakewood, NJ 08701
March 20, 2017 Judee DeStefano-Anen Interim Executive County Superintendent 212 Washington Street Toms River, NJ 08753 Dear Dr. DeStefano-Anen: It is with great sadness that I must inform you that the
More informationAPC Board Meeting Location: (Building B - 2 nd floor Conf Room) March 16th, :00 P.M.
Fronteras Spanish Immersion Charter School P. O. Box 871433 Wasilla, Alaska 99687-1433 (907) 745-2223 (info@fronteras-k8.us) APC Board Meeting Location: (Building B - 2 nd floor Conf Room) March 16th,
More informationDesign Principles to Set the Stage
6 for Design Principles to Set the Stage Learning As published in Learning By Design E-News 7/15/2008 Six Design Principles to Set the Stage for Learning 6 Design Principles to Set the Stage for Learning
More informationOffice of Planning and Budgets. Provost Market for Fiscal Year Resource Guide
Office of Planning and Budgets Provost Market for Fiscal Year 2017-18 Resource Guide This resource guide will show users how to operate the Cognos Planning application used to collect Provost Market raise
More informationTransportation Service Standards Effective 9/1/2017
Transportation Service Standards 2017-2018 Effective 9/1/2017 Seattle Public Schools is committed to providing safe, efficient, and cost effective transportation services to the students of our schools.
More informationOakridge School District #76
Oakridge School District #76 Long Term Facilities Plan Dr. Donald L. Kordosky 6/29/2017 This document is the capstone of a six month committee review of a facilities assessment, seismic assessment, enrollment
More informationYour School and You. Guide for Administrators
Your School and You Guide for Administrators Table of Content SCHOOLSPEAK CONCEPTS AND BUILDING BLOCKS... 1 SchoolSpeak Building Blocks... 3 ACCOUNT... 4 ADMIN... 5 MANAGING SCHOOLSPEAK ACCOUNT ADMINISTRATORS...
More informationEverton Library: The Jewel on the Hill. Executive Summary. Phase 2 options appraisal study. Heritage Works Buildings Preservation Trust Ltd
Everton Library: The Jewel on the Hill Phase 2 options appraisal study Executive Summary 1. Introduction 1.1 This executive summary provides a precis of a phase 2 options appraisal study in relation to
More informationStudent Handbook. This handbook was written for the students and participants of the MPI Training Site.
Student Handbook This handbook was written for the students and participants of the MPI Training Site. Purpose To enable the active participants of this website easier operation and a thorough understanding
More informationInfrared Paper Dryer Control Scheme
Infrared Paper Dryer Control Scheme INITIAL PROJECT SUMMARY 10/03/2005 DISTRIBUTED MEGAWATTS Carl Lee Blake Peck Rob Schaerer Jay Hudkins 1. Project Overview 1.1 Stake Holders Potlatch Corporation, Idaho
More informationSouthwood Design Proposal. Eric Berry, Carolyn Monke, & Marie Zimmerman
Southwood Design Proposal Eric Berry, Carolyn Monke, & Marie Zimmerman This project was supported by the Resilient Communities Project (RCP), a program at the University of Minnesota that convenes the
More informationPractices Worthy of Attention Step Up to High School Chicago Public Schools Chicago, Illinois
Step Up to High School Chicago Public Schools Chicago, Illinois Summary of the Practice. Step Up to High School is a four-week transitional summer program for incoming ninth-graders in Chicago Public Schools.
More informationMe on the Map. Standards: Objectives: Learning Activities:
Me on the Map Grade level: 1 st Grade Subject(s) Area: Reading, Writing, and Social Studies Materials needed: One sheet of construction paper per child, yarn or string, crayons or colored pencils, pencils,
More informationFACILITIES & FINANCING: THE GOOD, THE BAD, AND THE UGLY... Jennifer Afdahl Rice Jonathan Dean, Ed. D. David Sciaretta, Ed. D.
FACILITIES & FINANCING: THE GOOD, THE BAD, AND THE UGLY... Jennifer Afdahl Rice Jonathan Dean, Ed. D. David Sciaretta, Ed. D. March 2015 Agenda The O Farrell Charter Schools Albert Einstein Academies Public
More informationADDENDUM 2016 Template - Turnaround Option Plan (TOP) - Phases 1 and 2 St. Lucie Public Schools
ADDENDUM 2016 Template - Turnaround Option Plan (TOP) - Phases 1 and 2 St. Lucie Public Schools The district requests an additional year to implement the previously approved turnaround option. Evidence
More informationASMC PROGRAM REVIEW
2015-2016 ASMC PROGRAM REVIEW Section 1: Program/Department Information and Summary 1. List those who participated in the writing or reviewing of this document Employee Name Participated in Writing Participated
More informationHow To Enroll using the Stout Mobile App
How To Enroll using the Stout Mobile App 1 Login Login using your user name and password. 2 Select Enrollment When you ve finished logging in, it will bring you to this page. Select enrollment. From here
More informationFRAMINGHAM SCHOOL COMMITTEE MEETING MINUTES Superintendent s Conference Room July 15, 2014
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 FRAMINGHAM SCHOOL COMMITTEE MEETING MINUTES Superintendent s Conference
More informationHardhatting in a Geo-World
Hardhatting in a Geo-World TM Developed and Published by AIMS Education Foundation This book contains materials developed by the AIMS Education Foundation. AIMS (Activities Integrating Mathematics and
More information2014 AIA State Cross Country
Posted: 11/4/14: dv 2014 AIA State Cross Country TOURNAMENT GUIDE Schedule, Rules, Regulations, Instructions AIA State Tournament Coordinator Dean Visser Phone: 602-385-3821 Fax: 602-385-3781 dvisser@aiaonline.org
More informationMassachusetts Hospital Lean Network
Extending Your Lean Journey through Design and Construction Projects Nick Masci, Dacon Paul Fallon, TRO JB January 22, 2013 AGENDA Introductions and Definitions Concepts Strength of cross collaboration
More informationM I N U T E S ANNUAL GENERAL MEETING Wednesday 18 March 2015
M I N U T E S ANNUAL GENERAL MEETING Wednesday 18 March 2015 Present: Marianne Stevenson (Chair), Lynda Robinson (Secretary) Neil Robinson, Arthur Stanway, Leslie Ash, Julie Ash, Eileen Harrison, Alan
More informationBackground Information. Instructions. Problem Statement. HOMEWORK INSTRUCTIONS Homework #3 Higher Education Salary Problem
Background Information Within higher education, faculty salaries have become a contentious issue as tuition rates increase and state aid shrinks. Competitive salaries are important for recruiting top quality
More informationRegistration Fee: $1490/Member, $1865/Non-member Registration Deadline: August 15, 2014 *Please see Tuition Policies on the following page
DHI Online Education Registration Form AHC215 Writing Hardware Specifications August 21, 2014 December 4, 2014 This course will be presented online: http://edu.dhi.org Registration Fee: $1490/Member, $1865/Non-member
More informationInternational Seminar: Dates, Locations, and Course Descriptions
International Seminar: Dates, Locations, and Course Descriptions The Executive MBA Programs at Columbia Business School offer several International Seminar course options in different international locations.
More informationIf we want to measure the amount of cereal inside the box, what tool would we use: string, square tiles, or cubes?
String, Tiles and Cubes: A Hands-On Approach to Understanding Perimeter, Area, and Volume Teaching Notes Teacher-led discussion: 1. Pre-Assessment: Show students the equipment that you have to measure
More informationCHANCERY SMS 5.0 STUDENT SCHEDULING
CHANCERY SMS 5.0 STUDENT SCHEDULING PARTICIPANT WORKBOOK VERSION: 06/04 CSL - 12148 Student Scheduling Chancery SMS 5.0 : Student Scheduling... 1 Course Objectives... 1 Course Agenda... 1 Topic 1: Overview
More informationUnit: Human Impact Differentiated (Tiered) Task How Does Human Activity Impact Soil Erosion?
The following instructional plan is part of a GaDOE collection of Unit Frameworks, Performance Tasks, examples of Student Work, and Teacher Commentary. Many more GaDOE approved instructional plans are
More informationHigher Education. Pennsylvania State System of Higher Education. November 3, 2017
November 3, 2017 Higher Education Pennsylvania s diverse higher education sector - consisting of many different kinds of public and private colleges and universities - helps students gain the knowledge
More informationChanging User Attitudes to Reduce Spreadsheet Risk
Changing User Attitudes to Reduce Spreadsheet Risk Dermot Balson Perth, Australia Dermot.Balson@Gmail.com ABSTRACT A business case study on how three simple guidelines: 1. make it easy to check (and maintain)
More informationSimCity 4 Deluxe Tutorial. Future City Competition
SimCity 4 Deluxe Tutorial Tutorial Outline 1. Getting Started 2. Using SimCity 4 Deluxe Tutorial 3. Building Regions 4. Develop Your Strategy 5. Create Your City Understanding the Toolbars 6. Mayor Mode
More informationPowerCampus Self-Service Student Guide. Release 8.4
PowerCampus Self-Service Student Guide Release 8.4 Banner, Colleague, PowerCampus, and Luminis are trademarks of Ellucian Company L.P. or its affiliates and are registered in the U.S. and other countries.
More informationNew Paths to Learning with Chromebooks
Thought Leadership Paper Samsung New Paths to Learning with Chromebooks Economical, cloud-connected computer alternatives open new opportunities for every student Research provided by As Computers Play
More informationThinking Maps for Organizing Thinking
Ann Delores Sean Thinking Maps for Organizing Thinking Roosevelt High School Students and Teachers share their reflections on the use of Thinking Maps in Social Studies and other Disciplines Students Sean:
More informationThe Revised Math TEKS (Grades 9-12) with Supporting Documents
The Revised Math TEKS (Grades 9-12) with Supporting Documents This is the first of four modules to introduce the revised TEKS for high school mathematics. The goals for participation are to become familiar
More informationHoughton Mifflin Online Assessment System Walkthrough Guide
Houghton Mifflin Online Assessment System Walkthrough Guide Page 1 Copyright 2007 by Houghton Mifflin Company. All Rights Reserved. No part of this document may be reproduced or transmitted in any form
More informationUtilizing FREE Internet Resources to Flip Your Classroom. Presenter: Shannon J. Holden
Utilizing FREE Internet Resources to Flip Your Classroom Presenter: Shannon J. Holden www.newteacherhelp.com This Presentation I gave this presentation to the Missouri Association of Secondary School Principals
More informationHampton Falls School Board Meeting September 1, W. Skoglund and S. Smylie.
School Board Members present: Administration present: R. Moyer Ratigan; Chair, E. Christo; Vice chair, T. Baker, W. Skoglund and S. Smylie. Dr. R. Sullivan; Superintendent, B. Hopkins; Assistant Superintendent,
More informationGetting a Sound Bite Across. Heather Long, MD ACMT Annual Scientific Meeting Clearwater, FL March 28, 2015
Getting a Sound Bite Across Heather Long, MD ACMT Annual Scientific Meeting Clearwater, FL March 28, 2015 How to be an effective science communicator Distill your message Make your message effective Be
More informationRover Races Grades: 3-5 Prep Time: ~45 Minutes Lesson Time: ~105 minutes
Rover Races Grades: 3-5 Prep Time: ~45 Minutes Lesson Time: ~105 minutes WHAT STUDENTS DO: Establishing Communication Procedures Following Curiosity on Mars often means roving to places with interesting
More informationDiocesan Review April 14, Catholic Athletic Trails West Catholic High School Catholic Central High School
Diocesan Review April 14, 2014 Catholic Athletic Trails West Catholic High School Catholic Central High School Historic Background Facility Planning from 2008-2014 1906 Catholic Central (CC) Founded 1952
More informationMoodle 2 Assignments. LATTC Faculty Technology Training Tutorial
LATTC Faculty Technology Training Tutorial Moodle 2 Assignments This tutorial begins with the instructor already logged into Moodle 2. http://moodle.lattc.edu/ Faculty login id is same as email login id.
More informationMilton Public Schools Fiscal Year 2018 Budget Presentation
Milton Public Schools Fiscal Year 2018 Budget Presentation 1 Background 2 How does Milton s per-pupil spending compare to other communities? Boston $18,372 Dedham $17,780 Randolph $16,051 Quincy $16,023
More informationEnhancing Learning with a Poster Session in Engineering Economy
1339 Enhancing Learning with a Poster Session in Engineering Economy Karen E. Schmahl, Christine D. Noble Miami University Abstract This paper outlines the process and benefits of using a case analysis
More informationField Experience Management 2011 Training Guides
Field Experience Management 2011 Training Guides Page 1 of 40 Contents Introduction... 3 Helpful Resources Available on the LiveText Conference Visitors Pass... 3 Overview... 5 Development Model for FEM...
More informationProposal of a PhD Programme (PhD) managed by the Politecnico di Milano. PhD in: STRUCTURAL, SEISMIC AND GEOTECHNICAL ENGINEERING CYCLE: XXVIII
Proposal of a PhD Programme (PhD) managed by the Politecnico di Milano PhD in: STRUCTURAL, SEISMIC AND GEOTECHNICAL ENGINEERING CYCLE: XXVIII TYPE OF ACTIVATION PROPOSAL: A.) Re-proposal of a PhD already
More informationAugusta Independent Board of Education August 11, :00 PM 207 Bracken Street Augusta, KY
Attendance Taken at 6:00 PM: Present Board Members: Ms. Jacqueline Hopkins Mrs. Dionne Laycock Mrs. Chasity Saunders Board Members: 1. Call to Order Augusta Independent Board of Education August 11, 2016
More information8. UTILIZATION OF SCHOOL FACILITIES
8. UTILIZATION OF SCHOOL FACILITIES Page 105 Page 106 8. UTILIZATION OF SCHOOL FACILITIES OVERVIEW The capacity of a school facility is driven by the number of classrooms or other spaces in which children
More informationProgram Proposal Construction Technology Construction Carpenter Diploma. Hazard Community and Technical College
Program Proposal Construction Technology Construction Carpenter Diploma Hazard Community and Technical College March 9-10, 2017 Kentucky Community and Technical College System Proposal for Initiation of
More informationCouncil of Educational Facilities Planners, International
Council of Educational Facilities Planners, International Case Study: Design of Hudson Bend Middle School, Lake Travis ISD How to Transform Cells and Bells into 21 st Century Learning CEFPI is a Registered
More informationOutreach Connect User Manual
Outreach Connect A Product of CAA Software, Inc. Outreach Connect User Manual Church Growth Strategies Through Sunday School, Care Groups, & Outreach Involving Members, Guests, & Prospects PREPARED FOR:
More informationUVA Office of University Building Official. Annual Report
UVA Office of University Building Official Annual Report 2009-2010 Introduction The University of Virginia Office of University Building Official (OUBO) is charged with the administration of the Virginia
More informationDiagnostic Test. Middle School Mathematics
Diagnostic Test Middle School Mathematics Copyright 2010 XAMonline, Inc. All rights reserved. No part of the material protected by this copyright notice may be reproduced or utilized in any form or by
More informationASSET MAPPING WITH YOUTH
ASSET MAPPING WITH YOUTH A Community Environmental Inventory OVERVIEW: In part one of this activity, youth will create maps of their communities that highlight locations and activities that are significant
More informationPOFI 2301 WORD PROCESSING MS WORD 2010 LAB ASSIGNMENT WORKSHEET Office Systems Technology Daily Flex Entry
POFI 2301 WORD PROCESSING MS WORD 2010 LAB ASSIGNMENT WORKSHEET Collin College Office Systems Technology Daily Flex Entry NAME _ STARTING DATE OF CLASS SECTION ENDING DATE This worksheet lists your assignments
More information2 nd grade Task 5 Half and Half
2 nd grade Task 5 Half and Half Student Task Core Idea Number Properties Core Idea 4 Geometry and Measurement Draw and represent halves of geometric shapes. Describe how to know when a shape will show
More informationEXPANSION PACKET Revision: 2015
EXPANSION PACKET Revision: 2015 Letter from the Executive Director Dear Prospective Members: We are pleased with your interest in Sigma Lambda Beta International Fraternity. Since April 4, 1986, Sigma
More informationSTUDENT MOODLE ORIENTATION
BAKER UNIVERSITY SCHOOL OF PROFESSIONAL AND GRADUATE STUDIES STUDENT MOODLE ORIENTATION TABLE OF CONTENTS Introduction to Moodle... 2 Online Aptitude Assessment... 2 Moodle Icons... 6 Logging In... 8 Page
More informationWiggleWorks Software Manual PDF0049 (PDF) Houghton Mifflin Harcourt Publishing Company
WiggleWorks Software Manual PDF0049 (PDF) Houghton Mifflin Harcourt Publishing Company Table of Contents Welcome to WiggleWorks... 3 Program Materials... 3 WiggleWorks Teacher Software... 4 Logging In...
More informationPUPIL PREMIUM REVIEW
PUPIL PREMIUM REVIEW 2015-2016 Pupil Premium Review 2015/2016 Ambition The school aims to provide pupils with a consistently good quality of provision for all pupils. We aim to maximise the progress of
More informationPreliminary AGENDA. Practical Applications of Load Resistance Factor Design for Foundation and Earth Retaining System Design and Construction
Preliminary AGENDA Committee Meeting A2K03 Foundations of Bridges and other Structures Monday, January 12, 2004 1:30 P.M. to 5:30 P.M. Hotel, Washington Room B3 Chairman, C. Dumas Secretary, J. Sheahan
More informationA History of College Community Schools Present
A History of College Community Schools 1953 - Present The Iowa State Legislature started a series of laws beginning in 1947 to have the Iowa educational system reorganized. At this point in time, there
More informationNANYANG TECHNOLOGICAL UNIVERSITY CONVOCATION 2017
Ceremony No: 11 NANYANG TECHNOLOGICAL UNIVERSITY CONVOCATION 2017 Date and Time: Venue: Tuesday, 1 August 2017, 10.00 am Nanyang Auditorium : Mr Ernest Wong Member, Board of Trustees Nanyang Technological
More informationLEt s GO! Workshop Creativity with Mockups of Locations
LEt s GO! Workshop Creativity with Mockups of Locations Tobias Buschmann Iversen 1,2, Andreas Dypvik Landmark 1,3 1 Norwegian University of Science and Technology, Department of Computer and Information
More information2 Any information on the upcoming science test?
Illinois State Board of Education (ISBE) Student Information System (SIS) Spring SIS Assessment Update Webinar (Webinar Date: 02/18/2016) # Question Answer 1 My district has a lot of student mobility and
More informationStudy Guide for Right of Way Equipment Operator 1
Study Guide for Right of Way Equipment Operator 1 Test Number: 2814 Human Resources Talent Planning & Programs Southern California Edison An Edison International Company REV082815 Introduction The 2814
More informationMGMT 479 (Hybrid) Strategic Management
Columbia College Online Campus P a g e 1 MGMT 479 (Hybrid) Strategic Management Late Fall 15/12 October 26, 2015 December 19, 2015 Course Description Culminating experience/capstone course for majors in
More information*Lesson will begin on Friday; Stations will begin on the following Wednesday*
UDL Lesson Plan Template Instructor: Josh Karr Learning Domain: Algebra II/Geometry Grade: 10 th Lesson Objective/s: Students will learn to apply the concepts of transformations to an algebraic context
More informationOn Human Computer Interaction, HCI. Dr. Saif al Zahir Electrical and Computer Engineering Department UBC
On Human Computer Interaction, HCI Dr. Saif al Zahir Electrical and Computer Engineering Department UBC Human Computer Interaction HCI HCI is the study of people, computer technology, and the ways these
More informationKS1 Transport Objectives
KS1 Transport Y1: Number and Place Value Count to and across 100, forwards and backwards, beginning with 0 or 1, or from any given number Count, read and write numbers to 100 in numerals; count in multiples
More informationINTERDISCIPLINARY STUDIES FIELD MAJOR APPLICATION TO DECLARE
INTERDISCIPLINARY STUDIES FIELD MAJOR APPLICATION TO DECLARE Please read the following carefully: The completed application packet with all materials listed below must be submitted and reviewed by an ISF
More informationF O O T B A L L
2 0 1 2 1 2 0 1 2 F O O T B A L L The High 5 Rules of the Game Mountaineer Football is the best game anywhere. And there s no better place to be on game day than Milan Puskar Stadium unless someone ruins
More informationAirplane Rescue: Social Studies. LEGO, the LEGO logo, and WEDO are trademarks of the LEGO Group The LEGO Group.
Airplane Rescue: Social Studies LEGO, the LEGO logo, and WEDO are trademarks of the LEGO Group. 2010 The LEGO Group. Lesson Overview The students will discuss ways that people use land and their physical
More informationNovember 11, 2014 SCHOOL NAMING NEWS:
November 11, 2014 SCHOOL NAMING NEWS: Town Council feels that the new school to be built in the Inspiration Subdivision warrants the named after St Paul residents John and Paula Scanlan. They passed the
More informationProcess improvement, The Agile Way! By Ben Linders Published in Methods and Tools, winter
Process improvement, The Agile Way! By Ben Linders Published in Methods and Tools, winter 2010. http://www.methodsandtools.com/ Summary Business needs for process improvement projects are changing. Organizations
More informationPile Driving Contractors Association and Pile Dynamics, Inc.
Pile Driving Contractors Association and Pile Dynamics, Inc. Present Seminar on Deep Foundation Integrity Testing and Wave Equation Analysis April 11 (Wed), 2018 High Strain Dynamic Foundation Testing
More informationSANTIAGO CANYON COLLEGE STUDENT PLACEMENTOFFICE PROGRAM REVIEW SPRING SEMESTER, 2010
SANTIAGO CANYON COLLEGE STUDENT PLACEMENTOFFICE PROGRAM REVIEW SPRING SEMESTER, 2010 Section I. Signature Page Signature of Program Leader Syed Rizvi Date: Printed Name/Title Signature of Vice President,
More informationKeyTrain Level 7. For. Level 7. Published by SAI Interactive, Inc., 340 Frazier Avenue, Chattanooga, TN
Introduction For Level 7 Published by SAI Interactive, Inc., 340 Frazier Avenue, Chattanooga, TN 37405. Copyright 2000 by SAI Interactive, Inc. KeyTrain is a registered trademark of SAI Interactive, Inc.
More informationHIDDEN RULES FOR OFFICE HOURS W I L L I A M & M A R Y N E U R O D I V E R S I T Y I N I T I A T I V E
HIDDEN RULES FOR OFFICE HOURS W I L L I A M & M A R Y N E U R O D I V E R S I T Y I N I T I A T I V E WHAT ARE OFFICE HOURS? An opportunity to discuss with your instructor any special needs or challenges
More informationNorthwest Region Touchpoint
Ohio State University Extension Northwest Region Touchpoint September 14, 2015 No-Till Field Day.....Page 1 Business Office News.. Page 2 Policy of the Month.....Page 2 Cooking Matters Class...Page 3 Ed
More informationINTERDISCIPLINARY STUDIES FIELD MAJOR APPLICATION TO DECLARE
INTERDISCIPLINARY STUDIES FIELD MAJOR APPLICATION TO DECLARE Please read the following carefully: The completed application packet with all materials listed below must be submitted and reviewed by an ISF
More informationIMPROVE THE QUALITY OF WELDING
Virtual Welding Simulator PATENT PENDING Application No. 1020/CHE/2013 AT FIRST GLANCE The Virtual Welding Simulator is an advanced technology based training and performance evaluation simulator. It simulates
More informationJoint Study Application Japan - Outgoing
Joint Study Application Japan - Outgoing 1 General Info 1.1 ABOUT THIS PROGRAM Under the specific agreements, the Japanese Partner Institution waives application, admission and tuition fees for students
More informationMillersville University Degree Works Training User Guide
Millersville University Degree Works Training User Guide Page 1 Table of Contents Introduction... 5 What is Degree Works?... 5 Degree Works Functionality Summary... 6 Access to Degree Works... 8 Login
More informationStudent Transportation
The district has not developed systems to evaluate transportation activities and improve operations. In addition, the district needs to systematically replace its aging buses. Conclusion The Manatee County
More information