1 Six Sigma for Auditors TCTC 2017 September 25, 2017

2 Agenda What is Six Sigma and Lean Lean Six Sigma and the IIA s IPPF DMAIC and phases of an audit Identification of Waste Process Capability Control Charts and Histograms Value Stream Mapping Cause and Effect Tools Poka-Yokes

3 What is Six Sigma Developed by Motorola in 1986 Business management strategy focused on eliminating defects and minimizing variability A Six Sigma process in one in which percent of results are free of defects Defect defined as any process that does not meet customer specifications, or could lead to an output that doesn t meet customer specifications

4

5 Six Sigma Defect Rates 3 Sigma Level 6 Sigma Level 8.1 million wrong drug prescriptions year worldwide 11,000 newborn babies accidently dropped in hospitals in USA yearly 6 short or long landings at Atlanta airport daily 500 incorrect surgical operations each week 10,000 wrong drug prescriptions a year worldwide 13 newborn babies dropped yearly Three short or long landings at Atlanta airport yearly 1 incorrect surgical operation every 2 weeks

6 Six Sigma Concepts Critical to Quality: Attributes most important to the customer Defect: Failing to deliver what the customer wants Process Capability: What your process can deliver Variation: What the customer sees and feels. Should be reduced and results in stable operations and predictability

7 Lean Principles Set of tools that help identify and eliminate waste. As waste is eliminated, quality improves and production time and cost are lowered Waste is anything that doesn t add value to the product. Identifies problem areas and bottlenecks

8 Six Sigma vs. Lean Six sigma is about eliminating anything that does not meet customer needs i.e. defects Very statistical and numbers driven Lean is about eliminating waste and ensuring that everything we do adds value to the customer Combined they are about using tools that enable your organization to take a more accurate and quantitative approach to identifying and correcting root causes of problems The goal of all Lean Six Sigma and internal audit projects is to improve internal controls by avoiding expenses that add no value to the organization

9 Lean Six Sigma and The IPPF Standards Lean Six Sigma s purpose is to improve the business processes that support an organization s operations Internal audit must evaluate the effectiveness and efficiency of risk management, control, and governance processes Standard 2100-Nature of Work states Internal Audit should use a systematic and disciplined approach Standard 2200-Engagment Planning requires that objectives, scope, timing, and resource allocations should be based upon adequate information and analysis of the process

10

11 Lean Six Sigma and The Audit Process Lean Six Sigma project methodology follows the DMAIC improvement Model and can be related to the 5 phases of an internal Audit Define the problem-pre Planning/Preliminary Survey Measure the key aspects of the process-planning Analyze the data for cause and effect relationships- Fieldwork/Execution/Testing Improve the process-reporting/recommendations Control the Future state-follow-up/remediation

12 Waste Waiting: Machine downtown, bottlenecked operations, approvals from others, system down time, sitting in queue Extra Processing: Unneeded steps, re-entering data, extra copies, unnecessary or excessive reports Defects: Production of defective parts, scrap, data input errors, design errors Inventory: Any excess inventory, batch processing Excess motion: Any additional reaching, steps to copier, handling something more than once Transportation: Move materials, parts, paperwork Underutilized Employees: Limited authority, ideas skills

13 Service Processes can be Full of Waste Too many signatures Unclear process steps Too many meetings Unnecessary s Obsolete databases Errors/typos Waiting for info Poor office layouts Unclear job duties Batching

14 Service Processes can be Full of Waste Too many signatures Unclear process steps Too many meetings Unnecessary s Obsolete databases Errors/typos Waiting for info Poor office layouts Unclear job duties Batching

15 Spaghetti Diagram Shows the flow of information, materials, and/or people Often shows an unexpectedly high amount of walking, carrying, waiting, etc Criss-crossing lines may indicate handoffs which often add delays and wait time Can be used to improve the layout of the office for better work flow

16 Spaghetti Diagram

17 Process Capability The capability of a process to meet its purpose All processes have inherent statistical variability Need to determine not just that the process is meeting desired goal, but what specifications the process can meet Need to identify bottlenecks and variations in the process

18 Theory of Constraint A chain in no stronger than its weakest link Need to address the weakest link (constraint) and look forward to the next constraint Helps to address the bottlenecks (constraints)

19 Focusing Steps Identify the constraint Work to exploit the constraint or make better Make other changes to break the constraint This will create new constraint which causes process to start over Don t let inertia become the constraint

20 Process Control Charts Graphs used to study how a process changes over time Helps distinguish between normal and unusual variations Always a central line for the average, an upper line for the upper control unit and a lower line for the lower control unit Use the data to determine if the process variation is in control or out of control

21 Benefits of Control Charts Focus attention of directing and monitoring process variation over time Distinguish special from common causes of variation Serve as a tool for ongoing control of a process Help improve a process to perform consistently and predictably for higher quality, efficiency, and lower cost

22

23 Out of Control Signals A single point outside the control limits Two out of three successive points are on the same side of the centerline and farther than 2 sigmas from it Four out of five successive points are on the same side of centerline and farther than 1 sigma from it A run of eight in a row on the same side of the centerline

24 Histogram Helps to summarize data from a process that has been collected over a period of time Shows the relative frequency of occurrence of the various data points and distribution of data Shows outliers that can indicate out of control processes Helps answers the question Is the process capable of meeting customer requirements?

25

26 Value Stream vs. Flowchart Quantification-VSM shows the amount of time consumed by tasks as well as specific transactional information Value-how value flows through the process from the customer s perspective Pre-scheduling activities to ensure follow-ups are conducted within goals.

27 Value Stream Map

28 Value Value adding (VA)-creates the product, service attributes and features the customer desires Business value-adding (BVA)-often hidden from the customer but necessary to ensure the product or service meets requirements (IT systems, inspection activities, etc) Nonvalue-adding (NVA)- completely unnecessary and should be eliminated

29 Cause and Effect Tools Fishbone Diagram 5 Whys Pareto Charts Impact/Difficulty Matrix

30 Fishbone Diagram Problems typically are not simple. They often involve the complex interaction among several causes Displays the major causes, sub-causes, and root causes Provide a focus for discussion and consensus Visualize the possible relationships among causes

31 Fishbone Diagram

32 Five Whys Simple technique to get beyond the symptoms of a problem and uncover root cause Why are we late? The copier jammed Why did the copier jam? Paper is Moist Why is the paper moist? High humidity Why is there high humidity? Ventilation is poor Why is ventilation poor? Filter is dirty

33 Pareto Chart A large percent of errors or defects in any process is usually caused by few problems Usually 80% of the quality issues can be corrected by eliminating 20% of root causes Helps identify the significant few problems so we can target them for action Use the chart to draw attention and cooperation to attack the most important issues

34 Pareto Chart

35 Impact/Difficulty Matrix Key Projects Impact Difficulty Resolve software issues 10 1 Design Recruiting Process 10 4 Create Customer Dockets 7 4 Plan for Market Presence 4 3 Replace Truck Fleet 3 1 Pricing Process for Custom 5 2

36 Poka-Yokes Japanese for Fail-safing or Mistake proofing Ensure proper conditions exist to prevent a mistake Help to process work right the first time Usually put into place after other tools have found issues and help correct problems

37 Examples of Poka-Yokes Locks on airline lavatory doors that active lights inside Indented trays used by surgeons to ensure no instruments are left in patient Color coding forms to make it easy to pick out an error All fields in an application entry screen must be completed to move forward

38 Lean Six Sigma at INPRS Quality Management Team is training several people in the organization on methodology 9 days of training Ran projects that are being ran to improve business processes Internal Audit is participating in each project to ensure that controls are not eliminated Continuing team that focuses on process improvement

39 Lean in Audit Everyone in the department has been trained in Lean Sigma methodology One Black belt and One Green belt in the department All audits include some sort of process improvement ascpect

40 Lean in Audit Review metrics and analyze where issues reside using more data than previous audit methodology Utilize other tools, such as control charts, histograms, fishbone diagrams, pareto charts, etc to determine where waste and root causes reside

41 Lean Six Sigma Benefits More efficient and effective processes Improved process quality output Ability to drive improvements and reduce process waste A better understanding of customer requirements Increased customer satisfaction and value More robust products and processes Improved delivery and quality performance Critical process inputs needed to respond to changing customer requirements

42 Lean Six Sigma Challenges Getting management and employee buy-in Time and resources needed to execute process improvement projects/initiatives Training required Data needed

43 Questions? Teresa Snedigar Chief Audit and Risk Officer Indiana Public Retirement Systems

APPENDIX A: Process Sigma Table (I)

APPENDIX A: Process Sigma Table (I) APPENDIX A: Process Sigma Table (I) 305 APPENDIX A: Process Sigma Table (II) 306 APPENDIX B: Kinds of variables This summary could be useful for the correct selection of indicators during the implementation

More information

Green Belt Curriculum (This workshop can also be conducted on-site, subject to price change and number of participants)

Green Belt Curriculum (This workshop can also be conducted on-site, subject to price change and number of participants) Green Belt Curriculum (This workshop can also be conducted on-site, subject to price change and number of participants) Notes: 1. We use Mini-Tab in this workshop. Mini-tab is available for free trail

More information

Introduction on Lean, six sigma and Lean game. Remco Paulussen, Statistics Netherlands Anne S. Trolie, Statistics Norway

Introduction on Lean, six sigma and Lean game. Remco Paulussen, Statistics Netherlands Anne S. Trolie, Statistics Norway Introduction on Lean, six sigma and Lean game Remco Paulussen, Statistics Netherlands Anne S. Trolie, Statistics Norway 1 Lean is. a philosophy a method a set of tools Waste reduction User value Create

More information

The Lean And Six Sigma Sinergy

The Lean And Six Sigma Sinergy International Journal for Quality research UDK- 658.5 / 006.83 Short Scientific Paper (1.03) The Lean And Six Sigma Sinergy Mirko Sokovic 1) D. Pavletic 2) 1) University of Ljubljana, 2) University of

More information

Visit us at:

Visit us at: White Paper Integrating Six Sigma and Software Testing Process for Removal of Wastage & Optimizing Resource Utilization 24 October 2013 With resources working for extended hours and in a pressurized environment,

More information

We Are a Place People Can Call Their Medical Home

We Are a Place People Can Call Their Medical Home Going Lean Agenda Introduction and Objectives Borgess Ambulatory Care and its Guiding Principles Overview of Lean Thinking Benefits of Value-Stream Mapping Transforming Office Practice Outcomes What We

More information

An Introduction to Simio for Beginners

An Introduction to Simio for Beginners An Introduction to Simio for Beginners C. Dennis Pegden, Ph.D. This white paper is intended to introduce Simio to a user new to simulation. It is intended for the manufacturing engineer, hospital quality

More information

Problem Solving for Success Handbook. Solve the Problem Sustain the Solution Celebrate Success

Problem Solving for Success Handbook. Solve the Problem Sustain the Solution Celebrate Success Problem Solving for Success Handbook Solve the Problem Sustain the Solution Celebrate Success Problem Solving for Success Handbook Solve the Problem Sustain the Solution Celebrate Success Rod Baxter 2015

More information

Module Title: Managing and Leading Change. Lesson 4 THE SIX SIGMA

Module Title: Managing and Leading Change. Lesson 4 THE SIX SIGMA Module Title: Managing and Leading Change Lesson 4 THE SIX SIGMA Learning Objectives: At the end of the lesson, the students should be able to: 1. Define what is Six Sigma 2. Discuss the brief history

More information

Certified Six Sigma Professionals International Certification Courses in Six Sigma Green Belt

Certified Six Sigma Professionals International Certification Courses in Six Sigma Green Belt Certification Singapore Institute Certified Six Sigma Professionals Certification Courses in Six Sigma Green Belt ly Licensed Course for Process Improvement/ Assurance Managers and Engineers Leading the

More information

For Portfolio, Programme, Project, Risk and Service Management. Integrating Six Sigma and PRINCE Mike Ward, Outperfom

For Portfolio, Programme, Project, Risk and Service Management. Integrating Six Sigma and PRINCE Mike Ward, Outperfom For Portfolio, Programme, Project, Risk and Service Management Integrating Six Sigma and PRINCE2 2009 Mike Ward, Outperfom White Paper July 2009 2 Integrating Six Sigma and PRINCE2 2009 Abstract A number

More information

Executive Guide to Simulation for Health

Executive Guide to Simulation for Health Executive Guide to Simulation for Health Simulation is used by Healthcare and Human Service organizations across the World to improve their systems of care and reduce costs. Simulation offers evidence

More information

The Application of Lean Six Sigma in Alleviating Water Shortage in Limpopo Rural Area to Avoid Societal Disaster

The Application of Lean Six Sigma in Alleviating Water Shortage in Limpopo Rural Area to Avoid Societal Disaster The Application of Lean Six Sigma in Alleviating Water Shortage in Limpopo Rural Area to Avoid Societal Disaster S. Ngoune, P. Kholopane Department of Quality and Operations Management, University of Johannesburg,

More information

Minitab Tutorial (Version 17+)

Minitab Tutorial (Version 17+) Minitab Tutorial (Version 17+) Basic Commands and Data Entry Graphical Tools Descriptive Statistics Outline Minitab Basics Basic Commands, Data Entry, and Organization Minitab Project Files (*.MPJ) vs.

More information

Certified Six Sigma - Black Belt VS-1104

Certified Six Sigma - Black Belt VS-1104 Certified Six Sigma - Black Belt VS-1104 Certified Six Sigma - Black Belt Professional Certified Six Sigma - Black Belt Professional Certification Code VS-1104 Vskills certification for Six Sigma - Black

More information

READY TO WORK PROGRAM INSTRUCTOR GUIDE PART I

READY TO WORK PROGRAM INSTRUCTOR GUIDE PART I READY TO WORK PROGRAM INSTRUCTOR GUIDE PART I LESSON TITLE: Problem Solving Tools Method: Informal Lecture, Guided Discussion EDUCATIONAL OBJECTIVE: Comprehend the many different uses of quality/problem

More information

Editor s Welcome. Summer 2016 Lean Six Sigma Innovation. You Deserve More. Lean Innovation: The Art of Making Less Into More

Editor s Welcome. Summer 2016 Lean Six Sigma Innovation. You Deserve More. Lean Innovation: The Art of Making Less Into More Summer 2016 Lean Six Sigma Innovation Editor s Welcome Lean Innovation: The Art of Making Less Into More Continuous improvement in business is about more than just a set of operational principles to increase

More information

Massachusetts Hospital Lean Network

Massachusetts Hospital Lean Network Extending Your Lean Journey through Design and Construction Projects Nick Masci, Dacon Paul Fallon, TRO JB January 22, 2013 AGENDA Introductions and Definitions Concepts Strength of cross collaboration

More information

Lean Six Sigma Innovative Safety Management

Lean Six Sigma Innovative Safety Management Session No. 561 Introduction Lean Six Sigma Innovative Safety Management Peter G. Furst, MBA, RA, CSP, ARM, REA Liberty Mutual Group Pleasanton, California The organization s safety effort is to create

More information

Reduce the Failure Rate of the Screwing Process with Six Sigma Approach

Reduce the Failure Rate of the Screwing Process with Six Sigma Approach Proceedings of the 2014 International Conference on Industrial Engineering and Operations Management Bali, Indonesia, January 7 9, 2014 Reduce the Failure Rate of the Screwing Process with Six Sigma Approach

More information

STABILISATION AND PROCESS IMPROVEMENT IN NAB

STABILISATION AND PROCESS IMPROVEMENT IN NAB STABILISATION AND PROCESS IMPROVEMENT IN NAB Authors: Nicole Warren Quality & Process Change Manager, Bachelor of Engineering (Hons) and Science Peter Atanasovski - Quality & Process Change Manager, Bachelor

More information

Inventory management optimization using lean six-sigma Case of Spare parts Moroccan company

Inventory management optimization using lean six-sigma Case of Spare parts Moroccan company Inventory management optimization using lean six-sigma Case of Spare parts Moroccan company Zoubida Benmamoun BOSS team GS laboratory ENSA University campus PO Box 242.kenitra14000 morocco benmamoun_zoubida@yahoo.fr

More information

2 Lean Six Sigma Green Belt Skill Set

2 Lean Six Sigma Green Belt Skill Set 2 Lean Six Sigma Green Belt Skill Set 3 LEAN SIX SIGMA GREEN BELT SKILL SET A GUIDELINE FOR LEAN SIX SIGMA GREEN BELT TRAINING AND CERTIFICATION H.C. Theisens; A. Meek; D. Harborne VERSION 2.4 Lean Six

More information

4-3 Basic Skills and Concepts

4-3 Basic Skills and Concepts 4-3 Basic Skills and Concepts Identifying Binomial Distributions. In Exercises 1 8, determine whether the given procedure results in a binomial distribution. For those that are not binomial, identify at

More information

University of Groningen. Systemen, planning, netwerken Bosman, Aart

University of Groningen. Systemen, planning, netwerken Bosman, Aart University of Groningen Systemen, planning, netwerken Bosman, Aart IMPORTANT NOTE: You are advised to consult the publisher's version (publisher's PDF) if you wish to cite from it. Please check the document

More information

ScienceDirect. A Lean Six Sigma (LSS) project management improvement model. Alexandra Tenera a,b *, Luis Carneiro Pintoª. 27 th IPMA World Congress

ScienceDirect. A Lean Six Sigma (LSS) project management improvement model. Alexandra Tenera a,b *, Luis Carneiro Pintoª. 27 th IPMA World Congress Available online at www.sciencedirect.com ScienceDirect Procedia - Social and Behavioral Scien ce s 119 ( 2014 ) 912 920 27 th IPMA World Congress A Lean Six Sigma (LSS) project management improvement

More information

STT 231 Test 1. Fill in the Letter of Your Choice to Each Question in the Scantron. Each question is worth 2 point.

STT 231 Test 1. Fill in the Letter of Your Choice to Each Question in the Scantron. Each question is worth 2 point. STT 231 Test 1 Fill in the Letter of Your Choice to Each Question in the Scantron. Each question is worth 2 point. 1. A professor has kept records on grades that students have earned in his class. If he

More information

It s a lean life! The Journey

It s a lean life! The Journey It s a lean life! The Journey What is LEAN? Lean Tools-5S, Takt time, Kaizen, SMED, A3, JIT, KANBAN Using the scientific method to continuously improve the business and other related parts of the entire

More information

The lab is designed to remind you how to work with scientific data (including dealing with uncertainty) and to review experimental design.

The lab is designed to remind you how to work with scientific data (including dealing with uncertainty) and to review experimental design. Name: Partner(s): Lab #1 The Scientific Method Due 6/25 Objective The lab is designed to remind you how to work with scientific data (including dealing with uncertainty) and to review experimental design.

More information

Guidance on the University Health and Safety Management System

Guidance on the University Health and Safety Management System Newcastle University Safety Office 1 Kensington Terrace Newcastle upon Tyne NE1 7RU Tel 0191 222 6274 University Safety Policy Guidance Guidance on the University Health and Safety Management System Document

More information

Value Creation Through! Integration Workshop! Value Stream Analysis and Mapping for PD! January 31, 2002!

Value Creation Through! Integration Workshop! Value Stream Analysis and Mapping for PD! January 31, 2002! Presented by:! Hugh McManus for Rich Millard! MIT! Value Creation Through! Integration Workshop! Value Stream Analysis and Mapping for PD!!!! January 31, 2002! Steps in Lean Thinking (Womack and Jones)!

More information

Generating Test Cases From Use Cases

Generating Test Cases From Use Cases 1 of 13 1/10/2007 10:41 AM Generating Test Cases From Use Cases by Jim Heumann Requirements Management Evangelist Rational Software pdf (155 K) In many organizations, software testing accounts for 30 to

More information

University of Waterloo School of Accountancy. AFM 102: Introductory Management Accounting. Fall Term 2004: Section 4

University of Waterloo School of Accountancy. AFM 102: Introductory Management Accounting. Fall Term 2004: Section 4 University of Waterloo School of Accountancy AFM 102: Introductory Management Accounting Fall Term 2004: Section 4 Instructor: Alan Webb Office: HH 289A / BFG 2120 B (after October 1) Phone: 888-4567 ext.

More information

SOCIAL STUDIES GRADE 1. Clear Learning Targets Office of Teaching and Learning Curriculum Division FAMILIES NOW AND LONG AGO, NEAR AND FAR

SOCIAL STUDIES GRADE 1. Clear Learning Targets Office of Teaching and Learning Curriculum Division FAMILIES NOW AND LONG AGO, NEAR AND FAR SOCIAL STUDIES FAMILIES NOW AND LONG AGO, NEAR AND FAR GRADE 1 Clear Learning Targets 2015-2016 Aligned with Ohio s Learning Standards for Social Studies Office of Teaching and Learning Curriculum Division

More information

Science Fair Project Handbook

Science Fair Project Handbook Science Fair Project Handbook IDENTIFY THE TESTABLE QUESTION OR PROBLEM: a) Begin by observing your surroundings, making inferences and asking testable questions. b) Look for problems in your life or surroundings

More information

Case Study Analysis of Six Sigma in Singapore Service Organizations

Case Study Analysis of Six Sigma in Singapore Service Organizations Case Study Analysis of Six Sigma in Singapore Service Organizations A. Chakrabarty and K.C. Tan, Department of Industrial and Systems Engineering, National University of Singapore, Singapore Abstract This

More information

M55205-Mastering Microsoft Project 2016

M55205-Mastering Microsoft Project 2016 M55205-Mastering Microsoft Project 2016 Course Number: M55205 Category: Desktop Applications Duration: 3 days Certification: Exam 70-343 Overview This three-day, instructor-led course is intended for individuals

More information

Conceptual Framework: Presentation

Conceptual Framework: Presentation Meeting: Meeting Location: International Public Sector Accounting Standards Board New York, USA Meeting Date: December 3 6, 2012 Agenda Item 2B For: Approval Discussion Information Objective(s) of Agenda

More information

Moderator: Gary Weckman Ohio University USA

Moderator: Gary Weckman Ohio University USA Moderator: Gary Weckman Ohio University USA Robustness in Real-time Complex Systems What is complexity? Interactions? Defy understanding? What is robustness? Predictable performance? Ability to absorb

More information

Major Milestones, Team Activities, and Individual Deliverables

Major Milestones, Team Activities, and Individual Deliverables Major Milestones, Team Activities, and Individual Deliverables Milestone #1: Team Semester Proposal Your team should write a proposal that describes project objectives, existing relevant technology, engineering

More information

The Lean Six Sigma Green Belt Examination. Rationale

The Lean Six Sigma Green Belt Examination. Rationale The Lean Six Sigma Green elt Examination Rationale isqi GmbH 2016 1 U60323 - Level III reating Stable and Efficient Processes escribe and review qualitative and quantitative data, continuous (variables)

More information

Mistake-Proofing: Changing Designs to Reduce Error. John Grout

Mistake-Proofing: Changing Designs to Reduce Error. John Grout Mistake-Proofing: Changing Designs to Reduce Error John Grout Disclosures Nothing to disclose Disclosures This continuing nursing education activity was approved by the Virginia Nurses Association, an

More information

Probability and Statistics Curriculum Pacing Guide

Probability and Statistics Curriculum Pacing Guide Unit 1 Terms PS.SPMJ.3 PS.SPMJ.5 Plan and conduct a survey to answer a statistical question. Recognize how the plan addresses sampling technique, randomization, measurement of experimental error and methods

More information

A Survey on Six Sigma Implementation in Singapore Service Industries

A Survey on Six Sigma Implementation in Singapore Service Industries A Survey on Six Sigma Implementation in Singapore Service Industries Ayon Chakrabarty 1, Kay Chuan Tan 2 Department of Industrial and Systems Engineering, National University of Singapore Abstract: The

More information

Sight Word Assessment

Sight Word Assessment Make, Take & Teach Sight Word Assessment Assessment and Progress Monitoring for the Dolch 220 Sight Words What are sight words? Sight words are words that are used frequently in reading and writing. Because

More information

Naviance Family Connection

Naviance Family Connection What is it? Naviance Family Connection Junior Year Naviance Family Connection is a web-based program that allows you and your parents to organize and manage your college search process. It also allows

More information

Software Maintenance

Software Maintenance 1 What is Software Maintenance? Software Maintenance is a very broad activity that includes error corrections, enhancements of capabilities, deletion of obsolete capabilities, and optimization. 2 Categories

More information

Citation for published version (APA): de Koning, H., Does, R. J. M. M., & de Mast, J. (2005). Lean Six Sigma. Kwaliteit in bedrijf, 21(8),

Citation for published version (APA): de Koning, H., Does, R. J. M. M., & de Mast, J. (2005). Lean Six Sigma. Kwaliteit in bedrijf, 21(8), UvA-DARE (Digital Academic Repository) Lean Six Sigma de Koning, H.; Does, R.J.M.M.; de Mast, J. Published in: Kwaliteit in bedrijf Link to publication Citation for published version (APA): de Koning,

More information

Measurement & Analysis in the Real World

Measurement & Analysis in the Real World Measurement & Analysis in the Real World Tools for Cleaning Messy Data Will Hayes SEI Robert Stoddard SEI Rhonda Brown SEI Software Solutions Conference 2015 November 16 18, 2015 Copyright 2015 Carnegie

More information

Barriers and Enablers of Lean Tools in Medical Laboratory Industry: A Case of Namibia

Barriers and Enablers of Lean Tools in Medical Laboratory Industry: A Case of Namibia Barriers and Enablers of Lean Tools in Medical Laboratory Industry: A Case of Namibia Michael Mutingi Faculty of Engineering, Namibia University of Science and Technology, Windhoek, Namibia Faculty of

More information

Early Warning System Implementation Guide

Early Warning System Implementation Guide Linking Research and Resources for Better High Schools betterhighschools.org September 2010 Early Warning System Implementation Guide For use with the National High School Center s Early Warning System

More information

C O U R S E. Tools for Group Thinking

C O U R S E. Tools for Group Thinking C O U R S E Tools for Group Thinking 1 Brainstorming What? When? Where? Why? Brainstorming is a procedure that allows a variable number of people to express problem areas, ideas, solutions or needs. It

More information

Beyond the Blend: Optimizing the Use of your Learning Technologies. Bryan Chapman, Chapman Alliance

Beyond the Blend: Optimizing the Use of your Learning Technologies. Bryan Chapman, Chapman Alliance 901 Beyond the Blend: Optimizing the Use of your Learning Technologies Bryan Chapman, Chapman Alliance Power Blend Beyond the Blend: Optimizing the Use of Your Learning Infrastructure Facilitator: Bryan

More information

I N T E R P R E T H O G A N D E V E L O P HOGAN BUSINESS REASONING INVENTORY. Report for: Martina Mustermann ID: HC Date: May 02, 2017

I N T E R P R E T H O G A N D E V E L O P HOGAN BUSINESS REASONING INVENTORY. Report for: Martina Mustermann ID: HC Date: May 02, 2017 S E L E C T D E V E L O P L E A D H O G A N D E V E L O P I N T E R P R E T HOGAN BUSINESS REASONING INVENTORY Report for: Martina Mustermann ID: HC906276 Date: May 02, 2017 2 0 0 9 H O G A N A S S E S

More information

Testing A Moving Target: How Do We Test Machine Learning Systems? Peter Varhol Technology Strategy Research, USA

Testing A Moving Target: How Do We Test Machine Learning Systems? Peter Varhol Technology Strategy Research, USA Testing A Moving Target: How Do We Test Machine Learning Systems? Peter Varhol Technology Strategy Research, USA Testing a Moving Target How Do We Test Machine Learning Systems? Peter Varhol, Technology

More information

Spinners at the School Carnival (Unequal Sections)

Spinners at the School Carnival (Unequal Sections) Spinners at the School Carnival (Unequal Sections) Maryann E. Huey Drake University maryann.huey@drake.edu Published: February 2012 Overview of the Lesson Students are asked to predict the outcomes of

More information

CHAPTER 4: REIMBURSEMENT STRATEGIES 24

CHAPTER 4: REIMBURSEMENT STRATEGIES 24 CHAPTER 4: REIMBURSEMENT STRATEGIES 24 INTRODUCTION Once state level policymakers have decided to implement and pay for CSR, one issue they face is simply how to calculate the reimbursements to districts

More information

Intro to Systematic Reviews. Characteristics Role in research & EBP Overview of steps Standards

Intro to Systematic Reviews. Characteristics Role in research & EBP Overview of steps Standards Intro to Systematic Reviews Characteristics Role in research & EBP Overview of steps Standards 5 Dr. Ben Goldacre, awardwinning Bad Science columnist and medical doctor, forward in Testing Treatments 7

More information

Author: Justyna Kowalczys Stowarzyszenie Angielski w Medycynie (PL) Feb 2015

Author: Justyna Kowalczys Stowarzyszenie Angielski w Medycynie (PL)  Feb 2015 Author: Justyna Kowalczys Stowarzyszenie Angielski w Medycynie (PL) www.angielskiwmedycynie.org.pl Feb 2015 Developing speaking abilities is a prerequisite for HELP in order to promote effective communication

More information

Edexcel GCSE. Statistics 1389 Paper 1H. June Mark Scheme. Statistics Edexcel GCSE

Edexcel GCSE. Statistics 1389 Paper 1H. June Mark Scheme. Statistics Edexcel GCSE Edexcel GCSE Statistics 1389 Paper 1H June 2007 Mark Scheme Edexcel GCSE Statistics 1389 NOTES ON MARKING PRINCIPLES 1 Types of mark M marks: method marks A marks: accuracy marks B marks: unconditional

More information

Hiring Procedures for Faculty. Table of Contents

Hiring Procedures for Faculty. Table of Contents Hiring Procedures for Faculty Table of Contents SECTION I: PROCEDURES FOR NEW FULL-TIME FACULTY APPOINTMENTS... 2 A. Search Committee... 2 B. Applicant Clearinghouse Form and Applicant Data Sheet... 2

More information

From Self Hosted to SaaS Our Journey (LEC107648)

From Self Hosted to SaaS Our Journey (LEC107648) From Self Hosted to SaaS Our Journey (LEC107648) Kathy Saville Director of Instructional Technology Saint Mary s College, Notre Dame Saint Mary s College, Notre Dame, Indiana Founded 1844 Premier Women

More information

Providing Feedback to Learners. A useful aide memoire for mentors

Providing Feedback to Learners. A useful aide memoire for mentors Providing Feedback to Learners A useful aide memoire for mentors January 2013 Acknowledgments Our thanks go to academic and clinical colleagues who have helped to critique and add to this document and

More information

Getting Started with Deliberate Practice

Getting Started with Deliberate Practice Getting Started with Deliberate Practice Most of the implementation guides so far in Learning on Steroids have focused on conceptual skills. Things like being able to form mental images, remembering facts

More information

Clinical Quality in EMS. Noah J. Reiter, MPA, EMT-P EMS Director Lenox Hill Hospital (Rice University 00)

Clinical Quality in EMS. Noah J. Reiter, MPA, EMT-P EMS Director Lenox Hill Hospital (Rice University 00) Clinical Quality in EMS Noah J. Reiter, MPA, EMT-P EMS Director Lenox Hill Hospital (Rice University 00) Presentation Overview Rationale Definitions Philosophy Prerequisites for a Successful Program The

More information

Appendix L: Online Testing Highlights and Script

Appendix L: Online Testing Highlights and Script Online Testing Highlights and Script for Fall 2017 Ohio s State Tests Administrations Test administrators must use this document when administering Ohio s State Tests online. It includes step-by-step directions,

More information

E C C. American Heart Association. Basic Life Support Instructor Course. Updated Written Exams. February 2016

E C C. American Heart Association. Basic Life Support Instructor Course. Updated Written Exams. February 2016 E C C American Heart Association Basic Life Support Instructor Course Updated Written Exams Contents: Exam Memo Student Answer Sheet Version A Exam Version A Answer Key Version B Exam Version B Answer

More information

Lean Six Sigma Report - No. 03

Lean Six Sigma Report - No. 03 Lean Six Sigma Report - No. 03 Since 2000, literally thousands of companies have implemented improvement initiatives. The questions we want to answer here are what are the mistakes being made that we need

More information

Measures of the Location of the Data

Measures of the Location of the Data OpenStax-CNX module m46930 1 Measures of the Location of the Data OpenStax College This work is produced by OpenStax-CNX and licensed under the Creative Commons Attribution License 3.0 The common measures

More information

Unit 7 Data analysis and design

Unit 7 Data analysis and design 2016 Suite Cambridge TECHNICALS LEVEL 3 IT Unit 7 Data analysis and design A/507/5007 Guided learning hours: 60 Version 2 - revised May 2016 *changes indicated by black vertical line ocr.org.uk/it LEVEL

More information

Activities for School

Activities for School Activities for School Label the School Label the school in the target language and then do a hide-n-seek activity using the directions in the target language. Label the Classroom I label my room (these

More information

Student Transportation

Student Transportation The district has not developed systems to evaluate transportation activities and improve operations. In addition, the district needs to systematically replace its aging buses. Conclusion The Manatee County

More information

SimCity 4 Deluxe Tutorial. Future City Competition

SimCity 4 Deluxe Tutorial. Future City Competition SimCity 4 Deluxe Tutorial Tutorial Outline 1. Getting Started 2. Using SimCity 4 Deluxe Tutorial 3. Building Regions 4. Develop Your Strategy 5. Create Your City Understanding the Toolbars 6. Mayor Mode

More information

Behaviors: team learns more about its assigned task and each other; individual roles are not known; guidelines and ground rules are established

Behaviors: team learns more about its assigned task and each other; individual roles are not known; guidelines and ground rules are established Stages of Team Development Each team will experience all four stages of development. Not all teams will choose a leader. In that situation, the team must establish a collaborative process for getting through

More information

SAP EDUCATION SAMPLE QUESTIONS: C_TPLM40_65. Questions. In the audit structure, what can link an audit and a quality notification?

SAP EDUCATION SAMPLE QUESTIONS: C_TPLM40_65. Questions. In the audit structure, what can link an audit and a quality notification? SAP EDUCATION SAMPLE QUESTIONS: C_TPLM40_65 SAP Certified Application Associate Quality Management with SAP ERP 6.0 EhP5 Disclaimer: These sample questions are for self-evaluation purposes only and do

More information

A GENERIC SPLIT PROCESS MODEL FOR ASSET MANAGEMENT DECISION-MAKING

A GENERIC SPLIT PROCESS MODEL FOR ASSET MANAGEMENT DECISION-MAKING A GENERIC SPLIT PROCESS MODEL FOR ASSET MANAGEMENT DECISION-MAKING Yong Sun, a * Colin Fidge b and Lin Ma a a CRC for Integrated Engineering Asset Management, School of Engineering Systems, Queensland

More information

Lip reading: Japanese vowel recognition by tracking temporal changes of lip shape

Lip reading: Japanese vowel recognition by tracking temporal changes of lip shape Lip reading: Japanese vowel recognition by tracking temporal changes of lip shape Koshi Odagiri 1, and Yoichi Muraoka 1 1 Graduate School of Fundamental/Computer Science and Engineering, Waseda University,

More information

Getting Started Guide

Getting Started Guide Getting Started Guide Getting Started with Voki Classroom Oddcast, Inc. Published: July 2011 Contents: I. Registering for Voki Classroom II. Upgrading to Voki Classroom III. Getting Started with Voki Classroom

More information

New Features & Functionality in Q Release Version 3.2 June 2016

New Features & Functionality in Q Release Version 3.2 June 2016 in Q Release Version 3.2 June 2016 Contents New Features & Functionality 3 Multiple Applications 3 Class, Student and Staff Banner Applications 3 Attendance 4 Class Attendance 4 Mass Attendance 4 Truancy

More information

Person Centered Positive Behavior Support Plan (PC PBS) Report Scoring Criteria & Checklist (Rev ) P. 1 of 8

Person Centered Positive Behavior Support Plan (PC PBS) Report Scoring Criteria & Checklist (Rev ) P. 1 of 8 Scoring Criteria & Checklist (Rev. 3 5 07) P. 1 of 8 Name: Case Name: Case #: Rater: Date: Critical Features Note: The plan needs to meet all of the critical features listed below, and needs to obtain

More information

Lesson M4. page 1 of 2

Lesson M4. page 1 of 2 Lesson M4 page 1 of 2 Miniature Gulf Coast Project Math TEKS Objectives 111.22 6b.1 (A) apply mathematics to problems arising in everyday life, society, and the workplace; 6b.1 (C) select tools, including

More information

The CTQ Flowdown as a Conceptual Model of Project Objectives

The CTQ Flowdown as a Conceptual Model of Project Objectives The CTQ Flowdown as a Conceptual Model of Project Objectives HENK DE KONING AND JEROEN DE MAST INSTITUTE FOR BUSINESS AND INDUSTRIAL STATISTICS OF THE UNIVERSITY OF AMSTERDAM (IBIS UVA) 2007, ASQ The purpose

More information

Listening to your members: The member satisfaction survey. Presenter: Mary Beth Watt. Outline

Listening to your members: The member satisfaction survey. Presenter: Mary Beth Watt. Outline Listening to your members: The satisfaction survey Listening to your members: The member satisfaction survey Presenter: Mary Beth Watt 1 Outline Introductions Members as customers Member satisfaction survey

More information

Practical Applications of Statistical Process Control

Practical Applications of Statistical Process Control feature measurement Practical Applications of Statistical Process Control Applying quantitative methods such as statistical process control to software development projects can provide a positive cost

More information

Managing Sustainable Operations MGMT 410 Bachelor of Business Administration (Sustainable Business Practices) Business Administration Program

Managing Sustainable Operations MGMT 410 Bachelor of Business Administration (Sustainable Business Practices) Business Administration Program Managing Sustainable Operations MGMT 410 Bachelor of Business Administration (Sustainable Business Practices) Business Administration Program Course Outline COURSE IMPLEMENTATION DATE: September 2010 OUTLINE

More information

Blank Table Of Contents Template Interactive Notebook

Blank Table Of Contents Template Interactive Notebook Blank Template Free PDF ebook Download: Blank Template Download or Read Online ebook blank table of contents template interactive notebook in PDF Format From The Best User Guide Database Table of Contents

More information

Utilizing Soft System Methodology to Increase Productivity of Shell Fabrication Sushant Sudheer Takekar 1 Dr. D.N. Raut 2

Utilizing Soft System Methodology to Increase Productivity of Shell Fabrication Sushant Sudheer Takekar 1 Dr. D.N. Raut 2 IJSRD - International Journal for Scientific Research & Development Vol. 2, Issue 04, 2014 ISSN (online): 2321-0613 Utilizing Soft System Methodology to Increase Productivity of Shell Fabrication Sushant

More information

The University of Wisconsin Library System

The University of Wisconsin Library System The University of Wisconsin Library System A Presentation to the UW Board of Regents April 4, 2002 Ken Frazier Speaking for the Council of UW Libraries Budget Increase for Collections 1999-2000 First state-funded

More information

AUTHORITATIVE SOURCES ADULT AND COMMUNITY LEARNING LEARNING PROGRAMMES

AUTHORITATIVE SOURCES ADULT AND COMMUNITY LEARNING LEARNING PROGRAMMES AUTHORITATIVE SOURCES ADULT AND COMMUNITY LEARNING LEARNING PROGRAMMES AUGUST 2001 Contents Sources 2 The White Paper Learning to Succeed 3 The Learning and Skills Council Prospectus 5 Post-16 Funding

More information

Managerial Decision Making

Managerial Decision Making Course Business Managerial Decision Making Session 4 Conditional Probability & Bayesian Updating Surveys in the future... attempt to participate is the important thing Work-load goals Average 6-7 hours,

More information

-Celebrating Your QI Success-

-Celebrating Your QI Success- Storyboard Development -Celebrating Your QI Success- Nanette Brey Magnani, EdD. HIVQUAL-USUS National Quality Center Learning Outcomes Participants will have an increased understanding of core elements

More information

Time Management. To receive regular updates kindly send test to : 1

Time Management. To receive regular updates kindly send test  to :  1 Time Management CA. Rajkumar S Adukia B.Com (Hons), FCA, ACS, ACWA, LLB, DIPR, DLL &LP, IFRS(UK), MBA email id: rajkumarradukia@caaa.in Mob: 09820061049/9323061049 To receive regular updates kindly send

More information

Module 12. Machine Learning. Version 2 CSE IIT, Kharagpur

Module 12. Machine Learning. Version 2 CSE IIT, Kharagpur Module 12 Machine Learning 12.1 Instructional Objective The students should understand the concept of learning systems Students should learn about different aspects of a learning system Students should

More information

Shockwheat. Statistics 1, Activity 1

Shockwheat. Statistics 1, Activity 1 Statistics 1, Activity 1 Shockwheat Students require real experiences with situations involving data and with situations involving chance. They will best learn about these concepts on an intuitive or informal

More information

Alberta Police Cognitive Ability Test (APCAT) General Information

Alberta Police Cognitive Ability Test (APCAT) General Information Alberta Police Cognitive Ability Test (APCAT) General Information 1. What does the APCAT measure? The APCAT test measures one s potential to successfully complete police recruit training and to perform

More information

Guidelines for Writing an Internship Report

Guidelines for Writing an Internship Report Guidelines for Writing an Internship Report Master of Commerce (MCOM) Program Bahauddin Zakariya University, Multan Table of Contents Table of Contents... 2 1. Introduction.... 3 2. The Required Components

More information

HUBBARD COMMUNICATIONS OFFICE Saint Hill Manor, East Grinstead, Sussex. HCO BULLETIN OF 11 AUGUST 1978 Issue I RUDIMENTS DEFINITIONS AND PATTER

HUBBARD COMMUNICATIONS OFFICE Saint Hill Manor, East Grinstead, Sussex. HCO BULLETIN OF 11 AUGUST 1978 Issue I RUDIMENTS DEFINITIONS AND PATTER HUBBARD COMMUNICATIONS OFFICE Saint Hill Manor, East Grinstead, Sussex Remimeo All Auditors HCO BULLETIN OF 11 AUGUST 1978 Issue I RUDIMENTS DEFINITIONS AND PATTER (Ref: HCOB 15 Aug 69, FLYING RUDS) (NOTE:

More information

AGENDA LEARNING THEORIES LEARNING THEORIES. Advanced Learning Theories 2/22/2016

AGENDA LEARNING THEORIES LEARNING THEORIES. Advanced Learning Theories 2/22/2016 AGENDA Advanced Learning Theories Alejandra J. Magana, Ph.D. admagana@purdue.edu Introduction to Learning Theories Role of Learning Theories and Frameworks Learning Design Research Design Dual Coding Theory

More information

Different Requirements Gathering Techniques and Issues. Javaria Mushtaq

Different Requirements Gathering Techniques and Issues. Javaria Mushtaq 835 Different Requirements Gathering Techniques and Issues Javaria Mushtaq Abstract- Project management is now becoming a very important part of our software industries. To handle projects with success

More information

Military Engineering Centre of Excellence (MILENG COE) Ingolstadt

Military Engineering Centre of Excellence (MILENG COE) Ingolstadt Military Engineering Centre of Excellence (MILENG COE) Ingolstadt Students Handbook Version Feb 2012 MILENG COE information, local maps, mess facilities and more Welcome Carry Stoffels LtC, USA Engineers,

More information